CN103001146B - Usage method of steel pipe pole operation platform - Google Patents
Usage method of steel pipe pole operation platform Download PDFInfo
- Publication number
- CN103001146B CN103001146B CN201210500323.8A CN201210500323A CN103001146B CN 103001146 B CN103001146 B CN 103001146B CN 201210500323 A CN201210500323 A CN 201210500323A CN 103001146 B CN103001146 B CN 103001146B
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- chain
- ladder type
- flat ladder
- type underframe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Ladders (AREA)
Abstract
<b>本发明属于供电维修器械技术领域,公开了一种钢管杆作业平台的使用方法。其主要技术特征为:包括带有坡形护栏的平梯式底架,所述平梯式底架的顶端设置有悬挂垂绳的垂绳挂环,平梯式底架的尾端通过转轴与抱杆相连接,所述的抱杆一端设置有带有链条的链条松紧调节器,另一端设置有链条卡槽,所述的坡形护栏设置有吊绳挂环,一端与吊绳挂环相固定的吊绳与滑轮相连接。本发明提供的钢管杆作业平台,使用安全,能适应不同规格型号的钢管杆,能够快速安装、拆卸,满足运输和高空安装要求,能适应高空作业的特殊要求,提高作业效率,可适用于各种场合,成本低,可多个工作点同时开展作业,极大提高检修效率,并具有一定的带电作业能力。</b>
<b>The invention belongs to the technical field of power supply maintenance equipment, and discloses a method for using a steel pipe rod working platform. Its main technical features are as follows: it includes a flat ladder-type underframe with a slope-shaped guardrail. The holding poles are connected, one end of the holding pole is provided with a chain tensioner with a chain, the other end is provided with a chain slot, the slope-shaped guardrail is provided with a sling ring, and one end is connected to the sling ring. The fixed lifting rope is connected to the pulley. The steel pipe pole operation platform provided by the invention is safe to use, can adapt to steel pipe poles of different specifications and models, can be quickly installed and disassembled, meets the requirements of transportation and high-altitude installation, can adapt to the special requirements of high-altitude operations, and improves operating efficiency. In such occasions, the cost is low, and multiple working points can be operated at the same time, which greatly improves the maintenance efficiency, and has a certain ability of live working. </b>
Description
技术领域 technical field
本发明属于供电维修器械技术领域,具体的讲涉及一种钢管杆作业平台的使用方法。The invention belongs to the technical field of power supply maintenance equipment, and in particular relates to a method for using a steel pipe rod working platform.
背景技术 Background technique
钢管杆由于其结构美观,占地面积少,基建施工方便等特点,已广泛应用于高压输电线路,特别是在市区周围得到了大范围使用。但是目前的钢管杆在检修中存在作业困难问题,横担狭长且没有借力点,以最常见的110kV线路钢管杆为例,其横担端部只有10——25厘米的宽度,而长度为1.5——2.5米。作业人员在横担上移动作业困难,在检修施工时极为不便,很多作业项目无法开展,只能使用斗臂车来进行作业,而斗臂车的作业又受到环境场地影响比较大,因此线路的正常检修维护工作受到很大限制。并且有些多回线路安全距离不够,只能停电作业。Due to its beautiful structure, small footprint, and convenient infrastructure construction, steel pipe poles have been widely used in high-voltage transmission lines, especially around urban areas. However, the current steel pipe poles are difficult to operate during maintenance. The cross arm is long and narrow and has no leverage point. Taking the most common 110kV line steel pipe pole as an example, the width of the end of the cross arm is only 10-25 cm, and the length is 1.5 - 2.5 meters. It is difficult for operators to move and work on the cross arm, which is extremely inconvenient during maintenance and construction. Many operations cannot be carried out, and only the bucket arm truck can be used for operations, and the operation of the bucket arm truck is greatly affected by the environment. Therefore, the line Normal inspection and maintenance work is greatly restricted. Moreover, the safety distance of some multi-circuit lines is not enough, so the operation can only be done in a power outage.
发明内容 Contents of the invention
本发明要解决的技术问题就是提供一种钢管杆作业平台的使用方法。The technical problem to be solved by the present invention is to provide a method for using a steel pipe pole working platform.
为解决上述技术问题,本发明采用的技术方案为:钢管杆作业平台包括带有坡形护栏的平梯式底架,所述平梯式底架的顶端设置有悬挂垂绳的垂绳挂环,平梯式底架的尾端通过转轴与抱杆相连接,所述的抱杆一端设置有带有链条的链条松紧调节器,另一端设置有链条卡槽,所述的坡形护栏设置有吊绳挂环,一端与吊绳挂环相固定的吊绳与滑轮相连接;所述平梯式底架的前部设置有绝缘板;所述的垂绳挂环和吊绳挂环成对设置,吊绳挂环设置在坡形护栏和平梯式底架重量的中分点处;所述的抱杆为上下设置的两个;所述的坡形护栏与平梯式底架活动连接;钢管杆作业平台的使用方法包括下列步骤:In order to solve the above-mentioned technical problems, the technical solution adopted in the present invention is: the steel pipe pole work platform includes a flat ladder-type underframe with a slope-shaped guardrail, and the top of the flat-ladder-type underframe is provided with a vertical rope hanging ring for hanging a vertical rope , the tail end of the flat ladder-type chassis is connected to the pole through the rotating shaft. One end of the pole is provided with a chain tensioner with a chain, and the other end is provided with a chain slot. The slope-shaped guardrail is provided with Hanging rope ring, one end of which is fixed to the hanging rope of the hanging rope ring is connected to the pulley; the front part of the flat ladder type chassis is provided with an insulating plate; the hanging rope hanging ring and the hanging rope hanging ring are paired Setting, the sling hanging ring is set at the middle point of the weight of the slope-shaped guardrail and the flat-ladder type chassis; the two poles are set up and down; the slope-shaped guardrail is movably connected with the flat-ladder type chassis; The method of using the steel pipe pole operation platform includes the following steps:
第一步 组装first step assembly
将平梯式底架各部分组装在一起,并在平梯式底架的前部铺设绝缘板,然后将坡形护栏与平梯式底架相固定,通过转轴将抱杆与平梯式底架的尾端相连接,将链条的一端与链条松紧调节器相固定,将垂绳的一端与垂绳挂环相固定,将吊绳的一端与吊绳挂环相固定,吊绳的另一端穿过滑轮;Assemble the parts of the flat ladder-type bottom frame together, and lay an insulating board on the front of the flat-ladder type bottom frame, then fix the slope-shaped guardrail and the flat-ladder type bottom Connect the tail end of the frame, fix one end of the chain with the chain tensioner, fix one end of the hanging rope with the hanging ring of the hanging rope, fix one end of the hanging rope with the hanging ring of the hanging rope, and fix the other end of the hanging rope through the pulley;
第二步 安装The second step is to install
先由一个操作人员携带穿有吊绳的滑轮攀上钢管杆,将滑轮固定在合适位置,再由地面其他操作人员拉动吊绳,使带有坡形护栏的平梯式底架上升,当带有坡形护栏的平梯式底架到达适当位置,钢管杆上的操作人员使抱杆与钢管杆接触,将一端与链条松紧调节器相固定的链条绕过钢管杆,使链条另一端卡入链条卡槽,再拧动链条松紧调节器将链条收紧,使带有坡形护栏的平梯式底架与钢管杆紧紧固定;First, an operator carries a pulley with a sling to climb up the steel pipe pole, fixes the pulley at a suitable position, and then other operators on the ground pull the sling to raise the flat ladder-type chassis with a slope-shaped guardrail. The flat ladder-type underframe with a slope-shaped guardrail reaches the proper position, and the operator on the steel pipe pole makes the holding pole contact with the steel pipe pole, and the chain with one end fixed to the chain tension adjuster goes around the steel pipe pole, so that the other end of the chain snaps into the steel pipe pole. Chain card slot, and then turn the chain tension adjuster to tighten the chain, so that the flat ladder bottom frame with slope-shaped guardrail and the steel pipe pole are tightly fixed;
第三步 施工The third step construction
钢管杆上的操作人员在带有坡形护栏的平梯式底架上行走,完成钢管更换绝缘子、更换防震锤、更换悬垂线夹、修补检查悬挂点周围导线输电线路的检修作业项目;地面上的操作人员根据需要拉动垂绳,平梯式底架以转轴为支点可实现0——120°转动,适应不同位置的需要;The operator on the steel pipe pole walks on the flat ladder-type underframe with a slope-shaped guardrail, and completes the maintenance work items of steel pipe replacement insulators, replacement of shock hammers, replacement of suspension clamps, repair and inspection of wire transmission lines around the suspension point; on the ground The operator pulls the vertical rope according to the needs, and the flat ladder bottom frame can realize 0-120° rotation with the rotating shaft as the fulcrum, adapting to the needs of different positions;
第四步 卸装The fourth step uninstall
输电线路的检修作业项目完成,钢管杆上的操作人员拧动链条松紧调节器将链条松开,将卡入链条卡槽的链条另一端取出,地面其他操作人员松动吊绳,使带有坡形护栏的平梯式底架下降到地面,然后钢管杆上的操作人员取下滑轮,由钢管杆上下来;After the maintenance work of the transmission line is completed, the operator on the steel pipe pole twists the chain tensioner to loosen the chain, and takes out the other end of the chain that is stuck in the chain slot. The flat ladder bottom frame of the guardrail is lowered to the ground, and then the operator on the steel pipe pole removes the pulley and goes up and down from the steel pipe pole;
第五步 拆运The fifth step dismantling
将吊绳抽离滑轮并由吊绳挂环上解下,将垂绳由垂绳挂环上解下,将链条由链条松紧调节器上解下,将抱杆与平梯式底架的尾端分离,将坡形护栏与平梯式底架分离,将平梯式底架各部分拆开,然后将各组件装箱运走。Pull the lifting rope away from the pulley and untie it from the hanging rope ring, untie the vertical rope from the hanging rope ring, untie the chain from the chain tension adjuster, and connect the pole to the end of the flat ladder bottom frame. Separate the slope-shaped guardrail from the flat ladder-type underframe, disassemble each part of the flat-ladder-type underframe, and then pack and transport each component away.
本发明提供的钢管杆作业平台使用时,电力维修车到达现场后先组装,将平梯式底架各部分组装在一起,并在平梯式底架的前部铺设绝缘板,然后将坡形护栏与平梯式底架相固定,通过转轴将抱杆与平梯式底架的尾端相连接,将链条的一端与链条松紧调节器相固定,将垂绳的一端与垂绳挂环相固定,将吊绳的一端与吊绳挂环相固定,吊绳的另一端穿过滑轮。然后进行安装,先由一个操作人员携带穿有吊绳的滑轮攀上钢管杆,将滑轮固定在合适位置,再由地面其他操作人员拉动吊绳,使带有坡形护栏的平梯式底架上升,当带有坡形护栏的平梯式底架到达适当位置,钢管杆上的操作人员使抱杆与钢管杆接触,将一端与链条松紧调节器相固定的链条绕过钢管杆,使链条另一端卡入链条卡槽,再拧动链条松紧调节器将链条收紧,使带有坡形护栏的平梯式底架与钢管杆紧紧固定。其后进行施工,钢管杆上的操作人员在带有坡形护栏的平梯式底架上行走,完成钢管更换绝缘子、更换防震锤、更换悬垂线夹、修补检查悬挂点周围导线等输电线路的检修作业项目;地面上的操作人员根据需要拉动垂绳,平梯式底架以转轴为支点可实现0——120°转动,适应不同位置的需要。输电线路的检修作业项目完成进行卸装,钢管杆上的操作人员拧动链条松紧调节器将链条松开,将卡入链条卡槽的链条另一端取出,地面其他操作人员松动吊绳,使带有坡形护栏的平梯式底架下降到地面,然后钢管杆上的操作人员取下滑轮,由钢管杆上下来。最后进行拆运,将吊绳抽离滑轮并由吊绳挂环上解下,将垂绳由垂绳挂环上解下,将链条由链条松紧调节器上解下,将抱杆与平梯式底架的尾端分离,将坡形护栏与平梯式底架分离,将平梯式底架各部分拆开,然后将各组件装箱运走。而平梯式底架的前部设置有绝缘板,方便操作人员施工。垂绳挂环和吊绳挂环成对设置,吊绳挂环设置在坡形护栏和平梯式底架重量的中分点处,有利于平梯式底架位置的调整。抱杆为上下设置的两个,使抱杆与钢管杆连接紧固。坡形护栏与平梯式底架活动连接,拆卸方便,有利运输。When the steel pipe rod work platform provided by the present invention is used, the power maintenance vehicle is assembled first after arriving at the scene, and the parts of the flat ladder type chassis are assembled together, and an insulating board is laid on the front part of the flat ladder type bottom frame, and then the slope shape The guardrail is fixed to the bottom frame of the flat ladder, and the pole is connected to the tail end of the bottom frame of the flat ladder through the rotating shaft, one end of the chain is fixed to the chain tension adjuster, and one end of the vertical rope is connected to the hanging ring of the vertical rope. To fix, fix one end of the sling with the sling ring, and pass the other end of the sling through the pulley. Then install it. First, an operator carries a pulley with a sling to climb up the steel pipe pole, fixes the pulley at a suitable position, and then other operators on the ground pull the sling to make the flat ladder-type chassis with a slope-shaped guardrail Ascent, when the flat ladder-type underframe with a slope-shaped guardrail reaches the proper position, the operator on the steel pipe pole makes the holding pole contact with the steel pipe pole, and the chain with one end fixed to the chain tensioner goes around the steel pipe pole, so that the chain The other end is snapped into the chain slot, and then the chain tensioner is turned to tighten the chain, so that the flat ladder-type chassis with slope-shaped guardrail and the steel pipe pole are tightly fixed. Afterwards, the construction is carried out, and the operators on the steel pipe pole walk on the flat ladder-type underframe with slope-shaped guardrails to complete the replacement of insulators on the steel pipe, the replacement of the anti-vibration hammer, the replacement of suspension clamps, repair and inspection of the wires around the suspension point and other transmission lines. Inspection and maintenance work items; the operator on the ground pulls the vertical rope according to the needs, and the flat ladder bottom frame can realize 0-120° rotation with the rotating shaft as the fulcrum, adapting to the needs of different positions. After the maintenance work of the transmission line is completed, unloading is carried out. The operator on the steel pipe pole twists the chain tensioner to loosen the chain, and takes out the other end of the chain that is stuck in the chain slot. Other operators on the ground loosen the sling, so that the The flat ladder-type underframe of the slope-shaped guardrail is lowered to the ground, and then the operator on the steel pipe pole removes the pulley and goes up and down from the steel pipe pole. Finally, dismantle and transport, pull the sling away from the pulley and untie it from the sling ring, untie the vertical rope from the sling ring, untie the chain from the chain tensioner, and connect the pole with the flat ladder. Separate the tail end of the ladder-type underframe, separate the slope-shaped guardrail from the flat-ladder-type underframe, disassemble each part of the flat-ladder-type underframe, and then pack and transport each component away. The front part of the flat ladder type chassis is provided with an insulating board, which is convenient for the operator to construct. The hanging rope hanging ring and the hanging rope hanging ring are arranged in pairs, and the hanging rope hanging ring is arranged at the midpoint of the weight of the slope-shaped guardrail and the flat ladder type underframe, which is conducive to the adjustment of the position of the flat ladder type underframe. The holding rods are two arranged up and down, so that the holding rods are connected with the steel pipe rods tightly. The slope-shaped guardrail is movably connected with the flat ladder-type chassis, which is easy to disassemble and convenient for transportation.
本发明提供的钢管杆作业平台,各部件采用绝缘材料,保证作业人员人身安全和设备安全。抱杆具备通用性,能适应不同规格型号的钢管杆,能满足直线杆、耐张杆、单回、双回线路等多种钢管杆的作业要求。钢管杆作业平台能够快速安装、拆卸,满足运输和高空安装要求,能适应高空作业的特殊要求,提高作业效率,可适用于各种场合。本发明提供的钢管杆作业平台,可以消除钢管杆输电线路检修工作对斗臂车的依赖,避免了斗臂车进入现场时对作业点线下的农田、果园等产生的青苗赔偿费用。在检修一条或数条线路时,可多个工作点同时开展作业,极大提高检修效率。该平台成本仅为数千元,使用该平台替代斗臂车进行作业,可节约大量的资金。同时该平台具有一定的带电作业能力,在紧急抢修或不能停电的特殊情况下发挥重要作用。In the steel pipe pole operation platform provided by the invention, each component is made of insulating material, so as to ensure the personal safety of operators and the safety of equipment. The holding pole is versatile and can adapt to steel pipe poles of different specifications and models, and can meet the operation requirements of various steel pipe poles such as straight poles, tension poles, single-circuit and double-circuit lines. The steel pipe pole work platform can be quickly installed and disassembled to meet the requirements of transportation and high-altitude installation, can adapt to the special requirements of high-altitude operations, improve work efficiency, and can be applied to various occasions. The steel pipe pole operation platform provided by the invention can eliminate the dependence on the bucket arm truck for the maintenance work of the steel pipe pole transmission line, and avoid the compensation costs for young crops generated on the farmland and orchard under the operation point line when the bucket arm truck enters the site. When overhauling one or several lines, multiple work points can be operated at the same time, which greatly improves the overhaul efficiency. The cost of the platform is only several thousand yuan, and using this platform to replace the arm truck for operations can save a lot of money. At the same time, the platform has a certain live working capability, which plays an important role in emergency repairs or special situations where power failure cannot be performed.
附图说明 Description of drawings
图1为本发明钢管杆作业平台的结构示意图。Fig. 1 is a structural schematic diagram of a steel pipe rod working platform of the present invention.
具体实施方式 Detailed ways
下面结合附图对本发明所提出的钢管杆作业平台的结构做进一步说明。The structure of the steel pipe rod working platform proposed by the present invention will be further described below in conjunction with the accompanying drawings.
如图1所示,本发明钢管杆作业平台包括平梯式底架1,平梯式底架1带有坡形护栏2,坡形护栏2与平梯式底架1活动连接,平梯式底架1的顶端设置有悬挂垂绳3的垂绳挂环4,平梯式底架1的尾端通过转轴5与抱杆6相连接,抱杆6一端设置有带有链条7的链条松紧调节器8,另一端设置有链条卡槽9,坡形护栏2设置有吊绳挂环10,一端与吊绳挂环10相固定的吊绳11与滑轮12相连接,平梯式底架1的前部设置有绝缘板13,垂绳挂环4和吊绳挂环10成对设置,吊绳挂环10设置在坡形护栏2和平梯式底架1重量的中分点处,抱杆6为上下设置的两个。As shown in Figure 1, the steel pipe rod work platform of the present invention includes a flat ladder type underframe 1, and the flat ladder type underframe 1 is provided with a slope-shaped guardrail 2, and the slope-shaped guardrail 2 is movably connected with the flat ladder type underframe 1. The top of the bottom frame 1 is provided with a vertical rope hanging ring 4 for hanging a vertical rope 3, and the tail end of the flat ladder type bottom frame 1 is connected with a pole 6 through a rotating shaft 5, and one end of the pole 6 is provided with a chain elastic with a chain 7. Regulator 8, the other end is provided with chain card groove 9, slope-shaped guardrail 2 is provided with sling ring 10, and the sling 11 that one end is fixed with sling ring 10 is connected with pulley 12, flat ladder type chassis 1 The front part of is provided with insulating plate 13, and hanging rope hanging ring 4 and hanging rope hanging ring 10 are arranged in pairs, and hanging rope hanging ring 10 is arranged on the midpoint of the weight of slope-shaped guardrail 2 and flat ladder type underframe 1, and the holding pole 6 is two that are set up and down.
本发明提供的钢管杆作业平台使用时,电力维修车到达现场后先组装,将平梯式底架1各部分组装在一起,并在平梯式底架1的前部铺设绝缘板13,然后将坡形护栏2与平梯式底架1相固定,通过转轴5将抱杆6与平梯式底架1的尾端相连接,将链条7的一端与链条松紧调节器8相固定,将垂绳3的一端与垂绳挂环4相固定,将吊绳11的一端与吊绳挂环10相固定,吊绳11的另一端穿过滑轮12。然后进行安装,先由一个操作人员携带穿有吊绳11的滑轮12攀上钢管杆,将滑轮12固定在合适位置,再由地面其他操作人员拉动吊绳11,使带有坡形护栏2的平梯式底架1上升,当带有坡形护栏2的平梯式底架1到达适当位置,钢管杆上的操作人员使抱杆6与钢管杆接触,将一端与链条松紧调节器8相固定的链条7绕过钢管杆,使链条7另一端卡入链条卡槽9,再拧动链条松紧调节器8将链条7收紧,使带有坡形护栏2的平梯式底架1与钢管杆紧紧固定。其后进行施工,钢管杆上的操作人员在带有坡形护栏2的平梯式底架1上行走,完成钢管更换绝缘子、更换防震锤、更换悬垂线夹、修补检查悬挂点周围导线等输电线路的检修作业项目;地面上的操作人员根据需要拉动垂绳3,平梯式底架1以转轴5为支点可实现0——120°转动,适应不同位置的需要。输电线路的检修作业项目完成进行卸装,钢管杆上的操作人员拧动链条松紧调节器8将链条7松开,将卡入链条卡槽9的链条7另一端取出,地面其他操作人员松动吊绳3,使带有坡形护栏2的平梯式底架1下降到地面,然后钢管杆上的操作人员取下滑轮12,由钢管杆上下来。最后进行拆运,将吊绳11抽离滑轮12并由吊绳挂环10上解下,将垂绳3由垂绳挂环4上解下,将链条7由链条松紧调节器8上解下,将抱杆6与平梯式底架1的尾端分离,将坡形护栏2与平梯式底架1分离,将平梯式底架1各部分拆开,然后将各组件装箱运走。而平梯式底架1的前部设置有绝缘板13,方便操作人员施工。垂绳挂环4和吊绳挂环10成对设置,吊绳挂环10设置在坡形护栏2和平梯式底架1重量的中分点处,有利于平梯式底架1位置的调整。抱杆6为上下设置的两个,使抱杆6与钢管杆连接紧固。坡形护栏2与平梯式底架1活动连接,拆卸方便,有利运输。When the steel pipe rod work platform provided by the present invention is used, the power maintenance vehicle is first assembled after arriving at the scene, and the parts of the flat ladder type underframe 1 are assembled together, and an insulating plate 13 is laid on the front part of the flat ladder type underframe 1, and then The slope-shaped guardrail 2 is fixed with the flat ladder-type underframe 1, the pole 6 is connected with the tail end of the flat-ladder-type underframe 1 through the rotating shaft 5, and one end of the chain 7 is fixed with the chain tightness adjuster 8. One end of hanging rope 3 is fixed with hanging rope hanging ring 4, and one end of hanging rope 11 is fixed with hanging rope hanging ring 10, and the other end of hanging rope 11 passes pulley 12. Then install it, first by an operator to carry the pulley 12 that is worn with the sling 11 and climb up the steel pipe pole, the pulley 12 is fixed in a suitable position, then pull the sling 11 by other operators on the ground to make the slope guardrail 2 The flat ladder type chassis 1 rises, and when the flat ladder type chassis 1 with the slope-shaped guardrail 2 reaches the appropriate position, the operator on the steel pipe pole makes the holding pole 6 contact with the steel pipe pole, and connects one end with the chain tension adjuster 8 The fixed chain 7 goes around the steel pipe rod, so that the other end of the chain 7 is snapped into the chain slot 9, and the chain 7 is tightened by twisting the chain tensioner 8, so that the flat ladder-type chassis 1 with the slope-shaped guardrail 2 and the The steel pipe pole is tightly fixed. Afterwards, the construction is carried out. The operator on the steel pipe pole walks on the flat ladder type chassis 1 with the slope-shaped guardrail 2, and completes the steel pipe to replace the insulator, replace the anti-vibration hammer, replace the suspension clamp, repair and check the wires around the suspension point, etc. Line maintenance work items; the operator on the ground pulls the vertical rope 3 as needed, and the flat ladder type chassis 1 can realize 0-120° rotation with the rotating shaft 5 as the fulcrum, adapting to the needs of different positions. After the maintenance work of the transmission line is completed, unloading is carried out. The operator on the steel pipe pole twists the chain tensioner 8 to loosen the chain 7, and takes out the other end of the chain 7 that is stuck in the chain slot 9. Other operators on the ground loosen the suspension rope. 3. Make the flat ladder type underframe 1 with slope-shaped guardrail 2 drop to the ground, then the operator on the steel pipe pole takes off the pulley 12, and goes up and down by the steel pipe pole. Finally carry out dismantling, pull the suspension rope 11 out of the pulley 12 and untie it from the suspension rope hanging ring 10, untie the vertical rope 3 from the vertical rope hanging ring 4, and untie the chain 7 from the chain tensioner 8 , separate the pole 6 from the tail end of the flat ladder chassis 1, separate the slope-shaped guardrail 2 from the flat ladder chassis 1, disassemble each part of the flat ladder chassis 1, and then pack and transport each component Walk. And the front portion of the flat ladder type underframe 1 is provided with an insulating plate 13, which is convenient for the operator to construct. The vertical rope hanging ring 4 and the hanging rope hanging ring 10 are arranged in pairs, and the hanging rope hanging ring 10 is arranged at the middle point of the weight of the slope-shaped guardrail 2 and the flat ladder type chassis 1, which is conducive to the adjustment of the position of the flat ladder type chassis 1 . The holding bar 6 is two arranged up and down, so that the holding bar 6 is connected and fastened with the steel pipe bar. The slope-shaped guardrail 2 is movably connected with the flat ladder type chassis 1, which is convenient for disassembly and convenient for transportation.
本发明的保护范围不仅仅局限于上述实施例,只要结构与本发明钢管杆作业平台结构相同,就落在本发明保护的范围。The protection scope of the present invention is not limited to the above-mentioned embodiments, as long as the structure is the same as that of the steel pipe rod working platform of the present invention, it falls within the protection scope of the present invention.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201210500323.8A CN103001146B (en) | 2012-11-30 | 2012-11-30 | Usage method of steel pipe pole operation platform |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201210500323.8A CN103001146B (en) | 2012-11-30 | 2012-11-30 | Usage method of steel pipe pole operation platform |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103001146A CN103001146A (en) | 2013-03-27 |
| CN103001146B true CN103001146B (en) | 2015-03-25 |
Family
ID=47929423
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201210500323.8A Active CN103001146B (en) | 2012-11-30 | 2012-11-30 | Usage method of steel pipe pole operation platform |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103001146B (en) |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103618237B (en) * | 2013-10-30 | 2017-02-22 | 合保电气(芜湖)有限公司 | An insulating overhead platform |
| CN104485605A (en) * | 2014-12-03 | 2015-04-01 | 国家电网公司 | Steel pipe pole operating platform |
| CN106476668B (en) * | 2015-08-28 | 2018-10-19 | 中国石油化工股份有限公司 | Vehicle-mounted automatic loading and unloading oil pipe device |
| CN107724660B (en) * | 2017-11-07 | 2020-12-25 | 广西电网有限责任公司北海供电局 | Multifunctional power maintenance operation platform |
| CN108847613B (en) * | 2018-06-29 | 2021-10-01 | 国家电网公司 | A kind of high-altitude suspension device for overhauling power transmission wires |
| CN108899807B (en) * | 2018-07-20 | 2019-12-06 | 中铁六局集团有限公司 | Electromechanical installation construction method for entrance and exit of subway long and large ramp |
| CN112701612A (en) * | 2020-11-10 | 2021-04-23 | 广东电网有限责任公司广州供电局 | Aerial work platform of transmission line shaft tower cross arm |
| CN115459148B (en) * | 2022-09-26 | 2025-01-14 | 国网天津市电力公司 | Swing movable type wire rod construction insulation platform |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201838934U (en) * | 2010-08-20 | 2011-05-18 | 胜利石油管理局电力管理总公司东区供电公司 | Novel portable adjustable rod upper platform |
| CN202474702U (en) * | 2012-03-20 | 2012-10-03 | 上海市电力公司 | Platform mounting support for live operation of power distribution line |
-
2012
- 2012-11-30 CN CN201210500323.8A patent/CN103001146B/en active Active
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201838934U (en) * | 2010-08-20 | 2011-05-18 | 胜利石油管理局电力管理总公司东区供电公司 | Novel portable adjustable rod upper platform |
| CN202474702U (en) * | 2012-03-20 | 2012-10-03 | 上海市电力公司 | Platform mounting support for live operation of power distribution line |
Non-Patent Citations (1)
| Title |
|---|
| 110kV钢管杆作业平台的研制与应用;刘明亮;《电气应用》;20110930;第30卷(第9期);第90-92页 * |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103001146A (en) | 2013-03-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103001146A (en) | Steel pipe pole operation platform and usage method thereof | |
| CN103437283B (en) | A kind of hanging basket truss of energy rapid-assembling | |
| CN105932601B (en) | Disconnected strand of overhead grounding wire method for repairing and mending | |
| CN106655037A (en) | A barrier-free way for allowing an overhead ground wire patrol robot to pass across straight line poles and stockbridge dampers | |
| CN103618252A (en) | Operation method for replacing tension insulator for 35kV overhead line in electrified mode | |
| CN204741221U (en) | Shaft tower drives electrified mounting tool of bird ware | |
| CN205472406U (en) | Light -duty fast -assembling freight transportation cableway lifting frame | |
| CN110649507A (en) | An anti-vibration hammer replacement system for transmission lines | |
| CN202906301U (en) | Steel-pipe pole operation platform | |
| CN205442567U (en) | Steel -pipe pole operation platform | |
| CN201758253U (en) | Overhaul frame | |
| CN204212065U (en) | Bridge crossing anticollision barrier punching block erection equipment | |
| CN204885994U (en) | Stockbridge damper appurtenance is changed to strain insulator pole circuit | |
| CN202390070U (en) | Lifting appliance for installing large-span roof color plate | |
| CN206712336U (en) | Shaft tower cable platform work protective cradle | |
| CN108847617A (en) | The device and method of UHV transmission line live-line replacing strain wire jumper insulator chain | |
| CN206685794U (en) | A kind of device of 10kV circuits earth potential live replacing tension-resistant rod insulator | |
| CN204760824U (en) | Small -size assembled hoist device | |
| CN203423430U (en) | Insulator maintenance device | |
| CN202936125U (en) | Boom frame and steel wire rope protection device thereof | |
| CN209805246U (en) | Lifting system based on insulator string | |
| CN202703588U (en) | Tribo-electric track overhaul trolley | |
| CN202103389U (en) | Safety guard for electric power lines | |
| CN105977860A (en) | Composite cross-arm insulator device and method for replacing overhead transmission line | |
| CN204552182U (en) | A kind of inspection platform |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| ASS | Succession or assignment of patent right |
Owner name: STATE ELECTRIC NET CROP. Free format text: FORMER OWNER: HENGSHUI POWER SUPPLY COMPANY Effective date: 20131224 Owner name: HENGSHUI POWER SUPPLY BRANCH COMPANY, STATE GRID H Effective date: 20131224 |
|
| C41 | Transfer of patent application or patent right or utility model | ||
| COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 053000 HENGSHUI, HEBEI PROVINCE TO: 100031 XICHENG, BEIJING |
|
| TA01 | Transfer of patent application right |
Effective date of registration: 20131224 Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Applicant after: State Grid Corporation of China Applicant after: Hengshui Power Supply Branch, State Grid Hebei Electric Power Co., Ltd. Applicant after: State Grid Hebei Electric Power Company Address before: 053000 Hengshui East Road, Hebei, No. 185 Applicant before: Hengshui Power Supply Company |
|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |