CN201132941Y - Mobile formwork self-floating lower shoulder beam - Google Patents
Mobile formwork self-floating lower shoulder beam Download PDFInfo
- Publication number
- CN201132941Y CN201132941Y CNU200720088693XU CN200720088693U CN201132941Y CN 201132941 Y CN201132941 Y CN 201132941Y CN U200720088693X U CNU200720088693X U CN U200720088693XU CN 200720088693 U CN200720088693 U CN 200720088693U CN 201132941 Y CN201132941 Y CN 201132941Y
- Authority
- CN
- China
- Prior art keywords
- girder
- steel
- self
- box
- beams
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本实用新型涉及一种桥梁施工中使用的钢梁,具体地说是一种用于节段梁架设的移动模架自浮式下扁担梁。它由钢梁(1)、梁间联结系(3)和吊耳(2)连接而成,其特征在于:所述的钢梁为变截面密封式箱形钢梁;变截面密封式箱形钢梁(1)与梁间联结系(3)焊接而成,箱形钢梁(1)两端通过销轴(4)连接吊耳2吊挂在造桥机主钢桁梁的横杆上。本实用新型在水域作业面采用箱形钢梁与梁间联结系组焊而成的自浮式下扁担梁,它具有结构简单、拆装运输方便的优点。过孔时利用提梁吊机将下扁担梁吊至水域面,利用扁担钢箱梁的自浮,拖运至下一孔就位,可以降低施工难度。
The utility model relates to a steel girder used in bridge construction, in particular to a movable formwork self-floating lower pole beam used for segmental girder erection. It is composed of steel girders (1), inter-beam linkages (3) and lifting lugs (2). The steel girder (1) is welded with the connecting system (3) between the girders, and the two ends of the box-shaped steel girder (1) are connected to the lifting lugs 2 through pin shafts (4) and hung on the cross bar of the main steel truss girder of the bridge building machine . The utility model adopts a self-floating lower pole beam formed by welding box-shaped steel beams and connecting systems between the beams on the working surface in the water area. It has the advantages of simple structure, convenient disassembly and transportation. When passing through the hole, use the beam lifting crane to lift the lower pole beam to the water surface, and use the self-flotation of the pole steel box girder to haul it to the next hole and put it in place, which can reduce the construction difficulty.
Description
技术领域 technical field
本实用新型涉及一种桥梁施工中使用的钢梁,具体地说是一种用于节段梁架设的移动模架自浮式下扁担梁。The utility model relates to a steel girder used in bridge construction, in particular to a movable formwork self-floating lower pole beam used for segmental girder erection.
背景技术 Background technique
目前用于移动模架造桥机的承重梁多为平推或吊挂方式,过孔前将承重梁向外平推或予以拆除运至下一孔位。对于在海域施工的移动模架造桥机,承重梁拆除的方式就需要多种运输设备配合拆除,因此投入的成本大,效率低。因此发明一种能够方便运输和拆除的新型钢桁梁非常有益。At present, the load-bearing beams used for mobile formwork bridge building machines are mostly pushed or hung. Before passing through the holes, the load-bearing beams are pushed or removed and transported to the next hole. For mobile formwork bridge building machines constructed in sea areas, the removal of load-bearing beams requires a variety of transportation equipment to cooperate with the removal, so the investment cost is high and the efficiency is low. Therefore, it is very beneficial to invent a new type of steel truss girder that can be easily transported and dismantled.
发明内容 Contents of the invention
本实用新型的目的就是针对现有技术的不足,提供一种移动模架自浮式下扁担梁来满足快速施工的需要。The purpose of this utility model is to provide a mobile formwork self-floating lower pole beam to meet the needs of rapid construction against the deficiencies of the prior art.
本实用新型的技术方案是这样实现的:它由钢梁(1)、梁间联结系(3)和吊耳(2)连接而成,其特征在于:所述的钢梁为变截面密封式箱形钢梁;变截面密封式箱形钢梁(1)与梁间联结系(3)焊接而成,箱形钢梁(1)两端通过销轴(4)连接吊耳2吊挂在造桥机主钢桁梁的横杆上。The technical scheme of the utility model is realized in the following way: it is formed by connecting steel beams (1), inter-beam couplings (3) and lifting lugs (2), and it is characterized in that: the steel beams are variable cross-section sealed type Box-shaped steel girder; variable cross-section sealed box-shaped steel girder (1) and the connecting system (3) between the beams are welded. On the cross bar of the main steel truss girder of the bridge building machine.
本实用新型在水域作业面采用箱形钢梁与梁间联结系组焊而成的自浮式下扁担梁,它具有结构简单、拆装运输方便的优点。过孔时利用提梁吊机将下扁担梁吊至水域面,利用扁担钢箱梁的自浮,拖运至下一孔就位,可以降低施工难度。The utility model adopts a self-floating lower pole beam formed by welding box-shaped steel beams and connecting systems between the beams on the working surface in the water area. It has the advantages of simple structure, convenient disassembly and transportation. When passing through the hole, use the beam lifting crane to lift the lower pole beam to the water surface, and use the self-flotation of the pole steel box girder to haul it to the next hole and put it in place, which can reduce the construction difficulty.
附图说明 Description of drawings
图1是本实用新型与主桁结构布置图Fig. 1 is the layout diagram of the utility model and the main truss structure
图2是本实用新型的俯视图Fig. 2 is the top view of the utility model
图3是本实用新型的横断面示意图Fig. 3 is a schematic cross-sectional view of the utility model
具体实施方式 Detailed ways
以下结合附图对本实用新型作进一步说明:Below in conjunction with accompanying drawing, the utility model will be further described:
如图1所示,本实用新型由钢梁(1)、梁间联结系(3)和吊耳(2)连接而成,其特征在于:所述的钢梁为变截面密封式箱形钢梁;如图3所示,变截面密封式箱形钢梁(1)与梁间联结系(3)焊接而成,箱形钢梁(1)两端通过销轴(4)连接吊耳(2)吊挂在造桥机主钢桁梁的横杆上。As shown in Figure 1, the utility model is formed by connecting steel beams (1), inter-beam couplings (3) and lifting lugs (2), and is characterized in that the steel beams are sealed box-shaped steel beams with variable cross-section Beam; as shown in Figure 3, the variable cross-section sealed box-shaped steel beam (1) is welded with the connecting system (3) between the beams, and the two ends of the box-shaped steel beam (1) are connected to the lifting lugs ( 2) Hanging on the cross bar of the main steel truss girder of the bridge building machine.
拆装式吊耳(2)将下扁担梁吊挂于主钢桁梁的横杆上,并将施工荷载均匀传递给主桁梁。下扁担梁的两端开有与吊耳连接的销轴孔,考虑到销轴较长且重,在销轴孔处设置了销轴套筒以便于安装销轴。同时在扁担梁的两端设起吊吊耳以方便吊机起吊扁担梁。扁担梁的顶面设有与钢垫块连接用的连接板,并安放50t油压千斤顶,用于节段箱梁的标高调整和分级张拉混凝土箱梁预应力束时卸载使用。扁担梁顶两侧还设有连接板,与施工平台进行栓接,施工平台下部满挂安全网。The detachable lifting lug (2) hangs the lower pole beam on the cross bar of the main steel truss beam, and evenly transmits the construction load to the main truss beam. Both ends of the lower pole beam are provided with pin holes connected with lifting lugs. Considering that the pin shaft is long and heavy, a pin shaft sleeve is provided at the pin shaft hole to facilitate the installation of the pin shaft. At the same time, lifting lugs are set at both ends of the pole beam to facilitate the lifting of the pole beam by a crane. The top surface of the pole beam is provided with a connecting plate for connection with the steel cushion block, and a 50t hydraulic jack is placed for the elevation adjustment of the segmental box girder and unloading when the prestressed beam of the concrete box girder is stretched in stages. There are also connecting plates on both sides of the pole beam top, which are bolted to the construction platform, and the lower part of the construction platform is fully hung with safety nets.
对于大跨度桥梁架设水面作业区,在造桥机吊挂扁担梁纵移架设至前方墩处时需要将下扁担梁连接拆除过墩,由于存在多组扁担梁高空吊装过墩,风险大,成本高、施工进程缓,为此将下扁担梁设计为密封式。充分利用钢箱梁在水面自浮(F浮>G自重)的原理,拖运至下一孔就位,然后再提升安装扁担梁,避免了高空吊装多次过桥墩孔,从而降低施工的难度,减少了施工成本和施工工期。For the water surface work area of long-span bridge erection, when the bridge-building machine hangs the pole beam and erects it vertically to the front pier, it is necessary to remove the connection of the lower pole beam to pass the pier. Since there are multiple groups of pole beams hoisted above the pier at high altitude, the risk is high and the cost is high. High and slow construction process, so the lower pole beam is designed as a sealed type. Make full use of the principle of steel box girder self-floating on the water surface (F floating > G self-weight ), haul it to the next hole and place it in place, and then lift and install the pole beam, avoiding multiple times of high-altitude hoisting through the pier hole, thereby reducing the difficulty of construction , reducing the construction cost and construction period.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU200720088693XU CN201132941Y (en) | 2007-12-04 | 2007-12-04 | Mobile formwork self-floating lower shoulder beam |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU200720088693XU CN201132941Y (en) | 2007-12-04 | 2007-12-04 | Mobile formwork self-floating lower shoulder beam |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201132941Y true CN201132941Y (en) | 2008-10-15 |
Family
ID=40061214
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNU200720088693XU Expired - Lifetime CN201132941Y (en) | 2007-12-04 | 2007-12-04 | Mobile formwork self-floating lower shoulder beam |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201132941Y (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102561188A (en) * | 2010-12-23 | 2012-07-11 | 上海市基础工程有限公司 | Suspension balance beam of mobile formwork bridge fabrication machine |
| CN102628253A (en) * | 2012-03-30 | 2012-08-08 | 中铁大桥局集团第五工程有限公司 | Self-floating type supporting bracket for bridge construction |
| CN105040991A (en) * | 2015-07-03 | 2015-11-11 | 中国建筑第八工程局有限公司 | Large-span steel structure segmental hoisting support structure and large-span steel structure segmental hoisting support method |
| CN106192755A (en) * | 2015-04-29 | 2016-12-07 | 江苏沪宁钢机股份有限公司 | A kind of fish-bellied type shaped form cross a river double width steel box-girder steel bridge construction method of installation |
| CN114572804A (en) * | 2022-03-15 | 2022-06-03 | 中铁大桥局集团有限公司 | Lifting appliance system and using method thereof |
-
2007
- 2007-12-04 CN CNU200720088693XU patent/CN201132941Y/en not_active Expired - Lifetime
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102561188A (en) * | 2010-12-23 | 2012-07-11 | 上海市基础工程有限公司 | Suspension balance beam of mobile formwork bridge fabrication machine |
| CN102628253A (en) * | 2012-03-30 | 2012-08-08 | 中铁大桥局集团第五工程有限公司 | Self-floating type supporting bracket for bridge construction |
| CN106192755A (en) * | 2015-04-29 | 2016-12-07 | 江苏沪宁钢机股份有限公司 | A kind of fish-bellied type shaped form cross a river double width steel box-girder steel bridge construction method of installation |
| CN105040991A (en) * | 2015-07-03 | 2015-11-11 | 中国建筑第八工程局有限公司 | Large-span steel structure segmental hoisting support structure and large-span steel structure segmental hoisting support method |
| CN114572804A (en) * | 2022-03-15 | 2022-06-03 | 中铁大桥局集团有限公司 | Lifting appliance system and using method thereof |
| CN114572804B (en) * | 2022-03-15 | 2024-12-31 | 中铁大桥局集团有限公司 | A sling system and method of using the same |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103410101B (en) | Tower crane conversion method for construction of parabola-shaped ultrahigh pier | |
| CN106758887A (en) | The whole bridge decentralization method for dismounting of continuous bridge | |
| CN104727236B (en) | A kind of whole bridge beam based on ground supports transfers the construction method of dismounting system | |
| CN104963301A (en) | Dragging, translating and lowering device and method for dismantling pier top beam section and pier | |
| CN103452126B (en) | Light combined hanging box with recyclable baseplate steels and construction technology thereof | |
| CN102653938B (en) | Offshore dismantling construction method for descending movable formwork | |
| CN101672102A (en) | Steel structural overhead ceiling construction platform | |
| CN103806593B (en) | A kind of precast concrete | |
| CN101555680B (en) | Large-span Pi type socle beam construction process in non-rope area of cable stayed bridge | |
| CN201132941Y (en) | Mobile formwork self-floating lower shoulder beam | |
| CN207244447U (en) | Movable hanging basket for steel-concrete composite bridge | |
| CN106368127A (en) | Whole support landing device and method for box girder support | |
| CN217579819U (en) | Steel cover beam integral hoisting structure free of limitation of beam bottom space condition | |
| CN208122371U (en) | On across the high-speed rail safe guarding shed fast dismounting device of operation line | |
| CN217839714U (en) | Adjustable railway pier top hanging fence installation device | |
| CN202658590U (en) | Integral assembled drilling platform | |
| CN202416191U (en) | Lifting device of main girder for offshore demolition of downward mobile formwork | |
| CN203855899U (en) | Non-counterweight self-balance movable die carrier | |
| CN105421251B (en) | Plate-girder jacking supporting mechanism, plate-girder jacking supporting tool | |
| CN100497834C (en) | Construction equipment for integral roof-holding highway bridge top structure | |
| CN102425123A (en) | A combined protective scaffolding and its construction method | |
| CN108374351A (en) | A kind of simple hoisting apparatus and method for removing box beam beret slice | |
| CN201952736U (en) | Auxiliary pier movable bracket for assisting invariable-amplitude beam erecting crane in erecting steel box girder | |
| CN105317031B (en) | A kind of ship lift main equipment room bridge main beam hanging method | |
| CN209816682U (en) | Bridge steel box girder aerial working operation platform |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| ASS | Succession or assignment of patent right |
Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD. Effective date: 20150206 |
|
| C41 | Transfer of patent application or patent right or utility model | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20150206 Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No. Patentee after: Group Co., Ltd., Zhongtie Daqiao Bureau Address before: 430050 No. 38, Hanyang Avenue, Wuhan, Hubei Patentee before: China Zhongtie Major Bridge Engineering Co., Ltd. |
|
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20081015 |