CN109488037A - A kind of environmental protection construction method that private residence is quickly rebuild - Google Patents
A kind of environmental protection construction method that private residence is quickly rebuild Download PDFInfo
- Publication number
- CN109488037A CN109488037A CN201811372935.7A CN201811372935A CN109488037A CN 109488037 A CN109488037 A CN 109488037A CN 201811372935 A CN201811372935 A CN 201811372935A CN 109488037 A CN109488037 A CN 109488037A
- Authority
- CN
- China
- Prior art keywords
- old
- frame
- private residence
- enclosing
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0266—Enlarging
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/06—Separating, lifting, removing of buildings; Making a new sub-structure
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/08—Wrecking of buildings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
The invention discloses a kind of environmental protection construction methods that private residence is quickly rebuild, comprising: humidifying: enclosing is arranged in old private residence surrounding, and spraying using private residence of the water mist machine into enclosing, so that humidifying inside and outside private residence wall;It demolishes walls: opening one section of enclosing, carry out the dismounting of aging blocks plate and pushing over for wall using excavator, the artificial collection for carrying out second-hand brick block and old stone is simultaneously piled up in enclosing lateral surface, and the particles such as broken brick, concrete block are cleared up;Piling: it is driven piles according to new residence design drawing, and a layer plane frame of ground is made using old stone, armored concrete, old tile and particle are filled in a layer plane frame;It builds a wall: carrying out the wall between column using second-hand brick block and pile up;Floor is fixed: being welded using the reinforcing bar of reinforcing bar and aging blocks plate end in two layer plane frames.By the above-mentioned means, the environmental protection construction method that private residence of the present invention is quickly rebuild, process is more quickly and environmentally friendly, greatly reduces the cost that old house is rebuild.
Description
Technical field
The present invention relates to civil buildings technical fields, more particularly to a kind of environmental protection construction method that private residence is quickly rebuild.
Background technique
In vast rural area and villages within the city, civilian house is mostly one-storey house and 3 layers of building below.It is older due to house
In bad repair, risk is high, and large quantities of civilian houses need original place to rebuild, it is common practice to first remove old house, transport building waste
Carry out the construction of new house in situ afterwards.
Since the dust in old house demolishing process is larger, the environmental sanitation and air quality of surrounding are affected, and build
Rubbish, which is directly transported, needs more freight, and wastes seriously, increases the construction cost of new house, and place has
Limit, can just purchase new material and be built, the period rebuild is long, the daily life to surrounding resident after building wastes can only being waited to transport
It is living to influence greatly.
Summary of the invention
The invention mainly solves the technical problem of providing a kind of environmental protection construction method that private residence is quickly rebuild, reduction is rebuild
Pollution problem and cost, shorten the period rebuild.
In order to solve the above technical problems, one technical scheme adopted by the invention is that: provide what a kind of private residence was quickly rebuild
Environmental protection construction method, comprising the following steps:
Humidifying: enclosing is set in old private residence surrounding, removes old tile, old wooden frame and old door and window, and utilize water mist machine to enclosing
Interior private residence is spraying, so that humidifying inside and outside private residence wall;
It demolishes walls: opening one section of enclosing, carry out the dismounting of aging blocks plate and pushing over for wall using excavator, and keep water mist machine
It opens, aging blocks sheetpile is placed on the outside of enclosing by crane, the artificial collection for carrying out second-hand brick block and old stone is simultaneously piled up in enclosing
Lateral surface is cleared up the particles such as broken brick, concrete block, is deposited on the outside of enclosing, and covered using waterproof cloth;
Piling: driving piles according to new residence design drawing, and using old stone, armored concrete be made one layer of ground it is flat
Surface frame frame is filled in old tile and particle in one layer plane frame, and compacting one layer concrete of after-pouring is covered and flattened;
Build a wall: using armored concrete on a layer plane frame continued access column and the two layer plane frames at the top of column
Frame carries out the wall between column using second-hand brick block and piles up, wall support is in two layer plane frames and one layer according to design drawing
Between plane framework;
Floor is fixed: aging blocks plate being lifted on two layer plane frames and is covered, and utilizes the reinforcing bar in two layer plane frames
It is welded with the reinforcing bar of aging blocks plate end, then pours a layer concrete and covered, obtain one-storey house matrix;
Building construction: according to design drawing, carrying out the construction of two floor rooms or even three-storey building according to above-mentioned steps, second-hand brick block and
Aging blocks plate purchases new brick when inadequate and new floor is supplemented;
It binds: when construction one-storey house, when top carries out the covering of water-proof concrete, builds building, carrying out new wooden frame at top
It sets up, is laid with hanging rod in slope surface, then tile hanging.
