CN113605635A - Anti-leakage device for floor heating in toilet - Google Patents

Anti-leakage device for floor heating in toilet Download PDF

Info

Publication number
CN113605635A
CN113605635A CN202110925570.1A CN202110925570A CN113605635A CN 113605635 A CN113605635 A CN 113605635A CN 202110925570 A CN202110925570 A CN 202110925570A CN 113605635 A CN113605635 A CN 113605635A
Authority
CN
China
Prior art keywords
layer
floor heating
toilet
leakage
heating pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110925570.1A
Other languages
Chinese (zh)
Inventor
颜伟阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shengdu Household Decoration Co ltd
Original Assignee
Shengdu Household Decoration Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shengdu Household Decoration Co ltd filed Critical Shengdu Household Decoration Co ltd
Priority to CN202110925570.1A priority Critical patent/CN113605635A/en
Publication of CN113605635A publication Critical patent/CN113605635A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/18Separately-laid insulating layers; Other additional insulating measures; Floating floors
    • E04F15/181Insulating layers integrally formed with the flooring or the flooring elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/665Sheets or foils impervious to water and water vapor
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/18Status alarms
    • G08B21/187Machine fault alarms
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B3/00Audible signalling systems; Audible personal calling systems
    • G08B3/10Audible signalling systems; Audible personal calling systems using electric transmission; using electromagnetic transmission

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • General Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Floor Finish (AREA)
  • Central Heating Systems (AREA)

Abstract

The invention provides a floor heating antiseep device for a toilet, which belongs to the technical field of antiseep engineering and comprises a toilet wall body, wherein a doorsill is arranged at the front part of the upper inner wall of the toilet wall body, a structural layer, an isolating layer, a waterproof layer, a first leveling layer, a filling layer, a second leveling layer and a decorative surface layer are sequentially paved on the upper inner wall of the toilet wall body from bottom to top, a floor heating pipe is arranged in the filling layer, the starting end and the tail end of the floor heating pipe penetrate through the doorsill and extend outwards, a plug is arranged at the joint of the floor heating pipe and the doorsill, the waterproof layer is provided with a slope with a middle part higher than two side bottoms, the whole device has reasonable structure, ingenious conception and convenient construction, improves the antiseep grade of the toilet with floor heating, can remind and find the leakage in time when the leakage occurs in the toilet, stop the loss in time, prevent more loss, and simultaneously avoid the leakage of the common leakage to other rooms along the floor heating, causing mildew and the like, and has strong practicability.

Description

Anti-leakage device for floor heating in toilet
Technical Field
The invention belongs to the technical field of anti-leakage engineering, and particularly relates to an anti-leakage device for floor heating in a toilet.
Background
In the north, heating is needed in winter, the existing heating carriers include a plurality of radiators, ground heating pipes, heat conducting wires and the like, ground heating is widely used due to simple and mature construction, low cost and space saving, ground heating construction is carried out on a concrete floor, an insulation board is arranged on the concrete floor, subsequent construction is carried out on the insulation board, an expansion joint of about 1 cm is reserved between the insulation board and the surrounding wall surface, when the concrete floor is constructed, cracks are easy to occur due to various reasons and water seepage is caused, once water leakage occurs after construction is finished, water enters the concrete floor below the insulation board through the expansion joint, so that the water leaks to the downstairs, huge economic loss is caused to a leaking party and a leaking party, and the water leaks to other rooms through the ground heating pipes, long-time leakage is not easy to discover and easy to cause mildew or other irreversible influences of the rooms, therefore, the floor heating anti-leakage device for the toilet is designed.
Disclosure of Invention
The invention aims to provide a floor heating anti-leakage device for a toilet, and aims to solve the problems that in the prior art, when water leaks from the toilet with the floor heating, the water enters a concrete floor slab below a heat insulation plate through an expansion joint and leaks to the downstairs, huge economic loss is caused to the leaking part and the leaking part, and the other leakage mode is that the water leaks to other rooms through a floor heating pipe, so that the long-time leakage is not easy to find, and the mildewing or other irreversible influences of the rooms are easy to cause.
In order to achieve the purpose, the invention provides the following technical scheme:
the utility model provides an antiseep device warms up bathroom includes the bathroom wall body, the last inner wall front portion of bathroom wall body is provided with the threshold, structural layer, isolation layer, waterproof layer, first screed-coat, filling layer, second screed-coat and architectural surface have been laid in proper order to inner wall on the bathroom wall body from bottom to top, be provided with the ground heating coil in the filling layer, the beginning end of ground heating coil all runs through the threshold and outwards extends, the ground heating coil is provided with the end cap with the junction of threshold, the waterproof layer is provided with the slope at the bottom of the high both sides in middle of, the inner wall is provided with the small opening about the bathroom wall body, all be provided with the detector of leaking on the lateral wall about the bathroom wall body, and two detectors of leaking communicate with two small openings respectively.
Preferably, the two leakage grooves are respectively positioned at the left side and the right side of the waterproof layer, a gap between the waterproof layer and the first leveling layer is communicated with the two leakage grooves, and the bottoms of the two leakage grooves are lower than the bottommost parts of the two waterproof layers.
Preferably, the starting end and the tail end of the floor heating pipe are both communicated with water pipe connectors, and the two water pipe connectors are respectively communicated with an external water inlet pipe and an external water outlet pipe.
Preferably, be provided with the extension layer of laminating mutually with the inner wall of bathroom wall body on the isolation layer, and the parcel has the ground heating coil in the extension layer.
Preferably, the two water leakage detectors are electrically connected with buzzers, and the two buzzers are electrically connected with an external power supply.
Preferably, a foam plastic heat insulation layer matched with the ground heating pipe is arranged in the filling layer, and the foam plastic heat insulation layer is attached to the ground heating pipe.
Preferably, a pure aluminum mirror reflection film is arranged between the filling layer and the ground heating pipe, and the pure aluminum mirror reflection film is attached to the ground heating pipe.
Preferably, a leakage stoppage king paint is coated between the doorsill and the lower inner wall of the toilet wall body, and the height of the leakage stoppage king paint is higher than the highest height of the floor heating pipe.
Preferably, the floor heating pipes are spirally laid in the toilet wall body at equal intervals, and the height of the doorsill is higher than the height of the top of the decorative surface layer.
Preferably, tie up fixedly through a plurality of bandages between ground heating coil and the pure aluminium specular reflection membrane, it is a plurality of the bandage all is provided with ground heating coil assorted radian.
Compared with the prior art, the invention has the beneficial effects that:
1. in the scheme, the whole device is reasonable in structure arrangement, ingenious in conception and convenient and fast to construct, the anti-leakage grade of the bathroom with the floor heating system is improved, the toilet can remind and find in time when leakage occurs in the bathroom, damage can be stopped in time, more loss can be prevented, meanwhile, the phenomenon that the common leakage water leaks to other rooms along the floor heating system to cause mildew and the like can be avoided, the practicability is high, the problem that the toilet with the floor heating system in the prior art leaks water, the water can enter a concrete floor slab below a heat insulation plate through expansion joints and then leaks to the downstairs, huge economic loss is caused to a leaking party and a leaking party is solved, the other leakage mode is that the water leaks to other rooms through the floor heating pipes, the problem that the mildew or other influences of the rooms are easily caused and the long-time leakage is not found easily caused is solved, and when the floor heating system is used, the structural layer, the isolation layer and the construction are irreversible, The waterproof layer, the first leveling layer, the filling layer, the second leveling layer and the decorative surface layer are sequentially laid on the lower inner wall of the toilet wall body, after the first leveling layer is laid, the floor heating pipe is firstly laid above the first leveling layer, then the filling layer is filled in a gap between the spiral floor heating pipe, the starting end and the tail end of the floor heating pipe penetrate and extend towards the front side of the doorsill, meanwhile, the two connecting parts of the floor heating pipe and the doorsill are respectively provided with a plug which can prevent leakage water from flowing out through the floor heating pipe, after the whole construction is finished, a layer of waterproof layer is added on the original leakage-proof standard, the double waterproof can further improve the leakage-proof grade in the whole toilet, and once the leakage occurs inside the toilet due to special reasons, the waterproof layer is provided with a structure with two high side bottoms in the middle and can guide the leaked water to the leakage grooves on the left side wall and the right side wall of the toilet wall body, once water appears in the leakage groove, the two water leakage detectors can detect and find the water in the leakage groove, so that the water leakage condition of the toilet can be found in time, and the loss can be stopped in time;
2. in the scheme, the two leakage grooves are respectively positioned at the left side and the right side of the waterproof layer and can conduct flow guide through the gradient of the waterproof layer after leakage water seeps, so that water is collected to the two leakage grooves, the two water pipe joints are respectively communicated with the external water inlet pipe and the water outlet pipe, the problem that the pipe is required to be additionally slotted after the toilet construction is avoided is solved, the convenience of connecting the floor heating pipe with the outside is improved, the whole isolation layer can wrap the multilayer structure in the toilet wall body by the extension layer which is attached to the inner wall of the toilet wall body, the isolation and waterproof effects of the whole isolation layer are improved, the two water leakage detectors are electrically connected with the buzzer, so that once one water leakage detector detects the water, an electric signal is transmitted to the buzzer to send out a water leakage alarm to prompt a user to check the condition of the toilet in time, the foam plastic heat insulation layer which is matched with the floor heating pipe is arranged in the filling layer to reduce the reverse loss speed of hot water in the floor heating pipe, the pure aluminium mirror reflection membrane set up and has improved ground heating coil to the internal heating effect of bathroom wall, scribble the highest high leaking stoppage royal coating that is higher than ground heating coil between the lower inner wall of threshold and bathroom wall, can further be to the prevention effect that the percolating water outwards oozes along ground heating coil, it can be even to the internal heating effect of bathroom wall to spiral laying ground heating coil in the bathroom wall to be the equidistance with ground heating coil, the condition that certain regional overheat or certain regional subcooling can not appear takes place, it can improve the construction convenience to ground heating coil to tie up fixedly through a plurality of ribbons between ground heating coil and the pure aluminium mirror reflection membrane, the fixed effect after laying ground heating coil has also been improved.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the principles of the invention and not to limit the invention. In the drawings:
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an exploded view of the present invention;
FIG. 3 is a top view of the present invention;
FIG. 4 is a partial cross-sectional view taken at A-A of FIG. 3 in accordance with the present invention;
FIG. 5 is a second perspective view of FIG. 2 according to the present invention.
In the figure: 1. a toilet wall; 2. a threshold; 3. a structural layer; 4. an isolation layer; 5. a waterproof layer; 6. a first leveling layer; 7. a ground heating pipe; 8. a plug; 9. a filling layer; 10. a second leveling layer; 11. decorating the surface layer; 12. a water leakage detector; 13. a water pipe joint.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides the following technical solutions: the utility model provides a antiseep device warms up bathroom includes bathroom wall body 1, bathroom wall body 1's last inner wall front portion is provided with threshold 2, structural layer 3 has been laid in proper order to inner wall from bottom to top on bathroom wall body 1, isolation layer 4, waterproof layer 5, first screed-coat 6, filling layer 9, second screed-coat 10 and architectural surface 11, be provided with ground heating coil 7 in the filling layer 9, ground heating coil 7's top and end all runs through threshold 2 and outwards extends, ground heating coil 7 is provided with end cap 8 with threshold 2's junction, waterproof layer 5 is provided with the slope at the bottom of the high both sides in the middle of, inner wall is provided with the small opening about bathroom wall body 1, all be provided with leak water detector 12 on the lateral wall about bathroom wall body 1, and two leak water detector 12 communicate with two small openings respectively.
In the specific embodiment of the invention, the whole device is reasonable in structure arrangement, ingenious in conception and convenient and fast to construct, the anti-leakage grade of a bathroom with a floor heating system is improved, the toilet can be reminded and found in time when leakage occurs in the bathroom, loss can be stopped in time, more loss can be prevented, the phenomenon that the common leakage water leaks to other rooms along the floor heating system and mildew occurs can be avoided, the practicability is high, the problems that the toilet with the floor heating system leaks water, the water enters a concrete floor slab below a heat insulation board through an expansion joint and leaks to the downstairs, huge economic loss is caused to the leaking party and the leaking party are solved, the other leakage mode is that the water leaks to other rooms through a floor heating pipe, the long-time leakage is not found easily, and the mildew or other irreversible influences of the rooms are easily caused are solved The isolation layer 4, the waterproof layer 5, the first leveling layer 6, the filling layer 9, the second leveling layer 10 and the decorative surface layer 11 are sequentially laid on the lower inner wall of the toilet wall body 1, wherein after the first leveling layer 6 is laid, the ground heating pipe 7 is laid above the first leveling layer 6, then the gap between the spiral ground heating pipe 7 is filled with the filling layer 9, the starting end and the tail end of the ground heating pipe 7 penetrate and extend towards the front side of the doorsill 2, meanwhile, the plugs 8 are arranged at two connecting positions of the ground heating pipe 7 and the doorsill 2 to prevent leakage water from flowing out through the ground heating pipe 7, after all construction is finished, a layer of waterproof layer is added on the original leakage-proof standard, double waterproof can further improve the leakage-proof grade in the whole toilet, and once leakage occurs inside due to special reasons, the waterproof layer 5 is provided with a structure with middle high two side bottoms to guide the leakage water to leakage grooves on the left side wall body and the right side wall body 1 of the toilet wall body, once water appears in the leakage groove, the two water leakage detectors 12 can detect and find the water in the leakage groove, the water leakage situation of the toilet can be found in time, and loss can be stopped in time.
Specifically, two small holes are located the left and right sides of waterproof layer 5 respectively, and the clearance between waterproof layer 5 and the first screed-coat 6 communicates with two small holes, and the bottom of two small holes is less than two waterproof layer 5 bottommost.
In this embodiment: the two leakage grooves are respectively positioned at the left side and the right side of the waterproof layer 5, and can conduct flow guide through the gradient of the waterproof layer 5 after water seepage occurs, so that water is collected to the two leakage grooves.
Specifically, the beginning and the end of the floor heating pipe 7 are both communicated with water pipe connectors 13, and the two water pipe connectors 13 are respectively communicated with an external water inlet pipe and an external water outlet pipe.
In this embodiment: two water pipe head 13 communicate with outside inlet tube and outlet pipe respectively can avoid taking over again after the bathroom construction and still need additionally fluting, have improved ground heating coil 7 and externally connected's convenient degree.
Specifically, the isolation layer 4 is provided with an extension layer attached to the inner wall of the toilet wall 1, and the extension layer is wrapped by the ground heating pipe 7.
In this embodiment: be provided with on isolation layer 4 with the extension layer of the interior wall looks laminating of bathroom wall body 1 can let whole isolation layer 4 wrap up multilayer structure in to bathroom wall body 1, improve the isolation and the water-proof effects of whole isolation layer 4.
Specifically, the two water leakage detectors 12 are electrically connected to a buzzer, and the two buzzers are electrically connected to an external power supply.
In this embodiment: the two water leakage detectors 12 are electrically connected with the buzzer, so that once one of the water leakage detectors 12 detects water, a water leakage alarm is sent out by transmitting an electric signal to the buzzer, and a user is prompted to check the toilet condition in time.
Specifically, a foam plastic heat insulation layer matched with the ground heating pipe 7 is arranged in the filling layer 9, and the foam plastic heat insulation layer is attached to the ground heating pipe.
In this embodiment: the foam plastic heat insulation layer matched with the ground heating pipe 7 is arranged in the filling layer 9, so that the reverse loss speed of hot water heat in the ground heating pipe 7 can be reduced.
Specifically, a pure aluminum mirror reflection film is arranged between the filling layer 9 and the ground heating pipe 7, and the pure aluminum mirror reflection film is attached to the ground heating pipe 7.
In this embodiment: the arrangement of the pure aluminum mirror reflection film improves the heating effect of the floor heating pipe 7 on the interior of the toilet wall body 1.
Specifically, a leaking stoppage king paint is coated between the doorsill 2 and the lower inner wall of the toilet wall body 1, and the height of the leaking stoppage king paint is higher than the highest height of the floor heating pipe 7.
In this embodiment: the highest-height plugging king paint higher than the floor heating pipes 7 is coated between the threshold 2 and the lower inner wall of the toilet wall body 1, and the effect of preventing leakage water from seeping outwards along the floor heating pipes 7 can be further achieved.
Specifically, the floor heating pipes 7 are spirally laid in the toilet wall body 1 at equal intervals, and the height of the doorsill 2 is higher than that of the top of the decorative surface layer 11.
In this embodiment: the floor heating pipes 7 are spirally laid in the toilet wall body 1 at equal intervals, so that the heating effect in the toilet wall body 1 can be uniformly achieved, and the situation that a certain area is overheated or a certain area is supercooled can not occur.
Concretely, tie up fixedly through a plurality of bandages between ground heating coil 7 and the pure aluminium specular reflection membrane, a plurality of bandages all are provided with 7 assorted radians with ground heating coil.
In this embodiment: the binding and fixing of the ground heating pipe 7 and the pure aluminum mirror reflection film through the plurality of binding belts can improve the construction convenience of the ground heating pipe 7, and also improves the fixing effect after the ground heating pipe 7 is laid.
During the use, structural layer 3, isolation layer 4, waterproof layer 5, first screed-coat 6, filling layer 9, second screed-coat 10 and decorative cover 11 are laid in proper order on the lower inner wall of bathroom wall body 1, wherein after laying first screed-coat 6, lay ground heating coil 7 in the top of first screed-coat 6 earlier, then gap that ground heating coil 7 spirals is filled filling layer 9, and run through the extension to threshold 2 front side with the top of ground heating coil 7, two junctions at ground heating coil 7 and threshold 2 all are provided with end cap 8 simultaneously and can prevent to leak water and outwards flow through ground heating coil 7, after the whole construction is accomplished, increase the one deck waterproofly on original leak protection standard, dual waterproofing also can further improve the antiseep grade in the whole bathroom, in case when inside seepage appears because of special reason, waterproof layer 5 is provided with the structure at high both sides end in the middle can be with the water of seepage to two lateral walls about bathroom wall body 1 The upper leakage groove conducts the flow, once water appears in the leakage groove, the two water leakage detectors 12 can detect and discover the water in the leakage groove, the discovery of the water leakage condition of the toilet is realized in time, and the damage can be stopped in time, the two leakage grooves are respectively positioned at the left side and the right side of the waterproof layer 5 and can conduct the flow through the gradient of the waterproof layer 5 after the water leakage seeps, the water is collected to the two leakage grooves, the two water pipe connectors 13 are respectively communicated with an external water inlet pipe and a water outlet pipe to avoid extra grooving after the toilet is constructed and then is taken over, the convenience of the floor heating pipe 7 and the external connection is improved, the extension layer which is arranged on the isolation layer 4 and is attached to the inner wall of the toilet wall 1 can wrap the multilayer structure in the toilet wall 1 by the whole isolation layer 4, the isolation and waterproof effects of the whole isolation layer 4 are improved, the two water leakage detectors 12 are electrically connected with a buzzer, so that the buzzer can realize that once one of the water leakage detector 12 detects the water and detects the water, and then transmits the electric signal Until the buzzer sends out the water leakage alarm, the user is reminded to check the toilet condition in time, the foam plastic heat insulation layer matched with the floor heating pipe 7 is arranged in the filling layer 9, the reverse loss speed of the hot water heat in the floor heating pipe 7 can be reduced, the arrangement of the pure aluminum mirror reflection film improves the heating effect of the floor heating pipe 7 on the toilet wall body 1, the highest-height plugging king paint higher than the floor heating pipe 7 is smeared between the threshold 2 and the lower inner wall of the toilet wall body 1, the prevention effect of the outward leakage of the leakage water along the floor heating pipe 7 can be further improved, the floor heating pipe 7 is spirally laid in the toilet wall body 1 in an equidistant mode, the heating effect on the toilet wall body 1 can be even, the condition of overheating or supercooling of a certain area can not occur, the construction convenience of the floor heating pipe 7 can be improved by bundling and fixing the floor heating pipe 7 and the pure aluminum mirror reflection film through a plurality of bands, also improved the fixed effect after laying ground heating coil 7, whole device structure sets up rationally, think about ingeniously, it is convenient to be under construction, the antiseep grade of the bathroom that has the ground heating has been improved, and can in time remind and discover when the seepage appears in the bathroom, in time stop the loss, prevent to cause more losses, also can avoid common percolating water to leak to other rooms along the ground heating simultaneously, cause phenomenons such as going mildy, therefore, the clothes hanger is strong in practicability, effectively solve among the prior art have the bathroom that ground heats up and leak, water will enter into the concrete floor below the heated board through the expansion joint, thereby the seepage is downstairs, give the side of leaking and cause huge economic loss by the side of leaking, another kind of seepage mode is that water passes through ground heating coil seepage to other rooms, long-time seepage is difficult for discovering and causes the moldy or some other irreversible influences scheduling problems of room easily.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that changes may be made in the embodiments and/or equivalents thereof without departing from the spirit and scope of the invention. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (8)

1. The utility model provides a antiseep device warms up bathroom which characterized in that: comprises a toilet wall body (1), a threshold (2) is arranged at the front part of the upper inner wall of the toilet wall body (1), the upper inner wall of the toilet wall body (1) is sequentially paved with a structural layer (3), an isolating layer (4), a waterproof layer (5), a first leveling layer (6), a filling layer (9), a second leveling layer (10) and a decorative surface layer (11) from bottom to top, a ground heating pipe (7) is arranged in the filling layer (9), the starting end and the tail end of the ground heating pipe (7) penetrate through the doorsill (2) and extend outwards, a plug (8) is arranged at the joint of the floor heating pipe (7) and the doorsill (2), the waterproof layer (5) is provided with a slope with a middle part higher than two side bottoms, the left inner wall and the right inner wall of the toilet wall body (1) are provided with leakage grooves, the left side wall and the right side wall of the toilet wall body (1) are both provided with water leakage detectors (12), and the two water leakage detectors (12) are respectively communicated with the two leakage grooves;
two the small opening is located the left and right sides of waterproof layer (5) respectively, clearance and two small opening intercommunications between waterproof layer (5) and first screed-coat (6), and the bottom of two small openings is less than two waterproof layer (5) bottommost, two the equal electric connection of detector of leaking (12) has bee calling organ, two bee calling organ all with external power source electric connection, arbitrary one leak detector (12) detect out after moisture through send signal of telecommunication to bee calling organ the alarm of leaking.
2. The bathroom floor heating antiseep device of claim 1, characterized in that: the start end and the tail end of the floor heating pipe (7) are communicated with water pipe connectors (13), and the two water pipe connectors (13) are respectively communicated with an external water inlet pipe and an external water outlet pipe.
3. The bathroom floor heating antiseep device of claim 1, characterized in that: the isolation layer (4) is provided with an extension layer which is attached to the inner wall of the toilet wall body (1), and the extension layer is wrapped with a ground heating pipe (7).
4. The bathroom floor heating antiseep device of claim 1, characterized in that: and a foam plastic heat insulation layer matched with the ground heating pipe (7) is arranged in the filling layer (9), and the foam plastic heat insulation layer is attached to the ground heating pipe.
5. The bathroom floor heating antiseep device of claim 4, characterized in that: and a pure aluminum mirror reflection film is arranged between the filling layer (9) and the ground heating pipe (7), and the pure aluminum mirror reflection film is attached to the ground heating pipe (7).
6. The bathroom floor heating antiseep device of claim 1, characterized in that: and a plugging king coating is smeared between the doorsill (2) and the lower inner wall of the toilet wall body (1), and the height of the plugging king coating is higher than the highest height of the floor heating pipe (7).
7. The bathroom floor heating antiseep device of claim 1, characterized in that: the floor heating pipe (7) is laid in the toilet wall body (1) in a spiral mode at equal intervals, and the height of the doorsill (2) is higher than the height of the top of the decorative surface layer (11).
8. The anti-leakage device for floor heating in toilet as claimed in claim 7, wherein: tie up fixedly, a plurality of through a plurality of ribbons between ground heating coil (7) and the pure aluminium mirror surface reflectance coating the ribbon all be provided with ground heating coil (7) assorted radian.
CN202110925570.1A 2021-08-16 2021-08-16 Anti-leakage device for floor heating in toilet Pending CN113605635A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110925570.1A CN113605635A (en) 2021-08-16 2021-08-16 Anti-leakage device for floor heating in toilet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110925570.1A CN113605635A (en) 2021-08-16 2021-08-16 Anti-leakage device for floor heating in toilet

