CN203345999U - Special multifunctional lifting frame for busbar bridge - Google Patents
Special multifunctional lifting frame for busbar bridge Download PDFInfo
- Publication number
- CN203345999U CN203345999U CN 201320273259 CN201320273259U CN203345999U CN 203345999 U CN203345999 U CN 203345999U CN 201320273259 CN201320273259 CN 201320273259 CN 201320273259 U CN201320273259 U CN 201320273259U CN 203345999 U CN203345999 U CN 203345999U
- Authority
- CN
- China
- Prior art keywords
- base
- column
- busbar
- construction
- hoisting frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 abstract description 26
- 239000012212 insulator Substances 0.000 description 8
- 238000009434 installation Methods 0.000 description 6
- 229910000831 Steel Inorganic materials 0.000 description 5
- 239000010959 steel Substances 0.000 description 5
- 238000000034 method Methods 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- 229910000746 Structural steel Inorganic materials 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
一种母线桥专用多功能吊装架,其技术方案是:它包括横梁和两支架,所述各支架由立柱和底座组成,立柱固定在底座上,所述横梁两侧由螺栓分别固定在各立柱上端,横梁上设置U形挂件。本实用新型使用时,底座可与母线槽匹配固定,根据吊装作业位置,在横梁上的U形挂件悬挂滑轮,设备则可由地面施工人员吊装到母线桥上。本实用新型轻巧灵活、安装方便,使用时省时、省力,节约施工成本,特别是它还可以起到护栏的作用,与施工人员的安全带形成了双重保护,确保施工人员的安全。
A special multifunctional hoisting frame for busbar bridges, the technical solution of which is: it includes a beam and two brackets, each bracket is composed of a column and a base, the column is fixed on the base, and the two sides of the beam are respectively fixed to each column by bolts On the upper end, a U-shaped pendant is arranged on the beam. When the utility model is in use, the base can be matched and fixed with the busway. According to the hoisting operation position, the U-shaped pendant on the beam hangs the pulley, and the equipment can be hoisted on the busbar bridge by the ground construction personnel. The utility model is light and flexible, easy to install, saves time and labor in use, and saves construction costs. In particular, it can also play the role of a guardrail, forming double protection with the safety belts of construction workers to ensure the safety of construction workers.
Description
技术领域 technical field
本实用新型涉及一种用于电缆工程的施工装置,特别是便于设备搬运、安装的母线桥专用多功能吊装架。 The utility model relates to a construction device for cable engineering, in particular to a special multifunctional hoisting frame for busbar bridges which is convenient for equipment handling and installation. the
背景技术 Background technique
随着电力建设的快速发展,新建变电站不断增加。在新建变电项目施工过程,母线桥设备安装是整个工程中占用人力资源较多、工期较长的施工项目。主变母线桥上面没有任何遮拦,安装支持绝缘子、硬母线、穿墙套管等设备时,施工人员只能站在几米高的母线桥槽钢上面依靠人力,用绳索一间一件的传送,十分费力,若使用设备吊装,则施工成本较高。在设备安装时既要保证自身安全,还要确保设备的安全,尤其在冬季,施工人员着装笨重,操作起来更为不便,耗时耗力又存有诸多不安全因素,进而影响到工程施工进度。 With the rapid development of power construction, new substations are increasing. In the construction process of new substation projects, the installation of busbar bridge equipment is a construction project that occupies more human resources and has a longer construction period in the entire project. There is no obstruction on the busbar bridge of the main transformer. When installing support insulators, hard busbars, wall bushings and other equipment, the construction personnel can only stand on the channel steel of the busbar bridge several meters high and rely on manpower to transfer one by one with ropes. It is very laborious, and if equipment is used for hoisting, the construction cost will be higher. When installing the equipment, it is necessary to ensure the safety of the equipment itself and the safety of the equipment. Especially in winter, the construction personnel wear heavy clothes, which makes the operation more inconvenient, time-consuming and labor-intensive, and there are many unsafe factors, which will affect the construction progress of the project. . the
实用新型内容 Utility model content
本实用新型的目的在于针对现有技术之弊端,提供一种便于设备搬运、有效提高施工效率的母线桥专用设备吊装架。 The purpose of this utility model is to provide a special equipment hoisting frame for busbar bridges, which is convenient for equipment handling and effectively improves construction efficiency, aiming at the disadvantages of the prior art. the
本实用新型所述问题是以下述技术方案实现的: Problem described in the utility model is realized with following technical scheme:
一种母线桥专用多功能吊装架,特别之处是,它包括横梁和两支架,所述各支架由立柱和底座组成,立柱固定在底座上,所述横梁两侧由螺栓分别固定在各立柱上端,横梁上设置U形挂件。 A special multifunctional hoisting frame for a bus bridge, in particular, it includes a beam and two brackets, each bracket is composed of a column and a base, the column is fixed on the base, and the two sides of the beam are respectively fixed to each column by bolts On the upper end, a U-shaped pendant is arranged on the beam.
上述母线桥专用多功能吊装架,所述底座为立方体形,底座中部设有底座安装孔,底座安装孔为矩形截面的通孔,底座上部设有底座紧固螺栓。 The above-mentioned multifunctional hoisting frame for the busbar bridge has a cube-shaped base, a base installation hole is provided in the middle of the base, the base installation hole is a through hole with a rectangular cross-section, and a base fastening bolt is provided on the upper part of the base. the
上述母线桥专用多功能吊装架,所述各立柱上部设有立柱挂件。 The above-mentioned multifunctional hoisting frame dedicated to the busbar bridge is provided with a column hanger on the upper part of each column. the
上述母线桥专用多功能吊装架,所述横梁上设置的U形挂件为1-5个。 For the multifunctional hoisting frame dedicated to the busbar bridge, 1-5 U-shaped pendants are arranged on the beam. the
本实用新型针对变电站母线桥项目施工中,设备搬运耗时费力的问题而设计了一种专用于母线桥安装时的设备搬运吊装架。所述吊装架包括底座、立柱和横梁,底座与立柱固定,横梁由立柱支撑,在横梁上设置了多个U形挂件。本实用新型使用时,底座可与母线槽匹配固定,根据吊装作业位置,在横梁上的U形挂件悬挂滑轮,设备则可由地面施工人员吊装到母线桥上。本实用新型轻巧灵活、安装方便,使用时省时、省力,节约施工成本,特别是它还可以起到护栏的作用,与施工人员的安全带形成了双重保护,确保施工人员的安全。 The utility model aims at the problem of time-consuming and labor-intensive equipment handling in the construction of the substation bus bridge project, and designs an equipment handling and hoisting frame specially used for the installation of the bus bridge. The hoisting frame includes a base, a column and a beam, the base is fixed to the column, the beam is supported by the column, and a plurality of U-shaped pendants are arranged on the beam. When the utility model is in use, the base can be matched and fixed with the busway. According to the hoisting operation position, the U-shaped pendant on the beam hangs the pulley, and the equipment can be hoisted on the busbar bridge by the ground construction personnel. The utility model is light and flexible, easy to install, saves time and labor in use, and saves construction costs. In particular, it can also play the role of a guardrail, forming double protection with the safety belts of construction workers to ensure the safety of construction workers. the
附图说明 Description of drawings
下面结合附图对本实用新型作进一步说明。 Below in conjunction with accompanying drawing, the utility model is further described. the
图1是本实用新型结构示意图; Fig. 1 is a structural representation of the utility model;
图2是图1的左视图。 Fig. 2 is a left side view of Fig. 1 .
图中各标号清单为:1、底座,2、底座紧固螺栓,3、立柱,4、横梁,5、U形挂件,6、立柱挂件,7、底座安装孔。 The list of each label in the figure is: 1. Base, 2. Base fastening bolts, 3. Column, 4. Beam, 5. U-shaped pendant, 6. Column pendant, 7. Base mounting hole. the
具体实施方式 Detailed ways
参看图1、图2,本实用新型由两个支架和由两支架支撑的横梁组成。支架由立柱3和底座1组成,立柱固定焊接在底座上。底座1是在母线桥上安装所述吊装架的基础,底座为立方体形,它采用槽钢和角铁焊接而成,在底座中部设有底座安装孔7,底座安装孔为矩形截面的通孔,底座安装孔的尺寸与母线桥上平铺槽钢的尺寸匹配。安装底座时,平铺槽钢直接插入底座安装孔内,再由底座上部设置的底座紧固螺栓2紧固,即可将实现底座稳定可靠的安装。底座安装完成后即可装配横梁4。横梁采用角钢制作,横梁的两侧由螺栓分别固定在各立柱上端,在横梁上设置数个U形挂件5,U形挂件5用于悬挂滑轮,可以根据吊装作业的位置,在横梁上的U形挂件悬挂滑轮。吊装架安装好后,由地面作业人员利用绳索和滑轮配合,把绝缘子等部件平稳传递给母线桥上的施工人员。 Referring to Fig. 1, Fig. 2, the utility model is made up of two supports and the beam supported by two supports. The bracket is composed of a column 3 and a base 1, and the column is fixedly welded on the base. The base 1 is the basis for installing the lifting frame on the busbar bridge. The base is in the shape of a cube. It is welded by channel steel and angle iron. There is a base mounting hole 7 in the middle of the base. The base mounting hole is a through hole with a rectangular cross section. , the size of the base mounting hole matches the size of the flat channel steel on the busbar bridge. When installing the base, the flat channel steel is directly inserted into the mounting hole of the base, and then fastened by the base fastening bolts 2 provided on the upper part of the base, so that the base can be installed stably and reliably. After the base installation is completed, the beam 4 can be assembled. The beam is made of angle steel, and the two sides of the beam are respectively fixed on the upper ends of the columns by bolts. Several U-shaped pendants 5 are arranged on the beam. The U-shaped pendants 5 are used to hang pulleys. Shaped pendant suspension pulley. After the hoisting frame is installed, the ground workers use ropes and pulleys to smoothly transfer the insulators and other components to the construction workers on the busbar bridge. the
仍参看图1、图2,本实用新型还可以作为安全护栏使用,与施工人员的安全带形成了双重保护,确保施工人员的安全。 Still referring to Fig. 1 and Fig. 2, the utility model can also be used as a safety guardrail, forming a double protection with the safety belt of the construction personnel to ensure the safety of the construction personnel. the
参看图2,在各立柱3上部设有立柱挂件6,立柱挂件可以供施工人员悬挂工具或设备部件,避免这些物品由高空坠落。 Referring to Fig. 2, a column hanger 6 is provided on each column 3 top, and the column hanger can hang tools or equipment parts for construction personnel to prevent these items from falling from a high altitude. the
现场测试,在某110kV变电站施工中采用本实用新型,该变电站母线桥长8米,共有支持绝缘子45只。首先是在母线桥上安装所述吊装架,用时5分钟;施工时,由地面作业人员利用绳索和滑轮配合,把支持绝缘子平稳传递给了母线桥上人员,待支持绝缘子固定好后,拆开绳索,保证了支持绝缘子安全就位。因横梁上装有多个U形挂件,一次可连续完成12只绝缘子的吊装。45只支持绝缘子不到两小时就完成了安装。此前,完成该项工作全部依靠人力,需四小时才能完成,而且很费力。使用本实用新型,可以提高工作效率近一倍,并减轻了施工人员的工作强度。 On-site test, the utility model is adopted in the construction of a 110kV substation, the busbar bridge of the substation is 8 meters long, and there are 45 supporting insulators in total. The first is to install the hoisting frame on the busbar bridge, which takes 5 minutes; during construction, the ground workers use ropes and pulleys to smoothly pass the supporting insulators to the personnel on the busbar bridge. After the supporting insulators are fixed, they are disassembled. The ropes keep the support insulators securely in place. Because there are multiple U-shaped pendants on the beam, the hoisting of 12 insulators can be completed continuously at one time. The 45 support insulators were installed in less than two hours. Previously, the completion of this work was all dependent on manpower, and it took four hours to complete, and it was very laborious. By using the utility model, the work efficiency can be nearly doubled, and the work intensity of construction personnel can be reduced. the
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320273259 CN203345999U (en) | 2013-05-20 | 2013-05-20 | Special multifunctional lifting frame for busbar bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320273259 CN203345999U (en) | 2013-05-20 | 2013-05-20 | Special multifunctional lifting frame for busbar bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203345999U true CN203345999U (en) | 2013-12-18 |
Family
ID=49745923
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320273259 Expired - Fee Related CN203345999U (en) | 2013-05-20 | 2013-05-20 | Special multifunctional lifting frame for busbar bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203345999U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104779545A (en) * | 2015-04-28 | 2015-07-15 | 国家电网公司 | 10 kV and 35 kV switch room bridge hoisting tool |
CN109835625A (en) * | 2017-11-28 | 2019-06-04 | 太仓中集特种物流装备有限公司 | Container |
-
2013
- 2013-05-20 CN CN 201320273259 patent/CN203345999U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104779545A (en) * | 2015-04-28 | 2015-07-15 | 国家电网公司 | 10 kV and 35 kV switch room bridge hoisting tool |
CN109835625A (en) * | 2017-11-28 | 2019-06-04 | 太仓中集特种物流装备有限公司 | Container |
CN109835625B (en) * | 2017-11-28 | 2024-01-26 | 太仓中集特种物流装备有限公司 | Container |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204138210U (en) | A kind of regularization tower crane service platform and escape way | |
CN103437283B (en) | A kind of hanging basket truss of energy rapid-assembling | |
CN204767097U (en) | High altitude construction safety belt linkage | |
CN203345999U (en) | Special multifunctional lifting frame for busbar bridge | |
CN207211918U (en) | Internally lifting pole | |
CN201918653U (en) | High-voltage isolating switch maintenance protection bracket | |
CN203284128U (en) | Hoisting tool of main mechanism of switch blade | |
CN102664377B (en) | Double-cross arm assembler for single lever and double-cross arm mounting method | |
CN204689451U (en) | A kind of power transformation device simple and easy hoisting erecting frame | |
CN204732751U (en) | On-load tap-changer of transformer service kit | |
CN103318745A (en) | Lightweight special-purposed spreader and mounting method thereof | |
CN107558793B (en) | A method for lifting and installing multi-layer cross-arms on overhead line poles and special tools thereof | |
CN203022328U (en) | Climbing operation platform | |
CN103323224B (en) | A kind of anti-falling safe pick-up unit | |
CN107069533A (en) | A kind of super UHV Overhead Transmission Line tangent tower ground wire lifting tool | |
CN206712336U (en) | Shaft tower cable platform work protective cradle | |
CN203345912U (en) | Portable special suspension tool | |
CN202961564U (en) | Convenient-to-assemble type safety belt hanging frame | |
CN202467221U (en) | Power plant main workshop steel roof truss hoisting lifting device | |
CN202026037U (en) | Clamping device for replacing multifunctional suspended insulator string cross-arm side armour clamp | |
CN204992369U (en) | Fixed frame that overhauls of GW4 type isolator | |
CN204927955U (en) | A support for laying ground wires and optical cables on overhead transmission lines | |
CN203998699U (en) | Voltage transformer attaching/detaching apparatus | |
CN203895804U (en) | Multifunctional overhaul platform for isolating switch | |
CN203707659U (en) | Rapid installation suspender for distribution grid cross arms |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131218 Termination date: 20180520 |
|
CF01 | Termination of patent right due to non-payment of annual fee |