CN201132941Y - Self floating lower carrying pole beam of moveable formwork - Google Patents

Self floating lower carrying pole beam of moveable formwork Download PDF

Info

Publication number
CN201132941Y
CN201132941Y CNU200720088693XU CN200720088693U CN201132941Y CN 201132941 Y CN201132941 Y CN 201132941Y CN U200720088693X U CNU200720088693X U CN U200720088693XU CN 200720088693 U CN200720088693 U CN 200720088693U CN 201132941 Y CN201132941 Y CN 201132941Y
Authority
CN
China
Prior art keywords
girder
steel girder
steel
shouldering
self
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU200720088693XU
Other languages
Chinese (zh)
Inventor
李军堂
涂满明
张瑞霞
周外男
唐勇
张维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
Original Assignee
China Railway Major Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Co Ltd filed Critical China Railway Major Bridge Engineering Co Ltd
Priority to CNU200720088693XU priority Critical patent/CN201132941Y/en
Application granted granted Critical
Publication of CN201132941Y publication Critical patent/CN201132941Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to a steel girder used in a bridge construction, in particular to a mobile mold carrier self-floating lower shouldering girder used for erecting segmental girders. The self-floating lower shouldering girder is formed by connecting a steel girder (1) with coupling systems among girders (3) and lifting lugs (2), and is characterized in that the steel girder is a non-uniform cross-section sealed box steel girder. The non-uniform cross-section sealed box steel girder (1) is welded with the coupling systems among the girders (3), and both ends of the box steel girder (1) are suspended on the transverse lever of the main steel truss girder of a bridge fabrication machine by being connected with the lifting lugs (2) through pin rolls (4). The steel girder used in the bridge construction adopts the self-floating lower shouldering girder formed by welding the box steel girder with coupling systems among the girders on a water working surface, and has the advantages of simple structure, convenient assembly and disassembly as well as convenient transportation. When passing through a hole, the lower shouldering girder is lifted to the water working surface by utilizing a girder-lifting crane and hauled to the next hole in position by utilizing the self-floating of the shouldering box steel girder, thereby reducing the construction difficulty.

Description

Shoulder pole girder under the mobile formwork self-floating
Technical field
The utility model relates to the girder steel that uses in a kind of bridge construction, specifically a kind ofly is used for shoulder pole girder under the mobile formwork self-floating that beam sections sets up.
Background technology
The spandrel girder that is used for mobile formwork bridge fabrication machine at present mostly is horizontal sliding or suspending way, before the via hole with the outside horizontal sliding of spandrel girder or removed and be transported to next position, hole.For the mobile formwork bridge fabrication machine in the marine site construction, the mode that spandrel girder is removed just needs multiple haulage device cooperation to remove, and therefore the cost that drops into is big, and efficient is low.Therefore inventing a kind of novel steel truss girder that can conveniently transport and remove is highly profitable.
Summary of the invention
The purpose of this utility model is exactly at the deficiencies in the prior art, provides shoulder pole girder under a kind of mobile formwork self-floating to satisfy the needs of rapid construction.
The technical solution of the utility model is achieved in that it is formed by connecting by bracing (3) between girder steel (1), beam and hanger (2), is characterized in that: described girder steel is the sealed box steel beam of variable cross-section; Bracing (3) is welded between sealed box steel beam of variable cross-section (1) and beam, and box steel beam (1) two ends connect hanger 2 by bearing pin (4) and hang on the cross bar of bridge fabrication machine master steel truss girder.
The utility model adopts shoulder pole girder under the self-floating that the bracing assembly welding forms between box steel beam and beam in the waters scope of operation, and it has advantage simple in structure, the dismounting convenient transportation.Utilize the bale handle loop wheel machine will descend shoulder pole girder to winch to the waters face during via hole, utilize the floating certainly of shoulder pole steel case beam, haul in placely, can reduce difficulty of construction to next hole.
Description of drawings
Fig. 1 is the utility model and main truss structure arrangement diagram
Fig. 2 is a vertical view of the present utility model
Fig. 3 is a schematic cross-sectional view of the present utility model
The specific embodiment
The utility model is described in further detail below in conjunction with accompanying drawing:
As shown in Figure 1, the utility model is formed by connecting by bracing (3) between girder steel (1), beam and hanger (2), it is characterized in that: described girder steel is the sealed box steel beam of variable cross-section; As shown in Figure 3, bracing (3) is welded between sealed box steel beam of variable cross-section (1) and beam, and box steel beam (1) two ends connect hanger (2) by bearing pin (4) and hang on the cross bar of bridge fabrication machine master steel truss girder.
Reassembling type hanger (2) will descend shoulder pole girder to be hung on the cross bar of main steel truss girder, and working load is evenly passed to the main truss beam.The two ends of following shoulder pole girder have the pin shaft hole that is connected with hanger, consider that bearing pin is long and heavy, are provided with the bearing pin sleeve so that bearing pin is installed at the pin shaft hole place.Establish the lifting hanger simultaneously at the two ends of shoulder pole girder to make things convenient for loop wheel machine lifting shoulder pole girder.The end face of shoulder pole girder is provided with the junction plate that is connected usefulness with the steel cushion block, and lays the 50t hydraulic jack, and unloading is used when being used for the absolute altitude adjustment of section box girder and grading tension concrete box girder prestressing tendon.Shoulder pole back both sides also are provided with junction plate, carry out bolt with operation platform, and the operation platform bottom completely hangs safety net.
Set up water surface operation area for Longspan Bridge, hanging at bridge fabrication machine needs to descend shoulder pole girder to connect during the square pier place before the shoulder pole girder vertical shift is inserted into and removed pier, owing to exist many group shoulder pole girder upper air installings to cross pier, has a big risk, cost height, construction progress delay, and it is sealed to descend shoulder pole girder to be designed to for this reason.Make full use of steel case beam at the certainly floating (F of the water surface Floating>G Deadweight) principle, haul in placely to next hole, and then shoulder pole girder promote to be installed, avoided upper air installing repeatedly to cross the bridge pier hole, thereby reduced the difficulty of construction, reduced construction cost and construction period.

