CN204782182U - Overhaul operation platform of cable conductor on steel pipe pole - Google Patents

Overhaul operation platform of cable conductor on steel pipe pole Download PDF

Info

Publication number
CN204782182U
CN204782182U CN201520331351.0U CN201520331351U CN204782182U CN 204782182 U CN204782182 U CN 204782182U CN 201520331351 U CN201520331351 U CN 201520331351U CN 204782182 U CN204782182 U CN 204782182U
Authority
CN
China
Prior art keywords
operation platform
inspection operation
steel pipe
fixed
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520331351.0U
Other languages
Chinese (zh)
Inventor
朱国强
孙旭明
杨建青
马汝括
徐世山
刘卫国
吴学军
董耀
薛剑峰
牛明
严峻青
辛志青
李承杰
祁连清
巨克玲
周炜
王重鹏
林成海
星生智
桓鹏
林永琎
李强
贺诚昊
王森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINING POWER INDUSTRIAL Corp
XINING POWER SUPPLY Co OF STATE GRID QINGHAI ELECTRIC POWER Co
State Grid Corp of China SGCC
State Grid Qinghai Electric Power Co Ltd
Original Assignee
XINING POWER INDUSTRIAL Corp
XINING POWER SUPPLY Co OF STATE GRID QINGHAI ELECTRIC POWER Co
State Grid Corp of China SGCC
State Grid Qinghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINING POWER INDUSTRIAL Corp, XINING POWER SUPPLY Co OF STATE GRID QINGHAI ELECTRIC POWER Co, State Grid Corp of China SGCC, State Grid Qinghai Electric Power Co Ltd filed Critical XINING POWER INDUSTRIAL Corp
Priority to CN201520331351.0U priority Critical patent/CN204782182U/en
Application granted granted Critical
Publication of CN204782182U publication Critical patent/CN204782182U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides an overhaul operation platform of cable conductor on steel pipe pole, the utility model relates to a cable conductor field of overhauing, its structure is: the inspection operation platform is rectangle, the bottom plate border of inspection operation platform is fixed with the rail, still be provided with the rectangle mouth on the bottom plate of inspection operation platform, the bottom plate of inspection operation platform passes through the bolt fastening on the mount, the bottom of mount is fixed with the U -shaped draw -in groove, the bottom of mount is provided with the round pin axle on one side, sell the epaxial buckle that is connected with, the buckle is crossed the top of U -shaped draw -in groove and is passed through the bolt fastening on the bottom plate of inspection operation platform, the construction cost is reduced with peripheral area, shortens the construction period. Prevent falling and reliably to ensure safely, be convenient for install and dismantle, convenient operation uses in a flexible way.

Description

A kind of operating platform overhauling cable on steel pipe pole
one, technical field
The utility model relates to cable installation and maintenance field, particularly a kind of operating platform overhauling cable on steel pipe pole.
two, background technology
Steel pipe pole due to structure simple, intensity is high, handsome in appearance, process-cycle is short, floor space is little, transport and the advantage such as easy for installation, more and more be widely used in transmission line of electricity, cable terminal steel pipe pole is as the transition vector of overhead wire and cable run, subject the Horizontal Tension of overhead wire and the vertical load of cable machinery, cable machinery is in operation, often there is the faults such as cable head blast, this just needs repairing, and steel pipe pole cross-arm mainly adopts oblique cone column type box-type section, it is a kind of cantilever beam structures, when cable machinery construction and repairing, increase operation intensity and difficulty, operating personnel stands in safety in cantilever beam structures and cannot ensure, instrument and operating personnel easily fall, abnormally dangerous, for reducing high-altitude safe risk, unit in charge of construction scaffolds erecting in steel pipe pole surrounding, scaffold erecting and need spend five or six ten ten thousand, and not relevant qualification, safety cannot ensure, in addition, scaffolding erecting relates to transport of materials and stacks difficulty, installs and removes the problems such as long in time limit, has a strong impact on construction speed, wastes time and energy.
three, summary of the invention
A kind of operating platform overhauling cable on steel pipe pole is provided for the problems referred to above the utility model, its structure is: inspection operation platform (8) is rectangle, base plate (5) edge repairing operating platform (8) is fixed with fence (7), the base plate (5) of inspection operation platform (8) is also provided with rectangle hole (9), the base plate (5) of inspection operation platform (8) is bolted on fixed mount (1), the bottom of fixed mount (1) is fixed with U-shaped draw-in groove (4), the bottom of fixed mount (1) is while be provided with bearing pin (2), bearing pin (2) is connected with buckle (3), buckle (3) cross U-shaped draw-in groove (4) top by bolt (6) be fixed on repair operating platform (8) base plate (5) on.
The utility model uses like this: first inspection operation platform (8) and fixed mount (1) are installed and fix, to repair operating platform (8) by crane is lifted on electric pole cross-arm, by buckle (3) around bearing pin (2) cross U-shaped draw-in groove (4) top bolt (6) be fixed on repair operating platform (8) base plate (5) on, installation, transports to inspection operation platform (8) and above just can start to have constructed by operating instrument and personnel after allowing.
The beneficial effects of the utility model are: reduce construction cost and periphery floor space, shorten the construction period; Eliminate the feared state of mind of work high above the ground personnel, anti-falling safe is able to reliable guarantee; Solve the safety problem of installing cables equipment on multiloop steel pipe pole; Be convenient to installation and removal, easy to operate, use flexibly.
four, accompanying drawing explanation
Fig. 1 is the utility model structure elevation;
Fig. 2 is the upward view of Fig. 1;
Fig. 3 is the utility model using state;
In figure: 1, fixed mount, 2, bearing pin, 3, buckle, 4, U-shaped draw-in groove, 5, base plate, 6, bolt, 7, fence, 8, repair operating platform, 9, rectangle hole.
five, detailed description of the invention
Embodiment 1, a kind of operating platform overhauling cable on steel pipe pole, its structure is: inspection operation platform (8) is rectangle, base plate (5) edge repairing operating platform (8) is fixed with fence (7), the base plate (5) of inspection operation platform (8) is also provided with rectangle hole (9), the base plate (5) of inspection operation platform (8) is bolted on fixed mount (1), the bottom of fixed mount (1) is fixed with U-shaped draw-in groove (4), the bottom of fixed mount (1) is while be provided with bearing pin (2), bearing pin (2) is connected with buckle (3), buckle (3) cross U-shaped draw-in groove (4) top by bolt (6) be fixed on repair operating platform (8) base plate (5) on.

Claims (1)

1. one kind is overhauled the operating platform of cable on steel pipe pole, it is characterized in that: inspection operation platform (8) is rectangle, base plate (5) edge of inspection operation platform (8) is fixed with fence (7), the base plate (5) of inspection operation platform (8) is also provided with rectangle hole (9), the base plate (5) of inspection operation platform (8) is bolted on fixed mount (1), the bottom of fixed mount (1) is fixed with U-shaped draw-in groove (4), the bottom of fixed mount (1) is while be provided with bearing pin (2), bearing pin (2) is connected with buckle (3), the top that buckle (3) crosses U-shaped draw-in groove (4) is fixed on the base plate (5) of inspection operation platform (8) by bolt (6).
CN201520331351.0U 2015-05-21 2015-05-21 Overhaul operation platform of cable conductor on steel pipe pole Withdrawn - After Issue CN204782182U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520331351.0U CN204782182U (en) 2015-05-21 2015-05-21 Overhaul operation platform of cable conductor on steel pipe pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520331351.0U CN204782182U (en) 2015-05-21 2015-05-21 Overhaul operation platform of cable conductor on steel pipe pole

Publications (1)

Publication Number Publication Date
CN204782182U true CN204782182U (en) 2015-11-18

Family

ID=54522251

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520331351.0U Withdrawn - After Issue CN204782182U (en) 2015-05-21 2015-05-21 Overhaul operation platform of cable conductor on steel pipe pole

Country Status (1)

Country Link
CN (1) CN204782182U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104989151A (en) * 2015-05-21 2015-10-21 国网青海省电力公司西宁供电公司 Operation platform for overhauling cables on steel pipe pole

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104989151A (en) * 2015-05-21 2015-10-21 国网青海省电力公司西宁供电公司 Operation platform for overhauling cables on steel pipe pole

Similar Documents

Publication Publication Date Title
CN103001146B (en) Usage method of steel pipe pole operation platform
CN103269036A (en) Tensioning resistant cross arm lifting machine
CN104993421A (en) Movable line laying crossing structure
CN105275253A (en) Equal-diameter rod erecting device and application method thereof
CN204782182U (en) Overhaul operation platform of cable conductor on steel pipe pole
CN103663235A (en) Hand-jack for rod
CN204781888U (en) Overhaul operation platform of cable conductor on steel pipe pole
CN201918653U (en) Protective bracket for overhaul of high-voltage disconnectors
CN203439984U (en) Handjack for pole
CN203289011U (en) Tension cross arm hoisting device
CN101299520B (en) Machine for lifting earth wire of ultrahigh-tension power transmission line
CN205170234U (en) Cantilever crane
CN203022328U (en) Climbing operation platform
CN104989151A (en) Operation platform for overhauling cables on steel pipe pole
CN205381879U (en) A lift by crane instrument for 35 -110kV isolator overhauls
CN107819290A (en) The anti-fall aerial work platform of height adjustable
CN104989150A (en) Operation platform for overhauling cables on steel pipe pole
CN107482524A (en) Power transmission line inspection robot with anti-falling function automatically up and down earth system
CN203345999U (en) Special multifunctional lifting frame for busbar bridge
CN107859475A (en) The anti-fall aerial work platform ladder of height adjustable
CN204324741U (en) Load switch of transformer suspended core apparatus
CN2897312Y (en) Permanent safety tower climbing protector of high-voltage transmission line
CN203326478U (en) Spooling-unspooling device of overhead ground wire and hauling cable connecting assembly thereof
CN205823144U (en) Disconnecting switch platform maintenance ladder
CN202696011U (en) Maintenance platform of transformer substation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20151118

Effective date of abandoning: 20171024

AV01 Patent right actively abandoned