CN205222349U - Segmentation promotes formula construction elevator mechanism - Google Patents
Segmentation promotes formula construction elevator mechanism Download PDFInfo
- Publication number
- CN205222349U CN205222349U CN201520721786.6U CN201520721786U CN205222349U CN 205222349 U CN205222349 U CN 205222349U CN 201520721786 U CN201520721786 U CN 201520721786U CN 205222349 U CN205222349 U CN 205222349U
- Authority
- CN
- China
- Prior art keywords
- construction elevator
- basis
- segmentation
- steel
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
The utility model discloses a segmentation promotes formula construction elevator mechanism, the piece is buried on its basis including the symmetry sets up in core section of thick bamboo shear force wall, detachable sets up the steel platform on the piece is buried on the basis, support and set up the steel corbel between piece and the steel platform is buried on the basis, detachable sets up the construction elevator standard festival on the steel platform, wherein, follow the longitudinal distribution has the multiunit basis to bury the piece in the shear force wall of core section of thick bamboo barrel. Through the longitudinal distribution has the multiunit basis to bury the piece in the shear force wall of core section of thick bamboo barrel, makes setting up the basis and can setting up on the piece is buried on the basis of different heights of lift according to the construction progress of construction elevator to can promote according to actual construction progress the construction elevator basis is vacateed basic lower part space and conveniently is under construction, has solved the interior construction elevator occupation space of a super high -rise building core section of thick bamboo and has leaded to the unable problem of being under construction of horizontal structure.
Description
Technical field
The utility model relates to technical field of building construction, and particularly high-rise building is arranged in construction elevator in Core Walls Structure, is specifically related to a kind of segmentation hoisting type construction elevator mechanism.
Background technology
Construction elevator is a kind of manned cargo-carrying construction machinery and equipment being widely used in various building operation, primarily of a few part composition such as car, driver train, standard knot, attached wall, chassis, fence, electric system.
In construction of super highrise building, Core Walls Structure is usually applied form frame system and is constructed in housing in advance, for ensureing that workmen can go up rapidly to form frame system work layer, construction elevator is usually attached to Core Walls Structure body of wall and carries out up and down, mainly comprise two kinds of arrangements, a kind of in order to utilize permanent elevator hoistways to install off-standard size construction elevator, another kind is at Core Walls Structure installation code size construction elevator, and influenced floor elevator to be onstructed is constructed after removing again.Front a kind of mode takies permanent elevator hoistways, incurs loss through delay permanent elevator and installs, and because of tunnel dimension restriction, construction elevator size is less, and transport power is limited, be unfavorable for personnel and equipment, material fast up and down.Rear a kind of mode incurs loss through delay horizontal structure construction in cylinder, and affect the insertion of the specialties such as follow-up structure, electromechanics, decorations, two kinds of modes also have a common ground, and namely construction elevator runs height the end of to top, highly higher.
In current construction industry, also there is no a kind of elevator arrangement, the problem that aforesaid way causes can be solved.Therefore design a kind of construction elevator scheme, can the problems referred to above be avoided, become the realm of building construction to need the difficult problem broken through.
Utility model content
In view of this, be necessary to provide one neither to affect permanent elevator in Core Walls Structure and install, also do not affect horizontal structure construction in Core Walls Structure, construction elevator scheme in the cylinder simultaneously ensureing safety and economy.
A kind of segmentation hoisting type construction elevator mechanism described in the utility model, it comprises,
Be symmetricly set in the basic embedded part in Core Walls Structure shear wall;
Detouchable sets up the steel platform on described basic embedded part;
Support the steel corbel be arranged between described basic embedded part and steel platform;
Detouchable sets up the construction elevator standard knot on described steel platform;
Wherein, the basic embedded part of many groups is had along genesis analysis in the shear wall of described Core Walls Structure cylindrical shell.
Preferably, described segmentation hoisting type construction elevator mechanism also comprises detouchable and is laid on shoulder guard on described steel platform.
Preferably, described basic embedded part comprises dowel and anchor slab, and described dowel is horizontally set in described shear wall, and described shear wall and described anchor slab piercing welding are stretched out in one end.
Preferably, described steel corbel comprises supporting steel plate and multiple straight triangle stiffened plate be arranged in parallel, and a square edge of described straight triangle stiffened plate welds with described anchor slab, and another square edge welds supporting steel plate.
Preferably, described steel platform comprises the upper and lower girder set up by steel beam with box shape, and is set up by I-beam section and form secondary beam, and described secondary beam is arranged between upper and lower girder.
Segmentation hoisting type construction elevator mechanism described in the utility model, the basic embedded part of many groups is had by genesis analysis in the shear wall of described Core Walls Structure cylindrical shell, the basis of setting up of construction elevator is enable to set up on the basic embedded part of different height of lift according to construction speed, thus can according to practice of construction progress, promote described construction elevator basis, vacate basic infrastructure space conveniently to construct, solve construction elevator in high-rise building Core Walls Structure to take up room the problem causing horizontal structure to construct, use segmentation hoisting type construction elevator described in the utility model basis, ensure that horizontal structure energy sequential production in Core Walls Structure, accelerating construction progress, reduce the setting height(from bottom) of construction elevator simultaneously, reduce security risk, cost-saving.
Accompanying drawing explanation
Fig. 1 is the section-drawing of segmentation hoisting type construction elevator mechanism described in the utility model;
Fig. 2 is the birds-eye view of segmentation hoisting type construction elevator mechanism described in the utility model;
Fig. 3 is the front view of steel corbel described in the utility model;
Fig. 4 is the right elevation of steel corbel described in the utility model;
Fig. 5 is the structural representation of basic embedded part described in the utility model.
Detailed description of the invention
Clearly understand to make the purpose of this utility model, technical scheme and advantage, below in conjunction with drawings and Examples, the utility model is further elaborated, be to be understood that, specific embodiment described herein only in order to explain the utility model, and is not used in restriction the utility model.
The utility model provides a kind of segmentation hoisting type construction elevator mechanism, and it comprises basic embedded part 10, steel platform 20, steel corbel 30 and construction elevator standard knot 40, and described basic embedded part 10 is symmetricly set in Core Walls Structure shear wall; Described steel platform 20 detouchable is set up on described basic embedded part 10; Described steel corbel 30 supports and is arranged between described basic embedded part 10 and steel platform 20; Described construction elevator standard knot 40 detouchable is set up on described steel platform 20; Wherein, the basic embedded part 10 of many groups is had along genesis analysis in the shear wall of described Core Walls Structure cylindrical shell.
The basic embedded part 10 of many groups is had by genesis analysis in the shear wall of described Core Walls Structure cylindrical shell, be described segmentation hoisting type construction elevator mechanism to provide multiple height of lift sets up basic point, simultaneously, detachable connection is between each parts, then the setting up basis and can set up on the basic embedded part 10 of different height of lift according to construction speed of construction elevator, formed and carry out along described Core Walls Structure cylindrical shell the construction elevator basis that constantly promotes, solve construction elevator in high-rise building Core Walls Structure and to take up room the problem causing horizontal structure to construct.
Concrete, described basic embedded part 10 comprises dowel 11 and anchor slab 12, and described dowel 11 is horizontally set in described shear wall, and one end is stretched out described shear wall and welded with described anchor slab twelve punch.Adopt piercing welding can be easy to observe molten bath district root penetration situation, thus effectively control the appearance of overlap, indent, lack of penetration or defect such as " misrun ".
Described steel platform 20 comprises the upper and lower girder 21,22 set up by steel beam with box shape, and is set up by I-beam section and form secondary beam 23, and described secondary beam is arranged between upper and lower girder 21,22.
Described steel corbel 30 comprises supporting steel plate 31 and multiple straight triangle stiffened plate 32 be arranged in parallel, and a square edge of described straight triangle stiffened plate 32 welds with described anchor slab 12, another square edge welds supporting steel plate 31.The setting of described steel corbel 30 can improve the steadiness of described segmentation hoisting type construction elevator mechanism, reduces the probability that construction accident occurs.
Further, described segmentation hoisting type construction elevator mechanism also comprises detouchable and is laid on shoulder guard 50 on described steel platform 20, falling to work layer below construction elevator, affecting below it and constructing for preventing falling thing above it.
The application of segmentation hoisting type construction elevator mechanism described in the utility model is as follows:
In the Core Walls Structure vertical structure construction stage, according to designed elevation, the basic embedded part 10 of many groups is set along genesis analysis in the shear wall of described Core Walls Structure cylindrical shell, described basic embedded part 10 is embedded in shear wall in advance.
When needing conveniently to construct to the lower space on construction elevator basis, construction elevator is promoted, first Demolition Construction elevator and standard knot thereof, utilize tower crane by steel platform 20 handling to embedded part 10 position, basis, top, utilize steel platform 20 as service platform, manually steel corbel 30 is welded with on basic embedded part 10.
Then steel platform 20 is hung and set up on the supporting steel plate 31 of steel corbel 30, and carry out positioning correcting.
After steel platform 20 is fixing, steel platform 20 completely spreads shoulder guard 50, namely position lifting has been carried out to construction elevator basis.
Last according to hoisting depth by the bottom standard knot handling of construction elevator on shoulder guard 50, after location fixedly completes, the top standard knot of lifting construction elevator and car successively, after installation mode completes, construction elevator gets final product place in operation.
There is the basic embedded part 10 of many groups in segmentation hoisting type construction elevator mechanism described in the utility model by genesis analysis in the shear wall of described Core Walls Structure cylindrical shell, the basis of setting up of construction elevator is enable to set up on the basic embedded part 10 of different height of lift according to construction speed, thus can according to practice of construction progress, promote described construction elevator basis, vacate basic infrastructure space conveniently to construct, solve construction elevator in high-rise building Core Walls Structure to take up room the problem causing horizontal structure to construct, use segmentation hoisting type construction elevator described in the utility model basis, ensure that horizontal structure energy sequential production in Core Walls Structure, accelerating construction progress, reduce the setting height(from bottom) of construction elevator simultaneously, reduce security risk, cost-saving.
The foregoing is only preferred embodiment of the present utility model, not in order to limit the utility model, all within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.
Claims (5)
1. a segmentation hoisting type construction elevator mechanism, is characterized in that, comprise,
Be symmetricly set in the basic embedded part (10) in Core Walls Structure shear wall;
Detouchable sets up the steel platform (20) on described basic embedded part (10);
Support is arranged on the steel corbel (30) between described basic embedded part (10) and steel platform (20);
Detouchable sets up the construction elevator standard knot (40) on described steel platform (20);
Wherein, the basic embedded part of many groups (10) are had along genesis analysis in the shear wall of described Core Walls Structure cylindrical shell.
2. segmentation hoisting type construction elevator mechanism according to claim 1, it is characterized in that, described basic embedded part (10) comprises dowel (11) and anchor slab (12), described dowel (11) is horizontally set in described shear wall, and described shear wall and described anchor slab (12) piercing welding are stretched out in one end.
3. segmentation hoisting type construction elevator mechanism according to claim 2, it is characterized in that, described steel corbel (30) comprises supporting steel plate (31) and multiple straight triangle stiffened plate (32) be arranged in parallel, one square edge of described straight triangle stiffened plate (32) welds with described anchor slab (12), another square edge welds supporting steel plate (31).
4. segmentation hoisting type construction elevator mechanism according to claim 1, it is characterized in that, described steel platform (20) comprise set up by steel beam with box shape upper and lower girder (21), (22), and to be set up by I-beam section and form secondary beam (23), described secondary beam (23) is arranged between upper and lower girder (21), (22).
5. segmentation hoisting type construction elevator mechanism according to claim 1, is characterized in that, described segmentation hoisting type construction elevator mechanism also comprises detouchable and is laid on shoulder guard (50) on described steel platform (20).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520721786.6U CN205222349U (en) | 2015-09-17 | 2015-09-17 | Segmentation promotes formula construction elevator mechanism |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520721786.6U CN205222349U (en) | 2015-09-17 | 2015-09-17 | Segmentation promotes formula construction elevator mechanism |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205222349U true CN205222349U (en) | 2016-05-11 |
Family
ID=55897426
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520721786.6U Active CN205222349U (en) | 2015-09-17 | 2015-09-17 | Segmentation promotes formula construction elevator mechanism |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205222349U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105217408A (en) * | 2015-09-17 | 2016-01-06 | 中建三局第三建设工程有限责任公司 | Segmentation hoisting type construction elevator mechanism and segmentation method for improving thereof |
CN108978713A (en) * | 2018-08-27 | 2018-12-11 | 江苏船谷重工有限公司 | A kind of prefabrication elevator shaft foundation pit and its installation method |
CN111021394A (en) * | 2019-11-29 | 2020-04-17 | 上海建工七建集团有限公司 | Construction elevator high-position conversion foundation and construction method thereof |
-
2015
- 2015-09-17 CN CN201520721786.6U patent/CN205222349U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105217408A (en) * | 2015-09-17 | 2016-01-06 | 中建三局第三建设工程有限责任公司 | Segmentation hoisting type construction elevator mechanism and segmentation method for improving thereof |
CN108978713A (en) * | 2018-08-27 | 2018-12-11 | 江苏船谷重工有限公司 | A kind of prefabrication elevator shaft foundation pit and its installation method |
CN108978713B (en) * | 2018-08-27 | 2023-12-15 | 江苏船谷重工有限公司 | Factory prefabricated elevator shaft pit and installation method thereof |
CN111021394A (en) * | 2019-11-29 | 2020-04-17 | 上海建工七建集团有限公司 | Construction elevator high-position conversion foundation and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103669832B (en) | A kind of standard type Bailey bracket assembled jacking formwork system | |
CN105217408A (en) | Segmentation hoisting type construction elevator mechanism and segmentation method for improving thereof | |
CN103711301A (en) | Construction method and device for two-track movable electric basket and lifting hoist | |
CN104695337B (en) | Self-lifting sliding and turnover construction system and construction method | |
CN206233576U (en) | For the hydraulic pressure lift turnover formwork construction device of bundled-tube structure chimney | |
CN205222349U (en) | Segmentation promotes formula construction elevator mechanism | |
CN202706503U (en) | Electric lifting discharging platform for main building construction | |
CN203794498U (en) | Built-in self-elevating tower crane device | |
CN103711078A (en) | Temporary girder-type support for bridge construction and dismantling method thereof | |
CN205296803U (en) | Elevator automatic lifting operation panel | |
CN102653938A (en) | Offshore dismantling construction method of descending form traveler | |
CN205348727U (en) | A promote formula operation platform for in shaft | |
CN204781927U (en) | Elevartor shaft formwork and elevartor shaft concrete placement operation platform | |
CN104291222B (en) | The inner hard protection of a kind of high-rise building Core Walls Structure hangs integrated system with row | |
CN203113793U (en) | Large formwork installation system of oblique structure | |
CN105621304A (en) | Building material elevator | |
CN205857026U (en) | A kind of movable type bridge anticollision barrier construction operation chassis | |
CN210084736U (en) | A portable lifting hook for installation of people's air defense door | |
CN204662929U (en) | A kind of cross-line walking fence operation device | |
CN203947754U (en) | Elevator shaft tool-type operating platform | |
CN206784891U (en) | A kind of prefabricated hoistway operation platform | |
CN102434006A (en) | Method for integral ground manufacture, suspension and construction of large-sized steel trestle conveying system | |
CN203475801U (en) | Telescopic steel platform for elevator shaft | |
CN107829553A (en) | A kind of elevator hoistways construction platform system | |
CN211473320U (en) | Tool type external hanging rack for corridor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |