CN203345999U - Special multifunctional lifting frame for busbar bridge - Google Patents
Special multifunctional lifting frame for busbar bridge Download PDFInfo
- Publication number
- CN203345999U CN203345999U CN 201320273259 CN201320273259U CN203345999U CN 203345999 U CN203345999 U CN 203345999U CN 201320273259 CN201320273259 CN 201320273259 CN 201320273259 U CN201320273259 U CN 201320273259U CN 203345999 U CN203345999 U CN 203345999U
- Authority
- CN
- China
- Prior art keywords
- base
- lifting frame
- column
- multifunctional lifting
- special multifunctional
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000725 suspension Substances 0.000 claims description 16
- 238000010276 construction Methods 0.000 abstract description 11
- 239000012212 insulator Substances 0.000 description 8
- 229910000831 Steel Inorganic materials 0.000 description 5
- 239000010959 steel Substances 0.000 description 5
- 238000009434 installation Methods 0.000 description 4
- 230000008878 coupling Effects 0.000 description 2
- 238000010168 coupling process Methods 0.000 description 2
- 238000005859 coupling reaction Methods 0.000 description 2
- 230000004888 barrier function Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model provides a special multifunctional lifting frame for a busbar bridge. According to the technical scheme, the special multifunctional lifting frame comprises a cross beam and two supports; each support is composed of stand columns and a base, and the stand columns are fixed on the base; the two sides of the cross beam are fixed to the upper ends of all the stand columns through bolts respectively; the cross beam is provided with a U-shaped pendant. When the special multifunctional lifting frame for the busbar bridge is used, the base and a bus duct can be fixed in a matched mode, a pulley is hung on the U-shaped pendant of the cross beam according to the lifting operation positions, and a device can be lifted to the busbar bridge by a constructor on the ground. The special multifunctional lifting frame for the busbar bridge is light, handy, flexible, and convenient to install, saves time and labor when used, lowers construction cost, and particularly plays the role of a guide rail to form double protection together with a safety belt for the constructor, thereby ensuring the safety of the constructor.
Description
Technical field
The utility model relates to a kind of constructing device for cable work, the bus bridge special-purpose multifunctional mast-up of particularly be convenient to the equipment carrying, installing.
Background technology
Along with the fast development of power construction, newly-built substation constantly increases.In newly-built power transformation project construction process, it is to take the project under construction that human resources are more, the duration is longer in whole engineering that bus bridge equipment is installed.Above the main transformer bus bridge, without any blocking, when the equipment such as supporting insulator, hard bus, wall bushing is installed, the workmen relies on manpower above can only standing in the bus bridge channel-section steel of several meters high, transmission with one one, rope, very require great effort, if use equipment hoisting, construction cost is higher.Should guarantee inherently safe when equipment is installed, also will guarantee the safety of equipment, especially in the winter time, workmen's dressing heaviness, operate more inconvenient, takes time and effort and have many safety hazard, and then having influence on the engineering construction progress.
The utility model content
The purpose of this utility model is the drawback for prior art, and a kind of bus bridge specialized equipment mast-up of being convenient to the equipment carrying, effectively improving operating efficiency is provided.
Problem described in the utility model realizes with following technical proposals:
A kind of bus bridge special-purpose multifunctional mast-up, special feature is, and it comprises crossbeam and two stands, and described each support is comprised of column and base, and column is fixed on base, and described crossbeam both sides are separately fixed at each column upper end by bolt, and the U-shaped suspension member is set on crossbeam.
Above-mentioned bus bridge special-purpose multifunctional mast-up, described base is cube shaped, the base middle part is provided with base installing hole, the through hole that base installing hole is square-section, base top is provided with the base binding bolt.
Above-mentioned bus bridge special-purpose multifunctional mast-up, described each column top is provided with the column suspension member.
Above-mentioned bus bridge special-purpose multifunctional mast-up, the U-shaped suspension member arranged on described crossbeam is 1-5.
The utility model is in substation bus bar bridge project construction, the problem of equipment carrying time and effort consuming and designed a kind of equipment carry and hoist frame when being exclusively used in bus bridge and installing.Described mast-up comprises base, column and crossbeam, and base and column are fixed, and crossbeam, by upright supports, is provided with a plurality of U-shaped suspension members on crossbeam.When the utility model is used, base can be fixing with the bus duct coupling, and according to the lifting operation position, the U-shaped suspension member on crossbeam hangs pulley, and equipment can be lifted on bus bridge by the ground construction personnel.The utility model is lightly flexible, easy for installation, during use, saves time, laborsaving, saves construction cost, and particularly it can also play the effect of guardrail, with workmen's safety strap, has formed duplicate protection, guarantees workmen's safety.
The accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is described in further detail.
Fig. 1 is the utility model structural representation;
Fig. 2 is the left view of Fig. 1.
In figure, each list of reference numerals is: 1, base, 2, the base binding bolt, 3, column, 4, crossbeam, 5, the U-shaped suspension member, 6, the column suspension member, 7, base installing hole.
The specific embodiment
Referring to Fig. 1, Fig. 2, the utility model forms by two supports with by the crossbeam that two stands supports.Support is comprised of column 3 and base 1, and column is fixedly welded on base.Base 1 is that the basis of described mast-up is installed on bus bridge, base is cube shaped, and it adopts channel-section steel and angle bar to be welded, and at the base middle part, is provided with base installing hole 7, the through hole that base installing hole is square-section, the size coupling of tiling channel-section steel on the size of base installing hole and bus bridge.During mounting seat, in the direct inserted base mounting hole of tiling channel-section steel, then the base binding bolt 2 arranged by base top is fastening, can be by the installation that realizes that base is reliable and stable.After completing, floor installation can assemble crossbeam 4.Crossbeam adopts angle steel to make, and the both sides of crossbeam are separately fixed at each column upper end by bolt, and several U-shaped suspension members 5 are set on crossbeam, and U-shaped suspension member 5, can be according to the position of lifting operation for hanging pulley, and the U-shaped suspension member on crossbeam hangs pulley.After mast-up installs, by the Ground Operation personnel, utilize rope and pulley to coordinate, parts smooth transfer such as insulators to the workmen on bus bridge.
Still, referring to Fig. 1, Fig. 2, the utility model can also be used as safety barrier, with workmen's safety strap, has formed duplicate protection, guarantees workmen's safety.
Referring to Fig. 2, be provided with column suspension member 6 on each column 3 tops, the column suspension member can, for workmen's hanging tool or equipment unit, avoid these article by falling from high altitude.
On-the-spot test adopts the utility model in certain 110kV construction of transformer substation, long 8 meters of this substation bus bar bridge, 45 of total supporting insulators.At first be to install described mast-up, 5 minutes used times on bus bridge; During construction, by the Ground Operation personnel, utilize rope and pulley to coordinate, given personnel on bus bridge the supporting insulator smooth transfer, after supporting insulator fixes, take rope apart, guaranteed that supporting insulator safety is in place.Because a plurality of U-shaped suspension members are housed on crossbeam, once can complete continuously the lifting of 12 insulators.45 supporting insulators are less than within two hours, just having completed installation.Before this, complete this work and all rely on manpower, need just can complete in four hours, and require great effort very much.Use the utility model, can increase work efficiency nearly one times, and alleviate workmen's working strength.
Claims (4)
1. a bus bridge special-purpose multifunctional mast-up, it is characterized in that, it comprises crossbeam and two stands, described each support is comprised of column (3) and base (1), column is fixed on base, described crossbeam (4) both sides are separately fixed at each column upper end by bolt, and U-shaped suspension member (5) is set on crossbeam.
2. bus bridge special-purpose multifunctional mast-up according to claim 1, it is characterized in that, described base (1) is cube shaped, and the base middle part is provided with base installing hole (7), the through hole that base installing hole is square-section, base top is provided with base binding bolt (2).
3. bus bridge special-purpose multifunctional mast-up according to claim 2, is characterized in that, described each column (3) top is provided with column suspension member (6).
4. bus bridge special-purpose multifunctional mast-up according to claim 3, is characterized in that, the upper U-shaped suspension member arranged of described crossbeam (4) is 1-5.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320273259 CN203345999U (en) | 2013-05-20 | 2013-05-20 | Special multifunctional lifting frame for busbar bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320273259 CN203345999U (en) | 2013-05-20 | 2013-05-20 | Special multifunctional lifting frame for busbar bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203345999U true CN203345999U (en) | 2013-12-18 |
Family
ID=49745923
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320273259 Expired - Fee Related CN203345999U (en) | 2013-05-20 | 2013-05-20 | Special multifunctional lifting frame for busbar bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203345999U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104779545A (en) * | 2015-04-28 | 2015-07-15 | 国家电网公司 | 10 kV and 35 kV switch room bridge hoisting tool |
CN109835625A (en) * | 2017-11-28 | 2019-06-04 | 太仓中集特种物流装备有限公司 | Container |
-
2013
- 2013-05-20 CN CN 201320273259 patent/CN203345999U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104779545A (en) * | 2015-04-28 | 2015-07-15 | 国家电网公司 | 10 kV and 35 kV switch room bridge hoisting tool |
CN109835625A (en) * | 2017-11-28 | 2019-06-04 | 太仓中集特种物流装备有限公司 | Container |
CN109835625B (en) * | 2017-11-28 | 2024-01-26 | 太仓中集特种物流装备有限公司 | Container |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202186848U (en) | Universal movable maintenance gantry crane | |
CN204333759U (en) | A kind of transmission line high-altitude maintenance platform | |
CN203345999U (en) | Special multifunctional lifting frame for busbar bridge | |
CN202957486U (en) | Auxiliary device for fixing safety belt during transformer maintenance | |
CN201918653U (en) | Protective bracket for overhaul of high-voltage disconnectors | |
CN204212065U (en) | Bridge crossing anticollision barrier punching block erection equipment | |
CN201722937U (en) | Sliding platform for installation of net rack | |
CN206712336U (en) | Shaft tower cable platform work protective cradle | |
CN205429592U (en) | Tunnel cabling hoisting device | |
CN103337801A (en) | Transformer substation overhaul platform | |
CN203855897U (en) | Crossing type multifunctional cantilever outer anti-collision wall mounting and moving device | |
CN204324741U (en) | Load switch of transformer suspended core apparatus | |
CN203345912U (en) | Portable special suspension tool | |
CN205092110U (en) | Safe transformer rack | |
CN203632113U (en) | Portable safety string bag for electric pole | |
CN202899721U (en) | Steel pole provided with platform and used for high-tension transmission line iron tower | |
CN202899720U (en) | Steel pole provided with foot treadles and used for high-tension transmission line iron tower | |
CN202787930U (en) | Hanging basket for high-place operations | |
CN202467221U (en) | Power plant main workshop steel roof truss hoisting lifting device | |
CN205231576U (en) | Half high -rise overall arrangement isolator's of dismouting auxiliary device | |
CN201261939Y (en) | Overhead trolley for construction | |
CN205114908U (en) | Cable cover plate lifting device | |
CN204597301U (en) | Isolator maintenance platform | |
CN203998699U (en) | Voltage transformer attaching/detaching apparatus | |
CN204645565U (en) | A kind of spiral case overhaul working platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131218 Termination date: 20180520 |