CN202542746U - Supporting structure for interior climbing tower crane - Google Patents

Supporting structure for interior climbing tower crane Download PDF

Info

Publication number
CN202542746U
CN202542746U CN 201220193485 CN201220193485U CN202542746U CN 202542746 U CN202542746 U CN 202542746U CN 201220193485 CN201220193485 CN 201220193485 CN 201220193485 U CN201220193485 U CN 201220193485U CN 202542746 U CN202542746 U CN 202542746U
Authority
CN
China
Prior art keywords
tower crane
internal
climbing tower
supporting construction
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220193485
Other languages
Chinese (zh)
Inventor
张松
石端学
吴欣之
崔晓强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Mechanized Construction Group Co Ltd
Original Assignee
Shanghai Construction Group Co Ltd
Shanghai Mechanized Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction Group Co Ltd, Shanghai Mechanized Construction Co Ltd filed Critical Shanghai Construction Group Co Ltd
Priority to CN 201220193485 priority Critical patent/CN202542746U/en
Application granted granted Critical
Publication of CN202542746U publication Critical patent/CN202542746U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model provides a supporting structure for an interior climbing tower crane. The supporting structure for the interior climbing tower crane is used for supporting a body of the interior climbing tower crane and arranged outside a core cylinder shear wall and comprises two steel columns, a steel beam, two supporting beams and an interior climbing frame. Compared with supporting structures for externally-hung type interior climbing tower cranes in the prior art, the supporting structure for the interior climbing tower crane has the advantages that by the aid of the steel columns and the steel beam, embedded parts needed for supporting are reduced, and four-point supporting of the supporting beams can be achieved, so that the interior climbing frame mounted on the two supporting beam can be firmer, and safety in use or climbing of the interior climbing tower crane is improved.

