CN103046565A CN2011103145210A CN201110314521A CN103046565A CN 103046565 A CN103046565 A CN 103046565A CN 2011103145210 A CN2011103145210 A CN 2011103145210A CN 201110314521 A CN201110314521 A CN 201110314521A CN 103046565 A CN103046565 A CN 103046565A
Authority
CN
China
Prior art keywords
water
collecting well
french drain
batholith
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011103145210A
Other languages
Chinese (zh)
Other versions
CN103046565B (en
Inventor
刘埃平
张中胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201110314521.0A priority Critical patent/CN103046565B/en
Publication of CN103046565A publication Critical patent/CN103046565A/en
Application granted granted Critical
Publication of CN103046565B publication Critical patent/CN103046565B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

A draining method for an ultra-deep batholith deep foundation pit is used for structural construction of a hot rolling rotational flow pool inclined bottom plate located on a batholith. The draining method is characterized by comprising the following steps: arranging blind ditches to drain ground water; arranging drain pipes to drain side wall crack water; arranging a water-collecting well; installing a plastic film water-resisting layer; and installing a submersible pump to drain the ground water. The draining method for the ultra-deep batholith deep foundation pit has the advantages that the construction steps are designed reasonably and are easy to operate, the crack water of the batholith deep foundation pit is drained, and the method guarantees that a concrete cushion layer is free of water after cushion layer pouring, guarantees construction quality of an underground concrete structure and reduces engineering construction cost.

Description

Water discharge method falls in super dark batholith deep foundation ditch
Technical field
Water discharge method falls in the foundation ditch that the present invention relates to a kind of construction work underground structure, specifically, is that water discharge method falls in a kind of super dark batholith deep foundation ditch.
Background technology
Deep foundation ditch falls that drainage pattern is whether proper effectively to be related to stable, the safety of Adjacent Buildings of deep foundation ditch and the construction quality of underground structure, and industry has had the ripe construction technology of a cover to the draining of falling of deep foundation pit of soft soil foundation at present.
Chinese patent CN102116033A discloses a kind of deep foundation ditch french drain collecting well on January 7th, 2011 and has fallen water discharge method and device, comprising the ponding in the outer wall of basement outside is concentrated the blind-ditch pipe that flows into the basement bottom board bottom by catchwater, ponding in the basement is concentrated through spilled water hole and is flowed into base plate bottom blind-ditch pipe, then cause interim collecting well through blind-ditch pipe, use water pump to efflux.
Yet the drainage construction that falls that water discharge method is not suitable for the batholith deep foundation ditch falls in this deep foundation ditch french drain collecting well.
In rock blasting, basement rock excavation and Underground Construction process, exist a large amount of crevice water in basement rock weathering fissures, structural fracture and the zone of fracture, a large amount of crevice waters ooze out from crack of stone, these crevice waters are again take earth's surface backwater and rainwater as replenishing, cause foundation ditch to catchment seriously, underground structure construction has been caused very large difficulty.How these crevice waters are carried out effective white-out, ensure the underground concrete structure smooth construction, there is no mature experience can use for reference.
Summary of the invention
Purpose of the present invention, underground water does not permeate more than the bed course when being to propose a kind of underground water the Whirlwind tank structure base slab being constructed, and does not bring the super dark batholith deep foundation ditch of negative effect to fall water discharge method to the compactness of concrete floor.
Another object of the present invention is to propose a kind of super dark batholith deep foundation ditch safe and reliable, effective, that can be the similar engineering reference and falls water discharge method.
For achieving the above object, technical solution of the present invention is:
Water discharge method falls in a kind of super dark batholith deep foundation ditch, is used for being seated in the hot rolling Whirlwind tank inclined bottom plate structure construction on the batholith, it is characterized in that may further comprise the steps:
A, french drain white-out underground water is set
After the Whirlwind tank earthwork evacuation is complete, before building bed course, form drainage system, make on the bed course without ponding, earthwork evacuation arranges french drain all around to substrate, change behind the excavation gutter and fill out rubble, the body refuse complete liquidation of excavation french drain is clean, and making complete in the french drain is that rubble is unimpeded by water;
B, gutter white-out sidewall crevice water is set
French drain change fill out rubble before, embedded steel tube in french drain, and perforate around the steel pipe, and pre-buried by 5% the gradient, the slope aspect collecting well filled up first the part rubble before burying steel pipe all around, and then the installation steel pipe, with rubble steel pipe is embedded in the french drain again, with around the water drainage to collecting well; Described Whirlwind tank bottom is the desk-top base plate of back taper, because groundwater table is higher, comparatively serious from the crack of stone infiltration on the slope, the water on the slope flows on the base plate, before the sealing bed course, first rubble loose on the slope is cleaned out, and fluting on the slope, the steel pipe of pre-buried ∮ 48, and be communicated with DN125 steel pipe in the french drain, make the water on the slope concentrate flow into pipe laying the french drain from steel pipe, and with mortar with slope pipe laying shutoff;
C, collecting well is set
A collecting well and french drain are set in the bottom of foundation ditch to be connected, collecting well adopts the thick steel plate of 10mm to make, the steel pipe of the ∮ 125 that french drain is pre-buried penetrates from the collecting well side, with the underground water drainage to collecting well, and perforate around collecting well, be convenient to the inflow of catchmenting of base plate, and set up steel deck-plate on collecting well top, steel deck-plate adopts the thick steel plate of 10mm to make, and put more energy into the L50*5 angle steel, after processing factory makes, winch to foundation ditch with the 16t crane, directly lay, and around collecting well the rubble of backfill 10~50mm;
D, installation plastic sheeting water barrier
After Whirlwind tank substrate french drain and slope pipe laying have been constructed, lay old template at french drain, before the sealing bed course, skew wall is laid the thick plastic sheeting of 0.08mm around substrate reaches, the upper end is connected with the band steel compression of Whirlwind tank waist rail bottom with 25*3, and fix with expansion bolt, the lower end is covered at the bottom of the whole pond, and the water on the slope flows into collecting well after naturally just flowing directly into the gutter like this;
Row's underground water falls in e, installing submersible pump
After the substrate drainage system forms, with the water drainage to collecting well, installing submersible pump, delivery port welding with steel pipe and submersible pump, submersible pump directly buries with below the structure base slab, water directly is evacuated to catch-basin gets final product, and in time builds bottom cushion after the drainage system installation.
Super dark batholith deep foundation ditch of the present invention falls water discharge method and can also be further achieved by the following technical measures.
Aforesaid method, among the wherein said step a, sectional dimension 500x500mm in the gutter.
Aforesaid method, among the wherein said step b, embedded steel tube is the DN125 steel pipe in french drain, and the perforate size is 20mm on the steel pipe.
