CN206625437U - A kind of building block water proof structure - Google Patents
A kind of building block water proof structure Download PDFInfo
- Publication number
- CN206625437U CN206625437U CN201720391363.1U CN201720391363U CN206625437U CN 206625437 U CN206625437 U CN 206625437U CN 201720391363 U CN201720391363 U CN 201720391363U CN 206625437 U CN206625437 U CN 206625437U
- Authority
- CN
- China
- Prior art keywords
- wall
- building block
- gap
- filling
- micro
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Finishing Walls (AREA)
Abstract
一种砌块防水构造,包括梁,所述梁设置在内墙面下方,梁的下方设置有填充墙,填充墙与梁之间有空隙,空隙内设置有多个混凝土预制砌块,梁的下端面为靠外墙面的一侧高阶的第一阶梯面;混凝土预制砌块的上端面为靠近外墙面的一侧低阶的第二阶梯面;所述第一阶梯面和第二阶梯面相互配合;混凝土预制砌块一侧面设置有凸起,另一侧面设置有与凸起相配合的凹部;所述第一阶梯面和第二阶梯面之间的缝隙填充微膨胀水泥砂浆,凸起与凹部之间的缝隙填充微膨胀水泥砂浆,混凝土预制砌块下端面与填充墙之间通过填充的微膨胀水泥砂浆固定连接。本实用新型结构简单实用,施工简便,避免梁下通缝,防止内墙面霉变。
A waterproof masonry structure includes a beam positioned below an inner wall. A filler wall is located below the beam, with a gap between the filler wall and the beam. Multiple precast concrete blocks are placed within this gap. The lower end face of the beam is a higher, first-step surface on the side closest to the outer wall. The upper end face of each precast concrete block is a lower, second-step surface on the side closest to the outer wall. The first and second step surfaces interlock. One side of each precast concrete block has a protrusion, and the other side has a recess that mates with the protrusion. The gap between the first and second step surfaces and the gap between the protrusion and the recess is filled with micro-expansion cement mortar. The lower end face of the precast concrete block is fixedly connected to the filler wall by the filled micro-expansion cement mortar. This invention features a simple and practical structure, is easy to construct, avoids through-joints under the beam, and prevents mold growth on the inner wall.
Description
技术领域technical field
本实用新型涉及一种砌块防水构造,属于建筑工程领域。The utility model relates to a block waterproof structure, which belongs to the field of construction engineering.
背景技术Background technique
目前,梁与后砌筑的填充墙之间的构造做法一般有两种:第一种是用顶砖斜砌,第二种是用微膨胀的细石混凝土填塞,目前,第一种方式的操作步骤为在砌体顶部预留 200毫米左右空隙,待砌体工程砌筑完成7天后再进行斜顶砖的砌筑,预先切割用于砌筑的顶砖,使斜顶砖的上下接触面为平面,斜放砌筑时与水平面成45度到60度,逐块敲紧,灰缝厚度宜为10毫米,与框架梁底挤实,填满砂浆,顶砖位置应按模数预留,不合模数时,应用配砖补砌,第二种方式在砌体顶部预留30到50毫米空隙,分两次嵌填密实,嵌缝前清除浮灰,支模板,第一次用C20细石微膨胀混凝土填塞,两侧留出20毫米,待砼初凝后,再用水泥砂浆嵌缝压实。At present, there are generally two construction methods between the beam and the infill wall built after the masonry: the first is to use top bricks to lay obliquely, and the second is to fill with micro-expanded fine stone concrete. At present, the first method The operation steps are to reserve a gap of about 200 mm on the top of the masonry, and then lay the sloping roof bricks after 7 days after the masonry project is completed. It is a plane, and when it is laid obliquely, it is 45° to 60° from the horizontal plane, and it is tightened block by block. The thickness of the mortar joint should be 10 mm, and it should be compacted with the bottom of the frame beam and filled with mortar. The position of the top brick should be reserved according to the modulus. , when the modulus is not suitable, it should be repaired with matching bricks. The second method is to reserve a gap of 30 to 50 mm on the top of the masonry, and fill it in two times. Remove the floating ash before the caulking, and support the formwork. For the first time, use C20 The fine stone micro-expansion concrete is filled, leaving 20 mm on both sides, and after the initial setting of the concrete, it is then compacted with cement mortar caulking.
