CN204001927U - The power transmission steel pipe tower cross-arm handle that strides - Google Patents

The power transmission steel pipe tower cross-arm handle that strides Download PDF

Info

Publication number
CN204001927U
CN204001927U CN201420032113.5U CN201420032113U CN204001927U CN 204001927 U CN204001927 U CN 204001927U CN 201420032113 U CN201420032113 U CN 201420032113U CN 204001927 U CN204001927 U CN 204001927U
Authority
CN
China
Prior art keywords
cross
arm
anchor ear
tower
strides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420032113.5U
Other languages
Chinese (zh)
Inventor
谢伟
崔艳东
杨腾腾
仲彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Maintenance Branch of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Maintenance Branch of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Maintenance Branch of State Grid Jiangsu Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201420032113.5U priority Critical patent/CN204001927U/en
Application granted granted Critical
Publication of CN204001927U publication Critical patent/CN204001927U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model discloses a kind of power transmission steel pipe tower cross-arm handle that strides, it is characterized in that, comprise 2 anchor ears, described each anchor ear is comprised of 2 semicircle anchor ears, described 2 semicircle anchor ears are connected to form full circle shape anchor ear by the first bolt, 2 interfaces of described anchor ear are fixed on 2 pull bar one end by the second bolt respectively, 2 anchor ears are separately fixed at pull bar two ends, 2 interfaces of each anchor ear are also welded with respectively stiffener, under use state, described anchor ear is connected 2 semicircle anchor ears by the first bolt, be fixed on 1-2 rice position, steel tube tower tower body cross-arm top simultaneously, between described the first bolt retainer and between anchor ear and tower body, be provided with check washer, the utlity model has remarkable advantage: the power transmission steel pipe tower cross-arm of the present utility model handle that strides can prevent the falling from high altitude work high above the ground personnel are from tower body to cross-arm shifting process, has increased safety guarantee coefficient, simplicity of design, easy to use, with low cost.

Description

The power transmission steel pipe tower cross-arm handle that strides
Technical field
The utility model relates to steel tube tower in electric transmission line Construction and Maintenance job safety technical field, the particularly a kind of power transmission steel pipe tower cross-arm handle that strides.
Background technology
Steel tube tower taking up an area less, the fireballing advantageous feature of construction, in the transmission line of electricity of urban district, comparatively generally use.But in the O&M maintenance process of transmission line of electricity, finding, also there is design defect in the steel tube tower of existing modular design.Because steel tube tower tower body diameter is larger, cat ladder is wider to cross-arm distance, causes work high above the ground to move inconvenience, has the work high above the ground operating personnel tower body road cross-arm shifting process high and medium serious potential safety hazard of falling simultaneously.
Utility model content
For solving the deficiencies in the prior art, the purpose of this utility model is to provide a kind of power transmission steel pipe tower cross-arm handle that strides, and can prevent from that work high above the ground personal height from falling to fall.
In order to realize above-mentioned target, the utility model adopts following technical scheme:
A kind of power transmission steel pipe tower cross-arm handle that strides, it is characterized in that, comprise 2 anchor ears, described each anchor ear is comprised of 2 semicircle anchor ears, described 2 semicircle anchor ears are connected to form full circle shape anchor ear by the first bolt, 2 interfaces of described anchor ear are fixed on 2 pull bar one end by the second bolt respectively, and 2 anchor ears are separately fixed at pull bar two ends.
A kind of power transmission steel pipe tower cross-arm handle that strides, is characterized in that, between described the first bolt and the fixture of the second bolt, is provided with check washer.
A kind of power transmission steel pipe tower cross-arm handle that strides, is characterized in that, 2 interfaces of each anchor ear are also welded with respectively stiffener.
A kind of power transmission steel pipe tower cross-arm handle that strides, is characterized in that, described anchor ear diameter is 1-2 rice, cross-arm top steel tube tower tower body diameter.
A kind of power transmission steel pipe tower cross-arm handle that strides, is characterized in that, described anchor ear diameter is the 1.5 meters of steel tube tower tower body diameters in cross-arm top.
A kind of power transmission steel pipe tower cross-arm handle that strides, is characterized in that, the material of described anchor ear, pull bar, bolt, stiffener is antirust steel.
A kind of power transmission steel pipe tower cross-arm handle that strides, it is characterized in that, under use state, described anchor ear is connected 2 semicircle anchor ears by the first bolt, be fixed on 1-2 rice position, steel tube tower tower body cross-arm top simultaneously, between described the first bolt retainer and between anchor ear and tower body, be provided with check washer.
Usefulness of the present utility model is: 1. the power transmission steel pipe tower cross-arm of the present utility model handle that strides can prevent the falling from high altitude work high above the ground personnel are from tower body to cross-arm shifting process, has increased safety guarantee coefficient; 2. simplicity of design, easy to use, with low cost.
Accompanying drawing explanation
Fig. 1 is the power transmission steel pipe tower cross-arm of the present utility model handle axonometric drawing that strides;
Fig. 2 is the power transmission steel pipe tower cross-arm of the present utility model handle top view that strides;
Fig. 3 is the power transmission steel pipe tower cross-arm of the present utility model handle front view that strides.
The implication of Reference numeral in figure: 1. pull bar, 2. anchor ear, 3. the first bolt, 4. the second bolt, 5. stiffener.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is done to concrete introduction.
In conjunction with Fig. 1-3, the power transmission steel pipe tower cross-arm of the present utility model handle that strides, comprise 2 pull bars 1, described 2 pull bar 1 two ends are fixing by the second bolt 4 with 2 anchor ears 2 respectively, each anchor ear 2 is connected by the first bolt 3 by 2 semicircle anchor ears, between described the first bolt and the fixture of the second bolt, be provided with check washer, described anchor ear 2 diameters are the 1.5 meters of steel tube tower tower body diameters in cross-arm top, on described anchor ear 2, be also welded with stiffener 5, described stiffener 5 fixedly secures on steel tube tower anchor ear 2, and make cross-arm pull bar 1 indeformable when operating personnel's cross-arm is shifted, anti-fall cross-arm handle safety is firmly available, there is enough tensile strength, the material of described anchor ear 2, pull bar 1, the first bolt 3, the second bolt 4, stiffener 5 is common antirust steel.
The power transmission steel pipe tower cross-arm of the present utility model handle that strides, except said structure, its difference is, described anchor ear 2 diameters are the 1 meter of steel tube tower tower body diameter in cross-arm top.
The power transmission steel pipe tower cross-arm of the present utility model handle that strides, except said structure, its difference is, described anchor ear 2 diameters are the 2 meters of steel tube tower tower body diameters in cross-arm top.
Table 1 is the anchor ear diameter (unit: millimeter) of different tower different parts.
Tower Upper cross-arm Middle cross-arm Lower cross-arm
2F2-SZG1 tangent tower 56064 9 736
2F2-SJG3 angle tower 785 973 1162
2F2-SKG1 tangent tower 715 835 956
The straight capstan head of 2F2-SZJG1 615 733 851
Table 1
The power transmission steel pipe tower cross-arm of the present utility model handle installation steps that stride are: first at steel tube tower construction institute vertical rod tower, all constructed, and complete tower body bolton locking after, by the vertical tower constructor of steel tube tower group, carry cross-arm handle anchor ear, bolt, the all components such as pull bar, step on tower to each cross-arm its assembling is fixed on to the installation of tower body position, the above 1-2m of steel tube tower cross-arm place, and add check washer fastening bolt, and after constructor installs, by high-altitude installation personnel after carrying out safety measure, the cross-arm handle that strides is done to preventative tensile strength check, guarantee that cross-arm handle is solid and reliable available.
The power transmission steel pipe tower cross-arm of the present utility model handle using method that strides is: when cross-arm is installed, stride after the steel tube tower transmission line of electricity of handle is on active service and puts into operation, O&M maintenance is done personnel and steel tube tower circuit is detected stepping on tower again, maintenance, when elimination line defct etc. need to be stepped on bar to cross-arm and need the steel tube tower work high above the ground of cross-arm displacement, operating personnel is when cross-arm is shifted, anti-falling from high altitude safety waistband or back safety rope can be tied up on cross-arm pull bar, and the cross-arm pull bar that can hand steeredly stride, easily safety realizes the displacement of power transmission steel pipe tower cross-arm, thereby reach, prevent that work high above the ground personnel cross-arm this type of steel tube tower that is shifted is more difficult and eliminate the risk that steel tube tower cannot be tied up back-up protection falling from high altitude when cross-arm is shifted.
Power transmission steel pipe tower cross-arm of the present utility model strides and shakes hands produced and come into operation, respond well.
More than show and described basic principle of the present utility model, principal character and advantage.The technician of the industry should understand, and above-described embodiment does not limit the utility model in any form, and all employings are equal to replaces or technical scheme that the mode of equivalent transformation obtains, all drops in protection domain of the present utility model.

Claims (6)

1. the power transmission steel pipe tower cross-arm handle that strides, it is characterized in that, comprise 2 anchor ears, described each anchor ear is comprised of 2 semicircle anchor ears, described 2 semicircle anchor ears are connected to form full circle shape anchor ear by the first bolt, 2 interfaces of described anchor ear are fixed on 2 pull bar one end by the second bolt respectively, and 2 anchor ears are separately fixed at pull bar two ends; Described anchor ear diameter is 1-2 rice, cross-arm top steel tube tower tower body diameter.
2. the power transmission steel pipe tower cross-arm according to claim 1 handle that strides, is characterized in that, between described the first bolt and the fixture of the second bolt, is provided with check washer.
3. the power transmission steel pipe tower cross-arm according to claim 1 handle that strides, is characterized in that, 2 interfaces of each anchor ear are also welded with respectively stiffener.
4. the power transmission steel pipe tower cross-arm according to claim 3 handle that strides, is characterized in that, described anchor ear diameter is the 1.5 meters of steel tube tower tower body diameters in cross-arm top.
5. the power transmission steel pipe tower cross-arm according to claim 1 handle that strides, is characterized in that, the material of described anchor ear, pull bar, bolt, stiffener is antirust steel.
6. the power transmission steel pipe tower cross-arm according to claim 1 handle that strides, it is characterized in that, under use state, described anchor ear is connected 2 semicircle anchor ears by the first bolt, be fixed on 1-2 rice position, steel tube tower tower body cross-arm top simultaneously, between described the first bolt retainer and between anchor ear and tower body, be provided with check washer.
CN201420032113.5U 2014-01-17 2014-01-17 The power transmission steel pipe tower cross-arm handle that strides Expired - Fee Related CN204001927U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420032113.5U CN204001927U (en) 2014-01-17 2014-01-17 The power transmission steel pipe tower cross-arm handle that strides

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420032113.5U CN204001927U (en) 2014-01-17 2014-01-17 The power transmission steel pipe tower cross-arm handle that strides

Publications (1)

Publication Number Publication Date
CN204001927U true CN204001927U (en) 2014-12-10

Family

ID=52041950

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420032113.5U Expired - Fee Related CN204001927U (en) 2014-01-17 2014-01-17 The power transmission steel pipe tower cross-arm handle that strides

Country Status (1)

Country Link
CN (1) CN204001927U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103758392A (en) * 2014-01-17 2014-04-30 江苏省电力公司检修分公司 Stepping handle of cross arm of power transmission steel pipe tower
CN107701095A (en) * 2017-09-22 2018-02-16 安徽柏桦电力科技有限公司 A kind of annular concurrent of safety

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103758392A (en) * 2014-01-17 2014-04-30 江苏省电力公司检修分公司 Stepping handle of cross arm of power transmission steel pipe tower
CN107701095A (en) * 2017-09-22 2018-02-16 安徽柏桦电力科技有限公司 A kind of annular concurrent of safety

Similar Documents

Publication Publication Date Title
CN202012047U (en) Steel strand inclined pulling and buckling system of tower
CN204001927U (en) The power transmission steel pipe tower cross-arm handle that strides
CN202955100U (en) Rust protection cap for gas pipeline
CN203347324U (en) Holding pole wall attached matched hoop
CN202913761U (en) Tower cross arm with handrail
CN203022328U (en) Climbing operation platform
CN203514918U (en) Concrete pole tower with ladder stand device
CN103758392A (en) Stepping handle of cross arm of power transmission steel pipe tower
CN203373983U (en) Discharging platform capable of rising and falling along with climbing frame
CN203486809U (en) Falling protector of tower crane vertical ladder
CN203977844U (en) A kind of for the fixing steel pipe iron wire fastener of building trade
CN202007522U (en) Safety construction device for pole tower
CN202990386U (en) Externally-suspended scaffold
CN204802886U (en) Instrument formula tower crane anchorage device's installation operation and half space
CN201815017U (en) Crawling ladder safety harness
CN203222433U (en) Rail-mounted tower crane attachment platform device
CN204356834U (en) A kind of vertical bearing plate of rainwater-collecting module
CN206448763U (en) A kind of crane is installed and uses detachable cat ladder
CN204040434U (en) A kind of safe operation platform for the wind-power tower measurement of planeness and internal installation
CN204597301U (en) Isolator maintenance platform
CN204059215U (en) Passive protection net column column cap connecting structure
CN203096624U (en) Cantilever pouring bridge high-attitude construction bracket
CN204152172U (en) A kind of reinforced general can assembled steel structure support
CN204356035U (en) A kind of portable steel pipe pole operation platform
CN202616660U (en) Personnel high-altitude translocation structure on power transmission line steel pipe tower

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Co-patentee after: JIANGSU ELECTRIC POWER Co.

Patentee after: State Grid Corporation of China

Co-patentee after: STATE GRID JIANGSU ELECTRIC POWER Co.,Ltd. MAINTENANCE BRANCH

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Co-patentee before: JIANGSU ELECTRIC POWER Co.

Patentee before: State Grid Corporation of China

Co-patentee before: MAINTENANCE DIVISION OF STATE GRID JIANGSU ELECTRIC POWER Co.

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Co-patentee after: JIANGSU ELECTRIC POWER Co.

Patentee after: State Grid Corporation of China

Co-patentee after: MAINTENANCE DIVISION OF STATE GRID JIANGSU ELECTRIC POWER Co.

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Co-patentee before: JIANGSU ELECTRIC POWER Co.

Patentee before: State Grid Corporation of China

Co-patentee before: JIANGSU ELECTRIC POWER COMPANY MAINTENANCE BRANCH

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141210

Termination date: 20190117