CN204802886U - Instrument formula tower crane anchorage device's installation operation and half space - Google Patents
Instrument formula tower crane anchorage device's installation operation and half space Download PDFInfo
- Publication number
- CN204802886U CN204802886U CN201520450109.5U CN201520450109U CN204802886U CN 204802886 U CN204802886 U CN 204802886U CN 201520450109 U CN201520450109 U CN 201520450109U CN 204802886 U CN204802886 U CN 204802886U
- Authority
- CN
- China
- Prior art keywords
- platform
- tower crane
- guardrail
- short
- long
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
- Jib Cranes (AREA)
Abstract
The utility model relates to an instrument formula tower crane anchorage device's installation operation and half space, include long platform, short platform, bear crossbeam and guardrail, long platform respectively sets up two with short platform, two long platform parallel arrangement, and two short platforms of fixedly connected with parallel arrangement between the long platform, long platform are connected the back outside with short platform and are constituted a confined quadrangle, long platform bottom with bear crossbeam fixed connection, bear crossbeam and tower crane standard festival fixed connection. The operation of this instrument formula tower crane and rest platform structure are simple, easy dismounting, operation of instrument formula tower crane and half space that the reliability is high.
Description
Technical field
The utility model relates to vehicle for construction technical field of construction, particularly a kind of fitting operation of tool-type attachment device of tower crane and half space.
Background technology
At present, in the tower crane installation process of building engineering construction, in order to reduce the swing of tower crane, make tower crane itself firmly stable, need to install attachment device of tower crane to tower crane, tower crane is higher, and the attachment device of tower crane of needs is more intensive.Attachment device of tower crane is installed need first to build service platform, traditional service platform generally adopts steel pipe to set up, there is complex structure, the shortcomings such as loaded down with trivial details, efficiency is low, repeated usage is difficult, waste of material is serious are installed, and, operating personal does not have the space of having a rest on platform, there is larger potential safety hazard.
Utility model content
Technical problem to be solved in the utility model is to provide fitting operation and the half space of the tool-type attachment device of tower crane that a kind of structure is simple, easy accessibility, reliability are high.
The utility model solves the problems of the technologies described above as follows: fitting operation and the half space of a kind of tool-type attachment device of tower crane described in the utility model comprise long platform, short platform, bearing beam and guardrail; Described long platform and short platform respectively arrange two, and two long platforms be arranged in parallel, are fixedly connected with two short platforms be arranged in parallel between long platform, and after long platform is connected with short platform, outside forms a closed quadrangle; Be fixedly connected with bearing beam bottom described long platform; Described bearing beam is fixedly connected with standard section of tower crane.
Described long platform is fixedly connected with by platform tie bolt with between short platform.
Described long platform and short platform are fixed with platform guardrail stationary pipes, and described guardrail is fixedly connected on long platform and short platform by platform guardrail stationary pipes.
Described long platform and bearing beam are provided with bolt connecting hole, and long platform is fixedly connected with bearing beam by bolt.
Described bearing beam is fixedly connected with by U-shaped tie bolt with between standard section of tower crane.
Described long platform is fixed as rectangle frame by four angle steel are end to end, is provided with some connecting cross beams, rectangle frame is divided into some little rectangle frames in rectangle frame; Described long platform is fixed with wire netting.
Described short platform is fixed as rectangle frame by four angle steel are end to end, is provided with some connecting cross beams, rectangle frame is divided into some little rectangle frames in rectangle frame; Described short platform is fixed with wire netting.
Described guardrail is welded by pipe, and the bottom of guardrail arranges guardrail bottom insertion pipe, and guardrail relies on guardrail bottom insertion pipe to be fixedly connected in platform guardrail stationary pipes; The top of described guardrail bottom insertion pipe is provided with the iron wire grille guard of rectangle.
Good effect of the present utility model: fitting operation and the half space of a kind of tool-type attachment device of tower crane described in the utility model integrate, long platform load is good, be mainly used in workman's operation, within one week at long platform and short platform, be all provided with guardrail, can be used for workman and have a rest, with a wide range of applications, platform and integrally is installed simple, and save manpower and Master Cost, safety is high, dismounting is simple, facilitates repeated usage.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
Fig. 1 is structural representation of the present utility model
Fig. 2 is the structural representation of the utility model long platform
Fig. 3 is the structural representation of the utility model short platform
Fig. 4 is the structural representation of the utility model guardrail
In figure, 1, long platform 2, short platform 3, bearing beam 4, bolt connecting hole 5, platform tie bolt 6, platform guardrail stationary pipes 7, guardrail 8, standard section of tower crane 9, iron wire grille guard 10, guardrail bottom insertion pipe
Detailed description of the invention
As shown in Figures 1 to 4, the fitting operation of a kind of tool-type attachment device of tower crane described in the utility model and half space comprise long platform (1), short platform (2), bearing beam (3) and guardrail (7); Described long platform (1) and short platform (2) respectively arrange two, two long platforms (1) be arranged in parallel, be fixedly connected with two short platforms (2) be arranged in parallel between long platform (1), after long platform (1) is connected with short platform (2), outside forms a closed quadrangle; Described long platform (1) bottom is fixedly connected with bearing beam (3); Described bearing beam (3) is fixedly connected with standard section of tower crane (8).
Be fixedly connected with by platform tie bolt (5) between described long platform (1) with short platform (2).
Described long platform (1) and short platform (2) are fixed with platform guardrail stationary pipes (6), and described guardrail (7) is fixedly connected on long platform (1) with on short platform (2) by platform guardrail stationary pipes (6).
Described long platform (1) and bearing beam (3) are provided with bolt connecting hole (4), and long platform is fixedly connected with bearing beam (3) by bolt.
Be fixedly connected with by U-shaped tie bolt between described bearing beam (3) with standard section of tower crane (8).
Described long platform (1) is fixed as rectangle frame by four angle steel are end to end, is provided with some connecting cross beams, rectangle frame is divided into some little rectangle frames in rectangle frame; (1) is fixed with wire netting to described long platform.
Described short platform (2) is fixed as rectangle frame by four angle steel are end to end, is provided with some connecting cross beams, rectangle frame is divided into some little rectangle frames in rectangle frame; (2) are fixed with wire netting to described short platform.
Described guardrail (7) is welded by pipe, the bottom of guardrail (7) arranges guardrail bottom insertion pipe (10), and guardrail (7) relies on guardrail bottom insertion pipe (10) to be fixedly connected in platform guardrail stationary pipes (6); The top of described guardrail bottom insertion pipe (10) is provided with the iron wire grille guard (9) of rectangle, guardrail bottom insertion pipe (10) when guardrail (7) bottom inserts after in platform guardrail stationary pipes (6), iron wire grille guard (9) is just in time in the upper plane of long platform (1) and short platform (2), this iron wire grille guard (9), around platform one week, the instrument of actv. when preventing operation and people's pin can lean out outside guardrail and meets accident.
Working process of the present utility model is:
The fitting operation of a kind of tool-type attachment device of tower crane described in the utility model and half space are when mounted, first bearing beam is fixedly connected with standard section of tower crane, then on ground, two pieces of short platforms first can be fixedly connected with on ground with a block length platform, with hoisting crane, half framework is lifted to installation site, and fixes with bearing beam; Again a remaining block length platform is lifted to installation site and half framework is fixed, the long platform be fixedly connected with and the inside casing of short platform and the spacing of standard section of tower crane remain on 100 millimeter; Finally the guardrail welded is inserted in the platform guardrail stationary pipes of long platform and short platform respectively, namely completes the installation of the operation of whole tool-type tower crane and half space.
Claims (8)
1. the fitting operation of tool-type attachment device of tower crane and a half space, is characterized in that: comprise long platform, short platform, bearing beam and guardrail; Described long platform and short platform respectively arrange two, and two long platforms be arranged in parallel, are fixedly connected with two short platforms be arranged in parallel between long platform, and after long platform is connected with short platform, outside forms a closed quadrangle; Be fixedly connected with bearing beam bottom described long platform; Described bearing beam is fixedly connected with standard section of tower crane.
2. the fitting operation of a kind of tool-type attachment device of tower crane according to claim 1 and half space, is characterized in that: described long platform is fixedly connected with by platform tie bolt with between short platform.
3. the fitting operation of a kind of tool-type attachment device of tower crane according to claim 1 and half space, it is characterized in that: described long platform and short platform are fixed with platform guardrail stationary pipes, and described guardrail is fixedly connected on long platform and short platform by platform guardrail stationary pipes.
4. the fitting operation of a kind of tool-type attachment device of tower crane according to claim 1 and half space, is characterized in that: described long platform and bearing beam are provided with bolt connecting hole, and long platform is fixedly connected with bearing beam by bolt.
5. the fitting operation of a kind of tool-type attachment device of tower crane according to claim 1 and half space, is characterized in that: described bearing beam is fixedly connected with by U-shaped tie bolt with between standard section of tower crane.
6. the fitting operation of a kind of tool-type attachment device of tower crane according to claim 1 and half space, it is characterized in that: described long platform is fixed as rectangle frame by four angle steel are end to end, be provided with some connecting cross beams in rectangle frame, rectangle frame be divided into some little rectangle frames; Described long platform is fixed with wire netting.
7. the fitting operation of a kind of tool-type attachment device of tower crane according to claim 1 and half space, it is characterized in that: described short platform is fixed as rectangle frame by four angle steel are end to end, be provided with some connecting cross beams in rectangle frame, rectangle frame be divided into some little rectangle frames; Described short platform is fixed with wire netting.
8. the fitting operation of a kind of tool-type attachment device of tower crane according to claim 1 and half space, it is characterized in that: described guardrail is welded by pipe, the bottom of guardrail arranges guardrail bottom insertion pipe, and guardrail relies on guardrail bottom insertion pipe to be fixedly connected in platform guardrail stationary pipes; The top of described guardrail bottom insertion pipe is provided with the iron wire grille guard of rectangle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520450109.5U CN204802886U (en) | 2015-06-29 | 2015-06-29 | Instrument formula tower crane anchorage device's installation operation and half space |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520450109.5U CN204802886U (en) | 2015-06-29 | 2015-06-29 | Instrument formula tower crane anchorage device's installation operation and half space |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204802886U true CN204802886U (en) | 2015-11-25 |
Family
ID=54587742
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520450109.5U Expired - Fee Related CN204802886U (en) | 2015-06-29 | 2015-06-29 | Instrument formula tower crane anchorage device's installation operation and half space |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204802886U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111851976A (en) * | 2020-06-29 | 2020-10-30 | 中天华南建设投资集团有限公司 | Sizing operation platform used around internal climbing type movable arm tower crane and installation method thereof |
-
2015
- 2015-06-29 CN CN201520450109.5U patent/CN204802886U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111851976A (en) * | 2020-06-29 | 2020-10-30 | 中天华南建设投资集团有限公司 | Sizing operation platform used around internal climbing type movable arm tower crane and installation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103437563B (en) | A kind of mounting method for large steel-strctrue building steel frame | |
CN204552050U (en) | A kind of anchor ear bearing frame and scaffolding platform assembly | |
CN202944998U (en) | Attached installation and maintenance platform of calibrated tower crane | |
CN104452702A (en) | Maintenance method for emergency gate of low-head gate dam and gate dam structure | |
CN204802886U (en) | Instrument formula tower crane anchorage device's installation operation and half space | |
CN204282842U (en) | A kind of segmentation steel column is installed and is connected hoisting structure | |
CN206971689U (en) | Support operating platform that is detachable and recycling | |
CN202785387U (en) | Indoor cantilever crane | |
CN203284126U (en) | Simple composite gantry high-altitude weight hoisting device | |
CN105016220A (en) | Holding rod joint adding device | |
CN203022328U (en) | Climbing operation platform | |
CN201908429U (en) | Assembly integral building overhanging discharging platform | |
CN204212065U (en) | Bridge crossing anticollision barrier punching block erection equipment | |
CN202672484U (en) | Steel pipe single-post structure | |
CN203361596U (en) | Auxiliary support of integrated lifting operation platform | |
CN204980945U (en) | Supplementary tower crane dismounting device | |
CN204001927U (en) | The power transmission steel pipe tower cross-arm handle that strides | |
CN204252565U (en) | One faces frontier defense protection unit | |
CN202542746U (en) | Supporting structure for interior climbing tower crane | |
CN202766139U (en) | Three-dimensional multi-functional movable hoisting platform | |
CN202705932U (en) | T-beam reinforced hanger frame structure | |
CN104652833A (en) | Manufacturing method for fixing device for pulleys for installation and lifting of purlines of steel structure factory building | |
CN208056592U (en) | A kind of tool-type inspection platform | |
CN202266184U (en) | Electric power overhaul ladder | |
CN206903206U (en) | A kind of electric climbing formwork system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151125 Termination date: 20190629 |
|
CF01 | Termination of patent right due to non-payment of annual fee |