CN209674587U - Assembled architecture lifts device for training skill - Google Patents
Assembled architecture lifts device for training skill Download PDFInfo
- Publication number
- CN209674587U CN209674587U CN201822167051.XU CN201822167051U CN209674587U CN 209674587 U CN209674587 U CN 209674587U CN 201822167051 U CN201822167051 U CN 201822167051U CN 209674587 U CN209674587 U CN 209674587U
- Authority
- CN
- China
- Prior art keywords
- prefabricated panel
- regulating device
- bearing plate
- wallboard
- horizontal position
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to assembled architectures to lift device for training skill, including bearing plate, horizontal position regulating device, perpendicularity regulating device and prefabricated panel;The bearing plate is made by light-weight high-strength material, and bearing plate periphery is equipped with the wallboard connecting with prefabricated panel and connects short muscle;The prefabricated panel is mounted on above bearing plate edge, and the pre-buried grout sleeve of the short muscle of wall connecting and prefabricated panel bottom on bearing plate is cooperatively connected;Prefabricated panel is equipped with wallboard temporary supporting and fixing device.The beneficial effects of the utility model are: the instructional device that the present apparatus can be used as assembled architecture lifting operation uses, construction, installation process and the Installation Considerations of prefabricated panel are explained by the device, during education activities are carried out, can using the present apparatus as the teaching aid of precast shear wall wallboard come using, professional teachers control is in kind and atlas is explained, and is conducive to grasp of the student to professional knowledge.
Description
Technical field
The utility model relates to a kind of device for training skill, and in particular to a kind of assembled architecture lifting skill training dress
It sets.
Background technique
Pre-cast building has had nearly 30 years development courses in China, recent years under the support energetically of national policy,
The assembled architecture in China has obtained tremendous development.Assembled architecture component component production plant rises sheer from level ground throughout the country,
The assembled architecture accounting and assembly rate in each province and city rise year by year, and assembled architecture has become the leading of construction industry transition and upgrade
Direction.While assembled architecture great development like a raging fire, many Prefabrication factories and assembled architecture construction project department
Complaint can not find suitable assembled architecture worker, and assembled architecture personnel training becomes the bottleneck for restricting building industrialization.Make
For the Building class college Architecture Colleges of assembled architecture industrial worker's culturing base, although it is relevant to have opened up assembled architecture
Course, but due to lacking the relevant teaching aid of assembled architecture on the market, directly with true assembled architecture component into
Row teaching, the safety problem of student can not ensure that, because true assembly concrete component is very heavy, each component has number
Ton weight, and the assembled architecture industrial worker that a line needs that constructs wants theory and practice that will be proficient in, Building class universities
Assembled architecture theory teaching can be smoothly completed, in the case where lacking actual training device, universities are difficult to complete technical ability
The teaching of operating aspect, especially organizing competition, because contest is formed with the technical ability of student very big facilitation, because
This, urgent need, which is ground, creates a kind of assembled architecture lifting device for training skill, to meet Building class professional colleges to assembled industry work
The needs of people's progress Skill Development.
Utility model content
The purpose of the utility model is to overcome deficiencies in the prior art, provide a kind of assembled architecture lifting skill training
Device.
This assembled architecture lifts device for training skill, including bearing plate, horizontal position regulating device, verticality tune
Regulating device and prefabricated panel;The bearing plate is made by light-weight high-strength material, and bearing plate periphery is equipped with and dry wall
The wallboard of plate connection connects short muscle;The prefabricated panel is mounted on above bearing plate edge, the wallboard connection on bearing plate
Short muscle is cooperatively connected with the pre-buried grout sleeve in prefabricated panel bottom;Prefabricated panel is equipped with wallboard temporary supporting and fixing device,
Bearing plate is equipped with bottom plate temporary supporting and fixing device;Wallboard temporary supporting and fixing device and bottom plate temporary supporting and fixing device
Between be equipped with horizontal position regulating device or perpendicularity regulating device;Prefabricated panel is adjusted horizontal by horizontal position regulating device
Position, horizontal position regulating device upper and lower side are separately fixed on prefabricated panel and bearing plate by bolt;Prefabricated panel
Verticality is installed to adjust by perpendicularity regulating device, perpendicularity regulating device upper and lower side is separately fixed at dry wall by bolt
On plate and bearing plate;Built-in hanger is embedded in prefabricated panel inner top;The horizontal position regulating device and verticality are adjusted
Extension adjustment device is equipped in the middle part of device, horizontal position regulating device and perpendicularity regulating device upper and lower side connect with anchor plate
It connects;The prefabricated panel two sides are equipped with the exposed muscle of wall for the connection between prefabricated panel;The grout sleeve is for connecting
Lower layer's vertical member is attached at the top of the prefabricated panel of lower layer in the grout sleeve of the prefabricated panel on dowel insertion upper layer.
As preferred: grout sleeve lower part is equipped with sleeve grout hole, and grout sleeve top is equipped with sleeve slurry outlet.
As preferred: wallboard temporary supporting and fixing device and bottom plate temporary supporting and fixing device are the pre-buried dress with internal thread
It sets, specification is matched with bolt.
As preferred: anchor plate is equipped with bolt hole, and specification is matched with bolt.
The beneficial effects of the utility model are:
(1) instructional device that the present apparatus can be used as assembled architecture lifting operation uses, and is explained by the device prefabricated
Construction, installation process and the Installation Considerations of wallboard can be cut during education activities are carried out using the present apparatus as prefabricated
The teaching aid of power wall wallboard comes using professional teachers control is in kind and atlas is explained, and is conducive to student to professional knowledge
Grasp.
(2) actual training device that the present apparatus can be used as assembled architecture lifting operation uses, this teaching training apparatus is with gently
Matter Materials with High Strength replaces concrete, greatly alleviates dead load, only the 1/ of comparable size concrete prefabricated element weight
20 or so, student can complete installation and removal by small lifting equipment, and the lifting operation of prefabricated panel is repeated, is hanging
The lifting technical ability that assembled architecture is cultivated during dress accumulates assembled architecture lifting operation experience, breaks through the behaviour of student comprehensively
Make technical ability, and ensure that the safety of entire practice teaching.
(3) present apparatus can be used as the race event devices of assembled architecture lifting operation, since the wall on bearing plate connects
It is adjustable to connect reinforcement location, several different types of prefabricated panel installation sports can be set, assembled by the device
Formula building lifting Skill Competition, promotes the training enthusiasm of student by contest, achievees the purpose that match and promote to learn.
Detailed description of the invention
Fig. 1 is that assembled architecture lifts device for training skill schematic diagram;
Fig. 2 is bearing plate schematic diagram;
Fig. 3 is prefabricated panel schematic diagram;
Fig. 4 is horizontal position regulating device schematic diagram;
Fig. 5 is perpendicularity regulating device schematic diagram.
Description of symbols: 01 bearing plate, 02 wallboard connect short muscle, 03 bottom plate temporary supporting and fixing device, 04 wallboard
Temporary supporting and fixing device, 05 horizontal position regulating device, 06 perpendicularity regulating device, 07 prefabricated panel, 08 built-in hanger,
09 extension adjustment device, the exposed muscle of 10 walls, 11 grout sleeves, 12 bolts, 13 anchor plates, 14 bolts hole, 15 sleeve grout holes,
16 sleeve slurry outlets.
Specific embodiment
The utility model is described further below with reference to embodiment.The explanation of following embodiments is only intended to help to manage
Solve the utility model.It should be pointed out that for those skilled in the art, not departing from the utility model principle
Under the premise of, several improvements and modifications can be made to this utility model, these improvement and modification also fall into the utility model
In scope of protection of the claims.
As shown in Figures 1 to 5, the assembled architecture lifts device for training skill, including bearing plate 01, wallboard connect
It connects short muscle 02, bottom plate temporary supporting and fixing device 03, wallboard temporary supporting and fixing device 04, horizontal position regulating device 05, hang down
Straight degree regulating device 06, prefabricated panel 07, built-in hanger 08, extension adjustment device 09, the exposed muscle 10 of wall, grout sleeve 11,
Bolt 12, anchor plate 13, bolt hole 14, sleeve grout hole 15, sleeve slurry outlet 16.
