CN104141317A - Basement tower crane foundation construction method and structure adopting reverse construction method - Google Patents

Basement tower crane foundation construction method and structure adopting reverse construction method Download PDF

Info

Publication number
CN104141317A
CN104141317A CN201410207433.4A CN201410207433A CN104141317A CN 104141317 A CN104141317 A CN 104141317A CN 201410207433 A CN201410207433 A CN 201410207433A CN 104141317 A CN104141317 A CN 104141317A
Authority
CN
China
Prior art keywords
basement
tower crane
construction
roof
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410207433.4A
Other languages
Chinese (zh)
Inventor
苏伟
叶磊
陈国宝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN201410207433.4A priority Critical patent/CN104141317A/en
Publication of CN104141317A publication Critical patent/CN104141317A/en
Pending legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses a basement tower crane foundation construction method and structure adopting a reverse construction method. The method comprises the steps as follows: a tower crane is directly mounted on a basement roof by means of a permanent basement structure; the basement roof is reinforced by a cross beam; and a tower crane foundation is constructed on the cross beam, and the tower crane foundation, the cross beam and the basement roof are connected into a whole through steel bars. At the early stage of design, permanent basement structure pile foundations, steel pipe columns and the basement roof are utilized, and through reexamination and checking calculation of an original design institute, a tower crane model meeting selection requirements is directly mounted on the basement roof for mounting construction. The basement tower crane foundation construction method and structure adopting the reverse construction method have the advantages as follows: the permanent basement structure is utilized, a tower crane foundation pile and a built-up steel column are omitted, reserved holes in the basement structure are reduced, secondary construction of the basement structure is reduced, the construction period is shortened, the potential safety hazard is reduced, the construction measurement expense is saved, and meanwhile, normal use of the tower crane and safety of the permanent basement structure are guaranteed.

Description

The construction method of basement top-down method tower crane and structure
Technical field
the construction method and the structure that the present invention relates to a kind of basement top-down method tower crane, belong to tower crane technical field of construction.
Background technology
along with the development of Building Trade in China, all kinds of types of construction continue to bring out, and the super dark engineering of super large is more and more.In conventional project reverse construction, modal a kind of tower crane mounting means is that tower crane is arranged on the basis of basement bottom board; Also having a kind of mounting means is first by tower crane requirement construction pile foundation, and then basement bottom board adopts laced of battened compression member to top board space, tower crane is raised to basement roof absolute altitude place, and then tower crane is arranged on laced of battened compression member.Above two kinds of methods all need to design separately tower crane pile foundation, reserving hole for tower crane.In basement construction, must strengthen the security protection to reserving hole, have potential safety hazard.After tower crane is removed, all need to carry out the structure secondary construction of tower crane position reserving hole.This practice causes larger waste, does not meet the thinking of energy-saving and emission-reduction.
Summary of the invention
the object of the invention is to, provide a kind of construction method and structure of basement top-down method tower crane, to save the construction period, reduce potential safety hazard, save working measure and take, ensure that tower crane normally uses and ensures the safety of basement permanent structure own simultaneously, thereby overcome the deficiencies in the prior art.
technical scheme of the present invention is achieved in that
the construction method of a kind of basement top-down method tower crane of the present invention is that the method is to utilize basement permanent structure directly tower crane to be arranged on basement roof; Described basement roof is reinforced by nine-squares beam, and the tower crane of constructing on nine-squares beam, and tower crane, nine-squares beam and basement roof are linked to be entirety by reinforcing bar.
in preceding method, described basement permanent structure comprises pile foundation, steel pipe column and basement roof, and its sequence of construction is followed successively by: pile foundation construction, steel pipe column construction, basement roof construction, nine-squares beam construction and tower crane construction; Tower crane is directly installed on tower crane.
the structure of the of the present invention a kind of basement top-down method tower crane building according to said method is that the structure of this basement top-down method tower crane comprises basement permanent structure; Basement permanent structure comprises pile foundation, steel pipe column and basement roof; Basement roof is provided with nine-squares beam, is provided with tower crane in nine-squares beam, and tower crane is installed on tower crane.
in the structure of above-mentioned basement top-down method tower crane, described basement roof is the strong concrete plate that intensity C35P6 thickness is 400mm.
in the structure of above-mentioned basement top-down method tower crane, described nine-squares beam is for being highly greater than 1200mm, and the strong concrete beam identical with basement roof intensity.
in the structure of above-mentioned basement top-down method tower crane, described tower crane intensity is C35 concrete.
owing to having adopted technique scheme, the present invention compared with prior art, the present invention utilizes basement permanent structure pile foundation, steel pipe column and basement roof at the design initial stage, checks checking computations through original design unit, meets the tower crane model selected and is directly installed on and on basement roof, carries out installation.Practice advantage is like this, utilize basement permanent structure, cancel tower crane stake and laced of battened compression member, reduce basement structure reserving hole, reduce the construction of basement structure secondary, save the construction period, reduce potential safety hazard, save working measure and take, ensure that tower crane normally uses and ensure the safety of basement permanent structure own simultaneously.
Brief description of the drawings
fig. 1 is construction method schematic diagram of the present invention;
fig. 2 is the structural representation of the structure of basement top-down method tower crane of the present invention;
fig. 3 is embodiments of the invention schematic diagrames.
being labeled as in figure: 1-pile foundation, 2-steel pipe column, 3-basement roof, 4-nine-squares beam, 5-tower crane, 6-tower crane, 7-basement bottom board.
Detailed description of the invention
below in conjunction with drawings and Examples, the present invention is described in further detail, but not as any limitation of the invention.
the construction method of a kind of basement top-down method tower crane of the present invention, as shown in Figure 1, the method is to utilize basement permanent structure directly tower crane to be arranged on basement roof; Described basement roof is reinforced by nine-squares beam, and the tower crane of constructing on nine-squares beam, and tower crane, nine-squares beam and basement roof are linked to be entirety by reinforcing bar.Basement permanent structure comprises pile foundation, steel pipe column and basement roof, and its sequence of construction is followed successively by: pile foundation construction, steel pipe column construction, basement roof construction, nine-squares beam construction and tower crane construction; Tower crane is directly installed on tower crane.
as shown in Figure 2, the structure of this basement top-down method tower crane comprises basement permanent structure to the structural representation of the structure of the of the present invention a kind of basement top-down method tower crane building according to said method; Basement permanent structure comprises pile foundation 1, steel pipe column 2 and basement roof 3; Basement roof 3 is provided with nine-squares beam 4, is provided with tower crane 5 in nine-squares beam 4, and tower crane 6 is installed on tower crane 5.The strong concrete plate that basement roof 3 is 400mm for intensity C35P6 thickness.Nine-squares beam 4 is for being highly greater than 1200mm, and the strong concrete beam identical with basement roof 3 intensity.Tower crane 5 intensity are C35 concrete.
Embodiment
when concrete enforcement, as shown in Figure 3, this example is applicable to the engineering of three layers of above super dark contrary sequence method of basement.
its principle is to utilize basement permanent structure to carry out tower crane installation.Sequence of construction is followed successively by: pile foundation construction → steel pipe column construction → basement roof construction → tower crane construction → head tower hangs to be installed and uses.Specific construction step is as follows:
1, way is carried out pile foundation 1 and is constructed routinely;
2, way is carried out basement bottom board 7 and steel pipe column 2 is constructed routinely;
3, carry out basement roof 3 by mode of the present invention and construct, concrete steps are as follows:
1) basement roof template is installed;
2) check checking computations requirement according to designing unit, carry out basement roof, tower crane and nine-squares beam construction.The strong concrete plate that basement roof 3 is 400mm for intensity C35P6 thickness.Nine-squares beam 4 is for being highly greater than 1200mm, and the strong concrete beam identical with basement roof 3 intensity.
3) basement roof is linked to be entirety with tower crane reinforcing bar, nine-squares beam reinforcing bar, meets layout design and corresponding code requirement.Carry out basement roof and tower crane concreting.Tower crane 5 intensity are C35 concrete.
4) concrete strength carries out tower crane installation after reaching designing requirement 75%, and basement roof shuttering supporting could be removed after concrete strength reaches 100%.
5) after tower crane 6 is installed, after testing qualified and list after just can come into operation.
the present invention goes for most of contrary sequence method basement engineering, and versatility is stronger, has good promotion advantage.Tower crane utilizes basement permanent structure.Tower crane utilizes basement permanent structure can reduce construction costs, save the construction period, solve the problem of conventional tower crane reserving hole, hole potential safety hazard and structure of the window secondary operation, ensured to ensure that tower crane normally uses safety under the inherently safe prerequisite of basement structure simultaneously.There is good Social benefit and economic benefit.The present invention had both met high efficiency construction requirement, and cost-saving cost is effectively avoided again the problem of reserved opening and structure of the window secondary construction in basement adverse construction method, has practicality and generalization widely.

Claims (6)

1. a construction method for basement top-down method tower crane, is characterized in that: the method is to utilize basement permanent structure directly tower crane to be arranged on basement roof; Described basement roof is reinforced by nine-squares beam, and the tower crane of constructing on nine-squares beam, and tower crane, nine-squares beam and basement roof are linked to be entirety by reinforcing bar.
2. method according to claim 1, it is characterized in that: described basement permanent structure comprises pile foundation, steel pipe column and basement roof, and its sequence of construction is followed successively by: pile foundation construction, steel pipe column construction, basement roof construction, nine-squares beam construction and tower crane construction; Tower crane is directly installed on tower crane.
3. a structure for the basement top-down method tower crane building according to method described in claim 1 or 2, comprises basement permanent structure; It is characterized in that: basement permanent structure comprises pile foundation (1), steel pipe column (2) and basement roof (3); Basement roof (3) is provided with nine-squares beam (4), is provided with tower crane (5) in nine-squares beam (4), and tower crane (6) is installed on tower crane (5).
4. the structure of basement top-down method tower crane according to claim 3, is characterized in that: described basement roof (3) intensity is the strong concrete plate that C35P6, thickness are 400mm.
5. the structure of basement top-down method tower crane according to claim 4, is characterized in that: described nine-squares beam (4) is for being highly greater than 1200mm, and the strong concrete beam identical with basement roof (3) intensity.
6. the structure of basement top-down method tower crane according to claim 3, is characterized in that: the intensity of described tower crane (5) is C35 concrete.
CN201410207433.4A 2014-05-16 2014-05-16 Basement tower crane foundation construction method and structure adopting reverse construction method Pending CN104141317A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410207433.4A CN104141317A (en) 2014-05-16 2014-05-16 Basement tower crane foundation construction method and structure adopting reverse construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410207433.4A CN104141317A (en) 2014-05-16 2014-05-16 Basement tower crane foundation construction method and structure adopting reverse construction method

Publications (1)

Publication Number Publication Date
CN104141317A true CN104141317A (en) 2014-11-12

Family

ID=51850636

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410207433.4A Pending CN104141317A (en) 2014-05-16 2014-05-16 Basement tower crane foundation construction method and structure adopting reverse construction method

Country Status (1)

Country Link
CN (1) CN104141317A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887918A (en) * 2015-12-31 2016-08-24 上海建工七建集团有限公司 Tower crane foundation and construction method thereof
CN106351255A (en) * 2016-10-12 2017-01-25 上海建工七建集团有限公司 Subway construction structure
CN107558607A (en) * 2017-09-20 2018-01-09 中国建筑第八工程局有限公司 Tower crane system and its construction method on existing concrete structure
CN108203994A (en) * 2018-03-14 2018-06-26 中建四局第建筑工程有限公司 Along the method for subinverse construction technology on a kind of basement
CN112875531A (en) * 2021-03-10 2021-06-01 北京庞源机械工程有限公司 Specially-made underframe for tower crane

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201671107U (en) * 2010-05-11 2010-12-15 徐州九鼎建设集团有限公司 Prestressed assembled box type precast concrete tower crane foundation
CN201826326U (en) * 2010-10-09 2011-05-11 浙江梁湖建设有限公司 Foundation of deep-excavation tower crane
CN203256761U (en) * 2013-05-17 2013-10-30 中建八局第三建设有限公司 Tower crane foundation arranged on top plate of basement
US20140102025A1 (en) * 2012-10-11 2014-04-17 Lafarge Canada Inc. Unitized precast grillage foundation and method for manufacturing the same

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201671107U (en) * 2010-05-11 2010-12-15 徐州九鼎建设集团有限公司 Prestressed assembled box type precast concrete tower crane foundation
CN201826326U (en) * 2010-10-09 2011-05-11 浙江梁湖建设有限公司 Foundation of deep-excavation tower crane
US20140102025A1 (en) * 2012-10-11 2014-04-17 Lafarge Canada Inc. Unitized precast grillage foundation and method for manufacturing the same
CN203256761U (en) * 2013-05-17 2013-10-30 中建八局第三建设有限公司 Tower crane foundation arranged on top plate of basement

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887918A (en) * 2015-12-31 2016-08-24 上海建工七建集团有限公司 Tower crane foundation and construction method thereof
CN105887918B (en) * 2015-12-31 2018-06-22 上海建工七建集团有限公司 A kind of tower crane and its construction method
CN106351255A (en) * 2016-10-12 2017-01-25 上海建工七建集团有限公司 Subway construction structure
CN107558607A (en) * 2017-09-20 2018-01-09 中国建筑第八工程局有限公司 Tower crane system and its construction method on existing concrete structure
CN107558607B (en) * 2017-09-20 2020-03-20 中国建筑第八工程局有限公司 Tower crane system arranged on existing concrete structure and construction method thereof
CN108203994A (en) * 2018-03-14 2018-06-26 中建四局第建筑工程有限公司 Along the method for subinverse construction technology on a kind of basement
CN112875531A (en) * 2021-03-10 2021-06-01 北京庞源机械工程有限公司 Specially-made underframe for tower crane

Similar Documents

Publication Publication Date Title
CN104141317A (en) Basement tower crane foundation construction method and structure adopting reverse construction method
CN103510640B (en) A kind of fabricated shear wall and assembly method thereof
CN102936968B (en) Construction method of inner steel frame reinforced structure of pseudo-classic architecture
CN103243640B (en) Cap beam efficient, convenient and quick to construct and construction method thereof
CN204040464U (en) A kind of slab form supporting construction
CN104929148B (en) The upside-down mounting hardened system of generation power foundation of wind power ring group plinth and reinforcement means thereof
CN108385871A (en) The precast wall body of fabricated structure
CN104358309A (en) Quickly installed high-strength house structure
CN104060830A (en) Method for lifting and transporting large parts of underground nuclear power station
CN204491828U (en) Can restore funcitons frame structure system
CN103470036A (en) Overhanging structure construction method
CN202945820U (en) Inner steel frame reinforced structure of pseudo-classic architecture
CN203834504U (en) Structure of basement reverse construction method tower crane foundation
CN203783243U (en) Assembled fender
CN102691267A (en) High pier construction method for external whole operation platform
CN103741961A (en) Aseismic strengthening method for adding pin key and hidden beam for prefabricated round hole plate of existing building
CN204418654U (en) For the aluminum alloy pattern plate between body of wall
CN204570446U (en) The T-shaped simply supported beam of a kind of precast assembly
CN208235587U (en) A kind of large-span deep foundation pit underground power house rack assembling construction platform
CN203546944U (en) Assembly type shear wall
CN204238443U (en) A kind of detachable suspension column fastening devices
CN204225503U (en) Large span steel truss high altitude bulk conversion beam moulding bed
CN207905417U (en) Assembling type steel structure underground stereo garage parking
CN204753298U (en) Cement covers worker's board
CN201546366U (en) Steel girder

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20141112