CN104358355A - Detachable column base fixing device and construction method thereof - Google Patents
Detachable column base fixing device and construction method thereof Download PDFInfo
- Publication number
- CN104358355A CN104358355A CN201410625155.4A CN201410625155A CN104358355A CN 104358355 A CN104358355 A CN 104358355A CN 201410625155 A CN201410625155 A CN 201410625155A CN 104358355 A CN104358355 A CN 104358355A
- Authority
- CN
- China
- Prior art keywords
- body unit
- suspension column
- built
- ribs
- hoop body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The invention relates to a detachable column base fixing device and a construction method thereof. The detachable column base fixing device comprises two hoop body units which are connected together through bolts, and an embedded part carrier plate, wherein the two hoop body units are fixed on the embedded part carrier plate; and each hoop body unit is composed of a semicircular steel pipe and reinforcing ribs on the circumference of the semicircular steel pipe. A steel structure column base is subjected to temporary fixed treatment; and the fixing device can be repeatedly dismantled and assembled.
Description
Technical field
The present invention relates to a kind of detachable suspension column fastening devices and construction method thereof, particularly in steel work unitary strip post sliding construction process, be applicable to the temporary fixed of steel column and column root-plate, and can reuse.
Background technology
In recent years, in Construction of Steel Structure, hydraulic pressure sliding construction is very general, according to structural steelwork design feature, there is the situation of pillar and roof system slippage simultaneously in increasing sliding construction, and how to ensure the interim stabilization that structure hoisting is in place, the particularly temporary fixed technological difficulties being this type of and constructing of steel column.As being welded and fixed with original, after welding fabrication, not only deposited metal is removed and is damaged mother metal but also affect construction, draws to establish cable wind rope or arrange temporary support on steel pile limit be welded and fixed and affect Contraction in Site face and the lengthy and tedious complexity of technique.
In order to solve the construction technology difficult point of this class formation, the applicant provides a kind of detachable suspension column fastening devices and construction method thereof, and this case produces thus.
Summary of the invention
The object of the present invention is to provide a kind of detachable suspension column fastening devices and construction method thereof, namely temporary fixed process is taken to steel pile suspension column, and fastening devices can repeat dismounting.
For achieving the above object, technical scheme provided by the invention is: a kind of detachable suspension column fastening devices, comprises two hoop body unit and the built-in fitting top boards be bolted together, and wherein, two hoop body unit are fixed on built-in fitting top board; Described hoop body unit is made up of semicircle steel pipe and the reinforcing ribs being positioned at semicircle steel pipe periphery.
Further setting, the reinforcing ribs of described semicircle steel pipe periphery comprises vertical strengthening ribs rib and cross reinforcing rib.
Further setting, described cross reinforcing rib is fixed on built-in fitting top board by pre embedded bolt, is also provided with a plate between two vertical strengthening ribs ribs, and described two vertical strengthening ribs ribs are connected by high-strength bolt with junction plate.
A kind of construction method of detachable suspension column fastening devices: it is characterized in that: 1), while installation suspension column built-in fitting, first pre embedded bolt is set on built-in fitting top board; 2), steel column is installed, suspension column is mounted to design elevation position; 3), bind round body unit and junction plate location suspension column, and two hoop body unit are fixed on pre embedded bolt position; 4), body unit, junction plate and steel column fixation is bound round by high-strength bolt by two; 5), treat superstructure installation, before structure slippage, remove this device and carry out sliding construction.
Beneficial effect of the present invention: the efficiency improving work progress, decrease the workload in high-altitude, safety factor improves greatly, and reduces operating expenses.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is hoop body block construction schematic diagram of the present invention;
Fig. 3 is hoop body unit connection relation schematic diagram of the present invention.
Detailed description of the invention
By reference to the accompanying drawings, present pre-ferred embodiments is described in further detail.
As Figure 1-3, what the present invention disclosed is a kind of detachable suspension column fastening devices, comprises two hoop body unit 1 and the built-in fitting top boards 2 be bolted together, and wherein, two hoop body unit 1 are fixed on built-in fitting top board 2; Described hoop body unit 1 is made up of with the reinforcing ribs 12 being positioned at semicircle steel pipe 11 periphery semicircle steel pipe 11.
Further setting, the reinforcing ribs 12 of described semicircle steel pipe 11 periphery comprises vertical strengthening ribs rib 121 and cross reinforcing rib 122, described cross reinforcing rib 122 is fixed on built-in fitting top board 2 by pre embedded bolt 3, also be provided with a plate 4 between two vertical strengthening ribs ribs 121, described two vertical strengthening ribs ribs 121 are connected by high-strength bolt 5 with junction plate 4.
A kind of construction method of detachable suspension column fastening devices: it is characterized in that: 1), while installation suspension column built-in fitting, first pre embedded bolt 3 is set on built-in fitting top board 2; 2), steel column 6 is installed, suspension column is mounted to design elevation position; 3), hoop body unit 1 and junction plate 4 are located suspension column, and two hoop body unit 1 are fixed on pre embedded bolt 3 position; 4), body unit 1, junction plate 4 and steel column 6 fixation is bound round by high-strength bolt 5 by two; 5), treat superstructure installation, before structure slippage, remove this device and carry out sliding construction.
The present embodiment is for explaining inventive concept of the present invention, but not limiting the scope of the present invention, allly does any unsubstantiality to above-described embodiment and changes, and all belongs to protection scope of the present invention.
Claims (4)
1. a detachable suspension column fastening devices, is characterized in that: comprise two hoop body unit and the built-in fitting top boards be bolted together, and wherein, two hoop body unit are fixed on built-in fitting top board; Described hoop body unit is made up of semicircle steel pipe and the reinforcing ribs being positioned at semicircle steel pipe periphery.
2. the detachable suspension column fastening devices of one according to claim 1, is characterized in that: the reinforcing ribs of described semicircle steel pipe periphery comprises vertical strengthening ribs rib and cross reinforcing rib.
3. the detachable suspension column fastening devices of one according to claim 2, it is characterized in that: described cross reinforcing rib is fixed on built-in fitting top board by pre embedded bolt, also be provided with a plate between two vertical strengthening ribs ribs, described two vertical strengthening ribs ribs are connected by high-strength bolt with junction plate.
4. the construction method of a detachable suspension column fastening devices: it is characterized in that: 1), while installation suspension column built-in fitting, first pre embedded bolt is set on built-in fitting top board; 2), steel column is installed, suspension column is mounted to design elevation position; 3), bind round body unit and junction plate location suspension column, and two hoop body unit are fixed on pre embedded bolt position; 4), body unit, junction plate and steel column fixation is bound round by high-strength bolt by two; 5), treat superstructure installation, before structure slippage, remove this device and carry out sliding construction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410625155.4A CN104358355A (en) | 2014-11-07 | 2014-11-07 | Detachable column base fixing device and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410625155.4A CN104358355A (en) | 2014-11-07 | 2014-11-07 | Detachable column base fixing device and construction method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104358355A true CN104358355A (en) | 2015-02-18 |
Family
ID=52525652
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410625155.4A Pending CN104358355A (en) | 2014-11-07 | 2014-11-07 | Detachable column base fixing device and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104358355A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104847052A (en) * | 2015-04-29 | 2015-08-19 | 华侨大学 | Earthquake damage replaceable combination column structure |
CN110761489A (en) * | 2019-11-01 | 2020-02-07 | 江苏沪宁钢机股份有限公司 | Strong-support elliptic cylinder and assembling and welding process thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04153427A (en) * | 1990-10-16 | 1992-05-26 | Hitachi Metals Ltd | Pedestal |
JPH05339992A (en) * | 1992-06-09 | 1993-12-21 | Daiwa House Ind Co Ltd | Structure of column base for square steel pipe column |
JPH06193143A (en) * | 1992-12-28 | 1994-07-12 | Daiwa House Ind Co Ltd | Column base structure of square steel tube column |
KR101179037B1 (en) * | 2010-08-13 | 2012-09-03 | 조선대학교산학협력단 | Exposed type Collumn Base |
CN202766972U (en) * | 2012-06-05 | 2013-03-06 | 葛洲坝集团第二工程有限公司 | Circular pier column hoop |
CN203429895U (en) * | 2013-09-04 | 2014-02-12 | 哈尔滨锅炉厂有限责任公司 | Column-foot bottom plate of large power station boiler |
CN204238443U (en) * | 2014-11-07 | 2015-04-01 | 浙江精工钢结构集团有限公司 | A kind of detachable suspension column fastening devices |
-
2014
- 2014-11-07 CN CN201410625155.4A patent/CN104358355A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04153427A (en) * | 1990-10-16 | 1992-05-26 | Hitachi Metals Ltd | Pedestal |
JPH05339992A (en) * | 1992-06-09 | 1993-12-21 | Daiwa House Ind Co Ltd | Structure of column base for square steel pipe column |
JPH06193143A (en) * | 1992-12-28 | 1994-07-12 | Daiwa House Ind Co Ltd | Column base structure of square steel tube column |
KR101179037B1 (en) * | 2010-08-13 | 2012-09-03 | 조선대학교산학협력단 | Exposed type Collumn Base |
CN202766972U (en) * | 2012-06-05 | 2013-03-06 | 葛洲坝集团第二工程有限公司 | Circular pier column hoop |
CN203429895U (en) * | 2013-09-04 | 2014-02-12 | 哈尔滨锅炉厂有限责任公司 | Column-foot bottom plate of large power station boiler |
CN204238443U (en) * | 2014-11-07 | 2015-04-01 | 浙江精工钢结构集团有限公司 | A kind of detachable suspension column fastening devices |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104847052A (en) * | 2015-04-29 | 2015-08-19 | 华侨大学 | Earthquake damage replaceable combination column structure |
CN104847052B (en) * | 2015-04-29 | 2017-04-05 | 华侨大学 | A kind of damaged replaceable composite column structure |
CN110761489A (en) * | 2019-11-01 | 2020-02-07 | 江苏沪宁钢机股份有限公司 | Strong-support elliptic cylinder and assembling and welding process thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104929148B (en) | The upside-down mounting hardened system of generation power foundation of wind power ring group plinth and reinforcement means thereof | |
CN204552050U (en) | A kind of anchor ear bearing frame and scaffolding platform assembly | |
CN204185120U (en) | Mobile unit dolly in place | |
CN105804400A (en) | Curved surface net frame lifting construction method | |
CN105019664A (en) | High-altitude sliding installation method for box room type electric room | |
CN204238443U (en) | A kind of detachable suspension column fastening devices | |
CN104358355A (en) | Detachable column base fixing device and construction method thereof | |
CN103669882A (en) | Method for conducting component installation with steel wire ropes serving as rails in industrial factory building | |
CN104141317A (en) | Basement tower crane foundation construction method and structure adopting reverse construction method | |
CN201506692U (en) | Roofing steel structure simple lifting device and installation structure thereof | |
CN204850048U (en) | Overlap joint structure of quick hoist and mount of supplementary high -rise girder steel | |
CN205153515U (en) | Overhanging bearing frame makes up positioner | |
CN204418654U (en) | For the aluminum alloy pattern plate between body of wall | |
CN204474202U (en) | Large-tonnage steel member integrated hoisting fixture | |
CN102383613B (en) | Hoisting construction method for steel roof truss of main power house of power plant and special hoisting device | |
CN206220534U (en) | The pump line support meanss of concrete pumping equipment | |
CN104032944A (en) | Suspension frame construction platform device | |
CN212403164U (en) | Lifting and mounting device for T-beam wet joint template | |
CN204023414U (en) | The few fulcrum support entirety of a kind of novel large falls rack device | |
CN203924659U (en) | Hanging frame type construction platform device | |
CN204225503U (en) | Large span steel truss high altitude bulk conversion beam moulding bed | |
CN203701878U (en) | Split-type bearing connection mechanism for vertical columns of platform screen door | |
CN209891066U (en) | Safety protection device in high tower crossbeam steel web construction | |
CN202108244U (en) | Pulling fixing piece | |
CN202644407U (en) | Demoulding device for bottom plate bracket of capping beam constructed by hoop method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150218 |
|
RJ01 | Rejection of invention patent application after publication |