CN108396781A - A kind of assembled vertical shaft fore shaft collar tie beam element structure - Google Patents

A kind of assembled vertical shaft fore shaft collar tie beam element structure Download PDF

Info

Publication number
CN108396781A
CN108396781A CN201810459526.4A CN201810459526A CN108396781A CN 108396781 A CN108396781 A CN 108396781A CN 201810459526 A CN201810459526 A CN 201810459526A CN 108396781 A CN108396781 A CN 108396781A
Authority
CN
China
Prior art keywords
plate
component
steel
bolt hole
assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810459526.4A
Other languages
Chinese (zh)
Other versions
CN108396781B (en
Inventor
惠丽萍
付秀勇
闫朝涛
贾明辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing General Municipal Engineering Design and Research Institute Co Ltd
Original Assignee
Beijing General Municipal Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing General Municipal Engineering Design and Research Institute Co Ltd filed Critical Beijing General Municipal Engineering Design and Research Institute Co Ltd
Priority to CN201810459526.4A priority Critical patent/CN108396781B/en
Publication of CN108396781A publication Critical patent/CN108396781A/en
Application granted granted Critical
Publication of CN108396781B publication Critical patent/CN108396781B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/121Manhole shafts; Other inspection or access chambers; Accessories therefor characterised by the connection between shaft elements, e.g. of rings forming said shaft
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Abstract

The invention discloses a kind of assembled vertical shaft fore shaft collar tie beam element structures, including first assembly, the second component, first assembly plugging plate, the second component plugging plate and connecting plate.First assembly includes girder steel, bottom plate, side plate and top plate;Second component includes girder steel, bottom plate, side plate and top plate;Second component plugging plate is a shape steel plate, is blocked on the part of the top plate both sides hollow out of the second component;First assembly plugging plate is a shape steel plate, is blocked on the part of the top plate both sides hollow out of first assembly;Connecting plate is a shape steel plate, is the connector between first assembly and the second component, the second component and the second component.The present invention can solve to use assembled steel component, overcome existing for traditional fore shaft collar tie beam live formwork erection, tie up muscle, pour, conserving and the processes such as the later stage cuts are various, the construction period is long, and generates building waste, is unfavorable for the technical problems such as green construction.

Description

A kind of assembled vertical shaft fore shaft collar tie beam element structure
Technical field
The present invention relates to assembled architecture technical fields, and in particular to a kind of underground engineering construction vertical shaft assembled fore shaft circle Beam system and connection structure.
Background technology
Underground engineering is built in completed region of the city, especially surface structures close quarters, mostly uses shallow mining method greatly, because This, construction shaft is widely used.
Vertical shaft is temporary structure, need to meet and promote suspension bucket, stair laying, feed pipe, drainpipe, high-pressure air hose, constructs and lead to Plant, material etc. facilitates the requirements, generally square such as entrance in the line layouts such as air hose and communication, illumination, and construction Shape, plane geometric shape rule.Construction shaft includes fore shaft collar tie beam and vertical shaft well body;Fore shaft collar tie beam is generally mixed using cast in place reinforced bar Xtah Crude Clay structure, vertical shaft well body use the steel grating structure filled with concrete, and fore shaft collar tie beam passes through pre-buried longitudinally connected with well body Muscle is connected.
Fore shaft collar tie beam Specific construction walks sequence:The shallow excavation of foundation pit of fore shaft --- performs bed course --- assembling reinforcement --- formwork Plate --- the pre-inserted vertical dowel of well body --- pre-buried shaft headgear built-in fitting --- fore shaft collar tie beam concreting --- fore shaft Collar tie beam concrete curing.Fore shaft collar tie beam is as temporary component, and buried depth is shallower, generally waits for after the completion of engineering that fore shaft collar tie beam need to be into Row is cut.
Though fore shaft collar tie beam structure regular geometry, size are single, work progress needs formwork supporting plate, assembling reinforcement, mixes Solidifying soil is poured and is conserved, and the later stage also needs to cut, and causes field procedure various, and workload is larger, and the duration is also longer.
Invention content
The object of the present invention is to provide a kind of assembled vertical shaft fore shaft collar tie beam element structures, to solve to use assembled steel structure Part overcomes existing for traditional fore shaft collar tie beam live formwork erection, ties up muscle, pours, conserving and the processes such as the later stage cuts are various, work of constructing Phase is long, and generates building waste, is unfavorable for the technical problems such as green construction.
In order to achieve the above-mentioned object of the invention, the technical solution where the present invention is as follows:
A kind of assembled vertical shaft fore shaft collar tie beam element structure, including first assembly, the second component, first assembly plugging plate, Second component plugging plate and connecting plate;
1) first assembly
First assembly includes girder steel, bottom plate, side plate and top plate;Girder steel welds steel structure by the U-shaped that the edge of a wing and web form Part, two edge of a wing of girder steel are equipped with bolt hole;Bottom plate is steel plate with side plate, and bolt hole is arranged;Top plate is bar steel plate, is not provided with spiral shell Keyhole;
Girder steel be it is two or more, it is spaced and parallel to be placed between side plate;Top plate is located at perpendicular to girder steel direction above side plate Middle part;Bottom plate is used with girder steel and is welded to connect, and steel beam flange bolt hole is corresponding with bed bolt hole, is convenient for later stage bolt Bar passes through;Also use is welded to connect between side plate and girder steel, between top plate and girder steel;
2) the second component
Second component includes girder steel, bottom plate, side plate and top plate;Girder steel welds steel structure by the U-shaped that the edge of a wing and web form Part, girder steel are three or more, and girder steel is parallel to be connected between two side plates, are located at the steel equipped with bolt hole of side plate side Back portion is concordant with side plate, and the top and bottom of the other side is designed with the steel beam flange planar side plates of bolt hole;The girder steel at middle part Bottom is equipped with bolt hole;Bottom plate, top plate and side plate are steel plate, and top plate is perpendicular to girder steel and to be arranged at intervals above girder steel Bar steel plate;Bolt hole is arranged in side plate;Being located at the bolt hole of steel beam bottom setting for bottom plate, is again provided with corresponding bolt Hole, and connected them by bolt, form the connector reserved with the vertical dowel of vertical shaft;Between girder steel, side plate and top, bottom plate It is all made of and is welded to connect;
3) the second component plugging plate
Second component plugging plate is a shape steel plate, blocks on the part of the top plate both sides hollow out of the second component, sets thereon It is corresponding with the bolt hole at the top of girder steel to set bolt hole position;
4) first assembly plugging plate
First assembly plugging plate is a shape steel plate, blocks on the part of the top plate both sides hollow out of first assembly, sets thereon It is corresponding with the bolt hole at the top of girder steel to set bolt hole position;
5) connecting plate
Connecting plate is a shape steel plate, is the connector between first assembly and the second component, the second component and the second component, Outside the side plate for the adjacent being connect with the second component positioned at first assembly and the second component, the second component, be provided with on side plate The corresponding bolt hole of bolt hole;
6) fore shaft collar tie beam is connect with vertical shaft well body
Four angles of the first assembly as fore shaft collar tie beam, four sides of second component as fore shaft collar tie beam, pass through connecting plate It is connected with each other;The reserved connector being connect with the vertical muscle of vertical shaft in first assembly lower part;The vertical dowel of vertical shaft is used with reserved connector Bolt is welded to connect.
Advantages of the present invention:Fore shaft collar tie beam of the present invention uses fabricated construction, component to use Assembling mode, The duration is substantially reduced, construction efficiency is improved, hence it is evident that is shortened the construction period;Construction site wet construction is avoided, environment is effectively avoided Pollution;And each component of fore shaft collar tie beam is repeatable to be utilized, and meets energy saving, the section material requirement of green construction, it then follows sustainable development Principle.
Description of the drawings
Fig. 1 is the fore shaft collar tie beam element structure assembling figure of the present invention.
Fig. 2 is the three-dimensional structure diagram of the first assembly of the present invention.
Fig. 3 is the cut-away illustration of Fig. 2.
Fig. 4 is the three-dimensional structure diagram of the second component of the present invention.
Fig. 5 is the cut-away illustration of Fig. 4.
Fig. 6 is the second component plugging plate three-dimensional structure diagram of the present invention.
Fig. 7 is the first assembly plugging plate three-dimensional structure diagram of the present invention.
Fig. 8 is the connecting plate three-dimensional structure diagram of the present invention.
It is numbered in figure:1, first assembly, the 2, second component, the 3, second component plugging plate, 30, bolt hole, 4, first assembly Plugging plate, 40, bolt hole, 5, connecting plate, 50, bolt hole, 10, side plate, 11, girder steel, 12, top plate, 13, deep floor, 14, bottom Plate, 15, bolt hole, 20, side plate, 21, girder steel (top sets bolt hole), 22, girder steel (bottom sets bolt hole), 23, girder steel (top It is all provided with bolt hole with bottom), 24, top plate, 25, bottom plate, 26, bolt hole, 27, upper nut (being removed for fore shaft collar tie beam), 28, lower nuts, 29, screw rod.
Specific implementation mode
The concrete structure of the present invention is shown in Figure 1.
Fore shaft collar tie beam uses assembling type steel structure in the present invention, mainly by first assembly 1, the second component 2, plugging plate 3, envelope Closure plate 4, connecting plate 5 form.Component is prefabricated using batch production, according to collar tie beam size, scene commitment positions to component into The assembled molding of row bolt.
1) first assembly, shown in Fig. 2,3.
First assembly is made of girder steel 11+ bottom plate 14+ side plate 10+ top plates 12.The U that girder steel 11 is made of the edge of a wing and web Shape welds steel member, and 11 liang of edges of a wing of girder steel are equipped with bolt hole.Bottom plate 14 is steel plate with side plate 10, and bolt hole is arranged.Top plate 12 For bar steel plate, it is not provided with bolt hole.
Bottom plate 14 is used with girder steel 11 and is welded to connect, and 11 edge of a wing bolt hole of girder steel is corresponding with 14 bolt hole of bottom plate, It is passed through convenient for later stage shank of bolt;Also use is welded to connect between side plate 14 and girder steel 11, between top plate 12 and girder steel 11.
2) the second component, shown in Fig. 4,5.
Second component is made of girder steel 21,22,23+ deep floor 13+ bottom plate 25+ side plate 20+ top plates 24;Girder steel 21,22, 23 weld steel member by the U-shaped that the edge of a wing and web form, and the girder steel top edge of a wing is equipped with bolt hole.Deep floor, bottom plate and Side plate is steel plate, and top plate is interval setting bar steel plate;Bolt hole is arranged in side plate;Girder steel, floor, side plate and top, bottom plate it Between be all made of and be welded to connect.
3) the second component plugging plate 3, it is shown in Figure 6.
Plugging plate is a shape steel plate, and bolt hole 30 is arranged.
4) first assembly plugging plate 4, it is shown in Figure 7.
Plugging plate is a shape steel plate, and bolt hole 40 is arranged.
5) connecting plate 5, it is shown in Figure 8.
Connecting plate is a shape steel plate, and bolt hole 50 is arranged.
6) fore shaft collar tie beam is connect with vertical shaft well body
The reserved connector being connect with the vertical muscle of vertical shaft in first assembly lower part.The vertical dowel of vertical shaft uses spiral shell with reserved connector Nut at two is arranged in bolt or welding, bolt top, to fore shaft collar tie beam after the completion of construction period fixing lock mouth circle beam and construction It removes.

Claims (1)

1. a kind of assembled vertical shaft fore shaft collar tie beam element structure, which is characterized in that including first assembly, the second component, first group Part plugging plate, the second component plugging plate and connecting plate;
1) first assembly
First assembly includes girder steel, bottom plate, side plate and top plate;Girder steel welds steel member, steel by the U-shaped that the edge of a wing and web form Two edge of a wing of beam is equipped with bolt hole;Bottom plate is steel plate with side plate, and bolt hole is arranged;Top plate is bar steel plate, is not provided with bolt hole;
Girder steel be it is two or more, it is spaced and parallel to be placed between side plate;Top plate is located at side plate upper center perpendicular to girder steel direction; Bottom plate is used with girder steel and is welded to connect, and steel beam flange bolt hole is corresponding with bed bolt hole, is worn convenient for later stage shank of bolt It crosses;Also use is welded to connect between side plate and girder steel, between top plate and girder steel;
2) the second component
Second component includes girder steel, bottom plate, side plate and top plate;Girder steel welds steel member, steel by the U-shaped that the edge of a wing and web form Beam is three or more, and girder steel is parallel to be connected between two side plates, is located at the girder steel top equipped with bolt hole of side plate side Portion is concordant with side plate, and the top and bottom of the other side is designed with the steel beam flange planar side plates of bolt hole;The steel beam bottom at middle part Equipped with bolt hole;Bottom plate, top plate and side plate are steel plate, and top plate is perpendicular to girder steel and to be arranged at intervals at the bar shaped above girder steel Steel plate;Bolt hole is arranged in side plate;Being located at the bolt hole of steel beam bottom setting for bottom plate, is again provided with corresponding bolt hole, And connected them by bolt, form the connector reserved with the vertical dowel of vertical shaft;Between girder steel, side plate and top, bottom plate Using being welded to connect;
3) the second component plugging plate
Second component plugging plate is a shape steel plate, blocks on the part of the top plate both sides hollow out of the second component, spiral shell is arranged thereon Keyhole position is corresponding with the bolt hole at the top of girder steel;
4) first assembly plugging plate
First assembly plugging plate is a shape steel plate, blocks on the part of the top plate both sides hollow out of first assembly, spiral shell is arranged thereon Keyhole position is corresponding with the bolt hole at the top of girder steel;
5) connecting plate
Connecting plate is a shape steel plate, is the connector between first assembly and the second component, the second component and the second component, is located at Outside the side plate for the adjacent that first assembly is connect with the second component, the second component with the second component, it is provided with and the spiral shell on side plate The corresponding bolt hole of keyhole;
6) fore shaft collar tie beam is connect with vertical shaft well body
Four angles of the first assembly as fore shaft collar tie beam, four sides of second component as fore shaft collar tie beam are mutual by connecting plate Connection;The reserved connector being connect with the vertical muscle of vertical shaft in first assembly lower part;The vertical dowel of vertical shaft uses bolt with reserved connector Or it is welded to connect.
CN201810459526.4A 2018-05-15 2018-05-15 Assembled shaft fore shaft circle beam member structure Active CN108396781B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810459526.4A CN108396781B (en) 2018-05-15 2018-05-15 Assembled shaft fore shaft circle beam member structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810459526.4A CN108396781B (en) 2018-05-15 2018-05-15 Assembled shaft fore shaft circle beam member structure

Publications (2)

Publication Number Publication Date
CN108396781A true CN108396781A (en) 2018-08-14
CN108396781B CN108396781B (en) 2024-01-12

Family

ID=63102245

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810459526.4A Active CN108396781B (en) 2018-05-15 2018-05-15 Assembled shaft fore shaft circle beam member structure

Country Status (1)

Country Link
CN (1) CN108396781B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111636875A (en) * 2020-05-19 2020-09-08 北京市轨道交通建设管理有限公司 Construction method of vertical shaft locking ring for underground excavation construction of subway
CN112554884A (en) * 2020-11-20 2021-03-26 北京市政路桥股份有限公司 Excavation method of tunnel vertical shaft

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2866613Y (en) * 2005-12-14 2007-02-07 何锡旺 Adjustable manhole base structure
CN104763103A (en) * 2015-04-11 2015-07-08 桂林理工大学 Construction method of assembling-type prefabricated concrete ring beam
CN204491630U (en) * 2015-03-19 2015-07-22 林永江 A kind of reusable assembling vertical shaft collar tie beam
CN105625465A (en) * 2016-03-13 2016-06-01 青岛润国生态科技发展有限公司 Assembly type pipe rack gate type joint
CN106869548A (en) * 2017-04-09 2017-06-20 北京工业大学 A kind of newel framework assembled underground parking structural system and construction method
CN208415313U (en) * 2018-05-15 2019-01-22 北京市市政工程设计研究总院有限公司 A kind of assembled vertical shaft fore shaft collar tie beam element structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2866613Y (en) * 2005-12-14 2007-02-07 何锡旺 Adjustable manhole base structure
CN204491630U (en) * 2015-03-19 2015-07-22 林永江 A kind of reusable assembling vertical shaft collar tie beam
CN104763103A (en) * 2015-04-11 2015-07-08 桂林理工大学 Construction method of assembling-type prefabricated concrete ring beam
CN105625465A (en) * 2016-03-13 2016-06-01 青岛润国生态科技发展有限公司 Assembly type pipe rack gate type joint
CN106869548A (en) * 2017-04-09 2017-06-20 北京工业大学 A kind of newel framework assembled underground parking structural system and construction method
CN208415313U (en) * 2018-05-15 2019-01-22 北京市市政工程设计研究总院有限公司 A kind of assembled vertical shaft fore shaft collar tie beam element structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111636875A (en) * 2020-05-19 2020-09-08 北京市轨道交通建设管理有限公司 Construction method of vertical shaft locking ring for underground excavation construction of subway
CN112554884A (en) * 2020-11-20 2021-03-26 北京市政路桥股份有限公司 Excavation method of tunnel vertical shaft

Also Published As

Publication number Publication date
CN108396781B (en) 2024-01-12

Similar Documents

Publication Publication Date Title
KR101204763B1 (en) Structure of sandwich pannel with precast concrete and cast in place concrete for pipe utility conduit
CN206070835U (en) A kind of assembled architecture bottom composite floor
CN104018518B (en) The method of prefabricated diaphragm wall and construction outer wall of basement and floor
CN107780576A (en) A kind of assembled architecture bottom composite floor and its connected mode
CN109797778A (en) One kind being suitable for the anhydrous layer of sand area upper pipe working well in desert and construction method
CN208363127U (en) A kind of retaining wall structure of combined type high-speed rail platform
CN108729564A (en) Assembled architecture system
CN210369032U (en) Socket type precast concrete assembled retaining wall unit and assembled retaining wall thereof
CN108396781A (en) A kind of assembled vertical shaft fore shaft collar tie beam element structure
CN206667459U (en) A kind of pre-splicing Standard formula building of prefabrication type reinforced concrete shear wall
CN209260897U (en) Assembly concrete beam column sleeve combination connecting node
CN105002895B (en) More drilling rod cement mixing methods inserted with prefabricated shaped-section
CN208415313U (en) A kind of assembled vertical shaft fore shaft collar tie beam element structure
CN204000925U (en) Prefabricated diaphragm wall
CN206308707U (en) A kind of city integrated Pipe rack of prefabricated assembled concrete
CN112554206A (en) PC plate beam shared by foundation pit support structure and basement outer wall and installation method thereof
KR101230370B1 (en) The water-storage tank of assembly type and method for constructing thereof
CN205502313U (en) Assembled mixed structure straw concrete wall system
CN207525906U (en) A kind of assembled frame-shear structure wall splitlevel connection structure
CN104947687A (en) Integrated vertical load-bearing structure of underground structure external wall and enclosure row piles
CN106193081B (en) A kind of draining assembled basic structure for moving house certainly
CN210288282U (en) Prefabricated ditch
CN108343234A (en) It can be used as modification module and its application of the cast-in-place ring beam template of hollowed-block masonry
CN108286267B (en) Assembled corrugated steel Combined concrete pipe gallery
CN207919809U (en) A kind of high ductility concrete shear force wall connection structure of assembled

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Fu Xiuyong

Inventor after: Hui Liping

Inventor after: Yan Chaotao

Inventor after: Jia Minghui

Inventor before: Hui Liping

Inventor before: Fu Xiuyong

Inventor before: Yan Chaotao

Inventor before: Jia Minghui

GR01 Patent grant