Claims (2)

1, shoulder pole girder under a kind of mobile formwork self-floating, it is formed by connecting by bracing (3) between girder steel (1), beam and hanger (2), it is characterized in that: described girder steel is the sealed box steel beam of variable cross-section.
2, shoulder pole girder under the mobile formwork self-floating according to claim 1, it is characterized in that: bracing (3) is welded between sealed box steel beam of variable cross-section (1) and beam, and box steel beam (1) two ends connect hanger 2 by bearing pin (4) and hang on the cross bar of bridge fabrication machine master steel truss girder.
CNU200720088693XU 2007-12-04 2007-12-04 Self floating lower carrying pole beam of moveable formwork Expired - Lifetime CN201132941Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU200720088693XU CN201132941Y (en) 2007-12-04 2007-12-04 Self floating lower carrying pole beam of moveable formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU200720088693XU CN201132941Y (en) 2007-12-04 2007-12-04 Self floating lower carrying pole beam of moveable formwork

Publications (1)

Publication Number Publication Date
CN201132941Y true CN201132941Y (en) 2008-10-15

Family

ID=40061214

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU200720088693XU Expired - Lifetime CN201132941Y (en) 2007-12-04 2007-12-04 Self floating lower carrying pole beam of moveable formwork

Country Status (1)

Country Link
CN (1) CN201132941Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561188A (en) * 2010-12-23 2012-07-11 上海市基础工程有限公司 Suspension balance beam of mobile formwork bridge fabrication machine
CN102628253A (en) * 2012-03-30 2012-08-08 中铁大桥局集团第五工程有限公司 Self-floating type supporting bracket for bridge construction
CN105040991A (en) * 2015-07-03 2015-11-11 中国建筑第八工程局有限公司 Large-span steel structure segmental hoisting support structure and large-span steel structure segmental hoisting support method
CN106192755A (en) * 2015-04-29 2016-12-07 江苏沪宁钢机股份有限公司 A kind of fish-bellied type shaped form cross a river double width steel box-girder steel bridge construction method of installation

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561188A (en) * 2010-12-23 2012-07-11 上海市基础工程有限公司 Suspension balance beam of mobile formwork bridge fabrication machine
CN102628253A (en) * 2012-03-30 2012-08-08 中铁大桥局集团第五工程有限公司 Self-floating type supporting bracket for bridge construction
CN106192755A (en) * 2015-04-29 2016-12-07 江苏沪宁钢机股份有限公司 A kind of fish-bellied type shaped form cross a river double width steel box-girder steel bridge construction method of installation
CN105040991A (en) * 2015-07-03 2015-11-11 中国建筑第八工程局有限公司 Large-span steel structure segmental hoisting support structure and large-span steel structure segmental hoisting support method

Similar Documents

Publication Publication Date Title
CN105421249A (en) Novel dragging- hoisting combined type hanging basket structure and construction method
CN103061264B (en) Method and device for pre-pressing high-position support single column in water
CN101446074B (en) Installation and closure construction method for steel sliding roadway arch on top surface of steel trussed beam bridge
CN201943007U (en) Constant amplitude frame beam crane capable of being used in combination with movable support frame
CN205223872U (en) Drag and hang novel string of basket structure of convolution
CN201132941Y (en) Self floating lower carrying pole beam of moveable formwork
CN109653105A (en) Box girder bridge cantilever construction main truss cradle system and its application method
CN110468743B (en) Movable hanging bracket for transformation of old bridge pier cap and construction method
CN102251483A (en) Construction method for hoisting concrete-filled steel tube lattice bridge pier through self-lifting attached crane
CN201901516U (en) Detachable steel structural hoisting fixture
CN211498526U (en) Self-lifting type corrugated steel web cast-in-situ box girder hanging basket
CN201406269Y (en) Three-unit crane lifting T-shaped sling
CN205500636U (en) Water conservancy project component handling device
CN205387439U (en) Mast hoisting accessory
CN204112226U (en) A kind of holes connects does section assembling bridge manufacturing machine
CN201952736U (en) Auxiliary pier movable bracket for assisting invariable-amplitude beam erecting crane in erecting steel box girder
CN202379616U (en) Movable simple hoisting device
CN204198225U (en) A kind of suspension bracket of lifting for prefabricated U-shaped aqueduct and device
CN207551767U (en) By the use of precast main beam as the bridge construction hanging device of primary structure member
CN102535344A (en) Concrete transportation method for bridge body of high-pier bridge in gully region
CN208151872U (en) Scaffold formula Wavelike steel webplate hanging apparatus
CN111042004A (en) Hanging basket track beam traveling method
CN202185973U (en) Device for assisting dismounting and installing T beam formwork
CN201362860Y (en) Building concrete pile detection device
CN205187694U (en) Novel tower crane equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU

Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD.

Effective date: 20150206

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150206

Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No.

Patentee after: Group Co., Ltd., Zhongtie Daqiao Bureau

Address before: 430050 No. 38, Hanyang Avenue, Wuhan, Hubei

Patentee before: China Zhongtie Major Bridge Engineering Co., Ltd.

CX01 Expiry of patent term

Granted publication date: 20081015

CX01 Expiry of patent term