CN104234089A - Construction method for waterproof and water-draining combination of basement - Google Patents

Construction method for waterproof and water-draining combination of basement Download PDF

Info

Publication number
CN104234089A
CN104234089A CN201410412567.XA CN201410412567A CN104234089A CN 104234089 A CN104234089 A CN 104234089A CN 201410412567 A CN201410412567 A CN 201410412567A CN 104234089 A CN104234089 A CN 104234089A
Authority
CN
China
Prior art keywords
waterproof
basement
water
drainage
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410412567.XA
Other languages
Chinese (zh)
Other versions
CN104234089B (en
Inventor
从海虎
孙则树
刘中伟
李建华
濮厚靖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201410412567.XA priority Critical patent/CN104234089B/en
Publication of CN104234089A publication Critical patent/CN104234089A/en
Application granted granted Critical
Publication of CN104234089B publication Critical patent/CN104234089B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Building Environments (AREA)

Abstract

本发明公开了一种地下室防排水结合的施工方法,它包括地下室底板的防水疏水和地下室侧墙的防水疏水。本发明所提出的一种地下室防排水结合的施工方法,通过在基础底板下的卷材防水、疏水、排水系统和刚性防水混凝土底板,成功地将基础底板下的渗漏水全部排至集水井内,每当集水井内水位达到一定的高度,就会自动启动排水泵排水,保证了地下室地板的干燥状态和正常使用功能,而且地下室基础底板疏水系统可以在地下室施工完成后任何时间内插入回填和地面施工,而不必等到地下室全部完成并检查无渗漏后才进行以上工作,提高工作效率和工期。

The invention discloses a basement waterproof and drainage combined construction method, which includes the waterproof and hydrophobic of the basement bottom plate and the waterproof and hydrophobic of the side walls of the basement. A basement waterproof and drainage combined construction method proposed by the present invention successfully discharges all the seepage water under the foundation floor to the water collection well through the waterproof, water-repellent, drainage system of the coiled material under the foundation floor and the rigid waterproof concrete floor Inside, whenever the water level in the collection well reaches a certain height, the drainage pump will be automatically started to drain water, ensuring the dry state and normal use of the basement floor, and the drainage system of the basement foundation floor can be inserted and backfilled at any time after the construction of the basement is completed And ground construction, without having to wait until the basement is fully completed and checked for no leakage before carrying out the above work, improving work efficiency and construction period.

Description

一种地下室防排水结合的施工方法A construction method combining waterproofing and drainage in basement

技术领域 technical field

本发明属建筑施工防排水领域,尤其是涉及一种地下室防排水结合的施工方法。 The invention belongs to the field of waterproofing and drainage in building construction, and in particular relates to a construction method combining waterproofing and drainage in a basement.

背景技术 Background technique

地下室外墙及底板渗漏水是常见质量通病之一,目前,地下室防水层主要由刚性防水和柔性防水层组成。由于混凝土刚性防水层难以避免会产生一定的微裂缝,而柔性防水层由于搭接不牢、破损以及卷材防水和涂膜防水易于老化,后期很难保持防水效果,也事实上无法形成真正的围蔽体系,致使地下室深度在地下水位以下的建筑很容易出现漏水现象;传统的防水方法都是采用“堵”的方式,不能永久性的解决渗漏水问题,严重影响了建筑工程质量,也给地下室正常的使用和管理带来了很大的不便。  Leakage of basement exterior walls and floors is one of the common quality problems. At present, the basement waterproof layer is mainly composed of rigid waterproof and flexible waterproof layers. Because the concrete rigid waterproof layer will inevitably produce certain micro-cracks, while the flexible waterproof layer is prone to aging due to weak lap joints, damage, membrane waterproofing and coating waterproofing, it is difficult to maintain the waterproof effect in the later stage, and in fact cannot form a real The enclosure system makes the buildings whose basement depth is below the groundwater level prone to water leakage; the traditional waterproofing methods all adopt the "blocking" method, which cannot permanently solve the water leakage problem, which seriously affects the quality of construction projects and also It brings great inconvenience to the normal use and management of the basement. the

发明内容 Contents of the invention

本发明所要解决的技术问题是提供一种地下室防排水结合的施工方法,结构简单,建造成本低,防排结合,能长期保持很好的防水疏水效果,同时可减小地下室基础底板上浮力与地下室侧墙水压力,保障建筑工程质量。 The technical problem to be solved by the present invention is to provide a construction method combining waterproofing and drainage in basement, which has simple structure, low construction cost, combined waterproofing and drainage, can maintain a good waterproof and hydrophobic effect for a long time, and can reduce the buoyancy and drainage on the foundation floor of the basement at the same time. The water pressure of the side wall of the basement ensures the quality of the construction project.

 为实现上述目的,本发明一种地下室防排水结合的施工方法,它包括地下室底板的防水疏水和地下室侧墙的防水疏水,其具体技术方案为: In order to achieve the above object, the present invention provides a combined construction method for basement waterproofing and drainage, which includes the waterproofing and drainage of the basement floor and the waterproofing and drainage of the side walls of the basement, and its specific technical scheme is:

一、底板的防水疏水,其包括如下施工步骤: 1. The waterproof and hydrophobic of the bottom plate, which includes the following construction steps:

 (1)在基础垫层上,从下至上依次铺设:防水卷材 → 防水保护层,防水保护层设有排水坡度2%,排水坡度排向基础梁边设置有滤水沟的方向 → 石子滤水层 → 铺贴无纺布层 → 混凝土垫层→ 具有刚性自防水功能的基础底板; (1) On the foundation cushion, lay in sequence from bottom to top: waterproof coiled material → waterproof protective layer, the waterproof protective layer is provided with a drainage slope of 2%, and the drainage slope is discharged to the direction of the filter ditch beside the foundation beam → stone filter Water layer → laying non-woven fabric layer → concrete cushion layer → foundation floor with rigid self-waterproof function;

(2)通过梁边设置滤水沟排至集水井的节点,施工依次顺序为:将基础梁土方每边扩宽600mm → 浇注基础梁垫层 → 砌筑120砖胎膜,抹1:3水泥砂浆并在砖胎膜的阳角、阴角处设置圆弧 → 浇注底板垫层,底板垫层与梁交接处做圆弧角 → 铺设防水卷材 → 防水保护层,并设有排水坡度2%,坡度排向集水井,遇到梁与梁交差时设置两根直径100mmPVC管,在PVC管顺流水方向设置镀锌滤网 → 砌筑120梁砖胎膜,抹1:3水泥砂浆 → 碎石滤水层 → 铺设无纺布层→ 混凝土垫层、同时浇注刚性自防水底板7与基础梁; (2) Set the filter ditch on the side of the beam to the node of the water collection well, and the construction sequence is as follows: widen each side of the foundation beam earthwork by 600mm → pour the foundation beam cushion layer → build 120 brick tire membranes, and apply 1:3 cement Mortar and set arcs at the positive and negative corners of the brick membrane → pour the floor cushion, and make arc corners at the junction of the floor cushion and the beam → lay waterproof membranes → waterproof protective layer, and set a drainage slope of 2% , the slope is drained to the water collection well, and two 100mm PVC pipes with a diameter of 100mm are installed at the intersection of the beams, and a galvanized filter is installed along the flow direction of the PVC pipes → masonry 120 beams with brick membrane, and 1:3 cement mortar → gravel Water filter layer → Lay non-woven fabric layer → Concrete cushion layer, pour rigid self-waterproof bottom plate 7 and foundation beam at the same time;

(3)在浇注具有刚性自防水底板功能与基础梁的同时完成与基础底板相连的集水井的施工,在所述的集水井壁的侧面开有进水孔,并在进水孔上端设置滤网,在所述的集水井内装有自动装置排水泵,通过排水泵将水通过排水管排出与室外相接的雨水井; (3) Complete the construction of the water collection well connected to the foundation floor while pouring the rigid self-waterproof bottom plate function and the foundation beam. A water inlet hole is opened on the side of the water collection well wall, and a filter is set at the upper end of the water inlet hole. net, an automatic device drainage pump is installed in the water collection well, and the water is discharged through the drainage pipe to the rainwater well connected to the outside through the drainage pump;

二、侧墙的防水疏水,其包括如下施工步骤:地梁垫层与底板垫层同时施工 → 卷材防水预留300mm与混凝土墙板外保护墙侧面防水连接 → 防水保护层并设有排水坡度2%,坡度排向集水井 → 同时浇注底板连同基础梁及外墙板高500mm ,在墙板设置钢板止水带,钢板止水带厚度3mm → 浇注墙板混凝土 → 距离外墙边300mm砌筑240mm保护墙,抹1:3水泥砂浆,阴阳角做圆弧角,同时砌筑集水井,侧墙集水井与地板集水井之间距离50米 → 在集水井边设置集中进水管直径100,并在进水口处设置滤网 → 设置自动排水泵,将水排至最近的雨水井 → 保护墙外侧面卷材防水,上部预留300与顶板防水搭接 → 50mm厚挤塑板卷材防水保护层 → 分层回填土、在地下室墙板与保护墙中间填石子滤水层(内填石子滤水层与外回填土接替回填每次高度一致,防止将保护墙挤压变形)、做顶板防水与侧墙防水搭接。 2. Waterproof and hydrophobic side walls, which include the following construction steps: Simultaneous construction of the ground beam cushion and the floor cushion → 300mm waterproofing of the coiled material and waterproof connection with the side of the outer protection wall of the concrete wall panel → waterproof protection layer and a drainage slope 2%, the slope is drained to the water collection well → pour the bottom plate together with the foundation beam and the outer wall plate at a height of 500mm, set the steel plate waterstop on the wall plate, the thickness of the steel plate waterstop is 3mm → pour the wall plate concrete → build masonry 300mm away from the edge of the external wall 240mm protection wall, plastered with 1:3 cement mortar, arc angles for yin and yang corners, and build a water collection well at the same time, the distance between the side wall water collection well and the floor water collection well is 50 meters → set a centralized water inlet pipe with a diameter of 100 at the side of the water collection well, and Set up a filter at the water inlet → Set up an automatic drainage pump to drain the water to the nearest rainwater well → Protect the outer side of the wall from waterproofing, and reserve 300 for the upper part to overlap with the waterproof roof → 50mm thick extruded board coiled waterproof protective layer → Backfill soil layer by layer, fill the stone filter layer between the basement wall board and the protective wall (the height of the inner stone filter layer and the outer backfill soil are the same for backfilling each time, so as to prevent the protective wall from being squeezed and deformed), make the roof waterproof and Waterproof lap joints on side walls.

本发明所提出的一种地下室防排水结合的施工方法,通过在基础底板下的卷材防水、疏水、排水系统和刚性防水混凝土底板,成功地将基础底板下的渗漏水全部排至集水井内,每当集水井内水位达到一定的高度,就会自动启动排水泵排水,保证了地下室地板的干燥状态和正常使用功能,而且地下室基础底板疏水系统可以在地下室施工完成后任何时间内插入回填和地面施工,而不必等到地下室全部完成并检查无渗漏后才进行以上工作,提高工作效率和工期。 A basement waterproof and drainage combined construction method proposed by the present invention successfully drains all the seepage water under the foundation floor to the water collection well through the waterproof, water-repellent, drainage system of the coiled material under the foundation floor and the rigid waterproof concrete floor Inside, whenever the water level in the collection well reaches a certain height, the drainage pump will be automatically started to drain water, ensuring the dry state and normal use of the basement floor, and the basement floor drainage system can be inserted and backfilled at any time after the basement construction is completed And ground construction, without having to wait until the basement is fully completed and checked for no leakage before carrying out the above work, improving work efficiency and construction period.

附图说明 Description of drawings

图1为采用本发明所提出的一种地下室防排水结合的施工方法所述的建造的地下室底板防水疏水结构的示意图; Fig. 1 is the schematic diagram of the waterproof and hydrophobic structure of the basement floor that adopts the construction method that a kind of basement waterproof and drainage proposed by the present invention combines;

图2为图1所示的地下室底板防水疏水基础梁边滤水沟的节点示意图; Fig. 2 is a node schematic diagram of the girder side filter ditch of the basement floor waterproof and hydrophobic foundation shown in Fig. 1;

图3为图1所示的地下室防水疏水结构的集水井处的节点示意图; Fig. 3 is the node schematic diagram at the sump well of the basement waterproof and hydrophobic structure shown in Fig. 1;

图4为地下室外墙防水疏水结构的示意图。 Fig. 4 is a schematic diagram of the waterproof and hydrophobic structure of the basement exterior wall.

