CN204112242U - A kind of Concrete Filled Steel-tube Truss Arch Bridge suspender replacement special tool boom system - Google Patents

A kind of Concrete Filled Steel-tube Truss Arch Bridge suspender replacement special tool boom system Download PDF

Info

Publication number
CN204112242U
CN204112242U CN201420503952.0U CN201420503952U CN204112242U CN 204112242 U CN204112242 U CN 204112242U CN 201420503952 U CN201420503952 U CN 201420503952U CN 204112242 U CN204112242 U CN 204112242U
Authority
CN
China
Prior art keywords
suspension rod
replaced
tensioning system
hoisting
batten plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420503952.0U
Other languages
Chinese (zh)
Inventor
朱慈祥
陈进
盛海军
赵东奎
晏国泰
王世祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Road and Bridge Special Engineering Co Ltd
Original Assignee
CCCC Road and Bridge Special Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Road and Bridge Special Engineering Co Ltd filed Critical CCCC Road and Bridge Special Engineering Co Ltd
Priority to CN201420503952.0U priority Critical patent/CN204112242U/en
Application granted granted Critical
Publication of CN204112242U publication Critical patent/CN204112242U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to field of bridge construction, refers to a kind of Concrete Filled Steel-tube Truss Arch Bridge suspender replacement special tool boom system particularly.Comprise leveling unit, tensioning system, interim suspension rod and pocket device for hoisting; Leveling unit is fixed on the batten plate of the top of suspension rod to be replaced; Tensioning system is symmetricly set on suspension rod both sides to be replaced; Interim suspension rod upper end is connected with tensioning system through batten plate, leveling unit, and lower end is connected with pocket device for hoisting through the bridge floor immediately below suspension rod to be replaced; Pocket device for hoisting two ends are fixed on the floor beam lower end of suspension rod vertical lower to be replaced by interim suspension rod.The utility model fixes tensioning system by levelling cushion block, avoid the globality destroying steel pipe arch ring, do not affect the intensity of steel pipe arch ring, levelling cushion block is fixed on batten plate can remove and reuses in addition, reduce the cost changing suspension rod, save the working time, installation and maintenance easy construction, there is larger promotional value.

Description

A kind of Concrete Filled Steel-tube Truss Arch Bridge suspender replacement special tool boom system
Technical field
The utility model relates to field of bridge construction, refers to a kind of Concrete Filled Steel-tube Truss Arch Bridge suspender replacement special tool boom system particularly.
Background technology
Along with the development of economic society, steel arch bridge, the construction comprising concrete-filled steel tubes arch bridge gets more and more, and suspension rod is the component of its most critical.At present, China has implemented the suspender replacement of many concrete-filled steel tubes arch bridge, define multiple suspender replacement implementation method, wherein the most commonly arch ring top is symmetrical in suspension rod and arranges leveling unit, leveling unit arranges semi girder, and under bridge deck crossbeam, be symmetrical in suspension rod pocket device for hoisting is set, by punching jack tension fining twisted steel or steel strand at the bottom of vault or crossbeam, suspension rod power is transformed on interim instrument derrick rig.This kind of instrument derrick rig can be replaced in the equivalence of realizable force preferably, but for the concrete-filled steel tubes arch bridge of Long span, arrange leveling unit at arch ring top generally need bar planting or be welded and fixed, arch ring can be damaged like this, affect bearing capacity, after removing, generally can cause larger impact to arch ring outward appearance simultaneously.
Summary of the invention
The purpose of this utility model is exactly the deficiency that will solve above-mentioned background technology, provides a kind of Concrete Filled Steel-tube Truss Arch Bridge suspender replacement special tool boom system.
The technical solution of the utility model is: a kind of Concrete Filled Steel-tube Truss Arch Bridge suspender replacement special tool boom system, is characterized in that: comprise batten plate, leveling unit, tensioning system, interim suspension rod and pocket device for hoisting; Described batten plate is fixed on the arch ring below steel pipe main arch; Described leveling unit is arranged on batten plate centre position, is arranged in the both sides of suspension rod to be replaced in mode symmetrical between two; Described interim suspension rod upper end is connected with tensioning system through the truss of main arch steel pipe composition, and lower end is connected with pocket device for hoisting through the bridge floor below suspension rod to be replaced; Described tensioning system is fixed on the level leveling face of leveling unit; Described pocket device for hoisting two ends are fixed on the floor beam lower end of suspension rod vertical lower to be replaced by interim suspension rod.
Further described leveling unit comprises levelling cushion block; Described levelling cushion block lower surface laminating batten plate, upper end is provided with the horizontal plane of fixing tensioning system.
Further described pocket device for hoisting comprises shoulder pole girder; Described shoulder pole girder two ends are connected with interim suspension rod, and upper surface contacts with the lower surface of the floor beam of suspension rod vertical lower to be replaced.
The utility model fixes tensioning system by levelling cushion block, avoid the globality destroying steel pipe arch ring, do not affect the intensity of steel pipe arch ring, levelling cushion block is fixed on batten plate can remove and reuses in addition, reduce the cost changing suspension rod, save the working time, installation and maintenance easy construction, there is larger promotional value.
Accompanying drawing explanation
Fig. 1: the sectional drawing of the vertical bridge floor trend of the utility model;
Fig. 2: the structural representation that the utility model moves towards along bridge floor;
Fig. 3: tensioning system mounting structure schematic diagram of the present utility model;
Wherein: 1-steel pipe arch ring; 2-tensioning system; 3-leveling unit; 4-suspension rod to be replaced; 5-interim suspension rod; 6-pocket device for hoisting; 7-crossbeam; 8-bridge floor; 9-batten plate.
Detailed description of the invention
A kind of Concrete Filled Steel-tube Truss Arch Bridge suspender replacement special tool boom system as shown in Figures 1 to 3, comprise the batten plate 9 be fixed on steel pipe main arch bottom arch ring 1, batten plate 9 on steel pipe arch ring 1 is general with the gradient, if being directly arranged on by tensioning system 2 on batten plate 9 to make the pulling force of below not maintain vertical direction, therefore need to increase leveling unit 3.Leveling unit 3 is fixedly mounted on the centre position of batten plate 9 on main arch bottom arch ring 1.
Leveling unit 3 is for having the levelling cushion block identical with batten plate 9 gradient, levelling cushion block can form as required in interim concrete or other materials cast, levelling cushion block upper end horizontal plane installs tensioning system 2, and tensioning system 2 can be made like this to transmit the power of vertical direction.
Tensioning system 2 is fixed on levelling, the lower end of tensioning system 2 connects interim suspension rod 5, interim suspension rod 5 is fixed on tensioning system 2 through batten plate 9 and levelling cushion block, the hole that batten plate 9 and levelling cushion block bore is the vertical holes of vertical level, the connection of interim suspension rod 5 so not only can be facilitated to pass through, the movement of interim suspension rod 5 transverse direction can also be limited.Interim suspension rod 5 is generally arranged symmetrically in two side positions of suspension rod 4 to be replaced along bridge floor trend, be to ensure uniform force in stretching process like this.
Interim suspension rod 5 lower end connection flat spreader beam, the two ends of shoulder pole girder, by the crossbeam 7 being fastened on below suspension rod 4 to be replaced of interim suspension rod 5, are transferred on interim suspension rod 5 by the weight of shoulder pole girder by suspension rod 4 bridge section to be replaced.
During use, levelling cushion block is arranged on the batten plate 9 above suspension rod 4 to be replaced, centered by suspension rod 4 to be replaced, symmetry arrangement between two, levelling cushion block upper end horizontal plane fixes tensioning system 2, tensioning system 2 is generally jack, and the lower end of tensioning system 2 is connected with shoulder pole girder by interim suspension rod 5, and shoulder pole girder contacts with crossbeam 7.Regulate tensioning system 2 to make interim suspension rod 5 receive vertical load, interim suspension rod 5 is stressed to be delivered on shoulder pole girder, and shoulder pole girder holds up the weight of suspension rod 4 bridge section to be replaced, changes suspension rod 4 to be replaced, installs new suspension rod.
After suspender replacement completes, put a tensioning system 2, first remove interim suspension rod 5, shoulder pole girder, then remove tensioning system 2, wherein levelling cushion block can be removed, and carries out protection work, so that reuse later.
The utility model fixes tensioning system by levelling cushion block, avoid the globality destroying steel pipe arch ring, do not affect the intensity of steel pipe arch ring, levelling cushion block is fixed on batten plate can remove and reuses in addition, reduce the cost changing suspension rod, save the working time, installation and maintenance easy construction, there is larger promotional value.

Claims (3)

1. a Concrete Filled Steel-tube Truss Arch Bridge suspender replacement special tool boom system, is characterized in that: comprise batten plate (9), leveling unit (3), tensioning system (2), interim suspension rod (5) and pocket device for hoisting (6); Described batten plate (9) is fixed on the arch ring (1) below steel pipe main arch; Described leveling unit (3) is arranged on batten plate (9) centre position, is arranged in the both sides of suspension rod to be replaced (4) in mode symmetrical between two; Described interim suspension rod (5) upper end is connected with tensioning system (2) through the truss of main arch steel pipe composition, and lower end is connected with pocket device for hoisting (6) through the bridge floor (8) of suspension rod to be replaced (4) below; Described tensioning system (2) is fixed on the level leveling face of leveling unit (3); Described pocket device for hoisting (6) two ends are fixed on floor beam (7) lower end of suspension rod to be replaced (4) vertical lower by interim suspension rod (5).
2. a kind of Concrete Filled Steel-tube Truss Arch Bridge suspender replacement special tool boom system as claimed in claim 1, is characterized in that: described leveling unit (3) comprises levelling cushion block; Described levelling cushion block lower surface laminating batten plate (9), upper end is provided with the horizontal plane of fixing tensioning system (2).
3. a kind of Concrete Filled Steel-tube Truss Arch Bridge suspender replacement special tool boom system as claimed in claim 1, is characterized in that: described pocket device for hoisting (6) comprises shoulder pole girder; Described shoulder pole girder two ends are connected with interim suspension rod (5), and upper surface contacts with the lower surface of the crossbeam (7) of suspension rod to be replaced (4) vertical lower.
CN201420503952.0U 2014-09-03 2014-09-03 A kind of Concrete Filled Steel-tube Truss Arch Bridge suspender replacement special tool boom system Active CN204112242U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420503952.0U CN204112242U (en) 2014-09-03 2014-09-03 A kind of Concrete Filled Steel-tube Truss Arch Bridge suspender replacement special tool boom system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420503952.0U CN204112242U (en) 2014-09-03 2014-09-03 A kind of Concrete Filled Steel-tube Truss Arch Bridge suspender replacement special tool boom system

Publications (1)

Publication Number Publication Date
CN204112242U true CN204112242U (en) 2015-01-21

Family

ID=52329571

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420503952.0U Active CN204112242U (en) 2014-09-03 2014-09-03 A kind of Concrete Filled Steel-tube Truss Arch Bridge suspender replacement special tool boom system

Country Status (1)

Country Link
CN (1) CN204112242U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104929057A (en) * 2015-07-07 2015-09-23 合肥工业大学 Wrapping and hanging device with arch bridge suspenders convenient to replace
CN109162209A (en) * 2018-09-04 2019-01-08 广东和立土木工程有限公司 The quick-replaceable construction method of half-through and half/through arch bridge suspender
CN110593108A (en) * 2019-09-25 2019-12-20 中国五冶集团有限公司 Prefabricated construction platform and construction method for hollow arch bridge hanging beam support
CN110593109A (en) * 2019-09-25 2019-12-20 中国五冶集团有限公司 Cast-in-place construction platform and construction method for hollow arch bridge hanging beam support
CN114592420A (en) * 2022-03-15 2022-06-07 广西交科集团有限公司 Suspender system for simply replacing suspender and construction method for replacing suspender

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104929057A (en) * 2015-07-07 2015-09-23 合肥工业大学 Wrapping and hanging device with arch bridge suspenders convenient to replace
CN109162209A (en) * 2018-09-04 2019-01-08 广东和立土木工程有限公司 The quick-replaceable construction method of half-through and half/through arch bridge suspender
CN110593108A (en) * 2019-09-25 2019-12-20 中国五冶集团有限公司 Prefabricated construction platform and construction method for hollow arch bridge hanging beam support
CN110593109A (en) * 2019-09-25 2019-12-20 中国五冶集团有限公司 Cast-in-place construction platform and construction method for hollow arch bridge hanging beam support
CN114592420A (en) * 2022-03-15 2022-06-07 广西交科集团有限公司 Suspender system for simply replacing suspender and construction method for replacing suspender

Similar Documents

Publication Publication Date Title
CN204112242U (en) A kind of Concrete Filled Steel-tube Truss Arch Bridge suspender replacement special tool boom system
CN106978784B (en) A kind of Long span highway suspension bridge Demolition Construction method
CN102080357B (en) Integrated beam-falling device and method for steel pipe pier bailey beam cast-in-place bracket
CN104652298B (en) A kind of whole dismounting system and construction method thereof transferred across box beam supported based on bridge floor
CN102926332B (en) Derrick arrangement of tools for replacing steel arch bridge suspender and replacing method thereof
CN201459732U (en) Simple support guide device for pile casing sinking
CN203924147U (en) The compound counterforce device of anchoring pile ballast
CN206308702U (en) A kind of portable basis of derrick crane
CN203755173U (en) Formwork device used for hydraulic climbing of bridge high pier
CN201132941Y (en) Self floating lower carrying pole beam of moveable formwork
CN207047703U (en) A kind of beam piece prestressed stretch-draw jack easy device in place
CN207244425U (en) Part earth anchored suspension bridge
CN205772789U (en) A kind of transporting and hoisting device of prefabricated pile
CN102493367B (en) Non-blasting construction method for dismantling pier to land bridge
CN204174518U (en) A kind of bridge floor truss-like instrument boom system
CN204589823U (en) For the tension operation platform of expressway construction Prestressed Slab Beams
CN203403362U (en) Pretensioned prestressed pedestal
CN203403683U (en) Double-layer rib penetrating device
CN203699828U (en) Simple tool-type lifting frame for mounting of steel reinforcement cages
CN203795318U (en) Integral hoisting system for rebar cage for large members
CN203383563U (en) Fast assembled communication iron tower
CN204825670U (en) Inclined to one side hanging beam frame device is prevented turning round by eccentric case roof beam
CN202185973U (en) Device for assisting dismounting and installing T beam formwork
CN206090314U (en) Steel anchor beam lifting sling
CN202296886U (en) Hoisting device for installing oversized radial gate of hydropower station

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant