CN206385466U - A kind of Coping Construction platform - Google Patents

A kind of Coping Construction platform Download PDF

Info

Publication number
CN206385466U
CN206385466U CN201621482827.1U CN201621482827U CN206385466U CN 206385466 U CN206385466 U CN 206385466U CN 201621482827 U CN201621482827 U CN 201621482827U CN 206385466 U CN206385466 U CN 206385466U
Authority
CN
China
Prior art keywords
lifting rope
support frame
guide rod
steel
construction platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621482827.1U
Other languages
Chinese (zh)
Inventor
陈秋声
陈先义
郭少斌
张力文
李其展
张钦胜
王振宇
张宪武
黄彦涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Province's Water Conservancy And Hydropower 3rd Co Ltd Of Engineering Bureau
Original Assignee
Guangdong Province's Water Conservancy And Hydropower 3rd Co Ltd Of Engineering Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Province's Water Conservancy And Hydropower 3rd Co Ltd Of Engineering Bureau filed Critical Guangdong Province's Water Conservancy And Hydropower 3rd Co Ltd Of Engineering Bureau
Priority to CN201621482827.1U priority Critical patent/CN206385466U/en
Application granted granted Critical
Publication of CN206385466U publication Critical patent/CN206385466U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model is related to a kind of Coping Construction platform, including pin hole, latch, I-steel, flat board, flitch and suspension bracket, the pin hole is opened in the top of pier stud, the latch is interspersed in the pin hole and its two ends stretches out in pier stud along the bearing of trend of bridge, the I-steel is provided with two, two I-steel are parallel to ride upon the latch two ends, the flitch is set up in bearing of trend of between two I-steel and its two ends along bridge and stretched out, the flat board is laid on the flitch, the suspension bracket is arranged on the flat board, the suspension bracket includes support frame and lifting rope, the top of support frame as described above is provided with the first lifting rope guide rod being parallel to each other, second lifting rope guide rod and the 3rd lifting rope guide rod.The engineering time that the utility model can solve existing full hall scaffold is long, and resource consumption is big, human input is big, and cost is high, and potential safety hazard is more, bad adaptability, the problem of lifting object is also very inconvenient.

Description

A kind of Coping Construction platform
Technical field
The utility model is related to building engineering construction field, more particularly to a kind of Coping Construction platform.
Background technology
In bridge construction, the conventional construction method that operation platform is built on pier stud mainly uses full hall scaffold, full Hall scaffold construction is higher to the requirement for bearing capacity of ground, is typically required to base compacting over the ground, running into soft soil foundation will also enter Row hardening (such as cast concrete floor), more manpower and materials and financial resources will be spent to basement process, handle careless slightly, also The bulk settling or differential settlement of scaffold are likely to result in, causes bridge to be changed on locus, has a strong impact on The construction quality of bridge.
When pier stud is higher, it is necessary to which row's foundation width, which is widened lengthening, could more ensure the resistance to overturning of support, this Sample will can be multiplied because of the quantity of required steel pipe and fastener.Setting up, remove and transporting for full hall scaffold is required to largely Manpower, the corresponding engineering time can lengthen, and bridge height is higher, and cost is higher, also more more than potential safety hazard;When bridge is in river When in stream or pool, this kind of method can be harder to meet construction requirement, meanwhile, in riverbed during burst flood, it is unfavorable for flood passage, on foot Flood of strengthening defences is passed the flood period pressure, inconvenience recycling, is also inconvenient to remove.
The engineering time for building full hall scaffold is long, and resource consumption is big, human input is big, and cost is high, and potential safety hazard is more, fits Answering property is poor, and lifting object is also very inconvenient.
Utility model content
It is to be solved in the utility model be existing full hall scaffold engineering time it is long, resource consumption is big, human input is big, Cost is high, and potential safety hazard is more, bad adaptability, lifts the problem of object is also very inconvenient and provides a kind of Coping Construction platform.
In order to solve the above problems, the utility model provides a kind of Coping Construction platform, and the bent cap is on two pier studs Construction, the Coping Construction platform includes pin hole, latch, I-steel, flitch, flat board and suspension bracket, and the pin hole is opened in The top of pier stud, the latch is interspersed in the pin hole and bearing of trend of its two ends along bridge stretches out in pier stud, the work Word steel is provided with two, and two I-steel are parallel to ride upon the latch two ends, and the flitch is set up in two I-shapeds Bearing of trend of between steel and its two ends along bridge is stretched out, and the flat board is laid on the flitch, and the suspension bracket is arranged on described On flat board, the suspension bracket includes support frame and lifting rope, the top of support frame as described above be provided be parallel to each other the first lifting rope guide rod, Second lifting rope guide rod and the 3rd lifting rope guide rod;
When lifting rope is used to lift by crane the object being located on the outside of support frame as described above, described lifting rope one end bypasses the first lifting rope successively Guide rod, the connection of the 3rd lifting rope guide rod are located at the object on the outside of support frame as described above, and the other end is connected with pulling equipment;
When lifting rope is used to lift by crane the object being located at below support frame as described above, described lifting rope one end bypasses the first lifting rope successively Guide rod, the connection of the second lifting rope guide rod are located at the object below support frame as described above, and the other end is connected with pulling equipment.
Preferably, the pier stud upper measurement positioned at the lower section of the pin hole is provided with reinforcement.
Preferably, the spacing fastening of fixing muscle is passed through between two I-steel.
Preferably, the pin hole is that the steel pipe at the top of pier stud is embedded in when bridge pier column is constructed.
Preferably, the lap-joint of the latch and the I-steel is provided with chock.
Preferably, the top both sides of support frame as described above are respectively equipped with swing pipe telescopic arm, and the 3rd lifting rope is oriented to Bar is connected between the swing pipe telescopic arm.
Preferably, the middle part both sides of support frame as described above are respectively equipped with horizontal extension bracket, the horizontal extension support The object being located on the outside of support frame as described above after the lifting in place of frame support, the front end of the horizontal extension bracket is provided with stop part.
Preferably, dismountable hound is provided between the front end of the swing pipe telescopic arm and support frame as described above, The front end of the upper end of the hound and the swing pipe telescopic arm rotates and is connected, the lower end of the hound by latch with it is described Support frame is fixedly connected.
Preferably, the two ends of the first lifting rope guide rod are respectively equipped with the first sheave, and the 3rd lifting rope is led The 3rd sheave is respectively equipped with to the two ends of bar, when lifting rope is used to lift by crane the object being located on the outside of support frame as described above, the lifting rope The object that the first sheave, the connection of the 3rd sheave are located on the outside of support frame as described above is bypassed successively.
Preferably, the two ends of the first lifting rope guide rod are respectively equipped with the first sheave, and second lifting rope is led The second sheave is respectively equipped with to the two ends of bar, when lifting rope is used to lift by crane the object being located at below support frame as described above, the lifting rope The object that the first sheave, the connection of the second sheave are located at below support frame as described above is bypassed successively.
The utility model provides a kind of Coping Construction platform, and compared with prior art, it includes pin hole, latch, I-shaped Steel, flitch, flat board and suspension bracket;Pin hole and interspersed latch are opened up at the top of pier stud, parallel two set up are carried by latch I-steel, and set up flitch between I-steel, finally lays flat board on flitch, the construction process of the operation platform is simple, Save material saving, safe and reliable;In addition, the utility model mounting suspension also on flat board, facilitates lifting construction object, construction is improved Efficiency, and different lifting methods can be used for the object of different type, different putting positions, space availability ratio is high, real It is strong with property;The erection construction platform directly at the top of pier stud, the safety of platform bearer by the carrying basic guarantee of pier stud in itself Reliability, it is to avoid the influence of ground, and be conducive to flood control to pass the flood period, building for operation platform can be carried out in river environment, fitted Ying Xingqiang.
Brief description of the drawings
Fig. 1 is the front view of the Coping Construction platform in the utility model embodiment;
Fig. 2 is the side view of the Coping Construction platform in the utility model embodiment;
Fig. 3 is the enlarged drawing of the suspension bracket in the utility model embodiment.
Wherein:1st, pin hole;2nd, latch;3rd, I-steel;31st, fixing muscle;4th, flitch;5th, flat board;6th, suspension bracket;61st, support Frame;62nd, lifting rope;611st, the first lifting rope guide rod;612nd, the second lifting rope guide rod;613rd, the 3rd lifting rope guide rod;614th, swing pipe Telescopic arm;615th, hound;616th, horizontal extension bracket;617th, stop part;618th, the first sheave;619th, the second sheave;620、 3rd sheave;7th, pier stud;8th, bent cap.
Embodiment
With reference to the accompanying drawings and examples, embodiment of the present utility model is described in further detail.Below Embodiment is used to illustrate the utility model, but is not limited to scope of the present utility model.
Refer to Fig. 1 to Fig. 3, a kind of Coping Construction platform of the utility model preferred embodiment, the bent cap 8 is at two Constructed on pier stud 7, Coping Construction platform includes pin hole 1, latch 2, I-steel 3, flitch 4, flat board 5 and suspension bracket 6, the latch Hole 1 is opened in the top of pier stud 7, and the latch 2 is interspersed in the pin hole 1 and its two ends is stretched out in along the bearing of trend of bridge Pier stud 7, the I-steel 3 is provided with two, and two I-steel 3 are parallel to ride upon the two ends of latch 2, the frame of flitch 4 Between two I-steel 3 and bearing of trend of its two ends along bridge stretches out, the flat board 5 is laid on the flitch 4, The suspension bracket 6 is arranged on the flat board 5, and the suspension bracket 6 includes support frame 61 and lifting rope 62, and the top of support frame as described above 61 is set There are the first lifting rope guide rod 611 being parallel to each other, the second lifting rope guide rod 612 and the 3rd lifting rope guide rod 613;
When lifting rope 62 is used to lift by crane the object for being located at the outside of support frame as described above 61, described one end of lifting rope 62 bypasses the successively One lifting rope guide rod 611, the connection of the 3rd lifting rope guide rod 613 are located at the object in the outside of support frame as described above 61, the other end and traction Equipment is connected;
When lifting rope 62 is used to lift by crane the object for being located at the lower section of support frame as described above 61, described one end of lifting rope 62 bypasses the successively One lifting rope guide rod 611, the connection of the guide rod of the second lifting rope 612 are located at the object of the lower section of support frame as described above 61, the other end and traction Equipment is connected.
It can be seen that, the construction process of the operation platform is simple, energy-conservation material saving, safe and reliable;Hung in addition, being installed on flat board 5 Frame 6, facilitates lifting construction object, improves efficiency of construction, and can be used not for the object of different type, different putting positions Same lifting method, space availability ratio is high, practical;
By directly in the top erection construction platform of pier stud 7, by the carrying basic guarantee platform bearer of pier stud 7 itself Security reliability, it is to avoid the influence of ground, and be conducive to flood control to pass the flood period, taking for operation platform can be carried out in river environment Build, strong adaptability.
Exemplary, pin hole 1 is the steel pipe that the top of pier stud 7 is embedded in when bridge pier column 7 is constructed.By pre-buried suitable The steel pipe of caliber, the size that pin hole 1 can be effectively ensured meets the requirements, and ensure that pin hole 1 has certain intensity.
Exemplary, pass through the spacing fastening of fixing muscle 31 between two I-steel 3.
It is exemplary, it is preferred that described on pier stud 7 to insert in order to avoid pin hole 1 produces stress concentration destruction in load-bearing Enclose provided with reinforcement the lower section of pin-and-hole 1.
Dismantle for convenience, energy-conserving and environment-protective, beneficial to recycling platform member, while the effect of cushion impact forces is played, Exemplary, it is preferred that the lap-joint of latch 2 and the I-steel 3 is provided with chock.
Large volume object is lifted for convenience, it is to avoid the constructing structures such as operation platform are bumped to during lifting and cause safety hidden Suffer from, it is exemplary, it is preferred that the top both sides of support frame 61 are respectively equipped with swing pipe telescopic arm 614, the 3rd lifting rope guide rod 613 are connected between the swing pipe telescopic arm 614.The swing pipe telescopic arm that stretches can be passed through according to the volume size for lifting object The position of 614 the 3rd lifting rope guide rods 613 of adjustment.
For the intensity of enhancing structure, security is improved, it is exemplary, it is further preferred that the swing pipe telescopic arm 614 Front end and support frame as described above 61 between be provided with dismountable hound 615, upper end and the swing pipe of the hound 615 are stretched The front end of contracting arm 614 rotates connection, lower end and the company of fixation in the way of pin-and-hole-pin of support frame as described above 61 of the hound 615 Connect.Hound 615 plays support and fixed effect to swing pipe telescopic arm 614, improves under a load steady of swing pipe telescopic arm 614 Qualitative and reliability.
The items secure that lifting comes up reliably is shifted for convenience, it is exemplary, it is preferred that the middle part of support frame 61 Both sides are respectively equipped with horizontal extension bracket 616, are located at support frame as described above after the support of horizontal extension bracket 616 lifting in place The object in 61 outsides.In order to prevent object from dropping out horizontal extension bracket 616, security reliability is improved, it is exemplary, it is further excellent Choosing, the front end of horizontal extension bracket 616 is provided with stop part 617.
Exemplary, it is preferred that the two ends of the first lifting rope guide rod 611 are respectively equipped with the first sheave 618, described The two ends of three lifting rope guide rods 613 are respectively equipped with the 3rd sheave 620, are located at the outside of support frame as described above 61 when lifting rope 62 is used to lift by crane Object when, the lifting rope 62 bypasses the first sheave 618, the connection of the 3rd sheave 620 and is located at the outside of support frame as described above 61 successively Object.
Likewise, exemplary, the two ends of the first lifting rope guide rod 611 are respectively equipped with the first sheave 618, described The two ends of two lifting rope guide rods 612 are respectively equipped with the second sheave 619, are located at the lower section of support frame as described above 61 when lifting rope 62 is used to lift by crane Object when, the lifting rope 62 bypasses the first sheave 618, the connection of the second sheave 619 and is located at the lower section of support frame as described above 61 successively Object.
By setting the first sheave 618, the second sheave 619 and the 3rd sheave 620, it can effectively prevent lifting rope 62 in lifting During swing, facilitate lifting rope 62 to smoothly complete lifting.
To sum up, the utility model provides a kind of Coping Construction platform, compared with prior art, it include pin hole, latch, I-steel, flitch, flat board and suspension bracket;Open up pin hole and interspersed latch at the top of pier stud, parallel set up is carried by latch Two I-steel, and flitch is set up between I-steel, flat board is finally laid on flitch, the construction process letter of the operation platform It is single, energy-conservation material saving, safe and reliable;In addition, the utility model mounting suspension also on flat board, facilitates lifting construction object, improve Efficiency of construction, and different lifting methods, space availability ratio can be used for the object of different type, different putting positions Height, it is practical;The erection construction platform directly at the top of pier stud, the platform bearer by the carrying basic guarantee of pier stud in itself Security reliability, it is to avoid the influence of ground, and be conducive to flood control to pass the flood period, taking for operation platform can be carried out in river environment Build, strong adaptability.
Described above is only preferred embodiment of the present utility model, it is noted that for the common skill of the art For art personnel, on the premise of the utility model technical principle is not departed from, some improvement and replacement can also be made, these change Enter and replace and also should be regarded as protection domain of the present utility model.

Claims (10)

1. a kind of Coping Construction platform, the bent cap is constructed on two pier studs, it is characterised in that the Coping Construction platform bag Pin hole, latch, I-steel, flitch, flat board and suspension bracket are included, the pin hole is opened in the top of pier stud, and the latch interts In the pin hole and bearing of trend of its two ends along bridge stretches out in pier stud, the I-steel is provided with two, two works Word steel is parallel to ride upon the latch two ends, and the flitch is set up between two I-steel and extension of its two ends along bridge Direction is stretched out, and the flat board is laid on the flitch, and the suspension bracket is arranged on the flat board, and the suspension bracket includes support frame And lifting rope, the top of support frame as described above is provided with the first lifting rope guide rod, the second lifting rope guide rod and the 3rd lifting rope that are parallel to each other Guide rod;
When lifting rope is used to lift by crane the object being located on the outside of support frame as described above, described lifting rope one end bypasses the first lifting rope guiding successively Bar, the connection of the 3rd lifting rope guide rod are located at the object on the outside of support frame as described above, and the other end is connected with pulling equipment;
When lifting rope is used to lift by crane the object being located at below support frame as described above, described lifting rope one end bypasses the first lifting rope guiding successively Bar, the connection of the second lifting rope guide rod are located at the object below support frame as described above, and the other end is connected with pulling equipment.
2. Coping Construction platform as claimed in claim 1, it is characterised in that the pier stud upper measurement positioned at the lower section of the pin hole Provided with reinforcement.
3. Coping Construction platform as claimed in claim 1, it is characterised in that limited between two I-steel by fixing muscle Position fastening.
4. Coping Construction platform as claimed in claim 1, it is characterised in that the pin hole is pre- when bridge pier column is constructed It is embedded in the steel pipe at the top of pier stud.
5. Coping Construction platform as claimed in claim 1, it is characterised in that the lap-joint of the latch and the I-steel sets There is chock.
6. Coping Construction platform as claimed in claim 1, it is characterised in that the top both sides of support frame as described above, which are respectively equipped with, hangs Pipe telescopic arm, the 3rd lifting rope guide rod is connected between the swing pipe telescopic arm.
7. Coping Construction platform as claimed in claim 1, it is characterised in that the middle part both sides of support frame as described above are respectively equipped with water Flat telescoping bracket, the object being located on the outside of support frame as described above after the horizontal extension bracket support lifting in place, the level The front end of telescoping bracket is provided with stop part.
8. Coping Construction platform as claimed in claim 6, it is characterised in that the front end of the swing pipe telescopic arm and the support Dismountable hound is provided between frame, the upper end of the hound rotates with the front end of the swing pipe telescopic arm and is connected, described The lower end of hound is fixedly connected by latch with support frame as described above.
9. the Coping Construction platform as described in any one of claim 1 to 8, it is characterised in that the first lifting rope guide rod Two ends are respectively equipped with the first sheave, and the two ends of the 3rd lifting rope guide rod are respectively equipped with the 3rd sheave, when lifting rope is used to lift by crane During object on the outside of support frame as described above, the lifting rope bypasses the first sheave, the connection of the 3rd sheave and is located at the support successively Object on the outside of frame.
10. the Coping Construction platform as described in any one of claim 1 to 8, it is characterised in that the first lifting rope guide rod Two ends are respectively equipped with the first sheave, and the two ends of the second lifting rope guide rod are respectively equipped with the second sheave, when lifting rope is used to lift by crane During object below support frame as described above, the lifting rope bypasses the first sheave, the connection of the second sheave and is located at the support successively Object below frame.
CN201621482827.1U 2016-12-30 2016-12-30 A kind of Coping Construction platform Expired - Fee Related CN206385466U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621482827.1U CN206385466U (en) 2016-12-30 2016-12-30 A kind of Coping Construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621482827.1U CN206385466U (en) 2016-12-30 2016-12-30 A kind of Coping Construction platform

Publications (1)

Publication Number Publication Date
CN206385466U true CN206385466U (en) 2017-08-08

Family

ID=59490153

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621482827.1U Expired - Fee Related CN206385466U (en) 2016-12-30 2016-12-30 A kind of Coping Construction platform

Country Status (1)

Country Link
CN (1) CN206385466U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109183620A (en) * 2018-09-05 2019-01-11 广东省长大公路工程有限公司 Telescoping bracket, steel box-girder hanging device and hanging method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109183620A (en) * 2018-09-05 2019-01-11 广东省长大公路工程有限公司 Telescoping bracket, steel box-girder hanging device and hanging method

Similar Documents

Publication Publication Date Title
CN102661054B (en) Lateral reinforcing structure in whole lifting of plane steel truss and whole lifting method
CN106939707A (en) A kind of restricted clearance large-scale steel structure supporting platform from method for improving
CN106744257A (en) A kind of method of kiloton adjustable combined sling, assemble method and lifting caisson
CN207294093U (en) A kind of large span steel truss integral lifting apparatus
CN108252504A (en) Tube shear wall concrete structure large form hoisting type construction method and constructing device
CN105317205B (en) The construction method and equipment therefor of a kind of elevator
CN201334769Y (en) Attached type lifting scaffold with double guide rails
CN108004931B (en) Using the method for mixing drag-line construction steel reinforced concrete combination beam
CN206385466U (en) A kind of Coping Construction platform
CN209456892U (en) Cable-stayed bridge steel overhangs structure of sidewalk
CN205917601U (en) Integrally lift up device of bridge arch rib
CN206581147U (en) The support system constructed for bridge long-cantilever capping beam
CN209293474U (en) A kind of support device that cantilevered structure falsework is shared with external scaffolding
CN208309396U (en) A kind of bridge pier column overturn-preventing operation platform
CN107416685A (en) Installation of gas pipeline construction method and its supporting structure on the downside of a kind of bridge
CN205873594U (en) Special construction elevator of cooling tower section of thick bamboo wall
CN205329550U (en) Suspension bridge catwalk system
CN206957183U (en) Elevator hoisting frame
CN201495555U (en) Cap tower-crane foundation of concrete cast-in-place high pile for tower erection at the house center
CN203475801U (en) Telescopic steel platform for elevator shaft
CN205822454U (en) A kind of welding lattice column device
CN206220534U (en) The pump line support meanss of concrete pumping equipment
CN105155832B (en) A kind of hanging basket equipment and its moving method
CN105649209B (en) Applied to the hanging rack system in lifting platform small space
CN207063676U (en) Swing suspension column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170808

Termination date: 20211230