采用以上现有技术的不足之处在于:第一种方式,砌筑时砌块需要切割,砌块容易被损坏,浪费材料。由于斜砖填充不够密实,墙体材料与混凝土材料变形模量不同,填充墙容易和梁底分离,填充墙墙顶开裂,特别在抹灰后填充墙与梁底交接处易产生通缝,影响墙面外观质量,内墙面容易引起霉变。第二种方式关键是需要支模板,不易操作。以上两种方法都施工步骤都比较繁琐,增加人力资源消耗。The disadvantage of adopting the above prior art is: in the first way, the blocks need to be cut during masonry, and the blocks are easily damaged, which wastes materials. Because the oblique brick filling is not dense enough, the deformation modulus of the wall material is different from that of the concrete material, the filling wall is easy to separate from the bottom of the beam, and the top of the filling wall cracks, especially at the junction of the filling wall and the bottom of the beam after plastering. The exterior quality of the wall surface is poor, and the interior wall surface is prone to mildew. The key to the second method is that it needs a support template, which is not easy to operate. The construction steps of the above two methods are all relatively cumbersome, which increases the consumption of human resources.
实用新型内容Utility model content
本实用新型提出一种新的用于防止梁下裂缝的砌块防水构造,施工简便,避免梁下通缝,防止内墙面霉变。The utility model proposes a new block waterproof structure for preventing cracks under beams, which is easy to construct, avoids cracks under beams, and prevents mildew on inner walls.
本实用新型的技术方案如下:The technical scheme of the utility model is as follows:
一种砌块防水构造,包括梁,所述梁设置在内墙面下方,梁的下方设置有填充墙,填充墙与梁之间有空隙,空隙内设置有多个混凝土预制砌块,梁的下端面为靠外墙面的一侧高阶的第一阶梯面;混凝土预制砌块的上端面为靠近外墙面的一侧低阶的第二阶梯面;所述第一阶梯面和第二阶梯面相互配合;混凝土预制砌块一侧面设置有凸起,另一侧面设置有与凸起相配合的凹部;所述第一阶梯面和第二阶梯面之间的缝隙填充微膨胀水泥砂浆,凸起与凹部之间的缝隙填充微膨胀水泥砂浆,混凝土预制砌块下端面与填充墙之间通过填充的微膨胀水泥砂浆固定连接。A block waterproof structure, including a beam, the beam is arranged under the inner wall, a filling wall is arranged under the beam, there is a gap between the filling wall and the beam, and a plurality of prefabricated concrete blocks are arranged in the gap, and the beam The lower end surface is the first stepped surface with a higher step on the side near the outer wall; the upper end surface of the prefabricated concrete block is the second stepped surface with a lower step near the outer wall; the first stepped surface and the second stepped surface The stepped surfaces cooperate with each other; one side of the prefabricated concrete block is provided with a protrusion, and the other side is provided with a concave part matched with the protrusion; the gap between the first stepped surface and the second stepped surface is filled with micro-expansion cement mortar, The gap between the protrusion and the recess is filled with micro-expansion cement mortar, and the lower end surface of the concrete prefabricated block and the filling wall are fixedly connected by the filled micro-expansion cement mortar.
其中,所述填充墙上端面到梁下端面的距离为180-200mm;所述混凝土预制块的下端面到第一阶梯面高阶的高度为180-200mm。Wherein, the distance from the end surface of the filling wall to the lower end surface of the beam is 180-200mm; the height from the lower end surface of the prefabricated concrete block to the high step of the first stepped surface is 180-200mm.
其中,所述第一阶梯面的高阶和低阶的高度差为50mm。Wherein, the height difference between the high step and the low step of the first stepped surface is 50 mm.
其中,所述凸起长度为50mm。Wherein, the length of the protrusion is 50mm.
本实用新型具有如下有益效果:The utility model has the following beneficial effects:
1、施工简便,易于操作,能加快工程进度,缩短工程工期,而且提高施工质量,降低施工成本;1. The construction is simple and easy to operate, which can speed up the progress of the project, shorten the construction period, improve the construction quality and reduce the construction cost;
2、砌筑混凝土预制砌块工厂化生产尺寸精确,产品质量高;2. The factory production of masonry concrete prefabricated blocks has precise dimensions and high product quality;
3、存在结构高低差能有效防止渗水,强度得以保证。3. The existence of structural height difference can effectively prevent water seepage and ensure the strength.
附图说明Description of drawings
图1为本实用新型正面结构示意图;Fig. 1 is a schematic diagram of the front structure of the utility model;
图2为本实用新型侧面结构示意图;Fig. 2 is a schematic view of the side structure of the utility model;
图3为本实用新型中混凝土预制砌块的三维立体图;Fig. 3 is a three-dimensional perspective view of a concrete prefabricated block in the utility model;
图中附图标记表示为:The reference signs in the figure represent:
1-混凝土预制砌块,2-微膨胀水泥砂浆,3-填充墙,4-梁、5-第一阶梯面、6-第二阶梯面、7-凸起、8-凹部。1-concrete prefabricated block, 2-micro-expansion cement mortar, 3-filled wall, 4-beam, 5-first step surface, 6-second step surface, 7-protrusion, 8-recess.
具体实施方式detailed description
下面结合附图和具体实施例来对本实用新型进行详细的说明。The utility model will be described in detail below in conjunction with the accompanying drawings and specific embodiments.
参见图1至图3,一种砌块防水构造,包括梁4,所述梁4设置在内墙面下方,梁4的下方设置有填充墙3,填充墙3与梁4之间有空隙,空隙内设置有多个混凝土预制砌块1,梁4的下端面为靠外墙面的一侧高阶的第一阶梯面5;混凝土预制砌块1的上端面为靠近外墙面的一侧低阶的第二阶梯面6;所述第一阶梯面5和第二阶梯面6相互配合;混凝土预制砌块1一侧面设置有凸起7,另一侧面设置有与凸起7相配合的凹部8;所述第一阶梯面5和第二阶梯面6之间的缝隙填充微膨胀水泥砂浆2,凸起7与凹部8之间的缝隙填充微膨胀水泥砂浆2,混凝土预制砌块1下端面与填充墙3之间通过填充的微膨胀水泥砂浆2固定连接。Referring to Fig. 1 to Fig. 3, a block waterproof structure includes a beam 4, the beam 4 is arranged under the inner wall surface, a filling wall 3 is arranged under the beam 4, and there is a gap between the filling wall 3 and the beam 4, A plurality of prefabricated concrete blocks 1 are arranged in the gap, the lower end surface of the beam 4 is the first stepped surface 5 of a higher step on the side close to the outer wall; the upper end surface of the prefabricated concrete block 1 is the side close to the outer wall Low-level second stepped surface 6; the first stepped surface 5 and the second stepped surface 6 cooperate with each other; one side of the prefabricated concrete block 1 is provided with a protrusion 7, and the other side is provided with a protrusion that matches the protrusion 7 Recess 8; the gap between the first step surface 5 and the second step surface 6 is filled with micro-expansion cement mortar 2, the gap between the protrusion 7 and the recess 8 is filled with micro-expansion cement mortar 2, and the concrete prefabricated block 1 The end face and the filling wall 3 are fixedly connected by filling micro-expansion cement mortar 2 .
参见图1,所述填充墙3上端面到梁4下端面的距离为180-200mm;所述混凝土预制块1的下端面到第一阶梯面5高阶的高度为180-200mm,方便将混凝土预制砌块1放进填充墙3与梁4之间的空隙中,空隙高度过高会增加建筑难度,浪费大量时间,高度过低会导致填充不方便,使梁下防水构造效果不明显。Referring to Fig. 1, the distance from the upper end surface of the filling wall 3 to the lower end surface of the beam 4 is 180-200mm; the height from the lower end surface of the prefabricated concrete block 1 to the first step surface 5 is 180-200mm, which is convenient for placing the concrete The prefabricated block 1 is put into the gap between the filling wall 3 and the beam 4. If the height of the gap is too high, it will increase the difficulty of construction and waste a lot of time. If the height of the gap is too low, it will cause inconvenient filling and make the waterproof structure under the beam less effective.
参见图1,所述第一阶梯面5的高阶和低阶的高度差为50mm,便于与混凝土预制砌块1的第二阶梯面6配合;混凝土预制砌块1的第二阶梯面6高度差为50mm,能够有效阻止雨水进入内墙面。Referring to Fig. 1, the height difference between the high step and the low step of the first stepped surface 5 is 50mm, which is convenient to cooperate with the second stepped surface 6 of the concrete prefabricated block 1; the height of the second stepped surface 6 of the concrete prefabricated block 1 The difference is 50mm, which can effectively prevent rainwater from entering the inner wall.
参见图3,所述混凝土预制砌块1的上端面为第二阶梯面6,存在结构高低差,具有防水功能,相邻混凝土预制砌块1的侧面凹凸配合,使梁4与填充墙3之间更加密实,避免形成通缝,采用工厂化生产,根据需要可以设计多种混凝土预制砌块1的尺寸,以混凝土预制砌块1代替砖砌块,强度得到保证。Referring to Fig. 3, the upper end surface of the prefabricated concrete block 1 is the second stepped surface 6, which has a structural height difference and has a waterproof function. The space is denser, avoiding the formation of joints, factory production is adopted, and the size of various concrete prefabricated blocks 1 can be designed according to needs, and the concrete prefabricated blocks 1 are used instead of brick blocks, and the strength is guaranteed.
参见图3,所述凸起7长度为50mm,长度过短对避免通缝的形成不利,长度过长会影响砌筑难度。Referring to Fig. 3, the length of the protrusion 7 is 50mm, too short length is not good for avoiding the formation of through joints, and too long length will affect the difficulty of masonry.
本实用新型的工作流程如下:Work process of the present utility model is as follows:
首先搭建好梁4,梁4的下端面砌筑成第一阶梯面5,高阶侧朝向外墙面,再使用砌砖砌筑填充墙3,砌筑到距离梁4底部180-200mm时停止砌筑,静止七天沉降趋于稳定后,将预先生产出来的混凝土预制砌块1塞进填充墙3与梁4之间的空隙中,需要将混凝土预制块1的第二阶梯面6的低阶侧朝向外墙面,左右超出墙体范围的部分应割除,然后用微膨胀水泥砂浆2砌筑混凝土预制砌块1,使填充墙3、混凝土预制砌块1和梁4之间形成有效的连接。First build the beam 4, the lower end of the beam 4 is built into the first stepped surface 5, and the high-level side faces the outer wall, and then the filling wall 3 is built with bricks, and the masonry stops when the distance from the bottom of the beam 4 is 180-200mm For masonry, after the settlement has stabilized for seven days, the pre-produced concrete prefabricated block 1 is stuffed into the gap between the filling wall 3 and the beam 4, and the lower level of the second stepped surface 6 of the concrete prefabricated block 1 needs to be The side faces the outer wall, and the left and right parts beyond the scope of the wall should be cut off, and then the precast concrete block 1 is built with micro-expansion cement mortar 2, so that an effective connection is formed between the filling wall 3, the precast concrete block 1 and the beam 4 .
因为混凝土预制块1的上端面和梁4的下端面为阶梯面,存在高低结构差,当外墙面有雨水时,因为混凝土预制砌块1的第一阶梯面5在外墙面的一端比较低,雨水很难克服重力进入进入内墙面,达到防水的效果,相邻的混凝土预制块1的侧面凹凸配合避免了通缝的产生,使梁4和填充墙3更紧密的结合,同时避免了框架结构下挠造成梁4的负弯矩改变框架结构的受力状态,造成安全隐患,也避免填充墙3因梁4下挠被挤压而开裂。Because the upper end surface of the concrete prefabricated block 1 and the lower end surface of the beam 4 are stepped surfaces, there is a difference in height and structure. When there is rain on the outer wall surface, because the first stepped surface 5 of the concrete prefabricated block 1 is relatively low at one end of the outer wall surface , it is difficult for rainwater to overcome the gravity to enter the inner wall surface to achieve the effect of waterproofing. The concavo-convex cooperation of the side of the adjacent prefabricated concrete block 1 avoids the generation of through joints, so that the beam 4 and the infill wall 3 are more closely combined, and at the same time avoid The deflection of the frame structure causes the negative bending moment of the beam 4 to change the stress state of the frame structure, causing potential safety hazards and avoiding cracking of the infill wall 3 due to the compression of the deflection of the beam 4 .
以上所述仅为本实用新型的实施例,并非因此限制本实用新型的专利范围,凡是利用本实用新型说明书及附图内容所作的等效结构或等效流程变换,或直接或间接运用在其他相关的技术领域,均同理包括在本实用新型的专利保护范围内。The above is only an embodiment of the utility model, and does not limit the patent scope of the utility model. Any equivalent structure or equivalent process conversion made by using the utility model specification and accompanying drawings, or directly or indirectly used in other Related technical fields are all included in the patent protection scope of the present utility model in the same way.
Claims (4)
- A kind of 1. building block water proof structure, it is characterised in that:Including beam(4), the beam(4)It is arranged on below inner wall surface, beam(4)'s Lower section is provided with filling wall(3), fill wall(3)With beam(4)Between have space, multiple concrete prefabricated building blocks are provided with space (1), beam(4)Lower surface for outer metope side high-order the first cascaded surface(5);Concrete prefabricated building block(1)Upper end Face is the second cascaded surface of the side low order close to wall face(6);First cascaded surface(5)With the second cascaded surface(6)Mutually Coordinate;Concrete prefabricated building block(1)One side is provided with projection(7), another side is provided with and projection(7)The recess being engaged (8);First cascaded surface(5)With the second cascaded surface(6)Between gap filling micro-expansion cement mortar(2), it is raised(7)With Recess(8)Between gap filling micro-expansion cement mortar(2), concrete prefabricated building block(1)Lower surface and filling wall(3)Between Pass through the micro-expansion cement mortar of filling(2)It is fixedly connected.