In a preferred embodiment of the present invention, the water mist machine is arranged on multiple angles of enclosing, and spraying end is distinguished
It is directed toward private residence.
In a preferred embodiment of the present invention, the layer plane frame includes the first concrete framework and is embedded in the
The intracorporal first reinforcing bar framework of one concrete frame, old stone are filled in the first reinforcing steel bar frame body.
In a preferred embodiment of the present invention, the two layer planes frame includes the second concrete framework and is embedded in the
The intracorporal second reinforcing bar framework of two concrete frames.
In a preferred embodiment of the present invention, in the floor fixing step, extension is welded in the second reinforcing bar framework
To the hollow steel pipe of floor through-hole end.
In a preferred embodiment of the present invention, in the piling step, old tile and particle import crusher and carry out brokenly
It is refilled after broken in a layer plane frame.
The beneficial effects of the present invention are: the environmental protection construction method that a kind of private residence that the present invention points out quickly is rebuild, utilizes water
The synergistic effect of mist machine and enclosing reduces the dust pollution question during old private residence is removed and is newly-built, process more ring
It protects, reduces the adverse effect lived to surrounding resident, and during newly-built, make full use of original old tile, second-hand brick block, old
Stone and particle greatly reduce the cost that old house is rebuild, it is ensured that the structural strength of new house is suitable for large-scale promotion and application.
Specific embodiment
The technical scheme in the embodiments of the invention will be clearly and completely described below, it is clear that described implementation
Example is only a part of the embodiments of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this field is common
Technical staff's all other embodiment obtained without making creative work belongs to the model that the present invention protects
It encloses.
The embodiment of the present invention includes:
A kind of environmental protection construction method that private residence is quickly rebuild, comprising the following steps:
Humidifying: enclosing is set in old private residence surrounding, old tile, old wooden frame and old door and window, and benefit are removed in lifting construction safety
Spraying with private residence of the water mist machine into enclosing, so that humidifying inside and outside private residence wall, multiple angles of enclosing are arranged in the water mist machine
On, and spraying end is respectively directed to private residence, and the covering of 360 degree of progress water mist is carried out outside old private residence, avoids fugitive dust problem;
It demolishes walls: opening one section of enclosing, carry out the dismounting of aging blocks plate and pushing over for wall using excavator, and keep water mist machine
It opens, aging blocks sheetpile is placed on the outside of enclosing by crane, the artificial collection for carrying out second-hand brick block and old stone is simultaneously piled up in enclosing
Lateral surface promotes the structural strength of enclosing, reduces occupied area, clears up the particles such as broken brick, concrete block, is deposited in outside enclosing
Side, and covered using waterproof cloth, avoid fugitive dust and rainwash problem;
Piling: driving piles according to new residence design drawing, and using old stone, armored concrete be made one layer of ground it is flat
Surface frame frame, the layer plane frame is including the first concrete framework and is embedded in intracorporal first reinforcing steel bar frame of the first concrete frame
Body, old stone are filled in the first reinforcing steel bar frame body, and the structural stability after concrete package is high, and old tile and particle are filled in
In one layer plane frame, compacting one layer concrete of after-pouring is covered and is flattened, in order to promote density, old tile and particle
Crusher can be imported refill in a layer plane frame after being crushed, reduce gap;
Build a wall: using armored concrete on a layer plane frame continued access column and the two layer plane frames at the top of column
