CN204875423U - Peripheral stereoplasm of arbor structure of mating formation - Google Patents

Peripheral stereoplasm of arbor structure of mating formation Download PDF

Info

Publication number
CN204875423U
CN204875423U CN201520431137.2U CN201520431137U CN204875423U CN 204875423 U CN204875423 U CN 204875423U CN 201520431137 U CN201520431137 U CN 201520431137U CN 204875423 U CN204875423 U CN 204875423U
Authority
CN
China
Prior art keywords
permeable
arbor
district
finish coat
bed course
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520431137.2U
Other languages
Chinese (zh)
Inventor
赵强民
胡传伟
甘美娜
徐慧
王栋宇
李曦婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PALM Eco-Town Development Co., Ltd.
Original Assignee
PALM LANDSCAPE ARCHITECTURE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PALM LANDSCAPE ARCHITECTURE CO Ltd filed Critical PALM LANDSCAPE ARCHITECTURE CO Ltd
Priority to CN201520431137.2U priority Critical patent/CN204875423U/en
Application granted granted Critical
Publication of CN204875423U publication Critical patent/CN204875423U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a peripheral stereoplasm of arbor structure of mating formation, including the soil matrix layer that is used for planting the arbor, blotter is equipped with in soil matrix layer top and outside lieing in the arbor root, the projection and form tree crown projection district on the blotter of the tree crown of arbor, in blotter top and lie in tree crown projection district within range and be equipped with the bed course that permeable to waterly to permeate water, the blotter top still is equipped with the concrete cushion that is located tree crown projection foreign side and meets with the bed course that permeates water, it is equipped with the finish coat that permeates water that is located tree crown projection district within range to permeate water bed course top, the concrete cushion top is equipped with the ground decorative layer that is located tree crown projection foreign side and meets with the finish coat that permeates water. The utility model discloses simple structure, low cost, the gas permeability of permeating water is good, can not reduce people's activity space.

