CN207663599U - Precast stair teaching training apparatus - Google Patents
Precast stair teaching training apparatus Download PDFInfo
- Publication number
- CN207663599U CN207663599U CN201721142377.6U CN201721142377U CN207663599U CN 207663599 U CN207663599 U CN 207663599U CN 201721142377 U CN201721142377 U CN 201721142377U CN 207663599 U CN207663599 U CN 207663599U
- Authority
- CN
- China
- Prior art keywords
- steel reinforcement
- net
- framework
- precast stair
- bench
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Steps, Ramps, And Handrails (AREA)
Abstract
The utility model is related to a kind of precast stair teaching training apparatus, including upper mounting plate framework of steel reinforcement, lower platform framework of steel reinforcement, bench stress truss bars net, steel bar stress net of marking time, installation lifting anchor bolt, suspension centre stiffener, rigid plastics foam, pin key reserving hole, reserving hole stiffener, plastering fiber cloth mortar and form removal swivel lifting anchor bolt;The upper mounting plate framework of steel reinforcement is located at the larger absolute altitude of precast stair installation site, the lower platform framework of steel reinforcement is located at the relatively small tenon eminence of precast stair installation site, and bench stress truss bars net is connected between upper mounting plate framework of steel reinforcement and lower platform framework of steel reinforcement;It is online that steel bar stress net of marking time is set to bench stress truss bars.The utility model has the beneficial effects that:During education activities are carried out, this teaching training apparatus can be used as the teaching aid of precast rc slab formula stair, professional teachers control is in kind and atlas is explained, and is conducive to grasp of the student to professional knowledge.
Description
Technical field
The utility model is a kind of teaching training apparatus, specifically a kind of precast stair teaching training apparatus.
Background technology
Pre-cast building has had nearly 30 years development courses in China, recent years under the support energetically of national policy,
The assembled architecture in China has obtained tremendous development.However college student and building industry worker to the understanding of assembled architecture and
Understanding is not deep, traces it to its cause and is a lack of suitable teaching training apparatus.Precast stair is the main member of assembled architecture
One of, it is indispensable one of the critical function component of vertical transport, however, Building class college students and building industry chemical industry
People is not deep enough to the understanding of precast stair, also has the teacher of many schools or student that precast stair factory is gone to view and emulate
Production process, but architectural discipline is a very strong profession of practicality, and many professional skills, which need to put into practice, to be operated and can cultivate,
And the precast stair of prefabricated components manufacturer manufacture is very heavy, few then 1~2 ton, at most 4~8 tons, it is contemplated that the behaviour of student
Make safety, such bulky precast stair is not used to teaching and is operated with practice.Therefore, it is badly in need of grinding a kind of the prefabricated of lightweight of wound
Stair teaching training apparatus learns the manufacturing process and installation process of precast stair for architectural speciality student.
Utility model content
It the purpose of the utility model is to overcome deficiency in the prior art, provides a kind of reasonable for structure, facilitates the pre- of teaching
Stair teaching training apparatus processed.
Precast stair teaching training apparatus, including upper mounting plate framework of steel reinforcement, lower platform framework of steel reinforcement, bench stress Truss Steel
Muscle net, installation lifting anchor bolt, suspension centre stiffener, rigid plastics foam, pin key reserving hole, is reserved steel bar stress net of marking time
Hole stiffener, plastering fiber cloth mortar and form removal swivel lifting anchor bolt;The upper mounting plate framework of steel reinforcement is located at precast stair
At the larger absolute altitude of installation site, the lower platform framework of steel reinforcement is located at the relatively small tenon eminence of precast stair installation site, upper flat
Bench stress truss bars net is connected between platform framework of steel reinforcement and lower platform framework of steel reinforcement;Steel bar stress net of marking time is set to bench
Stress truss bars are online;Bench stress truss bars be additionally provided on the net installation lifting anchor bolt, bench stress truss bars net with
The installation site of lifting anchor bolt is additionally provided with L-shaped suspension centre stiffener;The upper mounting plate framework of steel reinforcement, lower platform framework of steel reinforcement,
Bench stress truss bars net and steel bar stress net of marking time are wrapped in rigid plastics foam, and rigid plastics foam is externally provided with plastering
Fiber cloth mortar.
As preferred:Bench stress truss bars net side face is equipped with form removal swivel lifting anchor bolt.
As preferred:It is equipped with pin key reserving hole and correspondence on the upper mounting plate framework of steel reinforcement and lower platform framework of steel reinforcement
Reserving hole stiffener.
The utility model has the beneficial effects that:It, can be by the conduct of this teaching training apparatus during education activities are carried out
The teaching aids of precast rc slab formula stair uses, and professional teachers control is in kind and atlas is explained, and is conducive to
Grasp of the student to professional knowledge.At the same time, this teaching training apparatus replaces concrete with rigid plastics foam, greatly subtracts
Light dead load, the precast stair of 3m or so, total weight about 150kg, only comparable size concrete prefabricated stairs weight
1/10, student can complete installation and dismounting by small lifting equipment, break through the operative skill of student comprehensively, and ensure that
The safety of entire practice teaching.
Description of the drawings
Fig. 1 precast stair teaching training apparatus plan views
Fig. 2 precast stair teaching training apparatus ground plans
Fig. 3 precast stair teaching training apparatus detail structure figures
Fig. 4 precast stair teaching training apparatus detail structure Fig. 1-1 sectional views
Fig. 5 precast stair teaching training apparatus detail structure Fig. 2-2 sectional views
Fig. 6 precast stair teaching training apparatus detail structure Fig. 3-3 sectional views
Fig. 7 installs hanging bolt schematic diagram
Fig. 8 form removals turn hanging bolt schematic diagram
Reference sign:1. upper mounting plate framework of steel reinforcement;2. lower platform framework of steel reinforcement;3. bench stress truss bars net;
4. steel bar stress net of marking time;5. installation lifting anchor bolt;6. suspension centre stiffener;7. rigid plastics foam;8. pin key reserving hole;
9. reserving hole stiffener;10. fiber cloth mortar of plastering;11. form removal swivel lifting anchor bolt.
Specific implementation mode
The utility model is described further with reference to embodiment.The explanation of following embodiments is only intended to help to manage
Solve the utility model.It should be pointed out that for those skilled in the art, not departing from the utility model principle
Under the premise of, several improvements and modifications can be made to this utility model, these improvement and modification also fall into the utility model
In scope of the claims.
As shown in Figures 1 to 8, the precast stair teaching training apparatus of this example includes upper mounting plate framework of steel reinforcement 1, lower platform
It is framework of steel reinforcement 2, bench stress truss bars net 3, steel bar stress net 4 of marking time, installation lifting anchor bolt 5, suspension centre stiffener 6, hard
Matter plastic foam 7, pin key reserving hole 8, reserving hole stiffener 9, plastering fiber cloth mortar 10, form removal swivel lifting anchor bolt
11 equal parts form.The upper mounting plate framework of steel reinforcement 1 is mounted at the larger absolute altitude of precast stair installation site, and by bench lotus
Load is effectively transmitted in floor structure;The lower platform framework of steel reinforcement 2 is mounted on the smaller absolute altitude of precast stair installation site
Place, and bench load is effectively transmitted in floor structure;The bench stress truss bars net 3 is carrying stair load
Main member, and deliver load to upper mounting plate framework of steel reinforcement 1 and lower platform framework of steel reinforcement 2, can in order to ensure that load transmits
By property, need bench stress truss bars net 3 connecting into stress in upper mounting plate framework of steel reinforcement 1 and lower platform framework of steel reinforcement 2 whole
Body;The effect for marking time steel bar stress net 4 is support 1-2 people in upper operation of marking time, and steel bar stress net 4 of marking time is needed with ladder
Duan Shouli truss bars nets are reliably connected;The hoisting point position in reasonable stress is arranged in the installation lifting anchor bolt 5, four altogether,
For in this actual training device installation process, being lifted by crane and being installed by component by small-sized hoisting device, installation lifting anchor bolt 5 must be with ladder
Duan Shouli truss bars nets are reliably connected;The suspension centre stiffener 6 is the strength and stiffness for reinforcing suspension centre region, improves installation
Lift by crane the reliability of anchor bolt working performance;The rigid plastics foam 7 is used to clog the gap between framework of steel reinforcement;The pin key is pre-
Box out the device of plan-position of the hole 8 for fixing precast stair in component mounting process, when precast stair position adjust with
Afterwards, reinforcing bar is inserted into pin key reserving hole 8, and casting concrete fixes precast stair;The reserving hole stiffener 9
Effect is to reinforce the intensity around reserving hole;The effect of the plastering fiber cloth mortar 10 is by framework of steel reinforcement and foam packet
Wrap up in into the stress entirety for having some strength and rigidity;The form removal swivel lifting anchor bolt 11 was produced in precast stair
Cheng Zhong hangs prefabricated components swivel when concrete strength reaches sufficient intensity (generally the 75% of concrete design strength)
It is attached to the boom hoisting that other places carry out maintenance.
The bench stress truss bars net is to carry the main member of stair load, and no concrete bonds reinforcing bar
Bench stress truss bars net is fabricated to truss structure by skeleton, and levels reinforcing bar forms stress entirety by truss tie-rod.Institute
It states rigid plastics foam and has certain intensity, it is main the reason is that quality is very light, it is of less demanding in entire element bearing capacity
Under the premise of (teaching training apparatus), using rigid plastics foam fill precast stair between framework of steel reinforcement can effectively mitigate knot
The weight of structure.Framework of steel reinforcement and foam are rolled into a stress for having some strength and rigidity by the plastering fiber cloth mortar
It is whole.Fiber cloth has high intensity and high tenacity, and very light weight, is wrapped on the outside of rigid plastics foam and framework of steel reinforcement,
Effectively raise the stress performance of entire component.
Following table is precast stair reinforcement summary in Fig. 1 to Fig. 8:
Precast stair reinforcement summary
Claims (3)
1. a kind of precast stair teaching training apparatus, it is characterised in that:Including upper mounting plate framework of steel reinforcement (1), lower platform reinforcing bar
Frame (2), bench stress truss bars net (3), steel bar stress net (4) of marking time, installation lifting anchor bolt (5), suspension centre stiffener
(6), rigid plastics foam (7), pin key reserving hole (8), reserving hole stiffener (9), plastering fiber cloth mortar (10) and
Form removal swivel lifting anchor bolt (11);The upper mounting plate framework of steel reinforcement (1) is located at the larger absolute altitude of precast stair installation site, institute
State the relatively small tenon eminence that lower platform framework of steel reinforcement (2) is located at precast stair installation site, upper mounting plate framework of steel reinforcement (1) and lower platform
Bench stress truss bars net (3) is connected between framework of steel reinforcement (2);Steel bar stress net (4) of marking time is set to bench stress truss
On bar-mat reinforcement (3);Installation lifting anchor bolt (5), bench stress truss bars net are additionally provided on bench stress truss bars net (3)
(3) installation site with lifting anchor bolt (5) is additionally provided with L-shaped suspension centre stiffener (6);The upper mounting plate framework of steel reinforcement (1), under
Platform framework of steel reinforcement (2), bench stress truss bars net (3) and steel bar stress net (4) of marking time are wrapped in rigid plastics foam (7)
Interior, rigid plastics foam (7) is externally provided with plastering fiber cloth mortar (10).
2. precast stair teaching training apparatus according to claim 1, it is characterised in that:The bench stress truss bars
Net (3) side is equipped with form removal swivel lifting anchor bolt (11).
3. precast stair teaching training apparatus according to claim 1, it is characterised in that:The upper mounting plate framework of steel reinforcement
(1) and on lower platform framework of steel reinforcement (2) pin key reserving hole (8) and corresponding reserving hole stiffener (9) are equipped with.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721142377.6U CN207663599U (en) | 2017-09-07 | 2017-09-07 | Precast stair teaching training apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721142377.6U CN207663599U (en) | 2017-09-07 | 2017-09-07 | Precast stair teaching training apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207663599U true CN207663599U (en) | 2018-07-27 |
Family
ID=62935940
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721142377.6U Active CN207663599U (en) | 2017-09-07 | 2017-09-07 | Precast stair teaching training apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207663599U (en) |
-
2017
- 2017-09-07 CN CN201721142377.6U patent/CN207663599U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209674587U (en) | Assembled architecture lifts device for training skill | |
CN104863362A (en) | Construction process for arched cylindrical-shaped latticed shell provided with arched steel grid jig frame by adopting slippage installation | |
CN107564399A (en) | Fabricated construction system demonstration lesson platform | |
CN105464456B (en) | Go straight up to method and suspender that unit founds UHV transmission steel tower | |
CN207244452U (en) | A kind of suspension bridge vice saddle adjusting apparatus in place | |
CN204112242U (en) | A kind of Concrete Filled Steel-tube Truss Arch Bridge suspender replacement special tool boom system | |
CN106006363B (en) | Movable switch cabinet hoisting platform | |
CN207663599U (en) | Precast stair teaching training apparatus | |
CN206680994U (en) | Assembled steel reinforced cage descending frame | |
CN207458381U (en) | Precast shear wall lining teaching training apparatus | |
CN207718654U (en) | Precast shear wall Side fascia teaching training apparatus | |
CN208889184U (en) | A kind of assembled architecture comprehensive practical traning model | |
CN108019225A (en) | Hydraulic moving formula subway station side wall formwork jumbo | |
CN208534069U (en) | The assembled support device of steel bar truss floor support plate composite floor system | |
CN207296361U (en) | A kind of regularization assembled overhanging protection canopy | |
CN207714496U (en) | Full prefabricated balcony teaching training apparatus | |
CN207690339U (en) | Truss bars superimposed sheet teaching training apparatus | |
CN205134921U (en) | Building outer wall concrete constructional column hangs construction platform | |
CN103924796A (en) | Tower type large-height building demolition machine | |
CN110886214B (en) | Mounting and dismounting method of maintenance platform for bridge maintenance vehicle | |
CN208202604U (en) | A kind of construction discharging platform | |
CN210340091U (en) | Column main reinforcement hoisting tool of concrete cast-in-place steel rib column | |
CN206385466U (en) | A kind of Coping Construction platform | |
CN203795885U (en) | Tower-type large-height-building demolition machine | |
CN210152143U (en) | A connection structure for concrete cladding panel hoist and mount construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 310020 B1047, building 1, 343 triumphal road, Zhejiang, Hangzhou Patentee after: Zhejiang Taixue Technology Group Co., Ltd Address before: 310020 B1047, building 1, 343 triumphal road, Zhejiang, Hangzhou Patentee before: ZHEJIANG TAIXUE TECHNOLOGY Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder |