CN108571065A - The assembled steel tendon concrete frame structure of connector is connected to based on steel plate - Google Patents

The assembled steel tendon concrete frame structure of connector is connected to based on steel plate Download PDF

Info

Publication number
CN108571065A
CN108571065A CN201710139395.7A CN201710139395A CN108571065A CN 108571065 A CN108571065 A CN 108571065A CN 201710139395 A CN201710139395 A CN 201710139395A CN 108571065 A CN108571065 A CN 108571065A
Authority
CN
China
Prior art keywords
connector
steel plate
building
plate
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710139395.7A
Other languages
Chinese (zh)
Inventor
刘永超
孙杰
肖保辉
刘静
张敏
朱利颖
崔璨
付立彬
郭艳芹
王永伟
党玲博
李红霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huanghe Science and Technology College
Original Assignee
Huanghe Science and Technology College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huanghe Science and Technology College filed Critical Huanghe Science and Technology College
Priority to CN201710139395.7A priority Critical patent/CN108571065A/en
Publication of CN108571065A publication Critical patent/CN108571065A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/19Three-dimensional framework structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general

Abstract

The assembled steel tendon concrete frame structure that connector is connected to based on steel plate is suitable for tier building, by the way that plug-in dry method connects between steel plate connection connector realization beam column, between girder and secondary beam, floor and waist slab are connected with beam overlap joint, wallboard and the embedded connection of beam, eliminate the situ wet operation of superstructure construction, the technical difficulty for reducing existing wet method connection, improves construction efficiency, reduces cost;Novel joint connection type is convenient for component removal and re-assemblies, and helps to realize building element replacement and overall structure recycles;Member Lip does not have to throw away reinforcing bar again, convenient for making, transporting and lift;Similar component way is as consistent as possible, improves utilization rate of single solitary building to template;Rectangular and squarish is used on architectural plane, and is ensured laterally no less than 3 across helping to realize that vertical and horizontal rigidity is almost the same, enhance the monolithic space action of building, anti-seismic performance is good.

Description

The assembled steel tendon concrete frame structure of connector is connected to based on steel plate
Technical field
The present invention relates to building components and fittings and Architectural Structure Design, and in particular to a kind of assembly being connected to connector based on steel plate Formula reinforced concrete frame structure.
Background technology
Assembled architecture is built made of assemble in site with prefabricated component component.It is construction side to develop assembled architecture The major transformation of formula is the important measure for promoting construction industry supply side structural reform, and the energy that is conducive to economize on resources is reduced and applied Work pollution, to promote labor productivity and quality safety horizontal, may advantageously facilitate construction industry and information-based industrialization depth integration, It cultivates the new kinetic energy of NPD projects, push neutralizing superfluous production capacity.In recent years, China tries to explore to develop assembled architecture, but construction side For formula mostly still based on cast in situs, assembled architecture ratio and large-scale degree are relatively low, related with Development of Green Building to want It asks and advanced mode of construction is compared to also there is a big difference.
Currently, China's assembled architecture has certain basis, some experiences in building technology and demonstration project are had accumulated, But progress is still relatively slower, also not high in the ratio of new building in assembled architecture, probably 5% or so.Influence assembled The reason of building is promoted is various, and it is wherein important one side that technology is not perfect.The skill that China's assembled architecture uses Art is introduced from foreign countries mostly, the technology shortcoming of autonomous innovation.Node is the significant points of building structure, cast-in-situ steel reinforced concrete knot Structure node good integrity, anti-seismic performance are good.However, node connectivity problem is very prominent when assembled arthitecutral structure component assembly, Node connection is key technical problem in assembled arthitecutral structure design and work progress.The complexity of construction is not only influenced, Also determine the overall mechanical properties of structure.
The connection type of assembled arthitecutral structure node is varied, the side of traditional prefabrication node connection Formula has bracket connect, be welded to connect, is bolted and is connected with rigid nose suspension type.Reinforced bar sleeve grouting connection and reinforcing bar slurry anchor overlap joint connect It is two kinds of node connection types that China's assembled integral concrete generally uses to connect.Assembled based on both connection types Building structural element is required to throw away reinforcing bar in Member Lip, by bar connecting together after casting concrete again, belong to wet method Connection.Still there is wet construction at scene, and technical difficulty is big together by a large amount of bar connecting, it is desirable that high, workload is also big.This Outside, the reinforcing bar that Member Lip is thrown away is required to be protected in component making, transport, hoisting process, brings inconvenience.By After-pouring concrete is used in existing assembled monolithic concrete structure node, after structure comes into operation, it is difficult to carry out It dismantles and assembles again, recycle relatively difficult.Geological process lower part component once destroys, and replaces also relatively more tired It is difficult.
Reinforced concrete frame structure using beam and column as main stress frame, as basic build by beam, plate, column, wall If plug connection can directly be carried out between each other by building component, rather than be poured again after being connected with each other by internal reinforcing bar The mode of concrete is attached, and can be efficiently solved assembled architecture node and be connected this key technology difficulty.In addition, such as Fruit component itself has integrality, easy to disassemble, helps to realize fabricated construction component and replaces and integrally-built cycle profit With.
Invention content
The purpose of the present invention is to provide a kind of novel assembled steel tendon concrete frame structures, realize beam, column, basis It is connect with the mutual plug-in dry method of these building elements of wall, floor and waist slab are taken and be placed on beam, break existing with steel Component node connection type based on muscle connection.Simplify the connection type of node, reduces the difficulty of construction of node connection, removal The situ wet operation of superstructure construction, mitigates workload, construction efficiency is improved, to push assembled architecture quick in China It promotes and applies.
The purpose of the present invention is what is be achieved through the following technical solutions:
General layout Plan:Using reinforced concrete frame structure, structural plan is rectangular or squarish, and is ensured laterally not Less than 3 across.All Vierendeel girder ways are the same, and all cross-section of frame column sizes are identical.
Component makes:Beam, plate, column, wall, basis are all made of reinforcing bar and concrete material, and when prefabricated processing need not throw away Reinforcing bar, to the regularity of holding member.Exterior wall uses light partition wall using glass curtain wall, interior wall.Floor uses precast hollow Plate or reinforced concrete thin plate.Inverted L-shaped section is used except Frame Side Beam end, and T section, beam are used except remaining beam-ends head Groove is reserved at bottom, and all beam-ends heads section is rectangle.
Steel plate is connected to connector and makes:Steel plate connection connector is welded using mold machine-shaping or by steel plate, tie-beam Logical crown plate it is reserved be used as hush panel, welding top plate sealing in field is reproduced after beam installation is in place.
Means of structural connection:Basis is using prefabricated rim of a cup basis, and bottom frame column is inserted into rim of a cup basis, after installation is in place It is filled with pea gravel concreten.Connector is connected between Vierendeel girder and frame column, non-framework beam by steel plate to link together.Floor two End is taken and is placed on beam, floor does not dock to form plate between groove.Light partition wall upper end is inserted into the reserved groove of top beam bottom, lightweight Groove between plate is inserted into partition wall lower end.
The beneficial effects of the invention are as follows:
The present invention provides a kind of novel assembled steel tendon concrete frame structures and its node connection type, are connected by steel plate Plug-in dry method connects between girder and secondary beam between pass joint realization beam column, and floor and waist slab are connected with beam overlap joint, wall Plate and the embedded connection of beam, eliminate the situ wet operation of superstructure, reduce the technical difficulty of existing wet method connection, improve Construction efficiency reduces cost;Novel joint connection type is convenient for component removal and re-assemblies, and helps to realize building element and replaces It changes and is recycled with overall structure;Member Lip does not have to throw away reinforcing bar again, convenient for making, transporting and lift;Similar component way It is as consistent as possible, improve utilization rate of single solitary building to template;Beam, column are inserted into steel plate and are connected to connector, and steel plate is connected to connector can To play Confinement effect, to improve the reliability of beam, styletable head, the design requirement of " strong node, weak component " is realized;Exterior wall Using glass curtain wall or light partition wall, interior wall uses light partition wall, reduces dead load, mitigates geological process, takes into account beauty of architecture It sees and daylighting demand;Rectangular and squarish is used on architectural plane, and is ensured laterally no less than 3 across helping to realize longitudinal direction It is almost the same with lateral stiffness, enhance the monolithic space action of building, to improve the anti-seismic performance of frame structure.
The present invention is suitable for tier building, can be used for office building, teaching building, dormitory building and new rural village resident house etc. and builds It builds, it is widely applicable, it is easy to utilize.
Description of the drawings
Fig. 1 is structure of the invention horizontal layout schematic diagram
Fig. 2 is that Vierendeel girder of the present invention is connected to connector schematic diagram with frame column steel plate
Fig. 3 is inventive joint box schematic diagram
Fig. 4 is that girder of the present invention is connected to connector schematic diagram with secondary beam steel plate
Fig. 5 is beam schematic diagram of the present invention
In attached drawing:1 is connector box, and 2 be upper post holes, and 3 be lower post holes, and 4 ~ 7 be Vierendeel girder hole, and 8 be cross ribbed stiffener, and 9 be secondary Liang Kong, 10 be girder hole, and 11 be frame column, and 12 be Vierendeel girder, and 13 be secondary beam.
Specific implementation mode
The present invention is further illustrated with reference to the accompanying drawings and examples.
As shown in Figure 1, structural plan is rectangular, vertical and horizontal are 5 across span is also identical, is across several identical 7200mm, in every across the span centre arrangement lateral secondary beam together of longitudinal framing beam.First floor floor height is 3900mm, and remainder layer is a height of 3000mm。
As shown in Fig. 2, Vierendeel girder(12)And frame column(11)Steel plate is connected to connector by connector box(1)With beam hole(4~7)With Post holes(2~3)Composition is six-way joint, is suitable for non-top layer center pillar and surrounding frame beam connecting node.Liang Kong(4~7)And post holes (2~3)It can be deleted as needed, for top-level boxes trestle and frame beam connecting node, upper post holes can be removed;For angle Column, side column and frame beam connecting node, part beam hole can be removed.As shown in figure 4, the steel for girder and time beam connecting node Plate connection connector does not have connector box, by girder hole(10)With secondary beam hole(9)It constitutes.The top plate in all beam holes is reserved, and beam is installed to Site welding again after position.Such as Fig. 3 connector boxs(1)Cross steel plate is as ribbed stiffener built in box(8).All beam holes(4~7)It is deep Degree is 300mm, all post holes(2~3)Depth is 400mm, connector box(1)Long 600mm, wide 600mm, high 500mm.
Scantling is chosen:As shown in figure 5, Vierendeel girder(Girder)For T section, width 300mm, flange width is 900mm, edge of a wing height are 100mm, web height 500mm.Secondary beam is also T section, width 250mm, and flange width is 850mm, edge of a wing height are 100mm, web height 450mm.The beam bottom depth of groove of all beams is 50mm, and width is 100mm.Cross-section of frame column size is 600mm*600mm, and length is determined by floor height.Slab thickness is 100mm, long 3500mm, Wide 1000m.Bench plate thickness is 100mm, wallboard thickness 95mm.
Main construction process:
Rim of a cup basis is installed in place, and lifts first floor frame column(11)It is inserted into rim of a cup basis, is filled out with pea gravel concreten after installation is in place It fills, forms fixing end;First floor frame column is all after installation in place, and in bottom frame capital, installation steel plate is connected to connector, hoisting frame It sets a roof beam in place(12)It is put into the steel plate connection connector of capital, after Vierendeel girder installation is in place, welding steel is connected to the reserved sealing top of connector Plate;After installation in place, girder and secondary beam all are installed in Vierendeel girder span centre for one layer of Vierendeel girder(13)Steel plate is connected to connector, lifting time Beam installs the reserved sealing top plate of rear welding steel connection connector in place;After first floor beam column is all completed, floor is lifted Be placed on beam, certain gap reserved when two boards are taken on same root beam, between two plates and forms groove between plate, and with top Beam bottom groove is opposite;Waist slab is lifted, waist slab is connected using sliding support with terraced beam and Vierendeel girder;Repeat above procedure, peace Fill column, beam and the floor and staircase component of remainder layer;It is unified that wall between windows are installed after general frame is completed.The wallboard of wall between windows Upper end insertion top beam bottom groove, groove between the insert plate of lower end, the gap reserved between embedded floor below the wallboard of breast, on End is freely;After each layer wallboard installation, whole building assembly construction terminates.
Finally illustrate, the above examples are only used to illustrate the technical scheme of the present invention and are not limiting, art technology The parameter that personnel make technical scheme of the present invention is changed or equivalent replacement, without departing from the essence of technical solution of the present invention God and range, are intended to be within the scope of the claims of the invention.

Claims (5)

1. being connected to the assembled steel tendon concrete frame structure of connector based on steel plate, it is characterised in that:The beam of the invention, plate, column, Basis and all precast member for reinforcing bar concrete of stair, Member Lip do not throw away reinforcing bar;Exterior wall uses glass curtain wall or lightweight Partition wall, interior wall use light partition wall;Bottom frame column is inserted into rim of a cup basis, Vierendeel girder(12)And frame column(11), Vierendeel girder And secondary beam(13)Between connecting node using steel plate connection connector carry out plug-in dry method connection, floor, which is taken, to be placed on beam, in advance Groove between plate, wallboard is stayed to be embedded between beam and floor, superstructure is constructed no rear pouring concrete wet construction;Structural plan is It is rectangular or be approximately it is rectangular, laterally across number no less than 3 across.
2. steel plate as described in claim 1 is connected to connector, it is characterised in that:By steel plate welding or mold machine-shaping, it is used for When Vierendeel girder is connected with frame column, by connector box(1), Liang Kong(4~7)And post holes(2~3)Composition, beam hole and post holes number can roots It is deleted according to requirement;When being connected with secondary beam for Vierendeel girder, by girder hole(10)With secondary beam hole(9)Composition, does not have Connector box(1).
3. steel plate as claimed in claim 2 is connected to connector, it is characterised in that:The top plate in all beam holes is reserved, and beam installation is in place Field welding top plate is reproduced afterwards to be sealed.
4. the connector box of steel plate connection connector as claimed in claim 2, it is characterised in that:Connector box is rectangular-shape, by steel Board group is at built-in cross ribbed stiffener(8).
5. Vierendeel girder as described in claim 1 and secondary beam, it is characterised in that:Two ends are rectangular section, remaining position is T shapes Section, beam bottom are fluted.
CN201710139395.7A 2017-03-10 2017-03-10 The assembled steel tendon concrete frame structure of connector is connected to based on steel plate Pending CN108571065A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710139395.7A CN108571065A (en) 2017-03-10 2017-03-10 The assembled steel tendon concrete frame structure of connector is connected to based on steel plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710139395.7A CN108571065A (en) 2017-03-10 2017-03-10 The assembled steel tendon concrete frame structure of connector is connected to based on steel plate

Publications (1)

Publication Number Publication Date
CN108571065A true CN108571065A (en) 2018-09-25

Family

ID=63576979

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710139395.7A Pending CN108571065A (en) 2017-03-10 2017-03-10 The assembled steel tendon concrete frame structure of connector is connected to based on steel plate

Country Status (1)

Country Link
CN (1) CN108571065A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109610637A (en) * 2019-01-02 2019-04-12 中国建筑第八工程局有限公司 Assembled coal gangue haydite steel tube concrete beam and column node structure and its construction method
CN115369999A (en) * 2022-07-12 2022-11-22 中冶赛迪工程技术股份有限公司 Beam with welded connection plate

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109610637A (en) * 2019-01-02 2019-04-12 中国建筑第八工程局有限公司 Assembled coal gangue haydite steel tube concrete beam and column node structure and its construction method
CN115369999A (en) * 2022-07-12 2022-11-22 中冶赛迪工程技术股份有限公司 Beam with welded connection plate

Similar Documents

Publication Publication Date Title
CN104532953B (en) 3D printing based assembly type special-shaped column framework structure and construction method thereof
CN107780576A (en) A kind of assembled architecture bottom composite floor and its connected mode
CN107143034A (en) A kind of assembly concrete frame structure beam column rigid connection node
CN105649360A (en) Integral assembling type building system and installing method
CN105143570B (en) Building structure and construction method for same
CN101967851A (en) Board-mixing structure assembly type house and building method thereof
CN206053131U (en) Precast floor slab steel reinforcement cage component and floor
CN206368422U (en) A kind of assembled beam-column connecting node
CN108301545A (en) A kind of big module overlapping contignation of the assembled with space truss temporary support
CN207812741U (en) Pre-manufactured steel structure overlapped shear wall
CN103452350B (en) Assembling electronic workshop and construction method thereof
CN108277881A (en) A kind of assembled beam-column connecting node
CN205224332U (en) Prefabricated wall body and prefabricated wallboard
CN207919737U (en) A kind of assembled steel-Combined concrete frame structure
CN207110035U (en) Assembled steel tendon concrete frame structure based on steel plate connection joint
CN108571065A (en) The assembled steel tendon concrete frame structure of connector is connected to based on steel plate
CN112593632A (en) Fabricated beam-slab structure suitable for large-span high-clearance building and construction method thereof
CN204356896U (en) Based on the assembling Framed Structure with Special-Shaped Columns that 3D prints
CN107152112A (en) A kind of modularization Prefabricated stacking floor and its construction method for being used to drop plate region
CN101886470B (en) Construction method of exposed concrete ribbed beams
CN209412978U (en) Connecting node and assembled architecture for assembled architecture
CN207597652U (en) A kind of cast-in-place sandwiched heat-preservation shear wall structure and assembled architecture
CN202925887U (en) A slab-column shear wall structure building based on prefabricated reinforced concrete hollow formworks
CN207032474U (en) A kind of assembly concrete frame structure beam column rigid connection node
CN205917973U (en) Precast beam integration composite wall panel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180925

WD01 Invention patent application deemed withdrawn after publication