Description

A kind of arbor periphery hard paving structure
[technical field]
The utility model relates to a kind of arbor periphery hard paving structure, belongs to garden layout technical field.
[background technology]
The urban built-up area that the population density is larger, because of functional requirements when building greenery patches, it is higher that the activity space of people builds ratio, and therefore mostly arbor species are to intert and mat formation centre at hard, both played the effect increasing green percentage, and shelter from heat or light space and activity space can have been built again.Arboreal growth needs enough soil spaces and sufficient moisture supply, the hard of current arbor periphery is mated formation still to lay fluid-tight stone material and concrete, natural precipitation is difficult to into being seeped into tree root periphery, the gas permeability of root system is deteriorated simultaneously, arboreal growth is greatly limited, very easily cause trunk infusion bad, even dead, this phenomenon is especially embodied on large tree and ancient tree.Also have at present build diameter be not less than 1 meter build planting bed by laying bricks or stones to plant the planting patterns of arbor, which reserves nature soil layer, can be permeable, ventilative well, but building planting bed on the ground by laying bricks or stones takies again very large space, decreases the activity space of people.
Chinese patent " a kind of ecological floor file structure (notification number: CN201962571U) " discloses and a kind ofly solves permeable scheme, the program is fixed with into many concrete beams arranged in parallel on ground, many concrete beams are provided with into many concrete longerons arranged in parallel, many concrete beam intersects with many concrete longerons are substantially at a right angle each other, mixed earth prefabricated chunk is equipped with on many concrete longerons, and be provided with vertical water-permeable passage at mixed earth prefabricated chunk, the ecology that above structure can reach a kind of Stability Analysis of Structures and air-and water-permeable is mated formation, but it is complicated that the deficiency of the program is construction structure, use the beam prefabricated structure of purlin of resemble construction, mounting process is also complicated, practicality is not high, and must support column be had, easily cause finish coat differential settlement.In addition, Chinese patent " a kind of compound water-permeable road structure (notification number: CN202031001U) " also discloses a kind of paving hazard that can be permeable, comprise water-permeable brick, leveling layer, pervious concrete and graded broken stone layer, graded broken stone is arranged at above soil matrix, above graded broken stone, pervious concrete is set, above pervious concrete, leveling layer is set, water-permeable brick is arranged at the top of leveling layer, this structure permeable road water permeability is superior, highway loading ability is strong, but the deficiency of the program is paving structure to be realized permeable using water-permeable brick and pervious concrete as major constituents layer, and the production cost of this water-permeable brick and pervious concrete is higher, engineering cost is high, be not suitable for promoting.
Therefore, the utility model arises at the historic moment.
[utility model content]
The utility model object overcomes the deficiencies in the prior art, and provide a kind of structure simple, with low cost, water-permeable and air permeable is good, can not reduce the arbor periphery hard paving structure of people's activity space.
The utility model is achieved through the following technical solutions:
A kind of arbor periphery hard paving structure, it is characterized in that: comprise the soil matrix layer for planting arbor, be positioned at outside arbor root and be provided with hardcore bed above described soil matrix layer, the tree crown of described arbor projects and forms crown mapping district on hardcore bed, above described hardcore bed and be positioned at crown mapping district scope be provided with can be permeable permeable bed course, the concrete cushion being positioned at and connecting outside crown mapping district and with permeable bed course is also provided with above described hardcore bed, the permeable finish coat being positioned at crown mapping district scope is provided with above described permeable bed course, the ground decoration floor being positioned at and connecting outside crown mapping district and with permeable finish coat is provided with above described concrete cushion.
Arbor periphery hard paving structure as above, is characterized in that: be provided with permeable adhered layer between described ground decoration layer and concrete cushion, between described permeable finish coat and permeable bed course.
Arbor periphery hard paving structure as above, is characterized in that: described adhered layer is cement mortar.
Arbor periphery hard paving structure as above, is characterized in that: described permeable bed course comprises grid screen, is filled with rubble in described grid screen.
Arbor periphery hard paving structure as above, is characterized in that: be provided with cobble district between described arbor and permeable finish coat, is equipped with cobble in described cobble district.
Arbor periphery hard paving structure as above, is characterized in that: the diameter in described cobble district is 1.5 times of arbor trunk diameter to 2.5 times.
Arbor periphery hard paving structure as above, is characterized in that: described permeable finish coat is stone material or the brick with multiple through hole.
Compared with prior art, the utility model has the following advantages:
1, hardcore bed is provided with above soil matrix layer of the present utility model, the tree crown of arbor projects and forms crown mapping district on hardcore bed, above hardcore bed and be positioned at crown mapping district scope be provided with can be permeable permeable bed course, the concrete cushion being positioned at and connecting outside crown mapping district and with permeable bed course is also provided with above hardcore bed, be provided with the permeable finish coat being positioned at crown mapping district scope above permeable bed course, above concrete cushion, be provided with the ground decoration floor being positioned at and connecting outside crown mapping district and with permeable finish coat.When rainy, the permeable finish coat of rainwater successively within the scope of crown mapping district, permeable bed course and the hardcore bed that drip from tree crown and enter in soil matrix floor, enable moisture penetrate into the surrounding of Tree root system and provide nutrition for arbor, guarantee the healthy growth of arbor.And to face down from ground that what arrange is ground decoration floor and concrete cushion crown mapping district scope is outer, the cost of ground decoration layer and concrete cushion lower than the construction costs of permeable finish coat and permeable bed course, so within the scope of crown mapping district and crown mapping district scope adopt different paving structures greatly to reduce costs outward respectively.
2, permeable finish coat of the present utility model is stone material or the brick with through hole, with low cost, can greatly reduce costs.
3, the utility model structure is simple, and with low cost, water-permeable and air permeable is good, can not reduce people's activity space, is applicable to promoting.
[accompanying drawing explanation]
Fig. 1 is the utility model schematic diagram;
Fig. 2 is the zoomed-in view at A place in Fig. 1;
Fig. 3 is the schematic diagram of crown mapping district of the present utility model and ground decoration floor;
[detailed description of the invention]
Below in conjunction with accompanying drawing, the utility model is further described:
A kind of arbor periphery hard paving structure, comprise the soil matrix layer 1 for planting arbor 99, be positioned at outside arbor 99 root and be provided with hardcore bed 2 above described soil matrix layer 1, the tree crown of described arbor 99 projects and forms crown mapping district 3 on hardcore bed 2, above described hardcore bed 2 and be positioned at crown mapping district 3 scope be provided with can be permeable permeable bed course 4, the concrete cushion 5 being positioned at and connecting outside crown mapping district 3 and with permeable bed course 4 is also provided with above described hardcore bed 2, the permeable finish coat 6 being positioned at crown mapping district 3 scope is provided with above described permeable bed course 4, the ground decoration floor 7 being positioned at and connecting outside crown mapping district 3 and with permeable finish coat 6 is provided with above described concrete cushion 5.When rainy, the permeable finish coat 6 of rainwater successively in crown mapping district 3 scope, permeable bed course 4 and the hardcore bed 2 that drip from tree crown and enter in soil matrix floor 1, moisture is enable to penetrate into the surrounding of Tree root system and provide nutrition for arbor, water-permeable and air permeable is very good, guarantees the healthy growth of arbor.And to face down from ground that what arrange is ground decoration floor 7 and concrete cushion 5 crown mapping district 3 scope is outer, the cost of ground decoration layer 7 and concrete cushion 5 lower than the construction costs of permeable finish coat 6 and permeable bed course 4, so in crown mapping district 3 scope and crown mapping district 3 scope adopt different paving structures greatly to reduce costs outward respectively.
Be provided with permeable adhered layer 8 between described ground decoration layer 7 and concrete cushion 5, between described permeable finish coat 6 and permeable bed course 4, described adhered layer 8 is cement mortar.Arranging of adhered layer 8 can make ground decoration layer 7 and permeable finish coat 6 mat formation more firm, people can not be caused to walk on ground decoration layer 7 and permeable finish coat 6 and just cause the displacement of the two, and cement mortar is with low cost, permeable effective.
Described permeable bed course 4 comprises grid screen 41, is filled with rubble 42 in described grid screen 41.Hardcore bed 2 is laid grid screen 41, then filling rubble 42 in grid screen 41, construction technology is simple, and due to the support of grid screen 41, permeable bed course 4 and permeable finish coat 6 there will not be sedimentation.
Be provided with cobble district between described arbor 99 and permeable finish coat 6, in described cobble district, be equipped with cobble 9.Because the trunk outer peripheral face of arbor 99 is irregular, so lay the problem that cobble 9 just can solve permeable finish coat 6 and the more difficult splicing of trunk of arbor 99, and also more attractive in appearance for laying cobble 9 garden landscape.
The diameter in described cobble district is 1.5 times of arbor 99 trunk diameter to 2.5 times.
Described permeable finish coat 6 is for having stone material or the brick of multiple through hole 601.Only need process multiple vertical through hole on stone material or brick just can complete permeable, and processing is got up very simple, with low cost, greatly can reduce engineering cost.
Arbor planting location periphery oozes under realizing rainwater nature, supplements arboreal growth to the demand of moisture, also avoids in addition building planting bed by laying bricks or stones and the activity space that affects people, alleviates trees and takes up room and the contradiction of people's activity space; Without the need to permeable finish coat 6 and the permeable bed course 4 of all mating formation when mating formation, only need to mat formation in crown mapping district 3 (water droplet namely arbor leaf dripped falls into district) scope permeable finish coat 6 and permeable bed course 4, and the ground decoration floor 7 of mating formation common at present outside crown mapping district 3 scope and concrete cushion 5, construction costs is low, can save cost.

Claims (7)

1. an arbor periphery hard paving structure, it is characterized in that: comprise the soil matrix layer (1) for planting arbor (99), be positioned at outside arbor (99) root and be provided with hardcore bed (2) in described soil matrix layer (1) top, the tree crown of described arbor (99) forms crown mapping district (3) in the upper projection of hardcore bed (2), described hardcore bed (2) top and be positioned at crown mapping district (3) scope be provided with can be permeable permeable bed course (4), described hardcore bed (2) top is also provided with and is positioned at outside, crown mapping district (3) and the concrete cushion (5) connected with permeable bed course (4), described permeable bed course (4) top is provided with the permeable finish coat (6) being positioned at crown mapping district (3) scope, described concrete cushion (5) top is provided with and is positioned at outside, crown mapping district (3) and the ground decoration floor (7) connected with permeable finish coat (6).
2. arbor periphery hard paving structure according to claim 1, is characterized in that: be provided with permeable adhered layer (8) between described ground decoration layer (7) and concrete cushion (5), between described permeable finish coat (6) and permeable bed course (4).
3. arbor periphery hard paving structure according to claim 2, is characterized in that: described adhered layer (8) is cement mortar.
4. arbor periphery hard paving structure according to claim 1, is characterized in that: described permeable bed course (4) comprises grid screen (41), is filled with rubble (42) in described grid screen (41).
5. arbor periphery hard paving structure according to claim 1, is characterized in that: be provided with cobble district between described arbor (99) and permeable finish coat (6), be equipped with cobble (9) in described cobble district.
6. arbor periphery hard paving structure according to claim 5, is characterized in that: the diameter in described cobble district is 1.5 times of arbor (99) trunk diameter to 2.5 times.
7. arbor periphery hard paving structure according to claim 1, is characterized in that: described permeable finish coat (6) is for having stone material or the brick of multiple through hole (601).
CN201520431137.2U 2015-06-19 2015-06-19 Peripheral stereoplasm of arbor structure of mating formation Active CN204875423U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520431137.2U CN204875423U (en) 2015-06-19 2015-06-19 Peripheral stereoplasm of arbor structure of mating formation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520431137.2U CN204875423U (en) 2015-06-19 2015-06-19 Peripheral stereoplasm of arbor structure of mating formation

Publications (1)

Publication Number Publication Date
CN204875423U true CN204875423U (en) 2015-12-16

Family

ID=54819817

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520431137.2U Active CN204875423U (en) 2015-06-19 2015-06-19 Peripheral stereoplasm of arbor structure of mating formation

Country Status (1)

Country Link
CN (1) CN204875423U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106368096A (en) * 2016-10-17 2017-02-01 安庆市汉久电子科技有限公司 Permeable road surface structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106368096A (en) * 2016-10-17 2017-02-01 安庆市汉久电子科技有限公司 Permeable road surface structure

Similar Documents

Publication Publication Date Title
CN102150596B (en) Method for constructing water saving type landscape plant community
CN100340153C (en) Roof lawn used as putting green of golf
CN102388768B (en) Awning and rain-sheltering shed with climbing plants and building method thereof
CN106013624B (en) A kind of technical method on the green sponge roof based on grass planting plane transformation
CN101982626A (en) Three-dimensional greening method of slope built on roof roofing
CN1844611A (en) Pot type ecological yard and construction method thereof
CN203360975U (en) Spin lock type floor tile
CN201232150Y (en) Moisture-keeping ecological brick
CN205591075U (en) Ecology structure of mating formation
CN204875423U (en) Peripheral stereoplasm of arbor structure of mating formation
CN202090637U (en) Parking lot for city old residential areas
CN205711591U (en) A kind of Novel garden brick
CN105075551A (en) Method for afforesting terrace planting tank type side slope
CN204825544U (en) Lawn brick
CN207692542U (en) A kind of tree pool structure with protecting cover
CN204849516U (en) Resistant lawn of trampleing on
CN202047535U (en) Microtopographic structure for planting trees on roofs
CN108103878A (en) A kind of ecological floor file structure
CN202064664U (en) Low-carbon ecological community parking lot
CN209047095U (en) A kind of ecology tree pool structure
CN2477698Y (en) Hollow, water storage and afforest environmental protecting street building blocks
CN203603158U (en) Flower bed structure convenient to clean garbage
CN103790381B (en) A kind of method of construction in aerial greenhouse
CN206157503U (en) Ventilative structure of moving walkways tree existence insurance
CN204940048U (en) A kind of Afforestation Landscape road

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 528400 Guangdong Province, Zhongshan City Xiaolan Town, Xinhua Road No. 120 building 11C Xiang Ming

Patentee after: PALM Eco-Town Development Co., Ltd.

Address before: 528400 Guangdong Province, Zhongshan City Xiaolan Town, Xinhua Road No. 120 building 11C Xiang Ming

Patentee before: Palm Landscape Architecture Co., Ltd.

CP02 Change in the address of a patent holder

Address after: Room 305, No. 136, Zhengkai Avenue, Zhengdong New District, Zhengzhou City, Henan Province

Patentee after: PALM ECO-TOWN DEVELOPMENT Co.,Ltd.

Address before: 528400 Xiang Ming building, No. 120 Xinhua Road, Xiaolan Town, Guangdong, Zhongshan province 11C

Patentee before: PALM ECO-TOWN DEVELOPMENT Co.,Ltd.

CP02 Change in the address of a patent holder