The bearing plate 01 is made by light-weight high-strength material, is the bearing system of entire device for training skill, branch
It holds 01 periphery of bottom plate and is equipped with the short muscle 02 of wallboard connection connecting with prefabricated panel 07;The prefabricated panel 07 passes through lifting equipment
It slings, prefabricated panel 07 is mounted on above 01 edge of bearing plate, and the short muscle 02 of wallboard connection on bearing plate 01 is inserted into prefabricated
In the pre-buried grout sleeve 11 in 07 bottom of wallboard, so that prefabricated panel 07 is reliably connected with bearing plate 01;Under grout sleeve 11
Portion is equipped with sleeve grout hole 15, and 11 top of grout sleeve is equipped with sleeve slurry outlet 16;Prefabricated panel 07 is equipped with wallboard and temporarily props up
Fixed device 04 is supportted, bearing plate 01 is equipped with bottom plate temporary supporting and fixing device 03, and temporary supporting and fixing device is band internal thread
Pre-embedded device, specification matches with bolt 12;Wallboard temporary supporting and fixing device 04 is fixed with bottom plate temporary support
Horizontal position regulating device 05 or perpendicularity regulating device 06 are equipped between device 03;It is prefabricated in order to guarantee in hoisting process
The installation site of wallboard meets design requirement, and after prefabricated panel 07 is in place, prefabricated panel 07 passes through horizontal position regulating device
05 adjusts horizontal position, and regulating device 05 upper and lower side in horizontal position is separately fixed at prefabricated panel 07 and bearing bottom by bolt 12
On plate 01;The installation verticality of prefabricated panel 07 is adjusted by perpendicularity regulating device 06,06 upper and lower side of perpendicularity regulating device
It is separately fixed on prefabricated panel 07 and bearing plate 01 by bolt 12;The built-in hanger 08 is embedded in prefabricated panel 07
Inner top, when lifting, the dedicated hook of lifting equipment is hung on built-in hanger 08, entire prefabricated panel 07 is lifted into specified
It is installed position;The extension adjustment device 09 is arranged in horizontal position regulating device 05 and perpendicularity regulating device 06,
Horizontal position regulating device 05 and the length of perpendicularity regulating device 06 can be made to change by extension adjustment device 09, from
And achieve the purpose that finely tune horizontal position and verticality;Horizontal position regulating device 05 and 06 upper and lower side of perpendicularity regulating device are equal
It is connect by bolt with anchor plate 13, anchor plate 13 is equipped with bolt hole 14, and specification is matched with bolt 12;The wall
The exposed muscle 10 of body is set to the connection that 07 two sides of prefabricated panel are used between prefabricated panel 07 and allows behind exposed muscle region after pouring concrete
Each prefabricated panel is connected to become stress entirety, strengthens the stress performance in total system horizontal direction;The grouting
Sleeve 11 is inserted into the prefabricated panel 07 on upper layer for connecting upper and lower level vertical member, the 07 top dowel of prefabricated panel of lower layer
It is attached in grout sleeve 11, and makes upper and lower level component vertical in slurries pressing-in grouting sleeve 11 by pressure grouting
Side is upwardly formed stress entirety.
The bottom plate temporary supporting and fixing device 03 is the pre-embedded device with internal thread, and position needs random according to skill training
Setting, specification and bolt 12 are suitable;Wallboard temporary supporting and fixing device 04 is the pre-embedded device with internal thread, specification ruler
It is very little suitable with bolt 12.
The horizontal position regulating device 05 and 06 upper and lower side of perpendicularity regulating device are connect with movable anchor plate 13,
Anchor plate 13 is equipped with bolt hole 14, and dimensions is matched with bolt 12.Horizontal position regulating device 05 and verticality tune
Regulating device 06 changes length by extension adjustment device 09.The work of horizontal position regulating device 05 and perpendicularity regulating device 06
With other than being used to adjust horizontal position and the verticality of prefabricated panel 07, after prefabricated panel 07 is in place, horizontal position tune
Regulating device 05 and perpendicularity regulating device 06 also act as the temporary fastening device of prefabricated panel 07, when the level of prefabricated panel 07
It, should be immediately by horizontal position regulating device 05 and perpendicularity regulating device 06 and prefabricated panel 07 and bearing after position is adjusted
01 fixation of bottom plate can remove horizontal position adjusting after the slurries poured into grout sleeve 11 reach design strength
Device 05 and perpendicularity regulating device 06.
The bearing plate 01 is the load-carrying members of entire assembled architecture lifting device for training skill, it is necessary to have enough
Intensity, rigidity, it is contemplated that carry and the needs of real training, bearing plate 01 be made using light-weight high-strength material, not only such as
This, in installation region, according to the requirement of building basic module, on bearing plate 01, spaced set is several connects with prefabricated panel 07
The wallboard connect connects short muscle 02, and wallboard, which connects short muscle 02, can according to need the suitable position for being arranged in 01 installation region of bearing plate
It sets, to meet the various demands of the lifting teaching and requirement, the even contest of skill training of different types of prefabricated wallboard.
The prefabricated panel 07 is process using light-weight high-strength material, effectively alleviates the weight of whole device, in advance
The quality of wallboard lifting device for training skill processed is only 1/20th or so of the concrete prefabricated wallboard of comparable size, real training
In the process, small-sized lifting equipment is only needed to assist installation.In addition, the construction of prefabricated panel is in strict accordance with assembled architecture
Standard design drawing collection requires to carry out, and can carry out the teaching that assembled architecture knows figure, construction aspect by this device, realize in kind
The one-to-one correspondence of teaching methodology and atlas teaching.
The present apparatus can be used as the race event devices of assembled architecture lifting operation, since the wall on bearing plate connects steel
Muscle position is adjustable, and several different types of prefabricated panel installation sports can be set, carry out assembled by the device and build
Lifting Skill Competition is built, promotes the training enthusiasm of student by contest, is achieved the purpose that match and promote to learn.In order to increase contest
Difficulty, if the precast shear wall wallboard of dry type can be produced, contestant, which draws lots, to be determined to lift what type of precast shear wall
Wallboard, player is according to sign, and by small lifting equipment, hook installation, the examination for completing lightweight precast shear wall wallboard hang, lift by crane
It is preceding check, lifting, interim in place, correction, in place, installation length supports and are fixed temporarily, the installation site of adjustment member and vertical
Straight degree, fastening length diagonal brace, remove the entire racing operation such as suspension hook, the hoisting process of real simulation precast shear wall wallboard, ginseng
Player is matched by conditioning, promotes the technical ability of assembled architecture lifting, and lifting technical ability is examined and consolidated by contest, is reached
The teaching efficiency promoted exercise by contest provides convenience to cultivate qualified assembled architecture industrial worker.
Claims (4)
1. assembled architecture lifts device for training skill, it is characterised in that: including bearing plate (01), horizontal position regulating device
(05), perpendicularity regulating device (06) and prefabricated panel (07);Bearing plate (01) periphery is equipped with and prefabricated panel (07)
The wallboard of connection connects short muscle (02);The prefabricated panel (07) is mounted on above bearing plate (01) edge, bearing plate
(01) wallboard on connects short muscle (02) and is cooperatively connected with the pre-buried grout sleeve (11) in prefabricated panel (07) bottom;Prefabricated panel
(07) it is equipped with wallboard temporary supporting and fixing device (04), bearing plate (01) is equipped with bottom plate temporary supporting and fixing device
(03);It is equipped with horizontal position between wallboard temporary supporting and fixing device (04) and bottom plate temporary supporting and fixing device (03) and adjusts dress
Set (05) or perpendicularity regulating device (06);Prefabricated panel (07) adjusts horizontal position by horizontal position regulating device (05),
Regulating device (05) upper and lower side in horizontal position is separately fixed on prefabricated panel (07) and bearing plate (01) by bolt (12);
The installation verticality of prefabricated panel (07) is adjusted by perpendicularity regulating device (06), and perpendicularity regulating device (06) upper and lower side is logical
Bolt (12) is crossed to be separately fixed on prefabricated panel (07) and bearing plate (01);Built-in hanger (08) is embedded in prefabricated panel
(07) inner top;Extension adjustment device is equipped in the middle part of the horizontal position regulating device (05) and perpendicularity regulating device (06)
(09), horizontal position regulating device (05) and perpendicularity regulating device (06) upper and lower side are connect with anchor plate (13);It is described pre-
Wallboard (07) two sides processed are equipped with the exposed muscle of wall (10);The dry wall on dowel insertion upper layer at the top of the prefabricated panel (07) of lower layer
It is attached in the grout sleeve (11) of plate (07).
2. assembled architecture according to claim 1 lifts device for training skill, it is characterised in that: under grout sleeve (11)
Portion is equipped with sleeve grout hole (15), and grout sleeve (11) top is equipped with sleeve slurry outlet (16).
3. assembled architecture according to claim 1 lifts device for training skill, it is characterised in that: wallboard temporary support is solid
Determine device (04) and bottom plate temporary supporting and fixing device (03) is the pre-embedded device with internal thread, specification and bolt (12)
It matches.
4. assembled architecture according to claim 1 lifts device for training skill, it is characterised in that: anchor plate is set on (13)
There are bolt hole (14), specification is matched with bolt (12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822167051.XU CN209674587U (en) | 2018-12-24 | 2018-12-24 | Assembled architecture lifts device for training skill |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822167051.XU CN209674587U (en) | 2018-12-24 | 2018-12-24 | Assembled architecture lifts device for training skill |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209674587U true CN209674587U (en) | 2019-11-22 |
Family
ID=68563136
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822167051.XU Expired - Fee Related CN209674587U (en) | 2018-12-24 | 2018-12-24 | Assembled architecture lifts device for training skill |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209674587U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111561061A (en) * | 2020-03-24 | 2020-08-21 | 河北工业大学 | Assembled wallboard, wall structure and construction method of wall structure |
CN113781890A (en) * | 2021-09-10 | 2021-12-10 | 南京宝舜达信息技术有限公司 | Equipment of buildding based on lightweight BIM building model |
CN114530090A (en) * | 2020-12-01 | 2022-05-24 | 浙江太学科技集团有限公司 | Can confirm to beat assembly type structure outer wall of gluing closely knit degree and glue real standard device |
-
2018
- 2018-12-24 CN CN201822167051.XU patent/CN209674587U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111561061A (en) * | 2020-03-24 | 2020-08-21 | 河北工业大学 | Assembled wallboard, wall structure and construction method of wall structure |
CN114530090A (en) * | 2020-12-01 | 2022-05-24 | 浙江太学科技集团有限公司 | Can confirm to beat assembly type structure outer wall of gluing closely knit degree and glue real standard device |
CN114530090B (en) * | 2020-12-01 | 2023-12-22 | 浙江太学科技集团有限公司 | Building outer wall gluing training device capable of determining gluing compactness |
CN113781890A (en) * | 2021-09-10 | 2021-12-10 | 南京宝舜达信息技术有限公司 | Equipment of buildding based on lightweight BIM building model |
CN113781890B (en) * | 2021-09-10 | 2023-11-14 | 南京宝舜达信息技术有限公司 | Building equipment based on light BIM building model |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209674587U (en) | Assembled architecture lifts device for training skill | |
CN101672102B (en) | Steel structural overhead ceiling construction platform | |
CN207966282U (en) | Fabricated construction system demonstration lesson platform | |
CN106703420A (en) | Large-span ball joint spherical wire frame cluster rocker hoisting construction method | |
CN105464456B (en) | Go straight up to method and suspender that unit founds UHV transmission steel tower | |
CN107217775A (en) | The design and installation integral method of the reverse support system structure of furred ceiling | |
CN108019225A (en) | Hydraulic moving formula subway station side wall formwork jumbo | |
CN208889184U (en) | A kind of assembled architecture comprehensive practical traning model | |
CN205259235U (en) | High strain detection isolated plant of foundation pile | |
CN208363461U (en) | A kind of segmented steel reinforced concrete assembling stair | |
CN208121589U (en) | Large-tonnage highway ramp spells wide beam construction equipment | |
CN207718654U (en) | Precast shear wall Side fascia teaching training apparatus | |
CN206319628U (en) | One kind building assembled wallboard fitting machine | |
CN207690339U (en) | Truss bars superimposed sheet teaching training apparatus | |
CN208265608U (en) | Large-tonnage hoisting device for reinforcement cage | |
CN207663599U (en) | Precast stair teaching training apparatus | |
CN209635721U (en) | A kind of clear-water concrete GRC plate lifting balancing device | |
CN208848484U (en) | Housing construction teaching facilities | |
CN203625891U (en) | Hanging structure for large-diameter hole drilling cast pile reinforcement cage hanging | |
CN209161290U (en) | The suspender of multiple concrete prefabricated beams capable of hoisting | |
CN206331735U (en) | Cast-in-situ bored pile suspension roof support node instructional device | |
CN208814490U (en) | A kind of novel drainage ditch cover plate hanging apparatus | |
CN203795318U (en) | Integral hoisting system for rebar cage for large members | |
CN208848485U (en) | Shear wall and raft foundation construction teaching facilities | |
CN206090314U (en) | Steel anchor beam lifting sling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200429 Address after: 322100 nanxitan, Liushi street, Dongyang City, Jinhua City, Zhejiang Province Patentee after: Zhejiang Tai Xue Construction Technology Co.,Ltd. Address before: Room 1101, floor 11, building 4, CHUANGMEI Huacai center, Sandun Town, Xihu District, Hangzhou City, Zhejiang Province Patentee before: Zhejiang Taixue Industry Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191122 Termination date: 20211224 |