CN204552050U - A kind of anchor ear bearing frame and scaffolding platform assembly - Google Patents

A kind of anchor ear bearing frame and scaffolding platform assembly Download PDF

Info

Publication number
CN204552050U
CN204552050U CN201520142578.0U CN201520142578U CN204552050U CN 204552050 U CN204552050 U CN 204552050U CN 201520142578 U CN201520142578 U CN 201520142578U CN 204552050 U CN204552050 U CN 204552050U
Authority
CN
China
Prior art keywords
anchor ear
beam frame
frame
platform assembly
scaffolding platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520142578.0U
Other languages
Chinese (zh)
Inventor
刘明华
朱玉明
巫军龙
任利民
岳仁峰
朱君卿
吴传锋
安峰
朱砂
马辰龙
刘洪雁
索菲
张永军
张永生
李晋才
王博
聂小健
闫浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Municipal Construction Co Ltd
Original Assignee
Beijing Municipal Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Municipal Construction Co Ltd filed Critical Beijing Municipal Construction Co Ltd
Priority to CN201520142578.0U priority Critical patent/CN204552050U/en
Application granted granted Critical
Publication of CN204552050U publication Critical patent/CN204552050U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model relates to a kind of anchor ear bearing frame and scaffolding platform assembly, and it comprises concrete column, anchor ear, i-beam frame, diagonal brace, end punching block, English truss supports and protection is gone along with sb. to guard him; Wherein, described anchor ear is installed on the top of concrete column; Described i iron level frame is located on anchor ear; Described diagonal brace is connected between i-beam frame and concrete column; Punching block of the described end is installed on i-beam frame by some split bolts; I-beam frame and end punching block described in described English truss support and connection; The surrounding being erected at i-beam frame is gone along with sb. to guard him in described protection.It is simple that anchor ear bearing frame of the present utility model and scaffolding platform assembly have structure, easy for installation, and support force is large, and the plurality of advantages such as safe and reliable.

Description

A kind of anchor ear bearing frame and scaffolding platform assembly
[technical field]
The utility model relates to a kind of bearing frame, is specifically related to a kind of anchor ear bearing frame and scaffolding platform assembly, belongs to construction engineering technical field.
[background technology]
Before Coping Construction, often need to set up bearing frame and scaffolding platform.In build process, often there is structural instability in the formwork-support of prior art and connection system for guide rail, supporting capacity is poor, easily produces security incident.
Therefore, for solving the problems of the technologies described above, necessary anchor ear bearing frame and the scaffolding platform assembly providing a kind of innovation, to overcome described defect of the prior art.
[utility model content]
For solving the problem, it is simple that the purpose of this utility model is to provide a kind of structure, and support force is large, and safe and reliable anchor ear bearing frame and scaffolding platform assembly.
For achieving the above object, the technical scheme that the utility model is taked is: a kind of anchor ear bearing frame and scaffolding platform assembly, and it comprises concrete column, anchor ear, i-beam frame, diagonal brace, end punching block, English truss supports and protection is gone along with sb. to guard him; Wherein, described anchor ear is installed on the top of concrete column; Described i-beam frame level frame is located on anchor ear; Described diagonal brace is connected between i-beam frame and concrete column; Punching block of the described end is installed on i-beam frame by some split bolts; I-beam frame and end punching block described in described English truss support and connection; The surrounding being erected at i-beam frame is gone along with sb. to guard him in described protection.
Anchor ear bearing frame of the present utility model and scaffolding platform assembly are set to further: the spacing that described English truss supports is 50cm.
Anchor ear bearing frame of the present utility model and scaffolding platform assembly are set to further: the bottom of extending i-beam frame is gone along with sb. to guard him in described protection, and is soldered on diagonal brace.
Anchor ear bearing frame of the present utility model and scaffolding platform assembly are also set to: described i-beam frame is equipped with large plate.
Compared with prior art, the utility model has following beneficial effect: it is simple that anchor ear bearing frame of the present utility model and scaffolding platform assembly have structure, easy for installation, and support force is large, and the plurality of advantages such as safe and reliable.
[accompanying drawing explanation]
Fig. 1 is the structural representation of anchor ear bearing frame of the present utility model and scaffolding platform assembly.
[detailed description of the invention]
Refer to shown in Figure of description 1, the utility model is a kind of anchor ear bearing frame and scaffolding platform assembly, its by concrete column 1, anchor ear 2, i-beam frame 3, diagonal brace 4, end punching block 5, English truss support 6 and protection go along with sb. to guard him several parts such as 7 and form.
Wherein, described anchor ear 2 is installed on the top of concrete column 1.
Described i-beam frame 3 level frame is located on anchor ear 2.Described i-beam frame 3 is equipped with large plate 9, thus constructability personnel walking.
Described diagonal brace 4 is connected between i-beam frame 3 and concrete column 1, and is symmetrical set relative to concrete column 1.
Punching block of the described end 5 is installed on i-beam frame 3 by some split bolts 8.Described English truss supports 6 and connects described i-beam frame 3 and end punching block 5, and its spacing is 50cm.
The surrounding that 7 are erected at i-beam frame 3 is gone along with sb. to guard him in described protection, and it can protect the safety of constructor.The bottom that 7 extend i-beam frame 3 is gone along with sb. to guard him in this protection, and is soldered on diagonal brace 4, thus it is firm to make protection go along with sb. to guard him 7 installations.
Above detailed description of the invention is only the preferred embodiment of this creation, and not in order to limit this creation, any amendment made within all spirit in this creation and principle, equivalent replacement, improvement etc., within the protection domain that all should be included in this creation.

Claims (4)

1. anchor ear bearing frame and a scaffolding platform assembly, is characterized in that: comprise concrete column, anchor ear, i-beam frame, diagonal brace, end punching block, English truss supports and protection is gone along with sb. to guard him; Wherein, described anchor ear is installed on the top of concrete column; Described i-beam frame level frame is located on anchor ear; Described diagonal brace is connected between i-beam frame and concrete column; Punching block of the described end is installed on i-beam frame by some split bolts; I-beam frame and end punching block described in described English truss support and connection; The surrounding being erected at i-beam frame is gone along with sb. to guard him in described protection.
2. anchor ear bearing frame as claimed in claim 1 and scaffolding platform assembly, is characterized in that: the spacing that described English truss supports is 50cm.
3. anchor ear bearing frame as claimed in claim 1 and scaffolding platform assembly, is characterized in that: the bottom of extending i-beam frame is gone along with sb. to guard him in described protection, and is soldered on diagonal brace.
4. anchor ear bearing frame as claimed in claim 1 and scaffolding platform assembly, is characterized in that: described i-beam frame is equipped with large plate.
CN201520142578.0U 2015-03-13 2015-03-13 A kind of anchor ear bearing frame and scaffolding platform assembly Expired - Fee Related CN204552050U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520142578.0U CN204552050U (en) 2015-03-13 2015-03-13 A kind of anchor ear bearing frame and scaffolding platform assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520142578.0U CN204552050U (en) 2015-03-13 2015-03-13 A kind of anchor ear bearing frame and scaffolding platform assembly

Publications (1)

Publication Number Publication Date
CN204552050U true CN204552050U (en) 2015-08-12

Family

ID=53827179

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520142578.0U Expired - Fee Related CN204552050U (en) 2015-03-13 2015-03-13 A kind of anchor ear bearing frame and scaffolding platform assembly

Country Status (1)

Country Link
CN (1) CN204552050U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836774A (en) * 2017-01-10 2017-06-13 中国建筑第八工程局有限公司 Bracing members access path and its construction method
CN107035130A (en) * 2017-06-05 2017-08-11 中国建筑第二工程局有限公司 Single-upright-column high-altitude operation platform and cantilever platform
CN108978482A (en) * 2018-08-23 2018-12-11 中国五冶集团有限公司 The pin-connected panel support frame of circle pier capping beam is with its installation method
CN110761557A (en) * 2019-12-02 2020-02-07 中铁建工集团有限公司 Reverse construction method major diameter ring beam makes up movable template system of consolidating
CN111424951A (en) * 2020-04-16 2020-07-17 中国建筑第四工程局有限公司 Steel structure high-altitude welding enclosure cage type closed environment operation platform and use method thereof
CN112523100A (en) * 2020-12-09 2021-03-19 中冶京诚工程技术有限公司 Template supporting structure of overhead concrete cantilever beam
CN114382149A (en) * 2022-01-27 2022-04-22 安徽海螺建材设计研究院有限责任公司 Collecting device and collecting method for wharf surface rainwater and flushing water

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836774A (en) * 2017-01-10 2017-06-13 中国建筑第八工程局有限公司 Bracing members access path and its construction method
CN107035130A (en) * 2017-06-05 2017-08-11 中国建筑第二工程局有限公司 Single-upright-column high-altitude operation platform and cantilever platform
CN108978482A (en) * 2018-08-23 2018-12-11 中国五冶集团有限公司 The pin-connected panel support frame of circle pier capping beam is with its installation method
CN110761557A (en) * 2019-12-02 2020-02-07 中铁建工集团有限公司 Reverse construction method major diameter ring beam makes up movable template system of consolidating
CN111424951A (en) * 2020-04-16 2020-07-17 中国建筑第四工程局有限公司 Steel structure high-altitude welding enclosure cage type closed environment operation platform and use method thereof
CN112523100A (en) * 2020-12-09 2021-03-19 中冶京诚工程技术有限公司 Template supporting structure of overhead concrete cantilever beam
CN114382149A (en) * 2022-01-27 2022-04-22 安徽海螺建材设计研究院有限责任公司 Collecting device and collecting method for wharf surface rainwater and flushing water

Similar Documents

Publication Publication Date Title
CN204552050U (en) A kind of anchor ear bearing frame and scaffolding platform assembly
CN204703480U (en) A kind of integral supporting structure for building
CN104213707B (en) All steel climbing frame inside contracts attached climbing device and the mounting method thereof at place in structure
CN203213019U (en) Long cantilever bent cap cast-in-place construction support system
CN202785387U (en) Indoor cantilever crane
CN205712133U (en) Enclose the centering attachment structure of purlin beam and bracing members
CN203420359U (en) Rigid connection joint connected through beam columns and capable of bearing overlarge loads in steel structure support system
CN203977840U (en) A kind of high-altitude long-span strengthening concrete vestibule braced structures
CN204491420U (en) A kind of reinforcement structure of bracket
CN206356799U (en) A kind of underframe of support Steel Bridge frame
CN202467170U (en) Aluminum alloy rising template system
CN205777531U (en) Floor slab construction beam string shuttering supporting equipment
CN203701878U (en) Split-type bearing connection mechanism for vertical columns of platform screen door
CN205742523U (en) A kind of anti-continuous collapse transfer framework structure
CN205444739U (en) Fixed railing structure of detachable
CN204238443U (en) A kind of detachable suspension column fastening devices
CN204186060U (en) A kind of Stilt layer place construction elevator attaching frame fastening devices
CN204024187U (en) A kind of precast concrete tile with detachable hoisting structure
CN104358355A (en) Detachable column base fixing device and construction method thereof
CN204802886U (en) Instrument formula tower crane anchorage device's installation operation and half space
CN204266500U (en) The board-like quakeproof stair of steel concrete
CN205242981U (en) Concrete construction operation platform
CN205444230U (en) Photovoltaic direct current lightning combiner box installs basis
CN204609422U (en) Three pipe tower platform structures
CN204781317U (en) Steel construction beam column sliding connection node

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150812

Termination date: 20160313

CF01 Termination of patent right due to non-payment of annual fee