具体实施方式 Detailed ways

参见附图,一种地下室防排水结合的施工方法,它包括地下室底板的防水疏水和地下室侧墙的防水疏水,其具体技术方案为: Referring to accompanying drawing, a kind of basement waterproof and drainage combined construction method, it comprises the waterproof and hydrophobic of basement baseboard and the waterproof and hydrophobic of basement side wall, and its specific technical scheme is:

 一、底板的防水疏水,其包括如下施工步骤: 1. The waterproof and hydrophobic of the bottom plate, which includes the following construction steps:

   (1)在基础垫层1从下至上依次铺设:防水卷材2 → 防水保护层3,防水保护层设有排水坡度2%,排水坡度排向基础梁边设置有滤水沟的方向 → 石子滤水层4 → 铺贴无纺布层5 → 混凝土垫层6 → 具有刚性自防水功能的基础底板7; (1) Lay the foundation cushion layer 1 from bottom to top: waterproof coiled material 2 → waterproof protective layer 3, the waterproof protective layer is provided with a drainage slope of 2%, and the drainage slope is discharged to the direction of the filter ditch beside the foundation beam → stones Water filter layer 4 → laying non-woven fabric layer 5 → concrete cushion layer 6 → foundation base plate 7 with rigid self-waterproof function;

   (2)通过梁边设置滤水沟排至集水井的节点,施工依次顺序为:挖基础梁土方每边扩宽600mm → 浇注基础梁垫层11 → 砌筑120砖胎膜9,抹1:3水泥砂浆并在120砖胎膜阳角、阴角处设置圆弧 → 浇注底板垫层1,底板垫层与梁交接处做圆弧角 → 铺设防水卷材2 → 防水保护层3,并设有排水坡度2%,坡度排向集水井,遇到梁与梁交差时设置两根直径100mmPVC管8,在PVC管顺流水方向设置镀锌滤网 → 砌筑120梁砖胎膜9,抹1:3水泥砂浆 → 碎石滤水层4 → 铺设无纺布层5→ 混凝土垫层6、同时浇注刚性自防水底板7与基础梁10; (2) Set the filter ditch to the node of the water collection well through the beam side, and the construction sequence is: digging the foundation beam earthwork and widening each side by 600mm → pouring the foundation beam cushion layer 11 → masonry 120 brick membranes 9, and plastering 1: 3 Cement mortar and set circular arcs at the male and female corners of the 120 brick membrane → pour the floor cushion layer 1, and make arc corners at the junction of the floor cushion layer and the beam → lay waterproof coiled material 2 → waterproof protective layer 3, and set There is a drainage slope of 2%, and the slope is drained to the water collection well. When encountering the intersection of beams and beams, install two PVC pipes with a diameter of 100mm 8, and install a galvanized filter screen on the PVC pipes along the direction of the water → Masonry 120 beam brick membrane 9, wipe 1 : 3 cement mortar → gravel water filter layer 4 → laying non-woven fabric layer 5 → concrete cushion 6, pouring rigid self-waterproof bottom plate 7 and foundation beam 10 at the same time;

(3)在浇注具有刚性自防水底板功能7与基础梁10的同时完成与基础底板相连的集水井13的施工,在所述的集水井壁的侧面开有进水孔14,并在进水孔上端设置滤网,在所述的集水井内装有自动装置排水泵21,通过排水泵将水通过排水管12排出与室外相接的雨水井; (3) Complete the construction of the water collection well 13 connected to the foundation floor while pouring the rigid self-waterproof floor function 7 and the foundation beam 10. A water inlet 14 is opened on the side of the wall of the water collection well, and the water inlet A strainer is arranged at the upper end of the hole, and an automatic device drainage pump 21 is housed in the described water collection well, and the water is discharged through the drainage pipe 12 through the drainage pump to the rainwater well connected to the outside;

    二、侧墙的防水疏水,其包括如下施工步骤:地梁垫层与底板垫层同时施工 → 卷材防水2预留300mm与混凝土墙板外保护墙侧面防水连接 → 防水保护层3并设有排水坡度2%,坡度排向集水井 → 同时浇注底板7连同基础梁10及外墙板高500mm 15,在墙板设置钢板止水带16,钢板止水带厚度3mm → 浇注墙板混凝土17 → 距离外墙边300mm砌筑240mm保护墙18,抹1:3水泥砂浆,阴阳角做圆弧角,同时砌筑集水井,侧墙集水井与底板集水井(因两井结构相同,说明书附图中以图3同时指示两井)之间距离50米 → 在集水井边设置集中进水管直径100,并在进水口处设置滤网 → 设置自动排水泵,将水排至最近的雨水井 → 保护墙外侧面卷材防水2,上部预留300与顶板防水搭接 → 50mm厚挤塑板卷材防水保护层19 → 分层回填土、在地下室墙板与保护墙中间填石子滤水层(内填石子滤水层与外回填土接替回填每次高度一致,防止将保护墙挤压变形)、做顶板防水与侧墙防水搭接。 2. Waterproof and hydrophobic side walls, which include the following construction steps: Simultaneous construction of ground beam cushion and floor cushion → Coil waterproof 2 Reserve 300mm for waterproof connection with the side of the outer protective wall of the concrete wall panel → Waterproof protective layer 3 and set The drainage slope is 2%, and the slope is drained to the water collection well → pour the bottom plate 7 together with the foundation beam 10 and the height of the outer wall plate 500mm 15 at the same time, set the steel plate water stop belt 16 on the wall plate, the thickness of the steel plate water stop belt is 3mm → pour the wall plate concrete 17 → Build 240mm protection wall 18 at a distance of 300mm from the outer wall, plaster 1:3 cement mortar, make arc angles at the inner and outer corners, and build water collection wells at the same time. In Figure 3, the distance between the two wells is 50 meters → Set up a centralized water inlet pipe with a diameter of 100 at the side of the water collection well, and set a filter screen at the water inlet → Set up an automatic drainage pump to drain water to the nearest rainwater well → Protect Waterproof 2 of the outer side membrane of the wall, 300 of the upper part is reserved for waterproof lapping with the roof → 50mm thick extruded board membrane waterproof protection layer 19 → layered backfill soil, and a stone filter layer between the basement wall and the protective wall (inner Fill the gravel filter layer and the external backfill soil to replace the backfill at the same height each time to prevent the protective wall from being squeezed and deformed), and do roof waterproofing and side wall waterproofing overlap.

本发明所提出的一种地下室防排水结合的施工方法,通过在基础底板下的卷材防水、疏水、排水系统和刚性防水混凝土底板,成功地将基础底板下的渗漏水全部排至集水井内,每当集水井内水位达到一定的高度,就会自动启动排水泵排水,保证了地下室地板的干燥状态和正常使用功能,而且地下室基础底板疏水系统可以在地下室施工完成后任何时间内插入回填和地面施工,而不必等到地下室全部完成并检查无渗漏后才进行以上工作,提高工作效率和工期。 A basement waterproof and drainage combined construction method proposed by the present invention successfully drains all the seepage water under the foundation floor to the water collection well through the waterproof, water-repellent, drainage system of the coiled material under the foundation floor and the rigid waterproof concrete floor Inside, whenever the water level in the collection well reaches a certain height, the drainage pump will be automatically started to drain water, ensuring the dry state and normal use of the basement floor, and the basement floor drainage system can be inserted and backfilled at any time after the basement construction is completed And ground construction, without having to wait until the basement is fully completed and checked for no leakage before carrying out the above work, improving work efficiency and construction period.

    the

Claims (1)

1. 一种地下室防排水结合的施工方法,它包括地下室底板的防水疏水和地下室侧墙的防水疏水,其具体技术方案为: 1. A construction method combining waterproofing and drainage in a basement, which includes the waterproofing and drainage of the basement floor and the waterproofing and drainage of the side walls of the basement, and its specific technical scheme is: 一、底板的防水疏水,其包括如下施工步骤: 1. The waterproof and hydrophobic of the bottom plate, which includes the following construction steps:  (1)在基础垫层上,从下至上依次铺设:防水卷材 → 防水保护层,防水保护层设有排水坡度2%,排水坡度排向基础梁边设置有滤水沟的方向 → 石子滤水层 → 铺贴无纺布层 → 混凝土垫层→ 具有刚性自防水功能的基础底板; (1) On the foundation cushion, lay in sequence from bottom to top: waterproof coiled material → waterproof protective layer, the waterproof protective layer is provided with a drainage slope of 2%, and the drainage slope is discharged to the direction of the filter ditch beside the foundation beam → stone filter Water layer → laying non-woven fabric layer → concrete cushion layer → foundation floor with rigid self-waterproof function; (2)通过梁边设置滤水沟排至集水井的节点,施工依次顺序为:将基础梁土方每边扩宽600mm → 浇注基础梁垫层 → 砌筑120砖胎膜,抹1:3水泥砂浆并在砖胎膜的阳角、阴角处设置圆弧 → 浇注底板垫层,底板垫层与梁交接处做圆弧角 → 铺设防水卷材 → 防水保护层,并设有排水坡度2%,坡度排向集水井,遇到梁与梁交差时设置两根直径100mmPVC管,在PVC管顺流水方向设置镀锌滤网 → 砌筑120梁砖胎膜,抹1:3水泥砂浆 → 碎石滤水层 → 铺设无纺布层→ 混凝土垫层、同时浇注刚性自防水底板7与基础梁; (2) Set the filter ditch on the side of the beam to the node of the water collection well, and the construction sequence is as follows: widen each side of the foundation beam earthwork by 600mm → pour the foundation beam cushion layer → build 120 brick tire membranes, and apply 1:3 cement Mortar and set arcs at the positive and negative corners of the brick membrane → pour the floor cushion, and make arc corners at the junction of the floor cushion and the beam → lay waterproof membranes → waterproof protective layer, and set a drainage slope of 2% , the slope is drained to the water collection well, and two 100mm PVC pipes with a diameter of 100mm are installed at the intersection of the beams, and a galvanized filter is installed along the flow direction of the PVC pipes → masonry 120 beams with brick membrane, and 1:3 cement mortar → gravel Water filter layer → Lay non-woven fabric layer → Concrete cushion layer, pour rigid self-waterproof bottom plate 7 and foundation beam at the same time; (3)在浇注具有刚性自防水底板功能与基础梁的同时完成与基础底板相连的集水井的施工,在所述的集水井壁的侧面开有进水孔,并在进水孔上端设置滤网,在所述的集水井内装有自动装置排水泵,通过排水泵将水通过排水管排出与室外相接的雨水井; (3) Complete the construction of the water collection well connected to the foundation floor while pouring the rigid self-waterproof bottom plate function and the foundation beam. A water inlet hole is opened on the side of the water collection well wall, and a filter is set at the upper end of the water inlet hole. net, an automatic device drainage pump is installed in the water collection well, and the water is discharged through the drainage pipe to the rainwater well connected to the outside through the drainage pump; 二、侧墙的防水疏水,其包括如下施工步骤:地梁垫层与底板垫层同时施工 → 卷材防水预留300mm与混凝土墙板外保护墙侧面防水连接 → 防水保护层并设有排水坡度2%,坡度排向集水井 → 同时浇注底板连同基础梁及外墙板高500mm ,在墙板设置钢板止水带,钢板止水带厚度3mm → 浇注墙板混凝土 → 距离外墙边300mm砌筑240mm保护墙,抹1:3水泥砂浆,阴阳角做圆弧角,同时砌筑集水井,侧墙集水井与地板集水井之间距离50米 → 在集水井边设置集中进水管直径100,并在进水口处设置滤网 → 设置自动排水泵,将水排至最近的雨水井 → 保护墙外侧面卷材防水,上部预留300与顶板防水搭接 → 50mm厚挤塑板卷材防水保护层 → 分层回填土、在地下室墙板与保护墙中间填石子滤水层(内填石子滤水层与外回填土接替回填每次高度一致,防止将保护墙挤压变形)、做顶板防水与侧墙防水搭接。 2. Waterproof and hydrophobic side walls, which include the following construction steps: Simultaneous construction of the ground beam cushion and the floor cushion → 300mm waterproofing of the coiled material and waterproof connection with the side of the outer protection wall of the concrete wall panel → waterproof protection layer and a drainage slope 2%, the slope is drained to the water collection well → pour the bottom plate together with the foundation beam and the outer wall plate at a height of 500mm, set the steel plate waterstop on the wall plate, the thickness of the steel plate waterstop is 3mm → pour the wall plate concrete → build masonry 300mm away from the edge of the external wall 240mm protection wall, plastered with 1:3 cement mortar, arc angles for yin and yang corners, and build a water collection well at the same time, the distance between the side wall water collection well and the floor water collection well is 50 meters → set a centralized water inlet pipe with a diameter of 100 at the side of the water collection well, and Set up a filter at the water inlet → Set up an automatic drainage pump to drain the water to the nearest rainwater well → Protect the outer side of the wall from waterproofing, and reserve 300 for the upper part to overlap with the waterproof roof → 50mm thick extruded board coiled waterproof protective layer → Backfill soil layer by layer, fill the stone filter layer between the basement wall board and the protective wall (the height of the inner stone filter layer and the outer backfill soil are the same for backfilling each time, so as to prevent the protective wall from being squeezed and deformed), make the roof waterproof and Waterproof lap joints on side walls.
CN201410412567.XA 2014-08-21 2014-08-21 The construction method that a kind of basement guarded drainage combines Active CN104234089B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410412567.XA CN104234089B (en) 2014-08-21 2014-08-21 The construction method that a kind of basement guarded drainage combines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410412567.XA CN104234089B (en) 2014-08-21 2014-08-21 The construction method that a kind of basement guarded drainage combines

Publications (2)

Publication Number Publication Date
CN104234089A true CN104234089A (en) 2014-12-24
CN104234089B CN104234089B (en) 2016-08-24

Family

ID=52222923

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410412567.XA Active CN104234089B (en) 2014-08-21 2014-08-21 The construction method that a kind of basement guarded drainage combines

Country Status (1)

Country Link
CN (1) CN104234089B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104988955A (en) * 2015-06-11 2015-10-21 中建一局集团第六建筑有限公司 Drainage-prevention combined waterproof system for ultra-deep basement and construction method
CN105735366A (en) * 2016-03-10 2016-07-06 深圳市深安企业有限公司 Waterproof construction method based concrete
CN106480979A (en) * 2016-12-20 2017-03-08 江西中联建设集团有限公司 A kind of active antiseepage basement shear wall and its construction technology
CN109322328A (en) * 2018-11-27 2019-02-12 上海应用技术大学 Method and system for roof waterproofing and drainage of subway stations in alpine regions
CN114439038A (en) * 2021-12-22 2022-05-06 上海建工四建集团有限公司 Deep foundation pit underground indoor water drainage system and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001241052A (en) * 2000-02-29 2001-09-04 Hiroshi Saito Waterproof construction method for basement and waterproof structure of basement
CN101298782A (en) * 2008-06-13 2008-11-05 朱邃科 Method and system for basement engineering water proof and water drain
CN101768976A (en) * 2009-12-29 2010-07-07 中建城市建设发展有限公司 Base pit dewatering and water saving device and construction method thereof
CN101914927A (en) * 2010-06-22 2010-12-15 中国建筑第二工程局有限公司 Waterproof system for basement bottom plate and wall surface and construction method thereof
CN201695408U (en) * 2010-02-02 2011-01-05 中国建筑第四工程局有限公司 A Basement Basement Combining Waterproofing and Drainage
CN103741715A (en) * 2013-12-25 2014-04-23 中建六局土木工程有限公司 Novel waterproof hydrophobic construction method for basement

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001241052A (en) * 2000-02-29 2001-09-04 Hiroshi Saito Waterproof construction method for basement and waterproof structure of basement
CN101298782A (en) * 2008-06-13 2008-11-05 朱邃科 Method and system for basement engineering water proof and water drain
CN101768976A (en) * 2009-12-29 2010-07-07 中建城市建设发展有限公司 Base pit dewatering and water saving device and construction method thereof
CN201695408U (en) * 2010-02-02 2011-01-05 中国建筑第四工程局有限公司 A Basement Basement Combining Waterproofing and Drainage
CN101914927A (en) * 2010-06-22 2010-12-15 中国建筑第二工程局有限公司 Waterproof system for basement bottom plate and wall surface and construction method thereof
CN103741715A (en) * 2013-12-25 2014-04-23 中建六局土木工程有限公司 Novel waterproof hydrophobic construction method for basement

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104988955A (en) * 2015-06-11 2015-10-21 中建一局集团第六建筑有限公司 Drainage-prevention combined waterproof system for ultra-deep basement and construction method
CN105735366A (en) * 2016-03-10 2016-07-06 深圳市深安企业有限公司 Waterproof construction method based concrete
CN106480979A (en) * 2016-12-20 2017-03-08 江西中联建设集团有限公司 A kind of active antiseepage basement shear wall and its construction technology
CN106480979B (en) * 2016-12-20 2019-07-09 中联建设集团股份有限公司 A kind of active antiseepage basement shear wall and its construction technology
CN109322328A (en) * 2018-11-27 2019-02-12 上海应用技术大学 Method and system for roof waterproofing and drainage of subway stations in alpine regions
CN114439038A (en) * 2021-12-22 2022-05-06 上海建工四建集团有限公司 Deep foundation pit underground indoor water drainage system and construction method

Also Published As

Publication number Publication date
CN104234089B (en) 2016-08-24

Similar Documents

Publication Publication Date Title
CN201695408U (en) A Basement Basement Combining Waterproofing and Drainage
CN102535488B (en) Waterproof construction method for bottom plate of high-water-level basement
CN109488371B (en) Waterproof system of full-enclosed waterproof station and dynamic setting and quantity-limiting drainage method
CN111691467A (en) Construction method for basement water prevention and drainage combination
CN105862873A (en) Construction method of underground water prevention and exterior wall structures of narrow space of deep foundation pit
RU2462560C1 (en) Underground part of concrete wall with wall drain
CN107816138A (en) A kind of construction technology of subsided rest room
CN104234089B (en) The construction method that a kind of basement guarded drainage combines
CN103046565A (en) Draining method for ultra-deep batholith deep foundation pit
CN112281882A (en) Method for treating water and sand gushing from substrate
CN108678029B (en) Water-rich land area basement water-proof and drainage construction method for river-facing hills
CN103741715B (en) The hydrophobic construction method of a kind of basement waterproofing
CN210887906U (en) A caisson type bathroom floor anti-leakage structure
CN115012452A (en) Post-casting belt construction technology and basement drainage and pressure relief structure
CN110847327A (en) Waterproof and drainage construction method for large-area basement roof
CN111894124B (en) Waterproof construction method for large-area civil air defense basement
CN111287793A (en) Deformation joint water-proof and drainage system based on automatic drainage function and construction process thereof
CN107100206A (en) A kind of prevention and controls of basement leakage
CN212104515U (en) A construction structure for the prevention and control of water leakage in the basement
CN202440826U (en) Waterproof system for high-water level basement foundation slabs
CN210712967U (en) Impervious anti structure that floats of basement
CN110093965A (en) A kind of water discharge method of construction site
TW451019B (en) Water-proof and damp-proof method for basement side wall
CN205421500U (en) Basement french drain is dredged and is fallen drainage device
CN116464102A (en) The Construction Method of Waterproof and Drainage Works for the Underground Exterior Wall of Buildings

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20141224

Assignee: Bengbu Jin'an Real Estate Co.,Ltd.

Assignor: CHINA MCC17 GROUP Co.,Ltd.

Contract record no.: X2024980045195

Denomination of invention: A construction method combining basement waterproofing and drainage

Granted publication date: 20160824

License type: Common License

Record date: 20250102