- A kind of 2. building block water proof structure according to claim 1, it is characterised in that:The filling wall(3)Upper surface is to beam (4)The distance of lower surface is 180-200mm;The concrete precast block(1)Lower surface to the first cascaded surface(5)The height of high-order Spend for 180-200mm.
- A kind of 3. building block water proof structure according to claim 1, it is characterised in that:First cascaded surface(5)High-order Difference in height with low order is 50mm.
- A kind of 4. building block water proof structure according to claim 1, it is characterised in that:The projection(7)Length is 50mm.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720391363.1U CN206625437U (en) | 2017-04-14 | 2017-04-14 | A kind of building block water proof structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720391363.1U CN206625437U (en) | 2017-04-14 | 2017-04-14 | A kind of building block water proof structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206625437U true CN206625437U (en) | 2017-11-10 |
Family
ID=60205252
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720391363.1U Active CN206625437U (en) | 2017-04-14 | 2017-04-14 | A kind of building block water proof structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206625437U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108104286A (en) * | 2017-12-31 | 2018-06-01 | 陈惠海 | It is a kind of to be used for the building block of space and its construction method between padding girder bottom and wall top |
| CN112663661A (en) * | 2020-12-17 | 2021-04-16 | 山东三箭建设工程股份有限公司 | Construction method and construction structure for preventing ground settlement caused by backfill loosening under foundation straining beam |
-
2017
- 2017-04-14 CN CN201720391363.1U patent/CN206625437U/en active Active
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108104286A (en) * | 2017-12-31 | 2018-06-01 | 陈惠海 | It is a kind of to be used for the building block of space and its construction method between padding girder bottom and wall top |
| CN108104286B (en) * | 2017-12-31 | 2024-03-15 | 陈惠海 | Building block for filling gap between beam bottom and wall top and construction method thereof |
| CN112663661A (en) * | 2020-12-17 | 2021-04-16 | 山东三箭建设工程股份有限公司 | Construction method and construction structure for preventing ground settlement caused by backfill loosening under foundation straining beam |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103266767B (en) | Construction method for preventing and treating cracks between concrete structure and filler wall | |
| CN204098017U (en) | A kind of novel full coercion underground continuous wall | |
| CN103216024A (en) | Self-heat-preservation mortar-free block masonry shear wall system and construction method thereof | |
| CN106812219A (en) | Filling wall top stuff up a crack construction method | |
| CN208023601U (en) | A kind of prefabricated pile foundation support table side form of mutual buckle type | |
| CN105019597A (en) | Lightweight partition board with net rack and fiber-reinforced hollows and splicing method thereof | |
| CN210117716U (en) | Trapezoidal foundation ditch lateral wall concrete typical forms of elevartor shaft | |
| CN211949044U (en) | An infill wall masonry structure | |
| CN105133630A (en) | Prefabricated part for constructing foundation forming molds | |
| CN217896800U (en) | Plugging structure of shaped steel preformed hole of encorbelmenting of wall body outrigger | |
| CN108277895A (en) | A kind of composite heat preserving external wall system and construction method | |
| CN107237448A (en) | A kind of prefabricated interior fill concrete wallboard and its manufacture method | |
| CN110042973A (en) | Vertical hole grouting type lightweight concrete inner partition wall filling block | |
| CN102767284B (en) | Semi-prefabricating construction process for concrete thin-wall lower return eave | |
| CN111730726A (en) | How to make concrete precast column mould | |
| CN203383245U (en) | Cement board waterproof protective layer construction structure | |
| CN102535847A (en) | Method for constructing gypsum self-insulation outer wall block masonry | |
| CN109098307A (en) | Brick output enters the wall body structure and wall building method of stone | |
| CN116856565A (en) | Construction method for top plug of post-built filling wall | |
| CN104612315A (en) | Concrete self-temperature-preservation composite block and construction method | |
| CN212336496U (en) | A composite exterior wall of fair-faced concrete prefabricated blocks and fair-faced bricks | |
| CN111155664B (en) | Crack control construction method for aerated concrete block filler wall | |
| CN209244008U (en) | A kind of water-tight exterior wall structure | |
| CN210086629U (en) | Vertical hole grouting type light concrete inner partition wall filling building block | |
| CN202899345U (en) | Dry wall |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |