CN207829371U - Whole paving marble floor structure on a kind of raised flooring - Google Patents

Whole paving marble floor structure on a kind of raised flooring Download PDF

Info

Publication number
CN207829371U
CN207829371U CN201721665777.5U CN201721665777U CN207829371U CN 207829371 U CN207829371 U CN 207829371U CN 201721665777 U CN201721665777 U CN 201721665777U CN 207829371 U CN207829371 U CN 207829371U
Authority
CN
China
Prior art keywords
wall
pipe trench
raised flooring
subregion
leads
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721665777.5U
Other languages
Chinese (zh)
Inventor
代辉
陶晓华
陈世杰
周新中
鲍文江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI KANGYE BUILDING DECORATION ENGINEERING Co Ltd
Original Assignee
SHANGHAI KANGYE BUILDING DECORATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI KANGYE BUILDING DECORATION ENGINEERING Co Ltd filed Critical SHANGHAI KANGYE BUILDING DECORATION ENGINEERING Co Ltd
Priority to CN201721665777.5U priority Critical patent/CN207829371U/en
Application granted granted Critical
Publication of CN207829371U publication Critical patent/CN207829371U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Floor Finish (AREA)

Abstract

The utility model is related to whole paving marble floor structures on a kind of raised flooring, wall is led including pipe trench, subregion leads wall, pipe trench is led to be provided with pipe trench and leads joist within the walls, subregion is led to be provided with subregion and leads joist within the walls, subregion leads upper surface of the upper surface not less than raised flooring of wall, pipe trench leads in the pipe trench between wall and is provided with installation pipe, pipe trench, which is led, is equipped with hot-dip galvanizing sheet steel on wall, hot-dip galvanizing sheet steel is equipped with steel wire, pipe trench holder is installed in pipe trench below hot-dip galvanizing sheet steel, pipe trench, which is led, is equipped with aerial floor stand on the outside of wall, raised flooring is equipped on aerial floor stand, raised flooring is equipped with reinforced concrete floor, bar-mat reinforcement is equipped in reinforced concrete floor, reinforced concrete floor, the upper surface of hot-dip galvanizing sheet steel is equipped with cement mortar stone material adhesive layer, it is covered with terrace stone on cement mortar stone material adhesive layer;The utility model avoids displacement caused by the construction of large area raised flooring, reduces the weight issue of concrete lift, shortens construction period.

Description

Whole paving marble floor structure on a kind of raised flooring
[technical field]
The utility model is related to building ground floor technical field, whole paving marble on specifically a kind of raised flooring Floor structure.
[background technology]
In order to achieve the effect that fit up air, solemnity, entire wall body, ground can all use paving day for present building hall The decoration scheme of right stone material.Due to the intelligence currently built and modernization development, if it has to which multi-configuration has gone out the too many modern times The device for changing electric information has just had more many pipelines to reach corresponding requirement, while it is difficult to have drawn all kinds of maintenance Topic.The general issue pipeline of hiding for solving decorative ground is to use raised flooring laying technology, raises ground, is arranged under raised flooring Cloth pipeline.Currently, the technical solution that raised flooring is lifted is used mostly for the pipeline maintenance in this office building in the industry, But it uses in Office Area, and the fabrics class such as more paving carpets of finishing material is convenient for glued material more.But hall ground is again It is laid with marble architectural surface, since hall's area is excessive, raised flooring large area is equipped with certain activity, makes somebody a mere figurehead ground Although the face layer of plate can reach load-bearing requirements, stabilizer blade cannot meet the stability of large area stone laying, bring The problem of Cracking of face wet combining stone material, intolerant to using.
Another solution is then to pour thick concrete layer, reserves pipeline guide groove, though it can also reach beautiful decoration And maintenance effect, but thick concrete layer brings huge load-bearing pressure to basement roofing, is unfavorable for building safety. Single marble paving obviously cannot meet electrical overhaul needs.
If in conclusion being intended to reach the arrangement needs that finishing effect meets electromechanical pipeline again, if it has in addition seek Look for arrangement and method for construction.
[utility model content]
The purpose of this utility model seeks to solve above-mentioned deficiency and provides whole paving Dali on a kind of raised flooring Stone floor structure avoids displacement caused by the construction of large area raised flooring, greatly reduces the weight of concrete lift Problem, while construction period is shortened, it solves the problems, such as to be unable to large area paving stone material on raised flooring.
Design whole paving marble floor structure on a kind of raised flooring to achieve the above object, including pipe trench lead wall 1, Subregion leads wall 13, hot-dip galvanizing sheet steel 5, pipe trench holder 6, raised flooring 3, aerial floor stand 12, terrace stone 8, the pipe trench Lead and be provided with pipe trench in wall 1 and lead joist 2, the subregion, which is led, to be provided with subregion and leads joist 14 in wall 13, the pipe trench lead wall 1, point Area leads that wall 13 leads joist 2 by pipe trench respectively, subregion is led joist 14 and fixed on the ground, and the subregion leads the setting of wall 13 aerial Between floor 3, the subregion leads upper surface of the upper surface not less than raised flooring 3 of wall 13, and the pipe trench leads the pipe trench between wall 1 It is inside provided with installation pipe 4, the pipe trench leads and is equipped with hot-dip galvanizing sheet steel 5 on wall 1, and the hot-dip galvanizing sheet steel 5 is equipped with one layer of steel Silk screen 7, the lower section of hot-dip galvanizing sheet steel 5 is equipped with pipe trench holder 6 in the pipe trench, and the pipe trench holder 6 is used to support galvanizing Steel plate 5, the pipe trench lead 1 outside of wall and are equipped with multiple aerial floor stands 12, be equipped on the aerial floor stand 12 aerial Floor 3, the raised flooring 3 are equipped with reinforced concrete floor 11, and bar-mat reinforcement 10 is equipped in the reinforced concrete floor 11, described Reinforced concrete floor 11, hot-dip galvanizing sheet steel 5 upper surface be equipped with cement mortar stone material adhesive layer 9, the cement mortar stone material Terrace stone 8 is equipped on adhesive layer 9.
Further, the subregion is led the upper surface of wall 13 and is flushed with the lower surface of bar-mat reinforcement 10, and the subregion leads wall 13 It is arranged between two adjacent aerial floor stands 12, and one is fixedly connected as with two aerial floor stands 12 Body.
Further, the thickness of the cement mortar stone material adhesive layer 9 is 40-55mm, and the raised flooring 3 is 50mm thick Calcium silicates raised flooring.
Further, the pipe trench leads joist 2, subregion is led joist 14 and is made of main reinforcement and stirrup, and main ribs use The screw-thread steel of diameter 10mm is made, and the stirrup is made of the circular steel of diameter 6mm.
Further, expansion joint is reserved between the terrace stone 8, the expansion joint is for preventing 8 heat expansion of terrace stone Shrinkage is filled with gap filler 15 in the expansion joint.
Further, manhole is preset on the hot-dip galvanizing sheet steel 5, the manhole upper cover is equipped with cover board, the lid Plate matches with terrace stone 8.
The utility model compared with the existing technology, has the following advantages that:
(1) by using walled shield is led, concrete binder course is fixed and is combined, applied so as to avoid large area raised flooring Displacement caused by work, on the raised flooring that terminated can only paving carpet old technology, and greatly reduce concrete lift Weight issue, while shortening construction period;
(2) solve the problems, such as to be unable to large area paving stone material on raised flooring also solve to raise ground and band The basement roof-bearing problem come, while being also convenient for underground piping and having walked, easy access;
(3) reduce the environmental pollutions such as noise pollution, dust pollution and the building sewage that a large amount of concrete constructions are brought, make Decorative effect caused by natural marble is obtained to be able to retain and develop.
[description of the drawings]
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is that the utility model subregion leads structural schematic diagram at wall;
In figure:1, pipe trench leads wall 2, pipe trench leads joist 3, raised flooring 4, installation pipe 5, hot-dip galvanizing sheet steel 6, pipe trench Holder 7, steel wire 8, terrace stone 9, cement mortar stone material adhesive layer 10, bar-mat reinforcement 11, reinforced concrete floor 12, frame Vacant lot board mount 13, subregion lead wall 14, subregion leads joist 15, gap filler.
[specific implementation mode]
The utility model is made below in conjunction with the accompanying drawings further explained below:
As shown in the picture, the utility model includes:Pipe trench leads wall 1, subregion leads wall 13, hot-dip galvanizing sheet steel 5, pipe trench holder 6, Raised flooring 3, aerial floor stand 12, terrace stone 8, pipe trench, which is led, to be provided with pipe trench and leads joist 2 in wall 1, subregion is led in wall 13 It is provided with subregion and leads joist 14, pipe trench leads wall 1, subregion leads that wall 13 leads joist 2 by pipe trench respectively, subregion is led joist 14 and is fixed on On ground, subregion is led wall 13 and is arranged between raised flooring 3, and subregion leads upper surface of the upper surface not less than raised flooring 3 of wall 13, Pipe trench leads in the pipe trench between wall 1 and is provided with installation pipe 4, and for the size of the installation pipe 4 depending on requirement of engineering, pipe trench leads wall 1 On be equipped with hot-dip galvanizing sheet steel 5, hot-dip galvanizing sheet steel 5 is equipped with the steel wire 7 of one layer of a diameter of 2mm, hot-dip galvanizing sheet steel 5 in pipe trench Lower section pipe trench holder 6 is installed, pipe trench holder 6 is used to support hot-dip galvanizing sheet steel 5, pipe trench lead 1 outside of wall be equipped with it is multiple aerial Floor stand 12, raised flooring 3 is equipped on aerial floor stand 12, and raised flooring 3 is equipped with reinforced concrete floor 11, reinforcing bar The bar-mat reinforcement 10 of a diameter of 6mm is equipped in concrete layer 11, which can increase the intensity of entire cement binder course, reinforcing bar Concrete layer 11, hot-dip galvanizing sheet steel 5 upper surface be equipped with cement mortar stone material adhesive layer 9, on cement mortar stone material adhesive layer 9 It is equipped with terrace stone 8.
Wherein, subregion is led the upper surface of wall 13 and is flushed with the lower surface of bar-mat reinforcement 10, and subregion is led wall 13 and is arranged adjacent Between two aerial floor stands 12, and with two aerial floor stands 12 be connected to one;Cement mortar stone material is glutinous The thickness of paste layer 9 is 40-55mm (dividing joint-cutting, easy access according to terrace stone), and raised flooring 3 is 50mm thickness 600* The calcium silicates raised flooring of 600mm, hot-dip galvanizing sheet steel 5 are 10mm thick, can increase partial operation, pipe trench holder 6, raised flooring Holder 12 is galvanizing overstriking customization support, the structure for being in " I " fonts for longitudinal section;Pipe trench leads joist 2, subregion leads joist 14 are made of main reinforcement and stirrup, and main reinforcement is made of the screw-thread steel of diameter 10mm, and stirrup uses the round steel of diameter 6mm At;Expansion joint is reserved between terrace stone 8, expansion joint is for preventing terrace stone 8 from expanding with heat and contract with cold, filled with dark color in expansion joint Gap filler 15;Manhole is preset on hot-dip galvanizing sheet steel 5, manhole upper cover is equipped with cover board, cover board and 8 phase of terrace stone Match, terrace stone 8 is 20mm thick, depending on engine request.
The utility model can solve the limitation of original stone material and raised flooring construction, initiative to spread raised flooring Combination is optimized in patch technology, stone material paving technology and concrete guide wall pouring construction technology, to solve aerial ground The problem of large area paving stone material is unable on plate, also solves the problems, such as the basement roof-bearing brought to raise ground, It is also convenient for underground piping simultaneously to walk, easy access, has reached the requirement of beautification hall.Whole paving Dali on the raised flooring Stone floor structure, construction include mainly raised flooring installation, lead wall pouring technique etc., and concrete construction method is as follows:
(1) construction of wall is led on ground.First in surface drilling, bar planting, then branching standing template, if entire hall is separated into Dry fritter, every piece of area are less than 25 square metres, then start surface line slot, stringing;Assembling reinforcement again finally carries out coagulation Soil pours, and in order to ensure the intensity of concrete, carries out form removal again after need to reaching concrete solidification completely and raised flooring is laid with Construction.
(2) construction of raised flooring.Whether the intensity for first checking for concrete guide wall reaches the intensity of raised flooring construction, Then the default actual height for leading wall is measured, after height determines, then configures aerial floor stand, ensures raised flooring installation Height is consistent with wall is led, and can ensure that raised flooring installation is entrenched in this way and lead within wall, it is ensured that raised flooring is being led Displacement is avoided under walled shield.
(3) concreting binder course is used on raised flooring.It is laid with bar-mat reinforcement first, is poured again after inspection.It should be noted The thickness of binder course is stayed, joint thickness is too low, the phenomenon that causing concrete sky paddy, crack, will cause surface in this way The cracking of stone material;The weight that this structure can be then aggravated if thickness is blocked up brings load-bearing pressure, with 40- to basement roofing The thickness of 55mm is advisable.It is noted that having stayed the maintenance position of service conduits wire casing before casting concrete binder course, maintenance is preset Hole customizes cover board, mutually arranges in pairs or groups with ground marble.
(4) paving stone material.Checking whether completely solidification reaches construction requirement to ground binder course at this time, so that it may to start The paving of ground stone when paving stone material, needs first to have stayed expansion joint, avoids bringing stone material to crack due to expanding with heat and contract with cold The problem of empty paddy.
The utility model is simultaneously not limited to the embodiments described above, and other any spirit without departing from the utility model are real Changes, modifications, substitutions, combinations, simplifications made by under matter and principle, should be equivalent substitute mode, are included in this practicality Within novel protection domain.

Claims (6)

1. whole paving marble floor structure on a kind of raised flooring, it is characterised in that:Wall (1) is led including pipe trench, subregion is led Wall (13), hot-dip galvanizing sheet steel (5), pipe trench holder (6), raised flooring (3), aerial floor stand (12), terrace stone (8), institute It states pipe trench and leads and be provided with pipe trench in wall (1) and lead joist (2), the subregion, which is led, to be provided with subregion in wall (13) and lead joist (14), institute State that pipe trench leads wall (1), subregion leads that wall (13) leads joist (2) by pipe trench respectively, subregion is led joist (14) and fixed on the ground, institute It states subregion and leads wall (13) setting between raised flooring (3), the subregion leads the upper surface of wall (13) not less than raised flooring (3) Upper surface, the pipe trench lead and are provided with installation pipe (4) in the pipe trench between wall (1), and the pipe trench leads and is equipped with hot dip on wall (1) Zinc steel plate (5), the hot-dip galvanizing sheet steel (5) are equipped with layer of steel wire net (7), the lower section of hot-dip galvanizing sheet steel (5) in the pipe trench Pipe trench holder (6) is installed, the pipe trench holder (6) is used to support hot-dip galvanizing sheet steel (5), and the pipe trench is led and set on the outside of wall (1) There are multiple aerial floor stands (12), raised flooring (3), the raised flooring are equipped on the aerial floor stand (12) (3) it is equipped with reinforced concrete floor (11), bar-mat reinforcement (10), the armored concrete are equipped in the reinforced concrete floor (11) Layer (11), hot-dip galvanizing sheet steel (5) upper surface be equipped with cement mortar stone material adhesive layer (9), the cement mortar stone material is pasted It is equipped with terrace stone (8) on layer (9).
2. whole paving marble floor structure on raised flooring as described in claim 1, it is characterised in that:The subregion is led The upper surface of wall (13) is flushed with the lower surface of bar-mat reinforcement (10), and the subregion leads wall (13) and the aerial ground at adjacent two is arranged Between board mount (12), and it is connected to one with two aerial floor stands (12).
3. whole paving marble floor structure on raised flooring as claimed in claim 1 or 2, it is characterised in that:The water The thickness of cement mortar stone material adhesive layer (9) is 40-55mm, and the raised flooring (3) is the calcium silicates raised flooring of 50mm thickness.
4. whole paving marble floor structure on raised flooring as claimed in claim 3, it is characterised in that:The pipe trench is led Joist (2), subregion are led joist (14) and are made of main reinforcement and stirrup, and main ribs are made of the screw-thread steel of diameter 10mm, institute Stirrup is stated to be made of the circular steel of diameter 6mm.
5. whole paving marble floor structure on raised flooring as claimed in claim 4, it is characterised in that:The terrace stone Expansion joint is reserved between material (8), the expansion joint is filled with for preventing terrace stone (8) from expanding with heat and contract with cold in the expansion joint Gap filler (15).
6. whole paving marble floor structure on raised flooring as claimed in claim 5, it is characterised in that:The galvanizing Manhole is preset on steel plate (5), the manhole upper cover is equipped with cover board, and the cover board matches with terrace stone (8).
CN201721665777.5U 2017-12-04 2017-12-04 Whole paving marble floor structure on a kind of raised flooring Expired - Fee Related CN207829371U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721665777.5U CN207829371U (en) 2017-12-04 2017-12-04 Whole paving marble floor structure on a kind of raised flooring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721665777.5U CN207829371U (en) 2017-12-04 2017-12-04 Whole paving marble floor structure on a kind of raised flooring

Publications (1)

Publication Number Publication Date
CN207829371U true CN207829371U (en) 2018-09-07

Family

ID=63387014

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721665777.5U Expired - Fee Related CN207829371U (en) 2017-12-04 2017-12-04 Whole paving marble floor structure on a kind of raised flooring

Country Status (1)

Country Link
CN (1) CN207829371U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115288372A (en) * 2022-08-19 2022-11-04 中交第四公路工程局有限公司 Sound insulation and vibration reduction overhead stone roof structure and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115288372A (en) * 2022-08-19 2022-11-04 中交第四公路工程局有限公司 Sound insulation and vibration reduction overhead stone roof structure and construction method

Similar Documents

Publication Publication Date Title
CN106677440A (en) Roofing parapet water-floating structure and construction method thereof
CN104358341A (en) Building brickwork and masonry construction method of building brickwork
CN106522359A (en) Total-prefabricated rural residential class composite wall structure system and construction method thereof
CN107447948A (en) A kind of construction technology of subsided rest room
CN102061749A (en) External wall heat insulation system with fireproofing function and manufacturing method thereof
CN103806647A (en) Assembly and disassembly process for large-span concrete bidirectional dense rib beam formwork case
CN207194619U (en) A kind of assembled regeneration concrete enclosure wall
CN106958358A (en) The industrialization commercial residential buildings of energy-conserving and environment-protective
CN103615076A (en) Concrete construction method for big-gradient sloping roof
CN208777468U (en) A kind of kitchen and bath's water-proofing anticracking structure
CN203394108U (en) Fabricated bathroom
CN209145323U (en) Balcony is transformed in the low energy consumption of existing building
CN109797777A (en) Assembled is constructed from sealing underground pipe gallery and construction method
CN100507173C (en) Pre-seal structure of post-subsidence pouring belt and construction method thereof
CN207829371U (en) Whole paving marble floor structure on a kind of raised flooring
CN103266676A (en) Preparation method of film-coated rock wool board heat insulation system for building curtain wall
CN208717952U (en) A kind of reserved passage construction device of basement post-pouring zone
CN204645093U (en) Poured band of outer wall of basement advanced processing constructs
CN207672616U (en) A kind of outdoor cable penetration pipe is passed by one's way laying structure
CN204551694U (en) A kind of pre-buried type balcony floor drain
CN206681418U (en) The industrialization commercial residential buildings of energy-conserving and environment-protective
CN206916767U (en) A kind of prefabricated assembled elevator basis
CN206205166U (en) It is a kind of can synchronous crossed construction outer wall of basement waterproofing protection structure
CN206189906U (en) Bathroom room
CN206635786U (en) Prefabricated assembled transformer substation foundation structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180907

Termination date: 20181204

CF01 Termination of patent right due to non-payment of annual fee