Aforesaid method, among the wherein said step c, collecting well is of a size of 1000x1000x1500mm.
Aforesaid method, among the wherein said step e, the dredge pump of 5 50m lifts of installing submersible pump, one of them bore is 100mm, all the other 4 bores are 50mm, submersible pump bottom, is left two and is drawn water and get final product (float valve is set) greater than 20cm from the collecting well bottom level during normal construction, all the other submersible pumps are as for subsequent use.
After adopting technique scheme, super dark batholith deep foundation ditch of the present invention falls water discharge method and has the following advantages:
1, construction sequence is reasonable in design, simple to operate;
2, the crevice water of getting rid of the basement rock deep foundation ditch guarantees that bed course builds rear concrete mat surface without open fire;
3, guarantee the construction quality of underground concrete structure, reduce Construction Cost.
Description of drawings
Fig. 1 is the Whirlwind tank foundation ditch bottom discharge system architecture schematic diagram of the embodiment of the invention;
Fig. 2 is the A-A sectional view among Fig. 1.
Among the figure: 1 structural cushion coat bottom surface, 2 sloping sidewall steel pipes, 3 Whirlwind tanks, steel deck-plate on 4 collecting wells, 5 draining steel pipes, embedded steel tube in the bed course around the 6 Whirlwind tanks bottom.
The specific embodiment
Below in conjunction with embodiment and accompanying drawing thereof the present invention is illustrated further.
Embodiment 1
Now see also Fig. 1 and Fig. 2, Fig. 1 is the Whirlwind tank foundation ditch bottom discharge system architecture schematic diagram of the embodiment of the invention, and Fig. 2 is the A-A sectional view among Fig. 1.
Water discharge method falls in super dark batholith deep foundation ditch of the present invention, is used for being seated in the hot rolling Whirlwind tank inclined bottom plate structure construction on the batholith, it is characterized in that may further comprise the steps:
A, french drain white-out underground water is set
After the Whirlwind tank earthwork evacuation is complete, before building bed course, form drainage system, make on the bed course without ponding, earthwork evacuation arranges french drain all around to substrate, change behind the gutter of sectional dimension 500x500mm in the excavation and fill out rubble, the body refuse complete liquidation of excavation french drain is finished, and making complete in the french drain is that rubble is unimpeded by water;
B, gutter white-out sidewall crevice water is set
French drain change fill out rubble before, the steel pipe of pre-buried DN125 in french drain, perforate around steel pipe, the perforate size is 20mm on the steel pipe, and pre-buried by 5% the gradient, all around the slope aspect collecting well, before burying steel pipe, fill up first the part rubble, and then the installation steel pipe, with rubble steel pipe is embedded in the french drain again, with around the water drainage to collecting well; Described Whirlwind tank bottom from-12.5~-18.6m is the desk-top base plate of back taper, because groundwater table is higher, comparatively serious from the crack of stone infiltration on the slope, the water on the slope flows on the base plate, before the sealing bed course, first rubble loose on the slope is cleaned out, and fluting on the slope, the steel pipe of pre-buried ∮ 48, and be communicated with DN125 steel pipe in the french drain, make the water on the slope concentrate flow into pipe laying the french drain from steel pipe, and with mortar with slope pipe laying shutoff;
C, collecting well is set
Collecting well and french drain that a 1000x1000x1500mm is set in the bottom of foundation ditch connect, collecting well adopts the thick steel plate of 10mm to make, the steel pipe of the ∮ 125 that french drain is pre-buried penetrates from the collecting well side, with the underground water drainage to collecting well, and perforate around collecting well, be convenient to the inflow of catchmenting of base plate, and set up steel deck-plate on collecting well top, steel deck-plate adopts the thick steel plate of 10mm to make, and put more energy into the L50*5 angle steel, after processing factory makes, winch to foundation ditch with the 16t crane, directly lay, and around collecting well the rubble of backfill 10~50mm;
D, installation plastic sheeting water barrier
After Whirlwind tank substrate french drain and slope pipe laying have been constructed, lay old template at french drain, before the sealing bed course, skew wall is laid the thick plastic sheeting of 0.08mm around substrate reaches, the upper end is connected with the band steel compression of Whirlwind tank waist rail bottom with 25*3, and fix with expansion bolt, the lower end is covered at the bottom of the whole pond, and the water on the slope flows into collecting well after naturally just flowing directly into the gutter like this;
Row's underground water falls in e, installing submersible pump
After the substrate drainage system forms, the water drainage to collecting well, is installed the dredge pump of 5 50m lifts, and one of them bore is 100mm, all the other 4 bores are 50mm, water pump bottom, is left two and is drawn water and get final product (float valve is set) greater than 20cm from the collecting well bottom level during normal construction, all the other water pumps are as for subsequent use, delivery port welding with steel pipe and water pump, water pump directly buries with below the structure base slab, water directly is evacuated to catch-basin gets final product, and in time builds bottom cushion after the drainage system installation.
Super dark batholith deep foundation ditch of the present invention fall water discharge method Yantai Baosteel Tube hot rolling Whirlwind tank construct enterprising enforcement with and promote, all underground water are discharged in collecting well by submersible pump, without open fire, dewatering effect is good in the foundation ditch.The Whirlwind tank inclined bottom plate concrete compaction of constructing, the leakproof phenomenon is for Whirlwind tank has been created favourable condition along practice structure construction.
Above embodiment is only for explanation the present invention, but not limitation of the present invention, person skilled in the relevant technique in the situation that does not break away from the spirit and scope of the present invention, can also make various conversion or variation.Therefore, all technical schemes that are equal to also should belong to category of the present invention, should be limited by each claim.

Claims (5)

1. water discharge method falls in a super dark batholith deep foundation ditch, is used for being seated in the hot rolling Whirlwind tank inclined bottom plate structure construction on the batholith, it is characterized in that may further comprise the steps:
A, french drain white-out underground water is set
After the Whirlwind tank earthwork evacuation is complete, before building bed course, form drainage system, make on the bed course without ponding, earthwork evacuation arranges french drain all around to substrate, change behind the excavation gutter and fill out rubble, the body refuse complete liquidation of excavation french drain is clean, and making complete in the french drain is that rubble is unimpeded by water;
B, gutter white-out sidewall crevice water is set
French drain change fill out rubble before, embedded steel tube in french drain, and perforate around the steel pipe, and pre-buried by 5% the gradient, the slope aspect collecting well filled up first the part rubble before burying steel pipe all around, and then the installation steel pipe, with rubble steel pipe is embedded in the french drain again, with around the water drainage to collecting well; Described Whirlwind tank bottom is the desk-top base plate of back taper, because groundwater table is higher, comparatively serious from the crack of stone infiltration on the slope, the water on the slope flows on the base plate, before the sealing bed course, first rubble loose on the slope is cleaned out, and fluting on the slope, the steel pipe of pre-buried ∮ 48, and be communicated with DN125 steel pipe in the french drain, make the water on the slope concentrate flow into pipe laying the french drain from steel pipe, and with mortar with slope pipe laying shutoff;
C, collecting well is set
A collecting well and french drain are set in the bottom of foundation ditch to be connected, collecting well adopts the thick steel plate of 10mm to make, the steel pipe of the ∮ 125 that french drain is pre-buried penetrates from the collecting well side, with the underground water drainage to collecting well, and perforate around collecting well, be convenient to the inflow of catchmenting of base plate, and set up steel deck-plate on collecting well top, steel deck-plate adopts the thick steel plate of 10mm to make, and put more energy into the L50*5 angle steel, after processing factory makes, winch to foundation ditch with the 16t crane, directly lay, and around collecting well the rubble of backfill 10~50mm;
D, installation plastic sheeting water barrier
After Whirlwind tank substrate french drain and slope pipe laying have been constructed, lay old template at french drain, before the sealing bed course, skew wall is laid the thick plastic sheeting of 0.08mm around substrate reaches, the upper end is connected with the band steel compression of Whirlwind tank waist rail bottom with 25*3, and fix with expansion bolt, the lower end is covered at the bottom of the whole pond, and the water on the slope flows into collecting well after naturally just flowing directly into the gutter like this;
Row's underground water falls in e, installing submersible pump
After the substrate drainage system forms, with the water drainage to collecting well, installing submersible pump, delivery port welding with steel pipe and submersible pump, submersible pump directly buries with below the structure base slab, water directly is evacuated to catch-basin gets final product, and in time builds bottom cushion after the drainage system installation.
2. water discharge method falls in super dark batholith deep foundation ditch as claimed in claim 1, it is characterized in that, and among the described step a, sectional dimension 500x500mm in the gutter.
3. water discharge method falls in super dark batholith deep foundation ditch as claimed in claim 1, it is characterized in that among the described step b, embedded steel tube is the DN125 steel pipe in french drain, and the perforate size is 20mm on the steel pipe.
4. water discharge method falls in super dark batholith deep foundation ditch as claimed in claim 1, it is characterized in that among the described step c, collecting well is of a size of 1000x1000x1500mm.
5. water discharge method falls in super dark batholith deep foundation ditch as claimed in claim 1, it is characterized in that, among the described step e, the submersible pump of 5 50m lifts is installed, one of them bore is 100mm, and all the other 4 bores are 50mm, submersible pump bottom from the collecting well bottom level greater than 20cm.
CN201110314521.0A 2011-10-17 2011-10-17 Draining method for ultra-deep batholith deep foundation pit Active CN103046565B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110314521.0A CN103046565B (en) 2011-10-17 2011-10-17 Draining method for ultra-deep batholith deep foundation pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110314521.0A CN103046565B (en) 2011-10-17 2011-10-17 Draining method for ultra-deep batholith deep foundation pit

Publications (2)

Publication Number Publication Date
CN103046565A true CN103046565A (en) 2013-04-17
CN103046565B CN103046565B (en) 2015-05-06

Family

ID=48059403

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110314521.0A Active CN103046565B (en) 2011-10-17 2011-10-17 Draining method for ultra-deep batholith deep foundation pit

Country Status (1)

Country Link
CN (1) CN103046565B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103469799A (en) * 2013-09-24 2013-12-25 中国建筑第二工程局有限公司 Excavation method for red mudstone soil elevator foundation pit below underground water level in cold region
CN104314090A (en) * 2014-08-29 2015-01-28 中铁八局集团建筑工程有限公司 Deep foundation pit bedrock drainage culvert and drainage system and drainage construction method thereof
CN104452813A (en) * 2014-11-06 2015-03-25 国家电网公司 Method for protecting underground powerhouse gate shaft against water seepage
CN108457680A (en) * 2018-02-01 2018-08-28 中铁十二局集团有限公司 A kind of waterproof technology of water rich strata Station abutment wall
CN108589796A (en) * 2018-04-27 2018-09-28 中铁十二局集团有限公司 Substrate aproll processing method
CN109183820A (en) * 2018-11-03 2019-01-11 五冶集团上海有限公司 A kind of whirling well cone bottom Yield rainfall relation method and its application
CN110424428A (en) * 2019-07-30 2019-11-08 瑞洲建设集团有限公司 The construction method of the comprehensive Yield rainfall relation system of deep basal pit
CN110670613A (en) * 2019-08-22 2020-01-10 北京东地岩土工程有限公司 Anti-seepage structure of foundation pit elevator shaft and construction method thereof
CN110847199A (en) * 2019-11-12 2020-02-28 中国二十冶集团有限公司 Construction method for drainage of underground water of deep foundation pit
CN111877380A (en) * 2020-06-28 2020-11-03 中国二十冶集团有限公司 Drainage structure of cyclone tank open caisson
CN113463670A (en) * 2021-09-02 2021-10-01 中铁十八局集团第五工程有限公司 Water pumping and draining method and water pumping and draining structure for deep foundation pit bottom plate construction

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3967473B2 (en) * 1998-09-10 2007-08-29 株式会社間組 Construction method of underground structure
CN101148885A (en) * 2007-11-07 2008-03-26 中冶长天国际工程有限责任公司 Three-dimensional drainage system structure of groundwater in landfill
CN101768976A (en) * 2009-12-29 2010-07-07 中建城市建设发展有限公司 Base pit dewatering and water saving device and construction method thereof
CN102116033A (en) * 2011-01-07 2011-07-06 中国建筑第四工程局有限公司 Method and device for dewatering and draining water collecting well of blind drain of deep foundation pit
CN201896316U (en) * 2010-12-22 2011-07-13 中国建筑第六工程局有限公司 System for reducing and draining confined water in deep foundation pit of rock foundation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3967473B2 (en) * 1998-09-10 2007-08-29 株式会社間組 Construction method of underground structure
CN101148885A (en) * 2007-11-07 2008-03-26 中冶长天国际工程有限责任公司 Three-dimensional drainage system structure of groundwater in landfill
CN101768976A (en) * 2009-12-29 2010-07-07 中建城市建设发展有限公司 Base pit dewatering and water saving device and construction method thereof
CN201896316U (en) * 2010-12-22 2011-07-13 中国建筑第六工程局有限公司 System for reducing and draining confined water in deep foundation pit of rock foundation
CN102116033A (en) * 2011-01-07 2011-07-06 中国建筑第四工程局有限公司 Method and device for dewatering and draining water collecting well of blind drain of deep foundation pit