Publications (1)

Publication Number Publication Date
CN113605635A true CN113605635A (en) 2021-11-05

Family

ID=78308327

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110925570.1A Pending CN113605635A (en) 2021-08-16 2021-08-16 Anti-leakage device for floor heating in toilet

Country Status (1)

Country Link
CN (1) CN113605635A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114197813A (en) * 2021-12-23 2022-03-18 张云飞 Plastic floor
CN114960769A (en) * 2022-05-26 2022-08-30 济南市市政工程设计研究院(集团)有限责任公司 Basement waterproof layer structure, basement wall and building

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20070062951A (en) * 2007-03-06 2007-06-18 위영균 Waterproof structure for building floor using non-hardening material
CN205785691U (en) * 2016-02-22 2016-12-07 深圳市胜家网络科技集团有限公司 Toilet water-leakage detecting system based on the Internet
CN109537743A (en) * 2018-11-23 2019-03-29 圣都家居装饰有限公司 A kind of toilet floor heating leakage preventing construction technique
CN211622425U (en) * 2020-01-20 2020-10-02 盛联盛一装饰有限公司 Kitchen guarding's waterproof ground heating coil mounting structure
CN211923356U (en) * 2020-03-25 2020-11-13 北京天拓建筑装饰工程有限公司 Toilet waterproof structure
CN211948510U (en) * 2020-04-02 2020-11-17 文斌 Underground construction percolating water removing device
CN212929578U (en) * 2018-10-19 2021-04-09 成都生活家网络科技有限公司 Bathroom detection device that leaks based on internet

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20070062951A (en) * 2007-03-06 2007-06-18 위영균 Waterproof structure for building floor using non-hardening material
CN205785691U (en) * 2016-02-22 2016-12-07 深圳市胜家网络科技集团有限公司 Toilet water-leakage detecting system based on the Internet
CN212929578U (en) * 2018-10-19 2021-04-09 成都生活家网络科技有限公司 Bathroom detection device that leaks based on internet
CN109537743A (en) * 2018-11-23 2019-03-29 圣都家居装饰有限公司 A kind of toilet floor heating leakage preventing construction technique
CN211622425U (en) * 2020-01-20 2020-10-02 盛联盛一装饰有限公司 Kitchen guarding's waterproof ground heating coil mounting structure
CN211923356U (en) * 2020-03-25 2020-11-13 北京天拓建筑装饰工程有限公司 Toilet waterproof structure
CN211948510U (en) * 2020-04-02 2020-11-17 文斌 Underground construction percolating water removing device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114197813A (en) * 2021-12-23 2022-03-18 张云飞 Plastic floor
CN114960769A (en) * 2022-05-26 2022-08-30 济南市市政工程设计研究院(集团)有限责任公司 Basement waterproof layer structure, basement wall and building
CN114960769B (en) * 2022-05-26 2023-11-24 济南市市政工程设计研究院(集团)有限责任公司 Basement waterproof layer structure, basement wall and building

Similar Documents

Publication Publication Date Title
CN113605635A (en) Anti-leakage device for floor heating in toilet
CN201661054U (en) Carbon-fiber electric-heating ceramic tile
CN112064810A (en) Self-joint-repairing water-removing type anti-seepage building outer wall
CN208363452U (en) A kind of double-layer drainage structure of heat-insulating roof
CN207700560U (en) A kind of passive type waterproofing and thermal insulation of roofing system
CN103776080B (en) phase change heat storage type electric heating floor
CN105066218A (en) Novel phase-change heat-storage radiant floor heating device for tail end of air source heat pump
CN210135697U (en) Solar water heater for realizing freezing prevention by using drainage and temperature measurement
CN106016422B (en) Curtain wall type solar energy indoor heating system
CN210267466U (en) Novel dampproofing safe type electricity warms up
CN110186208B (en) Solar water heater capable of achieving freezing prevention by using drainage and temperature measurement
JPH10204943A (en) Cover for piping
CN106016417B (en) Solar energy indoor heating system
CN206496396U (en) Floor heating structure
CN206563422U (en) Electric heater
CN210809637U (en) Biodegradable plastic lunch box
CN206669227U (en) Novel nano antibacterial heat-insulating pipe
CN214272439U (en) Building engineering waterproof construction
CN213931143U (en) Modularization electric heat membrane floor heating system
CN205804864U (en) Multi-functional floor heating module
CN110359481A (en) A kind of insulating layer and the swollen system of the integrated heat-preserving anti-freezing of heating tube and implementation method
CN106052155B (en) Energy-saving solar water system
CN208633913U (en) Air dielectric separation layer, deputy tank and vehicle
CN216196288U (en) Graphite alkene ceramic tile that warms up
CN205107028U (en) Warming bed

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20211105

WD01 Invention patent application deemed withdrawn after publication