CN203022328U - Climbing operation platform - Google Patents

Climbing operation platform Download PDF

Info

Publication number
CN203022328U
CN203022328U CN 201220606137 CN201220606137U CN203022328U CN 203022328 U CN203022328 U CN 203022328U CN 201220606137 CN201220606137 CN 201220606137 CN 201220606137 U CN201220606137 U CN 201220606137U CN 203022328 U CN203022328 U CN 203022328U
Authority
CN
China
Prior art keywords
main body
operating platform
support bar
type operating
climbing type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220606137
Other languages
Chinese (zh)
Inventor
王朝阳
陈文革
刘红军
唐富
柳伟
陈小伟
刘立兵
曹腾飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science and Industry Corp Ltd
Original Assignee
China Construction Steel Structure Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Corp Ltd filed Critical China Construction Steel Structure Corp Ltd
Priority to CN 201220606137 priority Critical patent/CN203022328U/en
Application granted granted Critical
Publication of CN203022328U publication Critical patent/CN203022328U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Installation Of Indoor Wiring (AREA)

Abstract

The utility model relates to a climbing operation platform, which comprises a main body, electric hoists and hauling cables, wherein one ends of the electric hoists are connected with the main body through the hauling cables, and the other ends of the electric hoists are connected with connecting ear plates on members through the hauling cables. According to the operation platform provided by the embodiment of the utility model, supporting points are arranged on the connecting ear plates of the members, so that the damage to base materials caused by secondary welding of the members is avoided. In addition, according to the operation platform, the main body and the connecting ear plates are fixed through the electric hoists. When the operation platform is used, only the electric hoists are used for ascending and descending the operation platform, the operation platform can gradually climb along with the construction process, repeated disassembly is not needed so as to effectively save manpower and material resources, and the construction efficiency is improved.

Description

The climbing type operating platform
Technical field
The utility model relates to technical field of building construction, particularly a kind of climbing type operating platform.
Background technology
Along with developing rapidly of steel work, form of structure is more and more diversified, and construction requirement is more and more high, and difficulty also increases gradually.At present, on-the-spot Construction of Steel Structure operating platform mostly is and adopts steel pipe scaffold to set up the scaffold operating platform that forms, the problems such as this scaffold operating platform exists and repeatedly sets up/remove, efficiency of construction is not high, potential safety hazard is many, management difficulty is large, thereby be difficult to satisfy the construction needs.In addition, this scaffold operating platform adopt more local welding fixedly mode and the member of otic placode fix, larger to the dependence of element structure itself, larger to mother metal damage.
The utility model content
Technical problem to be solved in the utility model is, a kind of climbing type operating platform of damaging mother metal and can improving efficiency of construction avoided is provided.
The utility model is achieved in that provides a kind of climbing type operating platform, comprises main body, electric hoist and pull rope; One end of described electric hoist is connected with described main body by described pull rope, and its other end connects by the otic placode that is connected on described pull rope and member.
Further, described main body can be set on described member.
Further, described main body comprises two semicircle cell cubes and bolt; Described two semicircle cell cubes connect by described bolt.
Further, described main body comprises the first ring body, the second ring body, connecting rod, support bar, rail bar, crossbeam and hangers; Described the first ring body and described the second ring body can be set on described member; Described connecting rod is spaced apart and arranged between described the first ring body and described the second ring body, and both are connected; Described support bar is the radial external side of described first ring that is arranged on; Described rail bar vertically is arranged on the free end of described support bar, and connects by described crossbeam between adjacent described rail bar; Described hangers is arranged on described support bar, and is connected with described pull rope.
Further, described main body also comprises bracing piece; One end of described bracing piece is arranged on described the second ring body and with corresponding connecting rod is contiguous and arranges; The other end of described bracing piece is connected with the described free end of corresponding described support bar.
Further, described bracing piece and corresponding described connecting rod, the leg-of-mutton structure of the common composition of described support bar.
Further, described main body also comprises the checkered steel plate that is laid on described support bar.
Further, described main body comprises that also being arranged on one on described rail bar encloses tin plate.
According to the operating platform of the utility model embodiment, the strong point is arranged on the connection otic placode of member the mother metal damage of having avoided the secondary welding on member to cause; In addition, operating platform by electric hoist with main body be connected otic placode and fix, during use, only with electric hoist, operating platform is carried out descending operation, can progressively climb along with construction speed, do not need repeatedly to dismantle and can effectively use manpower and material resources sparingly, can improve efficiency of construction.
Description of drawings
Fig. 1 is the schematic diagram when in the utility model one embodiment, the climbing type operating platform is arranged on the lattice post.
Fig. 2 is the enlarged diagram of operating platform in Fig. 1.
The specific embodiment
In order to make technical problem to be solved in the utility model, technical scheme and beneficial effect clearer, below in conjunction with drawings and Examples, the utility model is further elaborated.Should be appreciated that specific embodiment described herein only in order to explaining the utility model, and be not used in restriction the utility model.
Figure 1 shows that the schematic diagram when in the utility model one embodiment, the climbing type operating platform is arranged on the lattice post.As shown in Figure 1, operating platform comprises main body 100, electric hoist 200 and pull rope 300.Wherein, main body 100 can be set on lattice post 400, and utilize electric hoist 200 are connected with pull rope with lattice post 400 on the otic placode 410 of being connected connect.By operation electric hoist 200, can make main body 100 along 400 oscilaltions of lattice post.
Particularly, as shown in Figure 2, main body 100 comprises the first ring body 110, the second ring body 120, connecting rod 130, support bar 140, bracing piece 150, rail bar 160, crossbeam 170 and hangers 180.
The first ring body 110 and the second ring body 120 be arranged in parallel up and down, and it can be set on lattice post 400 or other elements.A plurality of connecting rods 130 are spaced apart and arranged between the first ring body 110 and the second ring body 120, and both are connected.
Support bar 140 is radial first ring body 110 outsides that are arranged on, in order to carry the checkered steel plate (not shown).In the embodiment shown in Figure 2, an end of support bar 140 is arranged on the first ring body 110, and arranges with corresponding connecting rod 130 is contiguous.
One end of bracing piece 150 is arranged on the second ring body 120, and arranges with corresponding connecting rod 130 is contiguous; The other end of bracing piece 150 is connected with the free end of corresponding support bar 140, and like this, connecting rod 130 forms leg-of-mutton structure jointly with support bar 140 and the bracing piece 150 of contiguous these connecting rod 130 two ends settings, to strengthen the intensity of structure.
Rail bar 160 generally perpendicularly is arranged on the free end of support bar 140, and the crossbeam 170 that arranges by approximate horizontal between adjacent rail bar 160 connects.The protective devices such as one circle tin plate are set, to improve safety on rail bar 160.
Hangers 180 is arranged on support bar 140, is used for being connected with pull rope 300.
In one embodiment, main body 100 is removable is divided into two semicircle cell cubes; Each cell cube skeleton adopts the angle steel of cross section L50X6 to be welded, and two semicircle cell cubes are bolted and form this main body 100.
As shown in Figure 1, an end of electric hoist 200 is by being connected otic placode 410 connections on pull rope 300 and lattice post 400; The other end of electric hoist 200 is connected with hangers 180 by pull rope 300.
During use, according to the closeer situation of ring beam distribution, only carry out descending operation with 200 pairs of operating platforms of electric hoist, can be along with construction speed is progressively climbed, do not need repeatedly to dismantle, can effectively use manpower and material resources sparingly, reduced the generation of security incident, both for constructing operation provides safe assurance, can improve efficiency of construction again.
In sum, the operating platform in the utility model one embodiment is arranged on the strong point on the connection otic placode 410 of lattice post 400 or other elements, the mother metal damage of having avoided the secondary welding on member to cause; In addition, with main body 100 with is connected otic placode 410 and fixes, and main body 100 is removable is divided into two semicircle cell cubes by electric hoist 200 for the operating platform in the utility model one embodiment, and can adopt bolt to tighten up, and installing/dismounting (only once) facilitates; In addition, during use, according to the closeer situation of ring beam distribution, only carry out descending operation with 200 pairs of operating platforms of electric hoist, can progressively climb along with construction speed, do not need repeatedly to dismantle, can effectively use manpower and material resources sparingly, can improve efficiency of construction.
The above is only preferred embodiment of the present utility model; not in order to limit the utility model; all any modifications of doing within spirit of the present utility model and principle, be equal to and replace and improvement etc., within all should being included in protection domain of the present utility model.

Claims (8)

1. a climbing type operating platform, is characterized in that, described operating platform comprises main body, electric hoist and pull rope; One end of described electric hoist is connected with described main body by described pull rope, and its other end connects by the otic placode that is connected on described pull rope and member.
2. climbing type operating platform as claimed in claim 1, is characterized in that, described main body can be set on described member.
3. climbing type operating platform as claimed in claim 1, is characterized in that, described main body comprises two semicircle cell cubes and bolt; Described two semicircle cell cubes connect by described bolt.
4. climbing type operating platform as described in any one in claims 1 to 3, is characterized in that, described main body comprises the first ring body, the second ring body, connecting rod, support bar, rail bar, crossbeam and hangers; Described the first ring body and described the second ring body can be set on described member; Described connecting rod is spaced apart and arranged between described the first ring body and described the second ring body, and both are connected; Described support bar is the radial external side of described first ring that is arranged on; Described rail bar vertically is arranged on the free end of described support bar, and connects by described crossbeam between adjacent described rail bar; Described hangers is arranged on described support bar, and is connected with described pull rope.
5. climbing type operating platform as claimed in claim 4, is characterized in that, described main body also comprises bracing piece; One end of described bracing piece is arranged on described the second ring body and with corresponding connecting rod is contiguous and arranges; The other end of described bracing piece is connected with the described free end of corresponding described support bar.
6. climbing type operating platform as claimed in claim 5, is characterized in that, described bracing piece and corresponding described connecting rod, the leg-of-mutton structure of the common composition of described support bar.
7. climbing type operating platform as claimed in claim 4, is characterized in that, described main body also comprises the checkered steel plate that is laid on described support bar.
8. climbing type operating platform as claimed in claim 4, is characterized in that, described main body comprises that also being arranged on one on described rail bar encloses tin plate.
CN 201220606137 2012-11-16 2012-11-16 Climbing operation platform Expired - Lifetime CN203022328U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220606137 CN203022328U (en) 2012-11-16 2012-11-16 Climbing operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220606137 CN203022328U (en) 2012-11-16 2012-11-16 Climbing operation platform

Publications (1)

Publication Number Publication Date
CN203022328U true CN203022328U (en) 2013-06-26

Family

ID=48646321

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220606137 Expired - Lifetime CN203022328U (en) 2012-11-16 2012-11-16 Climbing operation platform

Country Status (1)

Country Link
CN (1) CN203022328U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103643790A (en) * 2013-10-30 2014-03-19 中建钢构有限公司北京分公司 Self-crawling type operating platform applicable to colossal column
CN110242941A (en) * 2019-06-05 2019-09-17 五冶集团上海有限公司 A kind of dysprosium lamp frame being used in turn
CN110950279A (en) * 2019-11-19 2020-04-03 沪东中华造船(集团)有限公司 Operation method of pump tower construction platform

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103643790A (en) * 2013-10-30 2014-03-19 中建钢构有限公司北京分公司 Self-crawling type operating platform applicable to colossal column
CN110242941A (en) * 2019-06-05 2019-09-17 五冶集团上海有限公司 A kind of dysprosium lamp frame being used in turn
CN110950279A (en) * 2019-11-19 2020-04-03 沪东中华造船(集团)有限公司 Operation method of pump tower construction platform

Similar Documents

Publication Publication Date Title
CN204030347U (en) A kind of ring main unit integration is from bogey
CN201842567U (en) Lifting frame for modular tube panel of waste heat boiler
CN204138210U (en) A kind of regularization tower crane service platform and escape way
CN203499229U (en) Operating platform for construction of elevator shaft
CN203022328U (en) Climbing operation platform
CN106758862B (en) Lattice tubular tower and frame peace tears platform open
CN103967263B (en) Hydraulic automatic jumping discharging platform
CN202785351U (en) Tower cranes attached operating platform
CN205777580U (en) A kind of automatic lifting discharging platform
CN202945798U (en) Overhanging type scaffold corner device
CN203947758U (en) Novel hydraulic automatic climbing discharging platform
CN204212065U (en) Bridge crossing anticollision barrier punching block erection equipment
CN204059904U (en) A kind of hoistway operation platform being applied to multi-platform operation
CN202882454U (en) Temporary safe protective barrier
CN201722937U (en) Sliding platform for installation of net rack
CN205772893U (en) A kind of king-tower function at most lifting traction apparatus
CN204038917U (en) Dismountable external hanging service platform
CN104314354A (en) High-voltage electric tower base
CN202990386U (en) Externally-suspended scaffold
CN202467221U (en) Power plant main workshop steel roof truss hoisting lifting device
CN211338598U (en) Ring rail hoisting device for installing high-rise curtain wall
CN204897102U (en) Electronic cat ladder of instrument formula
CN204001887U (en) Dismantled and assembled dedicated platform for underground workshop vault lighting installation and repairing
CN201980890U (en) Herringbone hoisting mast for hoisting under special situation of high altitude
CN204802886U (en) Instrument formula tower crane anchorage device's installation operation and half space

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20130626

CX01 Expiry of patent term