Frame, the two layer planes frame is including the second concrete framework and is embedded in the intracorporal second reinforcing bar framework of the second concrete frame,
According to design drawing, the wall between column is carried out using second-hand brick block and concrete and is piled up, is reduced costs, wall support is two
Between layer plane frame and a layer plane frame, structural stability;
Floor is fixed: aging blocks plate being lifted on two layer plane frames and is covered, and utilizes the reinforcing bar in two layer plane frames
It is welded with the reinforcing bar of aging blocks plate end, is also welded with the hollow steel for extending to floor through-hole end in the second reinforcing bar framework
Pipe carries out positioning and structural strengthening, then pours a layer concrete and covered, obtain the smooth one-storey house matrix in top surface;
Building construction: according to design drawing, carrying out the construction of two floor rooms or even three-storey building according to above-mentioned steps, second-hand brick block and
Aging blocks plate purchases new brick when inadequate and new floor is supplemented, can make full use of second-hand brick block and aging blocks plate, reduces and rebuilds
Cost reduces the generation of building waste;
It binds: when construction one-storey house, when top carries out the covering of water-proof concrete, builds building, carrying out new wooden frame at top
It sets up, is laid with hanging rod in slope surface, then tile hanging, new wooden frame can be transformed on the basis of old wooden frame, reduce cost.
In conclusion the environmental protection construction method that a kind of private residence that the present invention points out quickly is rebuild, substantially reduces and rebuild
Time reduces the cost rebuild, and the pollution during rebuilding is small, reduces the influence to living environment around.
The above description is only an embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair
Equivalent structure or equivalent flow shift made by bright description is applied directly or indirectly in other relevant technology necks
Domain is included within the scope of the present invention.
Claims (6)
1. a kind of environmental protection construction method that private residence is quickly rebuild, which comprises the following steps:
Humidifying: enclosing is set in old private residence surrounding, removes old tile, old wooden frame and old door and window, and utilize water mist machine to enclosing
Interior private residence is spraying, so that humidifying inside and outside private residence wall;
It demolishes walls: opening one section of enclosing, carry out the dismounting of aging blocks plate and pushing over for wall using excavator, and keep water mist machine
It opens, aging blocks sheetpile is placed on the outside of enclosing by crane, the artificial collection for carrying out second-hand brick block and old stone is simultaneously piled up in enclosing
Lateral surface is cleared up the particles such as broken brick, concrete block, is deposited on the outside of enclosing, and covered using waterproof cloth;
Piling: driving piles according to new residence design drawing, and using old stone, armored concrete be made one layer of ground it is flat
Surface frame frame is filled in old tile and particle in one layer plane frame, and compacting one layer concrete of after-pouring is covered and flattened;
Build a wall: using armored concrete on a layer plane frame continued access column and the two layer plane frames at the top of column
Frame carries out the wall between column using second-hand brick block and piles up, wall support is in two layer plane frames and one layer according to design drawing
Between plane framework;
Floor is fixed: aging blocks plate being lifted on two layer plane frames and is covered, and utilizes the reinforcing bar in two layer plane frames
It is welded with the reinforcing bar of aging blocks plate end, then pours a layer concrete and covered, obtain one-storey house matrix;
Building construction: according to design drawing, carrying out the construction of two floor rooms or even three-storey building according to above-mentioned steps, second-hand brick block and
Aging blocks plate purchases new brick when inadequate and new floor is supplemented;
It binds: when construction one-storey house, when top carries out the covering of water-proof concrete, builds building, carrying out new wooden frame at top
It sets up, is laid with hanging rod in slope surface, then tile hanging.
2. the environmental protection construction method that private residence according to claim 1 is quickly rebuild, which is characterized in that the water mist machine setting
On multiple angles of enclosing, and spraying end is respectively directed to private residence.
3. the environmental protection construction method that private residence according to claim 1 is quickly rebuild, which is characterized in that the layer plane frame
Frame includes the first concrete framework and is embedded in the intracorporal first reinforcing bar framework of the first concrete frame, and old stone is filled in the first steel
In muscle framework.
4. the environmental protection construction method that private residence according to claim 1 is quickly rebuild, which is characterized in that the two layer planes frame
Frame is including the second concrete framework and is embedded in the intracorporal second reinforcing bar framework of the second concrete frame.
5. the environmental protection construction method that private residence according to claim 4 is quickly rebuild, which is characterized in that the fixed step of the floor
In rapid, the hollow steel pipe for extending to floor through-hole end is welded in the second reinforcing bar framework.
6. the environmental protection construction method that private residence according to claim 1 is quickly rebuild, which is characterized in that the piling step
In, old tile and particle import crusher and refill in a layer plane frame after being crushed.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811372935.7A CN109488037A (en) | 2018-11-19 | 2018-11-19 | A kind of environmental protection construction method that private residence is quickly rebuild |
PCT/CN2019/112163 WO2020103624A1 (en) | 2018-11-19 | 2019-10-21 | Environmentally friendly construction method for rapidly renovating private house |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811372935.7A CN109488037A (en) | 2018-11-19 | 2018-11-19 | A kind of environmental protection construction method that private residence is quickly rebuild |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109488037A true CN109488037A (en) | 2019-03-19 |
Family
ID=65696238
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811372935.7A Pending CN109488037A (en) | 2018-11-19 | 2018-11-19 | A kind of environmental protection construction method that private residence is quickly rebuild |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN109488037A (en) |
WO (1) | WO2020103624A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110924691A (en) * | 2019-11-28 | 2020-03-27 | 广州国屹建筑工程有限公司 | Environment-friendly building construction method |
WO2020103624A1 (en) * | 2018-11-19 | 2020-05-28 | 沙洲职业工学院 | Environmentally friendly construction method for rapidly renovating private house |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115478706A (en) * | 2022-09-05 | 2022-12-16 | 中建八局第三建设有限公司 | Construction method for widening corridor with cantilever structure |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006083691A (en) * | 2004-08-19 | 2006-03-30 | Ando Corp | Barrier-free extension structure of existing apartment house |
CN101078299A (en) * | 2007-06-25 | 2007-11-28 | 李林 | Method for reconstructing frontage multilayer brick-concrete structure building to frame structure building |
JP2009007786A (en) * | 2007-06-26 | 2009-01-15 | Miracle Three Corporation | Extension method for staircase-type apartment house, and building extended by the method |
KR20110119472A (en) * | 2010-04-27 | 2011-11-02 | 동국대학교 산학협력단 | Precast concrete blocks and remodeling reinforcing construction methods for low and middle-rise beam-column buildings by using that blocks |
CN105421810A (en) * | 2015-12-17 | 2016-03-23 | 北京筑福建筑事务有限责任公司 | Prefabricated panel reinforced masonry structure and construction method thereof |
CN207983703U (en) * | 2018-03-26 | 2018-10-19 | 四川省场道工程有限公司 | A kind of circulating water-saving system in job mix station |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106592996B (en) * | 2016-11-02 | 2019-06-14 | 中国建筑第八工程局有限公司 | The construction method that small ocean housing reform is made |
CN106760851A (en) * | 2016-12-30 | 2017-05-31 | 河北华研卓筑加固工程集团有限公司 | The construction method of the newly-increased Seismic Isolation of Isolation Layer of existing brick mix structure |
CN109488037A (en) * | 2018-11-19 | 2019-03-19 | 沙洲职业工学院 | A kind of environmental protection construction method that private residence is quickly rebuild |
-
2018
- 2018-11-19 CN CN201811372935.7A patent/CN109488037A/en active Pending
-
2019
- 2019-10-21 WO PCT/CN2019/112163 patent/WO2020103624A1/en active Application Filing
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006083691A (en) * | 2004-08-19 | 2006-03-30 | Ando Corp | Barrier-free extension structure of existing apartment house |
CN101078299A (en) * | 2007-06-25 | 2007-11-28 | 李林 | Method for reconstructing frontage multilayer brick-concrete structure building to frame structure building |
JP2009007786A (en) * | 2007-06-26 | 2009-01-15 | Miracle Three Corporation | Extension method for staircase-type apartment house, and building extended by the method |
KR20110119472A (en) * | 2010-04-27 | 2011-11-02 | 동국대학교 산학협력단 | Precast concrete blocks and remodeling reinforcing construction methods for low and middle-rise beam-column buildings by using that blocks |
CN105421810A (en) * | 2015-12-17 | 2016-03-23 | 北京筑福建筑事务有限责任公司 | Prefabricated panel reinforced masonry structure and construction method thereof |
CN207983703U (en) * | 2018-03-26 | 2018-10-19 | 四川省场道工程有限公司 | A kind of circulating water-saving system in job mix station |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020103624A1 (en) * | 2018-11-19 | 2020-05-28 | 沙洲职业工学院 | Environmentally friendly construction method for rapidly renovating private house |
CN110924691A (en) * | 2019-11-28 | 2020-03-27 | 广州国屹建筑工程有限公司 | Environment-friendly building construction method |
Also Published As
Publication number | Publication date |
---|---|
WO2020103624A1 (en) | 2020-05-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106801517B (en) | External reinforcing and reinforcing method for school shed with prefabricated porous plate brick mixed structure | |
CN109488037A (en) | A kind of environmental protection construction method that private residence is quickly rebuild | |
CN103266767A (en) | Construction method for preventing and treating cracks between concrete structure and filler wall | |
CN102116061A (en) | Masonry construction method for filling wall core pillar, core girder and building blocks into framework structure | |
CN105464396A (en) | Reinforcing method for external wall of protective historical building | |
CN106437034A (en) | Steel tube and semi-prefabricated semi-cast-in-place construction waste recycled concrete combined column and preparation method thereof | |
CN112227759B (en) | Repair, reinforcement and migration method for historic building clean water wall | |
CN102116092A (en) | Method for constructing reinforcing band for compensating contraction of concrete and preventing cracks | |
CN105239701B (en) | A kind of rammed earth wall construction technique | |
CN212613903U (en) | Brick-concrete structure old building body composite reinforcement structure | |
CN206737184U (en) | A kind of rammed earth feature wall | |
CN204266136U (en) | Stone arch bridge cover arch rib shotcrete ruggedized construction | |
CN108612233A (en) | A kind of cast-in-place fair-faced concrete wall construction method | |
CN106088657A (en) | The ruggedized construction of a kind of rowlock wall body and construction method thereof | |
CN104594654B (en) | A kind of concrete structure reinforcement scheme generation method | |
CN113374295A (en) | Old steel-wood structure roof truss dismantling and rebuilding construction method | |
CN103306439A (en) | Pouring technology for implanting high anti-leakage and anti-crack protective layer into roof structure layer | |
CN106337566A (en) | High-strength repairing method for hole of cement prefabricated component | |
CN103572786A (en) | Pile head joint waterproof processing device and construction method thereof | |
CN207110035U (en) | Assembled steel tendon concrete frame structure based on steel plate connection joint | |
CN113530235A (en) | Clean and environment-friendly building construction method | |
CN204876276U (en) | Building heat preservation prefabricated section | |
CN110924691A (en) | Environment-friendly building construction method | |
CN108571065A (en) | The assembled steel tendon concrete frame structure of connector is connected to based on steel plate | |
CN203373624U (en) | Bridge prefabricated reinforced concrete hidden beam slab wearproof pavement system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190319 |