Description

The supporting construction of internal-climbing tower crane
Technical field
The utility model relates to the preparation of construction of a kind of framework core barrel structure system skyscraper and structures, relates in particular to a kind of supporting construction of internal-climbing tower crane.
Background technology
Along with the fast development of high-rise building and structures, internal-climbing tower crane is used extensive day by day as actv. vertical transportation machinery in the building operation.The supporting construction of internal-climbing tower crane in the free height that reduces internal-climbing tower crane, keeps the stable aspect of internal-climbing tower crane to play crucial effects as the load transfer device that connects tower crane and building or structures.
At present, the internal-climbing tower crane high-rise, that construction of super highrise building uses, or place in the vertical hoistway of core tube, or be hung on the outside of core tube shear wall outward.High-rise building adopts steel frame more---core barrel structure system.Although if the fuselage of internal-climbing tower crane is placed in the core tube safe, need solve two problems, the first will be selected the suitable hoistway that does not influence follow-up professional construction; It two is fuselage distance in its corner post or side column and the core tube, under steel column segmentation fixing situation, needs to promote the load-carrying ability of internal-climbing tower crane, and it is then skyrocketing that tower crane improves a grade cost.If tower crane is arranged in outside the core tube, just can significantly reduce the distance of fuselage and the corner post or the side column of internal-climbing tower crane, reduce the tower crane grade and practice thrift cost.
When the fuselage of internal-climbing tower crane of the prior art is hung on the outside of cylindrical shell shear wall outward, there is the demanding problem of the high safety control of cost.As depicted in figs. 1 and 2; Adopt when climbing mode in plug-in at the fuselage of tower crane 1, per pass attached wall supporting construction by support beam 5, vertical hound 15, horizontal hound 16 and in climb frame 6 and form, said support beam 5, vertical hound 15 and horizontal hound 16 were attached on the core tube shear wall 2 o'clock; Need before shear wall concreting, place steel built-in fitting 8; And with support beam 5, vertical hound 15 and horizontal hound 16 and built-in fitting 8 welding, climb frame 6 in said and be installed on the support beam 5, the quantity of the built-in fitting 8 of per pass attached wall supports needs is the 4-6 piece; Required built-in fitting 8 quantity of the supporting construction of this internal-climbing tower crane are many; Positioning accuracy request is high, and high-altitude field welding working out is big, and cost and construction safety supervision difficulty all increase to some extent.
The utility model content
The utility model provides a kind of supporting construction of internal-climbing tower crane, has realized 4 supports of support beam, and has reduced the quantity of the required built-in fitting of per pass attached wall.
For solving the problems of the technologies described above; The utility model provides a kind of supporting construction of internal-climbing tower crane; It is used to support the fuselage of internal-climbing tower crane; The supporting construction of said internal-climbing tower crane is arranged at the outside of core tube shear wall, and the supporting construction of said internal-climbing tower crane comprises:
Two steel columns, said two steel columns are arranged at intervals on the ground in the said core tube shear wall outside;
Girder steel, said girder steel are arranged between said two steel columns;
Two support beams, the two ends of said two support beams are arranged on the said girder steel outside with core tube shear wall respectively, and arrange said two support beam horizontal interval (HI)s; And
In climb frame, climb frame in said and be arranged between said two support beams a side near said girder steel.
Further, said two support beams or wherein an end of a support beam insert and be fixed in the hole of said core tube shear wall.
Further, said two support beams or wherein an end of a support beam be fixed in the outside of said core tube shear wall through built-in fitting.
Further, the supporting construction of said internal-climbing tower crane also comprises steel corbel, said steel corbel and said two support beams or wherein the end welding of a support beam is fixing, and said steel corbel is fixed in the outside of said core tube shear wall through built-in fitting.
Further, the supporting construction of said internal-climbing tower crane also comprises steel plate, and said steel plate is weldingly fixed on said support beam and girder steel respectively.
Further, the supporting construction of said internal-climbing tower crane also comprises the first horizontal hound, and the two ends of the said first horizontal hound are arranged at respectively on said two support beams.
Further; The supporting construction of said internal-climbing tower crane also comprises the second horizontal hound; One end of the said second horizontal hound is arranged on the said support beam, and the other end of the said second horizontal hound is fixed in the outside of said core tube shear wall through built-in fitting.
Further, the supporting construction of said internal-climbing tower crane also comprises bearing pin and otic placode, and said otic placode is welded in the side of said built-in fitting and said support beam, and the said first horizontal hound is connected with said otic placode through bearing pin with the said second horizontal hound.
Further, the supporting construction of said internal-climbing tower crane also comprises two girder steels, and said two girder steels are arranged at respectively between said two steel columns and the core tube shear wall.
Compared with prior art, the utlity model has following beneficial effect:
Compare with the supporting construction of internal-climbing tower crane of the prior art, the supporting construction of the internal-climbing tower crane that the utility model provides has reduced per pass and has supported required built-in fitting quantity through the setting of steel column and girder steel; And make support beam can access 4 supports, so also make be installed on two support beams in climb frame can be more firm, in sum; This structure is because of the minimizing of built-in fitting, and it is fast with regard to bit rate to make that its fuselage at internal-climbing tower crane turns over when rising, and the setup time before internal-climbing tower crane climbs is short; Saved the construction period; Reduced construction cost, and because 4 supports make it improve the safety of internal-climbing tower crane when climbing or use; Have good practicability, be easy to apply.
Description of drawings
Below in conjunction with accompanying drawing the utility model is described further:
Fig. 1 is the front view of the supporting construction of internal-climbing tower crane in the prior art;
Fig. 2 is the birds-eye view of the supporting construction of internal-climbing tower crane in the prior art;
The birds-eye view of the supporting construction of the internal-climbing tower crane that Fig. 3 provides for the utility model embodiment;
The front view of the supporting construction of the internal-climbing tower crane that Fig. 4 provides for the utility model embodiment.
In Fig. 1 to 4,
1: fuselage; 2: core tube shear wall; 3: steel column; 4: girder steel; 5: support beam; 6: in climb frame; 7: the hole; 8: built-in fitting; 9: steel corbel; 10: steel plate; 11: the first horizontal hounds; 12: the second horizontal hounds; 13: bearing pin; 14: otic placode; 15: vertical hound; 16: horizontal hound.
The specific embodiment
Below in conjunction with accompanying drawing and specific embodiment the supporting construction of the internal-climbing tower crane of the utility model proposition is done further explain.According to following explanation and claims, advantage of the utility model and characteristic will be clearer.What need explanation is, accompanying drawing all adopts the form of simplifying very much and all uses non-ratio accurately, only in order to convenient, the purpose of aid illustration the utility model embodiment lucidly.
The core concept of the utility model is; A kind of supporting construction of internal-climbing tower crane is provided; It is used to support the fuselage of internal-climbing tower crane; The supporting construction of said internal-climbing tower crane is arranged at the outside of core tube shear wall, and the supporting construction of said internal-climbing tower crane comprises two steel columns, and said two steel columns are arranged at intervals on the ground in the said core tube shear wall outside; Girder steel, said girder steel are arranged between said two steel columns; Two support beams, the two ends of said two support beams are arranged on the said girder steel outside with core tube shear wall respectively, and arrange said two support beam horizontal interval (HI)s; And in climb frame, climb frame in said and be arranged between said two support beams near a side of said girder steel, compare with the supporting construction of plug-in internal-climbing tower crane of the prior art; The supporting construction of the internal-climbing tower crane that the utility model provides has reduced per pass and has supported required built-in fitting quantity, and made support beam can access 4 supports through the setting of steel column and girder steel; So also make be installed on two support beams in climb frame can be more firm, in sum, this structure is because the minimizing of built-in fitting; Make its fuselage turn over when rising fast with regard to bit rate at internal-climbing tower crane; Setup time before internal-climbing tower crane climbs is short, has saved the construction period, has reduced construction cost; And because 4 supports; Make it improve the safety of internal-climbing tower crane when climbing or use, have good practicability, be easy to apply.
Please refer to Fig. 1 to Fig. 4, Fig. 1 is the front view of the supporting construction of internal-climbing tower crane in the prior art; Fig. 2 is the birds-eye view of the supporting construction of internal-climbing tower crane in the prior art; The birds-eye view of the supporting construction of the internal-climbing tower crane that Fig. 3 provides for the utility model embodiment; The front view of the supporting construction of the internal-climbing tower crane that Fig. 4 provides for the utility model embodiment.
Like Fig. 3 and shown in Figure 4; The utility model provides a kind of supporting construction of internal-climbing tower crane; It is used to support the fuselage 1 of internal-climbing tower crane, and the supporting construction of said internal-climbing tower crane is arranged at the outside of core tube shear wall 2, and the supporting construction of said internal-climbing tower crane comprises:
Two steel columns 3, said two steel columns 3 are arranged at intervals on the ground in said core tube shear wall 2 outsides, and said two steel columns 3 are permanent steel structure frame posts, rather than build ground temporary structure outside shear wall 2;
Girder steel 4, said girder steel 4 are arranged between said two steel columns 3, and said girder steel 4 is permanent steel structure frame beams, rather than build the temporary structure between two steel columns 3;
Two support beams 5, the two ends of said two support beams 5 are arranged on the said girder steel 4 outside with core tube shear wall 2 respectively, and arrange said two support beam 5 horizontal interval (HI)s; And
In climb frame 6, climb frame 6 in said and be arranged between said two support beams 5 a side near said girder steel 4.
Compare with the supporting construction of internal-climbing tower crane of the prior art, the supporting construction of the internal-climbing tower crane that the utility model provides has reduced per pass and has supported required built-in fitting 8 quantity through the setting of steel column 3 with girder steel 4; And make support beam 5 can access 4 supports (on core tube shear wall 2, on girder steel 4) at 2 at 2, so also make be installed on two support beams 5 in climb frame 6 can be more firm; In sum, this structure is because the minimizing of built-in fitting 8 makes its fuselage 1 at internal-climbing tower crane turn over when rising fast with regard to bit rate; Setup time before internal-climbing tower crane climbs is short, has saved the construction period, has reduced construction cost; And because 4 supports; Make it improve the safety of internal-climbing tower crane when climbing or use, have good practicability, be easy to apply.
Further; When on the core tube shear wall 2 hole 7 being arranged; Quantity according to hole 7 is decided; With said two support beams 5 or wherein an end of a support beam 5 insert and be fixed in the hole 7 of said core tube shear wall 2, an end of another root support beam 5 is fixed in the outside of said core tube shear wall 2 through built-in fitting 8; When not having hole 7 on the core tube shear wall 2; Two support beams 5 all are fixed in the outside of said core tube shear wall 2 through built-in fitting 8; Such design makes the supporting construction of this internal-climbing tower crane can reduce the use of built-in fitting 8 as best one can, and the fixing step of internal-climbing tower crane required its supporting construction when climbing is reduced, and the setup time before internal-climbing tower crane climbs shortens; Save the construction period, reduced construction cost.
Further; The supporting construction of said internal-climbing tower crane also comprises steel corbel 9; Said steel corbel 9 and said two support beams 5 or wherein the end welding of a support beam 5 is fixing; Said steel corbel 9 is fixed in the outside of said core tube shear wall 2 through built-in fitting 8, and said steel corbel 9 can be strengthened the fixing firm degree of support beam 5 and built-in fitting 8, has increased the safety of the supporting construction of this internal-climbing tower crane.
Further; The supporting construction of said internal-climbing tower crane also comprises steel plate 10; Said steel plate 10 is weldingly fixed on said support beam 5 and girder steel 4 respectively; Such structure lets said two support beams 5 can be owing to it does not move in horizontal plane with the insecure support beam 5 that makes that is connected between the girder steel 4, thereby causes the loosening of supporting construction.
Further; The supporting construction of said internal-climbing tower crane also comprises the first horizontal hound 11 and the second horizontal hound 12; The two ends of the said first horizontal hound 11 are arranged at the side of said two support beams 5 respectively; One end of the said second horizontal hound 12 is arranged on the said support beam 5; The other end of the said second horizontal hound 12 is fixed in the outside of said core tube shear wall 2 through built-in fitting 8, and the said first horizontal hound 11 and the second horizontal hound 12 can play the effect of supporting two support beams 5 in horizontal plane, make support beam 5 when receiving the pressure of horizontal direction, can not be out of shape or damage.
Further, the supporting construction of said internal-climbing tower crane also comprises bearing pin 13 and otic placode 14, and said otic placode 14 is welded in the side of said built-in fitting 8 and said support beam 5; The said first horizontal hound 11 is connected with said otic placode 14 through bearing pin 13 with the said second horizontal hound 12, and this supporting construction is torn repeated usage open turning over, through after gas cutting several times and the welding; Otic placode 14 can be scrapped in loss; At this moment otic placode 14, the first horizontal hounds 11 and the second horizontal hound 12 that only need more to renew again need not to change, in addition; Pin-and-hole on first horizontal hound 11, the second horizontal hound 12 and the otic placode 14 needs fine limit work, guarantees that bearing pin 13 bonded assemblys are tight.
Further; The supporting construction of said internal-climbing tower crane also comprises two girder steels 4; Said two girder steels 4 are arranged at respectively between said two steel columns 3 and the core tube shear wall 2; Said two girder steels 4 are permanent steel structure frame beams, rather than build the temporary structure between steel column 3 and core tube shear wall 2, when two steel columns 3 receive the pressure of these two girder steel 4 bearing of trends; These two girder steels 4 can play the effect of supporting above-mentioned two steel columns 3, in order to avoid pressure causes steel column 3 distortion or distortion.
Obviously, those skilled in the art can carry out various changes and distortion to the utility model and not break away from the spirit and the scope of the utility model.Like this, belong within the scope of the utility model claim and equivalent technologies thereof if these of the utility model are revised with modification, then the utility model also is intended to comprise these changes and modification interior.

Claims (9)

1. the supporting construction of an internal-climbing tower crane, it is used to support the fuselage of internal-climbing tower crane, and the supporting construction of said internal-climbing tower crane is arranged at the outside of core tube shear wall, it is characterized in that, comprising:
Two steel columns, said two steel columns are arranged at intervals on the ground in the said core tube shear wall outside;
Girder steel, said girder steel are arranged between said two steel columns;
Two support beams, the two ends of said two support beams are arranged on the said girder steel outside with core tube shear wall respectively, and arrange said two support beam horizontal interval (HI)s;
In climb frame, climb frame in said and be arranged between said two support beams a side near said girder steel.
2. the supporting construction of internal-climbing tower crane according to claim 1 is characterized in that, said two support beams or wherein an end of a support beam insert and be fixed in the hole of said core tube shear wall.
3. the supporting construction of internal-climbing tower crane according to claim 1 is characterized in that, said two support beams or wherein an end of a support beam be fixed in the outside of said core tube shear wall through built-in fitting.
4. the supporting construction of internal-climbing tower crane according to claim 3; It is characterized in that; Also comprise steel corbel, said steel corbel and said two support beams or wherein the end welding of a support beam is fixing, said steel corbel is fixed in the outside of said core tube shear wall through built-in fitting.
5. the supporting construction of internal-climbing tower crane according to claim 1 is characterized in that, also comprises steel plate, and said steel plate is weldingly fixed on said support beam and girder steel respectively.
6. the supporting construction of internal-climbing tower crane according to claim 1 is characterized in that, also comprises the first horizontal hound, and the two ends of the said first horizontal hound are arranged at respectively on said two support beams.
7. the supporting construction of internal-climbing tower crane according to claim 6; It is characterized in that; Also comprise the second horizontal hound; One end of the said second horizontal hound is arranged on the said support beam, and the other end of the said second horizontal hound is fixed in the outside of said core tube shear wall through built-in fitting.
8. the supporting construction of internal-climbing tower crane according to claim 7; It is characterized in that; Also comprise bearing pin and otic placode, said otic placode is welded in the side of said built-in fitting and said support beam, and the said first horizontal hound is connected with said otic placode through bearing pin with the said second horizontal hound.
9. the supporting construction of internal-climbing tower crane according to claim 1 is characterized in that, also comprises two girder steels, and said two girder steels are arranged at respectively between said two steel columns and the core tube shear wall.
CN 201220193485 2012-04-28 2012-04-28 Supporting structure for interior climbing tower crane Expired - Lifetime CN202542746U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220193485 CN202542746U (en) 2012-04-28 2012-04-28 Supporting structure for interior climbing tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220193485 CN202542746U (en) 2012-04-28 2012-04-28 Supporting structure for interior climbing tower crane

Publications (1)

Publication Number Publication Date
CN202542746U true CN202542746U (en) 2012-11-21

Family

ID=47163412

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220193485 Expired - Lifetime CN202542746U (en) 2012-04-28 2012-04-28 Supporting structure for interior climbing tower crane

Country Status (1)

Country Link
CN (1) CN202542746U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102642784A (en) * 2012-04-28 2012-08-22 上海建工集团股份有限公司 Support structure of internal-climbing tower crane
CN106315432A (en) * 2016-09-19 2017-01-11 中国建筑第八工程局有限公司 Asymmetric structure of external hanging supporting system of large movable arm tower crane

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102642784A (en) * 2012-04-28 2012-08-22 上海建工集团股份有限公司 Support structure of internal-climbing tower crane
CN106315432A (en) * 2016-09-19 2017-01-11 中国建筑第八工程局有限公司 Asymmetric structure of external hanging supporting system of large movable arm tower crane
CN106315432B (en) * 2016-09-19 2017-12-22 中国建筑第八工程局有限公司 A kind of large-scale swing arm crane external support system dissymmetrical structure

Similar Documents

Publication Publication Date Title
CN103132766B (en) Truss for lifting power transmission line tower connecting leg and erection method
CN204940886U (en) A kind of mechanism of handling vestibule
CN203499229U (en) Operating platform for construction of elevator shaft
CN102642784A (en) Support structure of internal-climbing tower crane
CN202542746U (en) Supporting structure for interior climbing tower crane
CN103061514B (en) Long-span steel structure corridor construction method
CN104179121B (en) A kind of mobile mould frame support bracket four promotes from assembling method
CN103981966A (en) Tubular crossed plate assembly type steel-structure self-resetting pre-stressed buckling restrained brace
CN203247868U (en) Large-span steel structure construction temporary supporting frame
CN202785387U (en) Indoor cantilever crane
CN203006792U (en) Single-attachment-point tower crane wall attaching device
CN204038921U (en) Super High tower crane wall-attaching equipment
CN205116883U (en) Mast hoisting device of superelevation layer steel construction launching tower
CN203654703U (en) Lifting platform for erecting shear wall module in elevator shaft
CN203175134U (en) Truss used for lifting electric transmission line tower connecting legs
CN203878563U (en) Suspended single-row scaffold
CN202611250U (en) Concreting platform for concrete filled steel tube column
CN204802886U (en) Instrument formula tower crane anchorage device's installation operation and half space
CN205134205U (en) Arched bridge erects to change and promotes with promoting pylon structure
CN206940369U (en) A kind of dock wall hydraulic pressure maintenance platform
CN202467221U (en) Power plant main workshop steel roof truss hoisting lifting device
CN206476671U (en) Attachment device of tower crane
CN104652833A (en) Manufacturing method for fixing device for pulleys for installation and lifting of purlines of steel structure factory building
CN205526991U (en) A device for liftable erects to be coiled
CN214005989U (en) A urceolus extension node for turriform steel construction based on BIM

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 200120 Shanghai city Pudong New Area Fushan Road No. 33

Patentee after: Shanghai Construction Group Co., Ltd.

Patentee after: Shanghai Mechanized Construction Group Co., Ltd.

Address before: 200120 Shanghai city Pudong New Area Fushan Road No. 33

Patentee before: Shanghai Construction Group Co., Ltd.

Patentee before: Shanghai Mechanized Construction Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20121121