CN204782182U - Overhaul operation platform of cable conductor on steel pipe pole - Google Patents
Overhaul operation platform of cable conductor on steel pipe pole Download PDFInfo
- Publication number
- CN204782182U CN204782182U CN201520331351.0U CN201520331351U CN204782182U CN 204782182 U CN204782182 U CN 204782182U CN 201520331351 U CN201520331351 U CN 201520331351U CN 204782182 U CN204782182 U CN 204782182U
- Authority
- CN
- China
- Prior art keywords
- operation platform
- inspection operation
- steel pipe
- fixed
- bottom plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 12
- 239000010959 steel Substances 0.000 title claims abstract description 12
- 239000004020 conductor Substances 0.000 title abstract 3
- 238000007689 inspection Methods 0.000 claims abstract description 18
- 238000010276 construction Methods 0.000 abstract description 7
- 230000002093 peripheral effect Effects 0.000 abstract 1
- 238000009434 installation Methods 0.000 description 4
- 230000032258 transport Effects 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Abstract
The utility model provides an overhaul operation platform of cable conductor on steel pipe pole, the utility model relates to a cable conductor field of overhauing, its structure is: the inspection operation platform is rectangle, the bottom plate border of inspection operation platform is fixed with the rail, still be provided with the rectangle mouth on the bottom plate of inspection operation platform, the bottom plate of inspection operation platform passes through the bolt fastening on the mount, the bottom of mount is fixed with the U -shaped draw -in groove, the bottom of mount is provided with the round pin axle on one side, sell the epaxial buckle that is connected with, the buckle is crossed the top of U -shaped draw -in groove and is passed through the bolt fastening on the bottom plate of inspection operation platform, the construction cost is reduced with peripheral area, shortens the construction period. Prevent falling and reliably to ensure safely, be convenient for install and dismantle, convenient operation uses in a flexible way.
Description
one, technical field
The utility model relates to cable installation and maintenance field, particularly a kind of operating platform overhauling cable on steel pipe pole.
two, background technology
Steel pipe pole due to structure simple, intensity is high, handsome in appearance, process-cycle is short, floor space is little, transport and the advantage such as easy for installation, more and more be widely used in transmission line of electricity, cable terminal steel pipe pole is as the transition vector of overhead wire and cable run, subject the Horizontal Tension of overhead wire and the vertical load of cable machinery, cable machinery is in operation, often there is the faults such as cable head blast, this just needs repairing, and steel pipe pole cross-arm mainly adopts oblique cone column type box-type section, it is a kind of cantilever beam structures, when cable machinery construction and repairing, increase operation intensity and difficulty, operating personnel stands in safety in cantilever beam structures and cannot ensure, instrument and operating personnel easily fall, abnormally dangerous, for reducing high-altitude safe risk, unit in charge of construction scaffolds erecting in steel pipe pole surrounding, scaffold erecting and need spend five or six ten ten thousand, and not relevant qualification, safety cannot ensure, in addition, scaffolding erecting relates to transport of materials and stacks difficulty, installs and removes the problems such as long in time limit, has a strong impact on construction speed, wastes time and energy.
three, summary of the invention
A kind of operating platform overhauling cable on steel pipe pole is provided for the problems referred to above the utility model, its structure is: inspection operation platform (8) is rectangle, base plate (5) edge repairing operating platform (8) is fixed with fence (7), the base plate (5) of inspection operation platform (8) is also provided with rectangle hole (9), the base plate (5) of inspection operation platform (8) is bolted on fixed mount (1), the bottom of fixed mount (1) is fixed with U-shaped draw-in groove (4), the bottom of fixed mount (1) is while be provided with bearing pin (2), bearing pin (2) is connected with buckle (3), buckle (3) cross U-shaped draw-in groove (4) top by bolt (6) be fixed on repair operating platform (8) base plate (5) on.
The utility model uses like this: first inspection operation platform (8) and fixed mount (1) are installed and fix, to repair operating platform (8) by crane is lifted on electric pole cross-arm, by buckle (3) around bearing pin (2) cross U-shaped draw-in groove (4) top bolt (6) be fixed on repair operating platform (8) base plate (5) on, installation, transports to inspection operation platform (8) and above just can start to have constructed by operating instrument and personnel after allowing.
The beneficial effects of the utility model are: reduce construction cost and periphery floor space, shorten the construction period; Eliminate the feared state of mind of work high above the ground personnel, anti-falling safe is able to reliable guarantee; Solve the safety problem of installing cables equipment on multiloop steel pipe pole; Be convenient to installation and removal, easy to operate, use flexibly.
four, accompanying drawing explanation
Fig. 1 is the utility model structure elevation;
Fig. 2 is the upward view of Fig. 1;
Fig. 3 is the utility model using state;
In figure: 1, fixed mount, 2, bearing pin, 3, buckle, 4, U-shaped draw-in groove, 5, base plate, 6, bolt, 7, fence, 8, repair operating platform, 9, rectangle hole.
five, detailed description of the invention
Embodiment 1, a kind of operating platform overhauling cable on steel pipe pole, its structure is: inspection operation platform (8) is rectangle, base plate (5) edge repairing operating platform (8) is fixed with fence (7), the base plate (5) of inspection operation platform (8) is also provided with rectangle hole (9), the base plate (5) of inspection operation platform (8) is bolted on fixed mount (1), the bottom of fixed mount (1) is fixed with U-shaped draw-in groove (4), the bottom of fixed mount (1) is while be provided with bearing pin (2), bearing pin (2) is connected with buckle (3), buckle (3) cross U-shaped draw-in groove (4) top by bolt (6) be fixed on repair operating platform (8) base plate (5) on.
Claims (1)
1. one kind is overhauled the operating platform of cable on steel pipe pole, it is characterized in that: inspection operation platform (8) is rectangle, base plate (5) edge of inspection operation platform (8) is fixed with fence (7), the base plate (5) of inspection operation platform (8) is also provided with rectangle hole (9), the base plate (5) of inspection operation platform (8) is bolted on fixed mount (1), the bottom of fixed mount (1) is fixed with U-shaped draw-in groove (4), the bottom of fixed mount (1) is while be provided with bearing pin (2), bearing pin (2) is connected with buckle (3), the top that buckle (3) crosses U-shaped draw-in groove (4) is fixed on the base plate (5) of inspection operation platform (8) by bolt (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520331351.0U CN204782182U (en) | 2015-05-21 | 2015-05-21 | Overhaul operation platform of cable conductor on steel pipe pole |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520331351.0U CN204782182U (en) | 2015-05-21 | 2015-05-21 | Overhaul operation platform of cable conductor on steel pipe pole |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204782182U true CN204782182U (en) | 2015-11-18 |
Family
ID=54522251
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520331351.0U Withdrawn - After Issue CN204782182U (en) | 2015-05-21 | 2015-05-21 | Overhaul operation platform of cable conductor on steel pipe pole |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204782182U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104989151A (en) * | 2015-05-21 | 2015-10-21 | 国网青海省电力公司西宁供电公司 | Operation platform for overhauling cables on steel pipe pole |
-
2015
- 2015-05-21 CN CN201520331351.0U patent/CN204782182U/en not_active Withdrawn - After Issue
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104989151A (en) * | 2015-05-21 | 2015-10-21 | 国网青海省电力公司西宁供电公司 | Operation platform for overhauling cables on steel pipe pole |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103001146B (en) | Usage method of steel pipe pole operation platform | |
CN103269036A (en) | Tensioning resistant cross arm lifting machine | |
CN104993421A (en) | Movable line laying crossing structure | |
CN105275253A (en) | Equal-diameter rod erecting device and application method thereof | |
CN204782182U (en) | Overhaul operation platform of cable conductor on steel pipe pole | |
CN103663235A (en) | Hand-jack for rod | |
CN204781888U (en) | Overhaul operation platform of cable conductor on steel pipe pole | |
CN201918653U (en) | Protective bracket for overhaul of high-voltage disconnectors | |
CN203439984U (en) | Handjack for pole | |
CN203289011U (en) | Tension cross arm hoisting device | |
CN101299520B (en) | Machine for lifting earth wire of ultrahigh-tension power transmission line | |
CN205170234U (en) | Cantilever crane | |
CN203022328U (en) | Climbing operation platform | |
CN104989151A (en) | Operation platform for overhauling cables on steel pipe pole | |
CN205381879U (en) | A lift by crane instrument for 35 -110kV isolator overhauls | |
CN107819290A (en) | The anti-fall aerial work platform of height adjustable | |
CN104989150A (en) | Operation platform for overhauling cables on steel pipe pole | |
CN107482524A (en) | Power transmission line inspection robot with anti-falling function automatically up and down earth system | |
CN203345999U (en) | Special multifunctional lifting frame for busbar bridge | |
CN107859475A (en) | The anti-fall aerial work platform ladder of height adjustable | |
CN204324741U (en) | Load switch of transformer suspended core apparatus | |
CN2897312Y (en) | Permanent safety tower climbing protector of high-voltage transmission line | |
CN203326478U (en) | Spooling-unspooling device of overhead ground wire and hauling cable connecting assembly thereof | |
CN205823144U (en) | Disconnecting switch platform maintenance ladder | |
CN202696011U (en) | Maintenance platform of transformer substation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20151118 Effective date of abandoning: 20171024 |
|
AV01 | Patent right actively abandoned |