CN206289732U - A kind of active antiseepage basement shear wall - Google Patents

A kind of active antiseepage basement shear wall Download PDF

Info

Publication number
CN206289732U
CN206289732U CN201621400156.XU CN201621400156U CN206289732U CN 206289732 U CN206289732 U CN 206289732U CN 201621400156 U CN201621400156 U CN 201621400156U CN 206289732 U CN206289732 U CN 206289732U
Authority
CN
China
Prior art keywords
basement
drainpipe
shear wall
backfill
coarse sand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201621400156.XU
Other languages
Chinese (zh)
Inventor
周越
李海文
李志文
李志强
万海涛
周春明
樊雪勇
帅品峰
李珺
陈至柔
熊谟针
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGXI ZHANGYAO CONSTRUCTION Co Ltd
Nanchang Municipal Public Works Project Management Co Ltd
JIANGXI ZHONGLIAN CONSTRUCTION GROUP CO Ltd
Original Assignee
JIANGXI ZHANGYAO CONSTRUCTION Co Ltd
Nanchang Municipal Public Works Project Management Co Ltd
JIANGXI ZHONGLIAN CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGXI ZHANGYAO CONSTRUCTION Co Ltd, Nanchang Municipal Public Works Project Management Co Ltd, JIANGXI ZHONGLIAN CONSTRUCTION GROUP CO Ltd filed Critical JIANGXI ZHANGYAO CONSTRUCTION Co Ltd
Priority to CN201621400156.XU priority Critical patent/CN206289732U/en
Application granted granted Critical
Publication of CN206289732U publication Critical patent/CN206289732U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model is related to the outer shear wall antiseepage drainage system of a kind of active antiseepage basement shear wall, particularly shear wall upstream face.Basement is located in foundation ditch, and multiple sumps are set in basement surrounding, and drainpipe two ends are positioned in sump, and drainpipe connects integral;The basement it include basement roof, basement shear wall, basement bottom board;Backfill and medium coarse sand are filled with region in foundation ditch and on the outside of basement;Backfill is multilayer with the number of plies of medium coarse sand, and every layer of backfill and medium coarse sand are interlaced arrangement architecture, and drainpipe is located in medium coarse sand, filter membrane parcel drainpipe.The utility model is formed around drainage system in its basement shear wall, allows underground water and surface water to discharge on one's own initiative, so as to effectively guard against the influence of a large amount of underground water and surface water to basement shear wall, it is ensured that basement shearing is non-leakage.

Description

A kind of active antiseepage basement shear wall
Technical field
The utility model is related to a kind of active antiseepage basement shear wall, the particularly outer shear wall of shear wall upstream face to prevent Ooze drainage system.
Background technology
After the completion of basement main structure construction, its surrounding is required to do water-proofing treatment by the shear wall of upstream face, finishes The protection treatment of related waterproof layer is carried out afterwards, and basement backfilling of earthwork operation can be carried out after acceptance(check).This way is Normal conditions, the life-span of the use function of general waterproof roll is about 5-20 or so, and common buildings basement agent structure sets The meter life-span is about 40-70, and the Important building basement Design of Main Structure life-span is even up to 100 years.Once waterproof layer is used Disabler, carrys out waterproof by concrete structure itself entirely.Stayed in work progress set construction joint position, post-cast strip position and Meet cold seam position of construction set by construction requirement etc., if waterproof layer loses uses function, be easily caused with upper bit Infiltration.If facing precipitate heavy rain, the basement of waterproof layer protection is being lost, it is more likely that become a big pool, Caused economic loss will be difficult to estimate, or even have influence on the safety of owners and use function.At present, in underground In the waterproof layer design of room, its waterproof layer is generally twice waterproof roll, or even Important building is three to four times waterproof rolls, and this is just Substantial amounts of CO can be caused2Discharge, does not meet the strategic objective of China's energy-saving and emission-reduction.If meeting Spring In Southern plum rain season, underground Water level area higher, still occurs localized seepage, metope and ground humidity phenomenon.
It is extremely urgent basement shear wall antiseepage problem to be can be seen that from above-mentioned present situation.By increasing shear wall waterproof layer Quantity not only result in environmental pollution, and it is also possible to be unsatisfactory for requiring because the life-span of waterproof layer expires.So, development A kind of both simple and economic basement shear wall water-impervious construction technology seems particularly urgent.
Utility model content
Technical problem to be solved in the utility model is directed to the shortcoming of above-mentioned prior art, so that purpose is to provide A kind of active antiseepage basement shear wall.
The utility model to achieve these goals, is adopted the following technical scheme that:
A kind of active antiseepage basement shear wall, basement is located in foundation ditch, and multiple sumps are set in basement surrounding, Drainpipe two ends are positioned in sump, and drainpipe connects integral;
The basement it include basement roof, basement shear wall, basement bottom board;
Backfill and medium coarse sand are filled with region in foundation ditch and on the outside of basement;Backfill and medium coarse sand The number of plies is multilayer, and every layer of backfill and medium coarse sand are interlaced arrangement architecture, and drainpipe is located in medium coarse sand, filter membrane Parcel drainpipe.
Further, it is provided with hole on the drainpipe.
Its construction method is as follows:
(1), before basement surrounding backfilling of earthwork, first backfill first element soil to basement foundation ditch bottom position simultaneously press Real, it is necessary to which that there is the gradient of gravity flow water delivery middle arch camber both sides, the gradient is not less than 0.6%, i.e., lay slope along to both sides from base center Degree is not less than 0.6%;And in basement surrounding, sump is set, and be disposed about water pump in sump, so as to by ponding from catchmenting Extracted out in well;
(2), fill out blotter, spread filter membrane;One layer of blotter is filled out in the element soil bottom surface finished in backfill, and compacting puts down it It is whole, non-woven geotextile is laid thereon as filter membrane, non-woven geotextile will disconnect, and leave the length of overlap joint;
(3), drainpipe is put on filter membrane;The drainpipe of perisporium perforate is furnished on filter membrane, drainpipe two ends are positioned over In sump, drainpipe connects integral, and ensures the sealing of interface;
(4), filter membrane parcel drainpipe;The filter membrane being laid on the bottom surface of gutter is wrapped drainpipe from both sides;
(5), foundation ditch backfill;After drainpipe laying is finished, the less medium coarse sand of clay content is backfilled, substrate is backfilled to underground Room floor level;
(6), backfill second element soil to the position in the middle of basement foundation ditch and be compacted, there is gravity flow water delivery middle arch camber both sides The gradient, the gradient be not less than 0.6%, i.e., from base center along to both sides laying the gradient be not less than 0.6%;And import surrounding setting collection Well;
(7), fill out blotter for the second time, spread filter membrane, the same step of way(2);
(8), drainpipe, the same step of way are put on filter membrane(3);
(9), filter membrane parcel drainpipe, the same step of way(4);
(10), foundation ditch backfill, the same step of way(5);
(11), the 3rd road of backfill element soil and be compacted, it is necessary to there is the gradient of gravity flow water delivery middle arch camber both sides, and the gradient is not less than 0.6%, i.e., it is not less than 0.6% along to the both sides laying gradient from base center;And import surrounding setting sump;
(12), fill out blotter for the third time, spread filter membrane, the same step of way(2);
(13), drainpipe, the same step of way are put on filter membrane(3);
(14), filter membrane parcel drainpipe, the same step of way(4);
(15), foundation ditch backfill, the same step of way(5).
The beneficial effects of the utility model:
The utility model is formed around drainage system in its basement shear wall, allows underground water and surface water to arrange on one's own initiative Go out, so as to effectively guard against the influence of a large amount of underground water and surface water to basement shear wall, it is ensured that basement shearing is not permeable Leakage, and reduce waterproof layer thickness and pass, even if can also be played in the case where waterproof layer reaches the life-span or is damaged Active antiseepage leakproof, has reached the effect of dual guarantee.
Brief description of the drawings
Fig. 1 is the utility model drainage system floor plan schematic diagram.
Fig. 2 is the utility model drainage system sectional drawing schematic diagram.
Fig. 3 is the utility model drainage system elevational schematic view.
Specific embodiment
The utility model is further illustrated with implementation below in conjunction with the accompanying drawings.
A kind of active antiseepage basement shear wall, basement 3 is located in foundation ditch 4, and setting multiple in the surrounding of basement 3 catchments Well 1, the two ends of drainpipe 2 are positioned in sump 1, and drainpipe 2 connects integral;
The basement 3 it include basement roof 5, basement shear wall 6, basement bottom board 7;
Filled with backfill 8 and medium coarse sand 10 in foundation ditch 4 and in the region in the outside of basement 3;Backfill 8 is with The number of plies of coarse sand 10 is multilayer, and every layer of backfill 8 and medium coarse sand 10 are interlaced arrangement architecture, and drainpipe 2 is located at In medium coarse sand 10, filter membrane(9)Parcel drainpipe 2.
Hole 11 is provided with the drainpipe 2.
Construction method is as follows:
1), before basement surrounding backfilling of earthwork, first backfill first element soil to basement foundation ditch bottom position simultaneously press Real, it is necessary to which that there is the gradient of gravity flow water delivery middle arch camber both sides, the gradient is not less than 0.6%, i.e., lay slope along to both sides from base center Degree is not less than 0.6%;And in basement surrounding, sump is set, and be disposed about water pump in sump, so as to by ponding from catchmenting Extracted out in well;
(2), fill out blotter, spread filter membrane;One layer of blotter is filled out in the element soil bottom surface finished in backfill, and compacting puts down it It is whole, non-woven geotextile is laid thereon as filter membrane, non-woven geotextile will disconnect, and leave the length of overlap joint;
(3), drainpipe is put on filter membrane;The drainpipe of perisporium perforate is furnished on filter membrane, drainpipe two ends are positioned over In sump, drainpipe connects integral, and ensures the sealing of interface;
(4), filter membrane parcel drainpipe;The filter membrane being laid on the bottom surface of gutter is wrapped drainpipe from both sides;
(5), foundation ditch backfill;After drainpipe laying is finished, the less medium coarse sand of clay content is backfilled, substrate is backfilled to underground Room floor level;
(6), backfill second element soil to the position in the middle of basement foundation ditch and be compacted, there is gravity flow water delivery middle arch camber both sides The gradient, the gradient be not less than 0.6%, i.e., from base center along to both sides laying the gradient be not less than 0.6%;And import surrounding setting collection Well;
(7), fill out blotter for the second time, spread filter membrane, the same step of way(2);
(8), drainpipe, the same step of way are put on filter membrane(3);
(9), filter membrane parcel drainpipe, the same step of way(4);
(10), foundation ditch backfill, the same step of way(5);
(11), the 3rd road of backfill element soil and be compacted, it is necessary to there is the gradient of gravity flow water delivery middle arch camber both sides, and the gradient is not less than 0.6%, i.e., it is not less than 0.6% along to the both sides laying gradient from base center;And import surrounding setting sump;
(12), fill out blotter for the third time, spread filter membrane, the same step of way(2);
(13), drainpipe, the same step of way are put on filter membrane(3);
(14), filter membrane parcel drainpipe, the same step of way(4);
(15), foundation ditch backfill, the same step of way(5).

Claims (2)

1. a kind of active antiseepage basement shear wall, it is characterised in that:Basement(3)Positioned at foundation ditch(4)In, in basement(3) Surrounding sets multiple sumps(1), drainpipe(2)Two ends are positioned over sump(1)In, drainpipe(2)It is even integral;
The basement(3)It includes basement roof(5), basement shear wall(6), basement bottom board(7);
In foundation ditch(4)It is interior and in basement(3)Backfill is filled with the region in outside(8)With medium coarse sand(10);Backfill (8)With medium coarse sand(10)The number of plies be multilayer, and every layer of backfill(8)With medium coarse sand(10)It is interlaced arrangement knot Structure, drainpipe(2)Positioned at medium coarse sand(10)In, filter membrane(9)Parcel drainpipe(2).
2. active antiseepage basement shear wall according to claim 1, it is characterised in that:The drainpipe(2)On be provided with Hole(11).
CN201621400156.XU 2016-12-20 2016-12-20 A kind of active antiseepage basement shear wall Withdrawn - After Issue CN206289732U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621400156.XU CN206289732U (en) 2016-12-20 2016-12-20 A kind of active antiseepage basement shear wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621400156.XU CN206289732U (en) 2016-12-20 2016-12-20 A kind of active antiseepage basement shear wall

Publications (1)

Publication Number Publication Date
CN206289732U true CN206289732U (en) 2017-06-30

Family

ID=59104235

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621400156.XU Withdrawn - After Issue CN206289732U (en) 2016-12-20 2016-12-20 A kind of active antiseepage basement shear wall

Country Status (1)

Country Link
CN (1) CN206289732U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106480979A (en) * 2016-12-20 2017-03-08 江西中联建设集团有限公司 A kind of active antiseepage basement shear wall and its construction technology
CN108018885A (en) * 2017-12-05 2018-05-11 中建四局第五建筑工程有限公司 A kind of Novel underground room seepage treatment structure and method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106480979A (en) * 2016-12-20 2017-03-08 江西中联建设集团有限公司 A kind of active antiseepage basement shear wall and its construction technology
CN106480979B (en) * 2016-12-20 2019-07-09 中联建设集团股份有限公司 A kind of active antiseepage basement shear wall and its construction technology
CN108018885A (en) * 2017-12-05 2018-05-11 中建四局第五建筑工程有限公司 A kind of Novel underground room seepage treatment structure and method

Similar Documents

Publication Publication Date Title
CN102995599B (en) Anti-freeze anti-seepage water diversion treatment method of collapsible loess water-conveyance canal
CN103410175B (en) A kind of water seepage control construction method for karst water-rich geological underground structure waterproof construction
CN202926388U (en) Drainage facility for road surface bubbling water of highway tunnel
CN106638918A (en) Construction method for sponge city rainwater collection system
CN104514216B (en) A kind of canal on embankment frost heaving resistant leakage preventing structure and construction method
CN109488371B (en) Waterproof system of full-enclosed waterproof station and dynamic setting and quantity-limiting drainage method
CN107386326A (en) Underground pipe gallery structure and its construction method
CN103046565A (en) Draining method for ultra-deep batholith deep foundation pit
CN212052626U (en) Concrete panel rock-fill dam with multiple anti-seepage structure
CN206289732U (en) A kind of active antiseepage basement shear wall
CN105672443B (en) Structure integrating anchoring of anti-seepage film, flood interception and passing
CN107100206A (en) A kind of prevention and controls of basement leakage
CN104196046B (en) Reduce the water proof drainage system of underground hydrostatic water table
CN106480979B (en) A kind of active antiseepage basement shear wall and its construction technology
CN207891929U (en) A kind of ecotype Tailings Dam leakage preventing structure
CN212104515U (en) Be used for basement percolating water prevention and cure construction structures
CN205804423U (en) A kind of discharge structure of basement
CN206477347U (en) The water storage structure of basement
CN208619166U (en) Waterproof drainage structure of tunnel roof
CN108755724A (en) The external water drainage waterproof method of pipe gallery
CN105421499B (en) A kind of ground storehouse anti-floating construction method
CN210712967U (en) Impervious anti structure that floats of basement
CN214657275U (en) Self-flowing drainage pressure-limiting anti-floating structure
CN115012452A (en) Post-cast strip construction process and basement drainage pressure relief structure
CN204023593U (en) Reduce the water proof drainage system of underground hydrostatic water table

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20170630

Effective date of abandoning: 20190709

AV01 Patent right actively abandoned