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103469799A (en) * 2013-09-24 2013-12-25 中国建筑第二工程局有限公司 Excavation method for red mudstone soil elevator foundation pit below underground water level in cold region
CN104314090A (en) * 2014-08-29 2015-01-28 中铁八局集团建筑工程有限公司 Deep foundation pit bedrock drainage culvert and drainage system and drainage construction method thereof
CN104452813A (en) * 2014-11-06 2015-03-25 国家电网公司 Method for protecting underground powerhouse gate shaft against water seepage
CN108457680A (en) * 2018-02-01 2018-08-28 中铁十二局集团有限公司 A kind of waterproof technology of water rich strata Station abutment wall
CN108589796A (en) * 2018-04-27 2018-09-28 中铁十二局集团有限公司 Substrate aproll processing method
CN109183820A (en) * 2018-11-03 2019-01-11 五冶集团上海有限公司 A kind of whirling well cone bottom Yield rainfall relation method and its application
CN110424428A (en) * 2019-07-30 2019-11-08 瑞洲建设集团有限公司 The construction method of the comprehensive Yield rainfall relation system of deep basal pit
CN110670613A (en) * 2019-08-22 2020-01-10 北京东地岩土工程有限公司 Anti-seepage structure of foundation pit elevator shaft and construction method thereof
CN110670613B (en) * 2019-08-22 2024-03-19 北京东地岩土工程有限公司 Foundation pit elevator shaft water seepage prevention structure and construction method thereof
CN110847199A (en) * 2019-11-12 2020-02-28 中国二十冶集团有限公司 Construction method for drainage of underground water of deep foundation pit
CN111877380A (en) * 2020-06-28 2020-11-03 中国二十冶集团有限公司 Drainage structure of cyclone tank open caisson
CN113463670A (en) * 2021-09-02 2021-10-01 中铁十八局集团第五工程有限公司 Water pumping and draining method and water pumping and draining structure for deep foundation pit bottom plate construction

Also Published As

Publication number Publication date
CN103046565B (en) 2015-05-06

Similar Documents

Publication Publication Date Title
CN103046565B (en) Draining method for ultra-deep batholith deep foundation pit
CN102418347B (en) Drainage construction method for blind drain and sump wells in deep foundation pit
CN216640547U (en) Drainage decompression anti-floating system suitable for weak permeable soft soil stratum
CN103510528A (en) Blind trench water discharging structure used for underground structure up-floating prevention
CN102535488A (en) Waterproof construction method and system for bottom plate of high-water-level basement
CN102383437B (en) Well point positioned pumping tubular well and well point positioned pumping method
CN111236284A (en) A method and structure for groundwater drainage at the bottom of a basement and surrounding areas
CN106592756A (en) Karst region step-type basement water drainage structure and construction method thereof
CN110093971B (en) Combined water pump house of underground tunnel and construction method thereof
CN103741715A (en) Novel waterproof hydrophobic construction method for basement
CN113175005B (en) Anti-floating design and construction method of waterproof floor of underground garage during heavy rain
CN201567582U (en) A water-saving device for foundation pit dewatering
CN115012452A (en) Post-casting belt construction technology and basement drainage and pressure relief structure
CN108487331B (en) An underground structure anti-floating system integrating corridor drainage and fertilizer tank anti-seepage
CN111101531A (en) Foundation pit drainage system
CN107724405B (en) A construction method for foundation precipitation in underground pipe construction
CN205907658U (en) Be used for anti - structure that seeps water of concrete -faced rockfill dam construction time dam body
CN105970882B (en) Solve the structure and its building method of face dam construction time dam body reverse osmosis water problems
CN210712967U (en) Impervious anti structure that floats of basement
CN209620125U (en) A kind of underground structure blind drainage system
CN206477347U (en) The water storage structure of basement
CN216379604U (en) Foundation pit high-temperature bedrock crack water drainage and plugging structure
CN207331699U (en) Pit-in-pit reinforced concrete retaining wall composite supporting structure
CN101967834A (en) Pulp concentration pool underground base structure with anti-floating function
CN114045849B (en) A water drainage and plugging structure and method for high-temperature bedrock cracks in foundation pits

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant