CN105649209B - Applied to the hanging rack system in lifting platform small space - Google Patents

Applied to the hanging rack system in lifting platform small space Download PDF

Info

Publication number
CN105649209B
CN105649209B CN201610113723.1A CN201610113723A CN105649209B CN 105649209 B CN105649209 B CN 105649209B CN 201610113723 A CN201610113723 A CN 201610113723A CN 105649209 B CN105649209 B CN 105649209B
Authority
CN
China
Prior art keywords
pedal
rectangle frame
turnover panel
rack system
hanging rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610113723.1A
Other languages
Chinese (zh)
Other versions
CN105649209A (en
Inventor
苏亚武
邓明胜
周洪涛
柯子平
裴鸿斌
刘鹏
杨俊鹏
杨红岩
于海申
左宣
陈刚
韩冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201610113723.1A priority Critical patent/CN105649209B/en
Publication of CN105649209A publication Critical patent/CN105649209A/en
Application granted granted Critical
Publication of CN105649209B publication Critical patent/CN105649209B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/24Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Types And Forms Of Lifts (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention provides a kind of hanging rack system applied in lifting platform small space, in the lifting platform, small space is formed between wall and construction elevator or inside-climbing tower crane, the hanging rack system includes:The truss of the lifting platform and two vertical rods in the small space are hung on side by side;Interval is connected to multiple connecting rods of two vertical rods;The hanger pedal being fixed in the connecting rod;It is articulated with the turnover panel of the hanger pedal;And drawknot is in the turnover panel and the tension member of the vertical rod.The present invention solves the problems such as being difficult to arrange hanger in lifting platform small space.

Description

Applied to the hanging rack system in lifting platform small space
Technical field
The present invention relates to construction of super highrise building field, and in particular to a kind of extension applied in lifting platform small space Frame system.
Background technology
With scientific and technological progress and the raising of construction technology, Super High heavy construction is more and more, Super High Core Walls Structure knot Structure horizontal structure is often separately constructed with vertical structure, and Core Walls Structure vertical structure is using the formwork system-entirety that can be climbed certainly Lifting platform.Super High integral jacking platform includes jack-up system, trussing, hanging rack system and template system, jacking system Top lift is provided using oil cylinder working-pressure in system, passes through climbing for one floor of alternating lifting implementation of upper and lower box beam.
Because Super High high building is typically completed by the way of horizontal structure is separately constructed with vertical structure, therefore in wall , it is necessary to provide personnel's standing aisle for operations such as reinforcing bar colligation, formwork erections during construction, these aisle need to be abound with along wall. When completing the construction of Super High high building using lifting platform, double vertical rod hanger is set at all wall positions to provide personnel behaviour Make aisle.But in lifting platform, in tower crane position, wall and the space of construction elevator or inside-climbing tower crane are often more It is narrow, it is contemplated that the swing of inside-climbing tower crane, construction elevator in work progress, common hanger is difficult to carry out cloth in this position space Put, small space can not also meet space needed for extension under the double vertical rod of hanger.In addition, inside-climbing tower crane or construction elevator were being constructed Easily because hitting the walkway board in hanger in swing in journey so that walkway board hits wall, and then damages wall.
The content of the invention
The defects of to overcome present in prior art, now provide a kind of hanger system applied in lifting platform small space System, with solve to be difficult in lifting platform small space arrange hanger the problems such as.
To achieve the above object, a kind of hanging rack system applied in lifting platform small space, in the lifting platform It is interior, small space is formed between wall and construction elevator or inside-climbing tower crane, the hanging rack system includes:The top is hung on side by side The truss of peaceful and two vertical rods in the small space;Interval is connected to multiple connections of two vertical rods Bar;The hanger pedal being fixed in the connecting rod;It is articulated with the turnover panel of the hanger pedal;And drawknot in the turnover panel and The tension member of the vertical rod.
Hanging rack system of the present invention further improvement is that, the turnover panel include be articulated with the hanger pedal front end before End turnover panel and be articulated with the rear end turnover panel of the hanger pedal rear end, between the front end turnover panel and the vertical rod and it is described after Drawknot has the tension member between end turnover panel and the vertical rod.
Hanging rack system of the present invention further improvement is that, the hanger pedal includes pedal rectangle frame and is layed in institute State the pedal net on pedal rectangle frame;The front end turnover panel includes the multiple front end rectangle frames being hinged and is layed in described Front end expanded metal lath on the rectangle frame of front end, the front end rectangle frame for being close in the pedal rectangle frame are articulated with the pedal square Shape frame;The rear end turnover panel includes being articulated with the rear end rectangle frame of the pedal rectangle frame and is layed in the rear end rectangle frame On rear end expanded metal lath.
Hanging rack system of the present invention further improvement is that, between the front end rectangle frame both sides and two vertical rods with And correspond to drawknot between the rear end rectangle frame both sides and two vertical rods and have tension member.
Hanging rack system of the present invention further improvement is that, the pedal rectangle frame and the front end rectangle frame, described step on It is hinged between plate rectangle frame and the rear end rectangle frame, the two neighboring front end rectangle frame by hinge.
Hanging rack system of the present invention further improvement is that, the tension member includes:Rope, including relative first end and Second end;It is fixed in the vertical rod, the first fixture of first end for fixing the rope;And it is fixed on described turn over Second fixture at the second end on plate, for fixing the rope.
Hanging rack system of the present invention further improvement is that, first fixture includes the first fixed plate, described first Fixed plate is provided with corresponding first bolt hole with the vertical rod, and the first end for the rope is additionally provided with first fixed plate The first hanging hole worn;Second fixture includes the second fixed plate, and second fixed plate is provided with corresponding with the turnover panel The second bolt hole, the second hanging hole worn for the second end of the rope is additionally provided with second fixed plate.
Hanging rack system of the present invention further improvement is that, in addition to be fixed in the truss bottom of the lifting platform side by side Two skid beams, two vertical rods side by side correspond to is hung on two skid beams.
Hanging rack system of the present invention further improvement is that, the skid beam is I-beam, rod end both sides sandwiched There is supporting plate, the supporting plate top has upwardly extended riser, and the riser inner side is provided with the lower wing plate for being slidedly arranged on the I-beam Roller.
Hanging rack system of the present invention further improvement is that, the vertical rod both sides are folded with multipair clamping plate, the vertical rod bag Multiple bodies of rod are included, clamping plate described in each pair is located in the end of two adjacent bodies of rod, and the clamping plate on the body of rod with setting There is corresponding bolt hole.
The beneficial effects of the present invention are, by the way that two vertical rods are hung under the truss of the lifting platform side by side, and In the small space formed between wall and construction elevator or inside-climbing tower crane;Then, by pull-up tension member to incite somebody to action It is articulated with the hanger pedal and is intended for the turnover panel of wall and dig to certain angle of inclination, so as to when inside-climbing tower crane or construction electricity For ladder in work progress when hitting turnover panel in swing, the turnover panel of turnover will not strike wall, not only avoid damage wall Body, and solve the problems such as being difficult to arrange hanger in lifting platform small space.
Brief description of the drawings
Fig. 1 is the schematic diagram that hanging rack system of the present invention is hung in lifting platform.
Fig. 2 is the enlarged diagram in S1 regions in Fig. 1.
Fig. 3 is the enlarged diagram in the vertical rod S2 regions in fig. 2 in hanging rack system of the present invention.
Fig. 4 is the side view of the vertical rod in hanging rack system of the present invention.
Fig. 5 is the enlarged diagram in S3 regions in Fig. 4.
Fig. 6 is the enlarged diagram in S4 regions in Fig. 2.
Fig. 7 is the side view of the turnover panel in hanging rack system of the present invention.
Fig. 8 is the top view of the turnover panel in hanging rack system of the present invention.
Embodiment
Illustrate embodiments of the present invention below by way of specific instantiation, those skilled in the art can be by this specification Disclosed content understands other advantages and effect of the present invention easily.The present invention can also pass through specific realities different in addition The mode of applying is embodied or practiced, the various details in this specification can also be based on different viewpoints with application, without departing from Various modifications or alterations are carried out under the spirit of the present invention.
It should be noted that structure, ratio, size depicted in this specification institute accompanying drawings etc., only coordinating Content disclosed in bright book, so that those skilled in the art understands and reads, it is not limited to the enforceable limit of the present invention Fixed condition, therefore do not have technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size, not Influence under the effect of present invention can be generated and the purpose that can reach, all should still fall and be obtained in disclosed technology contents In the range of covering.It is meanwhile cited such as " on ", " under ", "left", "right", " centre " and " one " etc. in this specification Term, understanding for narration is merely convenient to, and is not used to limit the enforceable scope of the present invention, the change of its relativeness or tune It is whole, in the case where changing technology contents without essence, when being also considered as the enforceable category of the present invention.
Fig. 1, Fig. 2 and Fig. 4 are refer to, Fig. 1 is the schematic diagram that hanging rack system of the present invention is hung in lifting platform, and Fig. 2 is The enlarged diagram in S1 regions in Fig. 1, Fig. 4 are the side view of the vertical rod in hanging rack system of the present invention.
As shown in Figure 1, Figure 2 and Figure 4, the invention provides a kind of hanger system applied in lifting platform small space System, in the lifting platform, forms the small space, the extension between wall 13 and construction elevator 12 or inside-climbing tower crane 11 Frame system includes:The truss 10 of the lifting platform and two vertical rods 2 in the small space are hung on side by side;Interval It is connected to multiple connecting rods 3 of two vertical rods 2;The hanger pedal 4 being fixed in connecting rod 3;It is articulated with the turnover panel of hanger pedal 4 5;And drawknot is in turnover panel 5 and the tension member of vertical rod 26.In the use of the present invention, only two vertical rods 2 need to be hung on institute side by side Under the truss 10 for stating lifting platform, and the narrow and small sky formed between wall 13 and construction elevator 12 or inside-climbing tower crane 11 In;Then, dug by pull-up tension member 6 with will be articulated with hanger pedal 4 and be intended for the turnover panel 5 of wall 13 to a constant inclination Rake angle, so as to when inside-climbing tower crane 11 or construction elevator 12 in work progress when hitting turnover panel 5 in swing, turnover is turned over Plate 5 will not strike wall 13, not only avoid damage wall 13, and solve in lifting platform small space and be difficult to arrange The problems such as hanger.
Said modules are described in detail below.
Fig. 2, Fig. 4 and Fig. 5 are refer to, Fig. 5 is the enlarged diagram in S3 regions in Fig. 4, and two vertical rods 2 are hung on institute side by side Under the truss 10 for stating lifting platform, the bottom of truss 10 of the lifting platform is fixed with two skid beams 7 side by side, and two vertical rods 2 are simultaneously Row is corresponding to be hung under two skid beams 7.Skid beam 7 can be by opening up corresponding bolt hole on truss 10 and skid beam 7, passing through Bolt is arranged in corresponding bolt hole in truss 10 and skid beam 7, and then skid beam 7 is fixed on into the bottom of truss 10.It is preferred that it please join According to Fig. 5 and Fig. 6, Fig. 6 is the enlarged diagram in S4 regions in Fig. 2, and skid beam 7 is I-beam, and the top both sides of vertical rod 2 are folded with supporting plate 80, the top of supporting plate 80 has upwardly extended riser 81, and the inner side of riser 81 is provided with the roller 82 for the lower wing plate for being slidedly arranged on the I-beam. As shown in figure 5, two supporting plates 80 are located in the top both sides of vertical rod 2 respectively, fastening bolt is worn between supporting plate 80 and the top of vertical rod 2 83, and then vertical rod 2 can be hung on skid beam 7.As shown in fig. 6, two tops of supporting plate 80 have each extended over a riser 81 upwards, Two risers 81 are located in I-beam both sides.It is preferred that the spacing between two risers 81 is slightly larger than the lower wing plate of I-beam Width, roller 82 can be facilitated to be rolled on the lower wing plate of I-beam, so as to adjust the hanging position of vertical rod 2, be unlikely to roll again Wheel 82 skids off I-beam along I-beam both sides.
Refer to Fig. 2 and Fig. 3, Fig. 3 is the enlarged diagram in vertical rod 2 in hanging rack system of the present invention S2 regions in fig. 2, The both sides of vertical rod 2 are folded with multipair clamping plate 21, and vertical rod 2 includes multiple bodies of rod 20, and each pair clamping plate 21 is located in two adjacent bodies of rod 20 end, clamping plate 21 are provided with corresponding bolt hole with the body of rod 20.The length of vertical rod 2 can pass through increasing according to construction needs Subtract the body of rod 20 to adapt to the length of construction demand, dismantle for convenience or the body of rod 20 is installed, as shown in figure 3, the two neighboring body of rod 20 junction, being folded with a pair of clamping plates 21, i.e. two clamping plates 21 are located at the both sides of two adjacent junctions of the body of rod 20 respectively, The upper and lower ends of clamping plate 21 are connected to two adjacent bodies of rod 20.As shown in figure 3, the upper and lower ends of clamping plate 21 with it is adjacent Two bodies of rod 20 are provided with corresponding bolt hole, and bolt 22 is arranged in corresponding bolt hole, when dismantling the body of rod 20, need to only turn Bolt 22, bolt 22, which is extracted, can pull down clamping plate 21 and the body of rod 20 of lower section.
Fig. 2, Fig. 7 and Fig. 8 are refer to, Fig. 7 is the side view of the turnover panel in hanging rack system of the present invention, and Fig. 8 hangs for the present invention The top view of turnover panel in frame system, multiple intervals of connecting rod 3 are connected to two vertical rods 2, and hanger pedal 4 is fixed on described In connecting rod 3.It is preferred that as shown in figure 8, the spacing distance that the length of hanger pedal 4 corresponds between two vertical rods 2, hangs Frame pedal 4 includes the pedal rectangle frame 40 being fixed in connecting rod 3 and the pedal net 41 being layed on pedal rectangle frame 40.Such as Shown in Fig. 8, turnover panel 5 includes being articulated with the front end turnover panel 50 of the front end of hanger pedal 4 and is articulated with the rear end of hanger pedal 4 Rear end turnover panel 51, equal drawknot has tension member 6 between front end turnover panel 50 and vertical rod 2 and between rear end turnover panel 51 and vertical rod 2.Before End turnover panel 50 includes the multiple front end rectangle frames 500 being hinged and the front end expanded metal lath being layed on front end rectangle frame 500 501, the front end rectangle frame 500 for being close in pedal rectangle frame 40 is articulated with pedal rectangle frame 40;Rear end turnover panel 51 includes being articulated with The rear end rectangle frame 510 of pedal rectangle frame 40 and the rear end expanded metal lath 511 being layed on the rear end rectangle frame 510.Front end Corresponding between the both sides of rectangle frame 500 and two vertical rods 2 and drawknot between the both sides of rear end rectangle frame 510 and two vertical rods 2 has Tension member 6.Pedal rectangle frame 40 and front end rectangle frame 500, pedal rectangle frame 40 and rear end rectangle frame 510, two neighboring front end It is hinged between rectangle frame 500 by hinge.As depicted in figs. 1 and 2, front end turnover panel 50 is intended for wall 13, rear end turnover panel 51 Construction elevator 12 or inside-climbing tower crane 11 are intended for, when construction elevator 12 or inside-climbing tower crane 11 hit because of the swing in work progress During the rear end turnover panel 51, as shown in Figure 7 and Figure 8, by pull-up tension member 6, wall 13 will be adjacent in front end turnover panel 50 The front end rectangle frame 500 is dug to certain angle of inclination, so as to which the front end rectangle frame 500 of turnover is unlikely to strike wall Body 13, avoid damage wall 13.
As shown in Figure 2 and Figure 7, the drawknot of tension member 6 includes in turnover panel 5 and vertical rod 2, tension member 6:Rope 60, including it is relative First end and the second end;Be fixed in vertical rod 2, for stationary rope 60 first end the first fixture 61;It is and fixed In on turnover panel 5, for stationary rope 60 the second end the second fixture 62.First fixture 61, which includes first, to be fixed Plate, first fixed plate are provided with corresponding first bolt hole with vertical rod 2, are additionally provided with first fixed plate for rope 60 The first hanging hole that first end is worn;Second fixture 62 includes the second fixed plate, and second fixed plate is provided with corresponding with turnover panel 5 The second bolt hole, be additionally provided with the second hanging hole worn for the second end of rope 60 in second fixed plate.First fixture 61 and second fixed plate can be identical structure, it is preferred that rope 60 can be steel chain.
After with said structure feature, with reference to Fig. 1 and Fig. 2, the present invention can be implemented by procedure below:
First, two I-beams are fixed on to the bottom of truss 10 of the lifting platform, two vertical rods 2 are hung side by side Under two I-beams, the top both sides of vertical rod 2 are provided with the vertical of roller 82 by fixed supporting plate 80 on supporting plate 80 Plate 81 so that vertical rod 2 is slidedly arranged on the lower wing plate of the I-beam, is easy to adjust the hanging position of vertical rod 2;
Secondly, interval is connected with multiple connecting rods 3, and the fixed hanger pedal 4 in connecting rod 3 between two vertical rods 2;
Then, front end turnover panel 50 is articulated with to the front end of hanger pedal 4 by hinge, the front end of hanger pedal 4 is intended for Wall 13, rear end turnover panel 51 is articulated with to the rear end of hanger pedal 4;
Finally, tension part is set between front end turnover panel 50 and vertical rod 2 and between rear end turnover panel 51 and vertical rod 2, and led to Cross the rope 60 of pull-up tension member 6, by the front end rectangle frame 500 that wall 13 is adjacent in the front end turnover panel 50 dig to Certain angle of inclination, so as to be turned over when inside-climbing tower crane 11 or construction elevator 12 in work progress because hitting the rear end in swing During plate 51, the front end rectangle frame 500 of turnover will not strike wall 13, not only avoid damage wall 13, and solve The problems such as being difficult to arrange hanger in lifting platform small space.
The beneficial effects of the present invention are:
By the way that two vertical rods are hung under the truss of the lifting platform side by side, and it is located at wall and construction elevator or interior In the small space formed between climbing tower crane;Then, by pull-up tension member so that the hanger pedal and face will be articulated with Dug to the turnover panel in wall to certain angle of inclination, so as to work as inside-climbing tower crane or construction elevator in work progress because in swing And when hitting turnover panel, the turnover panel of turnover will not strike wall, not only avoid damage wall, and it is narrow to solve lifting platform The problems such as being difficult to arrange hanger in small space.
The present invention is described in detail above in association with accompanying drawing embodiment, those skilled in the art can be according to upper State and bright many variations example is made to the present invention.Thus, some details in embodiment should not form limitation of the invention, this Invention will be used as protection domain using the scope that appended claims define.

Claims (7)

1. a kind of hanging rack system applied in lifting platform small space, in the lifting platform, wall and construction elevator Or small space is formed between inside-climbing tower crane, it is characterised in that the hanging rack system includes:
The truss of the lifting platform and two vertical rods in the small space are hung on side by side;
Interval is connected to multiple connecting rods of two vertical rods;
The hanger pedal being fixed in the connecting rod, the hanger pedal include pedal rectangle frame and are layed in the pedal Pedal net on rectangle frame;
The turnover panel of the hanger pedal is articulated with, the turnover panel includes the front end turnover panel and hinge for being articulated with the hanger pedal front end The rear end turnover panel of the hanger pedal rear end is connected to, the front end turnover panel includes multiple front end rectangle frames and the paving being hinged Front end expanded metal lath on the front end rectangle frame, the front end rectangle frame for being close in the pedal rectangle frame are articulated with institute State pedal rectangle frame;The rear end turnover panel include be articulated with the pedal rectangle frame rear end rectangle frame and be layed in it is described after Hold the rear end expanded metal lath on rectangle frame;And
Drawknot between the turnover panel and the tension member of the vertical rod, the front end rectangle frame both sides and two vertical rods and Corresponding to drawknot between the rear end rectangle frame both sides and two vertical rods has tension member.
2. hanging rack system according to claim 1, it is characterised in that the pedal rectangle frame and the front end rectangle frame, It is hinged between the pedal rectangle frame and the rear end rectangle frame, the two neighboring front end rectangle frame by hinge.
3. hanging rack system according to claim 1, it is characterised in that the tension member includes:
Rope, including relative first end and the second end;
It is fixed in the vertical rod, the first fixture of first end for fixing the rope;And
It is fixed on the turnover panel, second fixture at the second end for fixing the rope.
4. hanging rack system according to claim 3, it is characterised in that
First fixture includes the first fixed plate, and first fixed plate is provided with corresponding first bolt with the vertical rod Hole, the first hanging hole worn for the first end of the rope is additionally provided with first fixed plate;
Second fixture includes the second fixed plate, and second fixed plate is provided with corresponding second bolt with the turnover panel Hole, the second hanging hole worn for the second end of the rope is additionally provided with second fixed plate.
5. hanging rack system according to claim 1, it is characterised in that also include the purlin for being fixed in the lifting platform side by side Two skid beams of frame bottom, two vertical rods correspond to be hung on two skid beams side by side.
6. hanging rack system according to claim 5, it is characterised in that the skid beam is I-beam, the rod end two Side is folded with supporting plate, and the supporting plate top has upwardly extended riser, has been provided with and is slidedly arranged under the I-beam on the inside of the riser The roller of wing plate.
7. hanging rack system according to claim 1, it is characterised in that the vertical rod both sides are folded with multipair clamping plate, described Vertical rod includes multiple bodies of rod, and clamping plate described in each pair is located in the end of two adjacent bodies of rod, the clamping plate and the bar Body is provided with corresponding bolt hole.
CN201610113723.1A 2016-03-01 2016-03-01 Applied to the hanging rack system in lifting platform small space Active CN105649209B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610113723.1A CN105649209B (en) 2016-03-01 2016-03-01 Applied to the hanging rack system in lifting platform small space

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610113723.1A CN105649209B (en) 2016-03-01 2016-03-01 Applied to the hanging rack system in lifting platform small space

Publications (2)

Publication Number Publication Date
CN105649209A CN105649209A (en) 2016-06-08
CN105649209B true CN105649209B (en) 2018-03-30

Family

ID=56491987

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610113723.1A Active CN105649209B (en) 2016-03-01 2016-03-01 Applied to the hanging rack system in lifting platform small space

Country Status (1)

Country Link
CN (1) CN105649209B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107268966B (en) * 2017-07-05 2019-09-20 中建三局第一建设工程有限责任公司 Folding rack and its installation method for low level jacking formwork system
CN107642048A (en) * 2017-09-22 2018-01-30 宁夏桥多美路桥钢模板科技有限公司 Pier stud high-altitude construction platform and high-altitude construction method
CN115929007B (en) * 2022-05-23 2024-09-24 中建七局第二建筑有限公司 Fixing device of building scaffold

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100895614B1 (en) * 2008-06-16 2009-05-06 이송복 Building construction method
CN201232343Y (en) * 2008-07-18 2009-05-06 中国建筑第四工程局有限公司 Hanging rack system
CN201339308Y (en) * 2008-12-23 2009-11-04 中国建筑第四工程局有限公司 Pylon guide device
JP2012007368A (en) * 2010-06-24 2012-01-12 Pica Corp Scaffolding device
CN205475706U (en) * 2016-03-01 2016-08-17 中国建筑第八工程局有限公司 Hanging rack system

Also Published As

Publication number Publication date
CN105649209A (en) 2016-06-08

Similar Documents

Publication Publication Date Title
CN106939707B (en) A kind of restricted clearance large-scale steel structure supporting platform from method for improving
CN105649209B (en) Applied to the hanging rack system in lifting platform small space
CN104763109B (en) Quick construction method for pressed bottom tile of large-span steel structure factory building roof
WO2020052291A1 (en) Construction elevator wall-attaching frame mounting platform attached to steel platform formwork and method therefor
CN105317205B (en) The construction method and equipment therefor of a kind of elevator
CN205475706U (en) Hanging rack system
CN103422662A (en) Integral mobile construction platform for cast-in-place of elevator shaft and method for using same
CN106638335A (en) Beam-end working hanging basket for stay cable or sling replacement and the method for stay cable or sling replacement beam-end operation thereof
CN104153586A (en) Construction method for installing purline through suspension cable cranes
CN206844431U (en) A kind of curtain wall construction support
CN212103679U (en) A construction platform for installation of assembled tower
CN101624872B (en) Movable type scaffold bracket for overhead construction of building engineering
CN107902536B (en) Improved method and structure of lifting cage for building
CN207973471U (en) A kind of quick-assembling column type overhead operation platform
CN201649607U (en) Overhung-type outer wall scaffold
CN110344334A (en) Steel reinforced concrete combined bridge construction method is done using two bridgings of dorsal funciculus formula Bridge Erector
CN205475709U (en) A scalable stores pylon for high -rise, super high -rise building jacking platform
CN108589552A (en) A kind of collapsible suspension apparatus
CN211369478U (en) Door type structural hanging basket suspension structure mounting system
CN208830767U (en) A kind of assembled architecture hoistway regularization protection and vertical passageway device
CN203904839U (en) Combined hanging basket structure
CN108071078A (en) A kind of steel construction arch rib vertical turning lifting construction method
CN208310158U (en) Construction protection crosshead
CN107245956B (en) A kind of construction method of steel arch bridge
CN207144440U (en) A kind of integrated Construction of Supporting security platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant