CN205429592U - Tunnel cabling hoisting device - Google Patents

Tunnel cabling hoisting device Download PDF

Info

Publication number
CN205429592U
CN205429592U CN201520538622.XU CN201520538622U CN205429592U CN 205429592 U CN205429592 U CN 205429592U CN 201520538622 U CN201520538622 U CN 201520538622U CN 205429592 U CN205429592 U CN 205429592U
Authority
CN
China
Prior art keywords
cable
motor
hoisting device
lifting cable
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201520538622.XU
Other languages
Chinese (zh)
Inventor
林志强
朱向雄
钟建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Southern Electric Power Technology Engineering Co Ltd
Original Assignee
Guangzhou Southern Electric Power Technology Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Southern Electric Power Technology Engineering Co Ltd filed Critical Guangzhou Southern Electric Power Technology Engineering Co Ltd
Priority to CN201520538622.XU priority Critical patent/CN205429592U/en
Application granted granted Critical
Publication of CN205429592U publication Critical patent/CN205429592U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型是一种隧道敷设电缆提升装置。包括有支柱、电机、拉线、定滑轮,其中电机装设在支柱的下部,支柱的顶部为T字型结构,T字型结构的一侧绑定拉线,T字型结构的另一侧挂有定滑轮,定滑轮上绕有提升线缆,提升线缆的一端与电机的输出轴连接,提升线缆的另一端装设有挂钩,拉线能与提升线缆连接。本实用新型隧道敷设电缆提升装置解决了人力无法上架或人力上架十分吃力的困难,持续性和稳定性高,确保高效率上架,同时保证不会伤及电缆和人,大大降低安全隐患。本实用新型设计合理,方便实用,可大大减少施工人员人工成本,且大大缩短施工工期。

The utility model relates to a hoisting device for laying cables in tunnels. It includes pillars, motors, pull wires, and fixed pulleys. The motor is installed at the lower part of the pillars. The top of the pillars is a T-shaped structure. The fixed pulley is wound with a lifting cable, one end of the lifting cable is connected to the output shaft of the motor, the other end of the lifting cable is equipped with a hook, and the pull wire can be connected with the lifting cable. The utility model solves the difficulty that manpower cannot or is very laborious for laying cables in tunnels, has high continuity and stability, ensures high-efficiency loading, and at the same time ensures that cables and people will not be hurt, greatly reducing safety hazards. The utility model is reasonable in design, convenient and practical, can greatly reduce the labor cost of construction personnel, and greatly shorten the construction period.

Description

一种隧道敷设电缆提升装置A tunnel laying cable lifting device

技术领域 technical field

本实用新型是一种隧道敷设电缆提升装置,属于隧道敷设电缆提升装置的创新技术。 The utility model relates to a cable hoisting device for tunnel laying, which belongs to the innovative technology of the cable hoisting device for tunnel laying.

背景技术 Background technique

隧道内敷设电缆最大特点就是敷设完成后还要搬上支架,而碍于隧道内狭窄的空间和效率等因素普遍采用人力上架或使用手扳葫芦。对于支架高度较低(1.6米以下)或电缆重量较轻,采用人力上架,对于支架高度较高(1.6米以上)或电缆重量较重,则采用手扳葫芦上架。人力上架需要人数较多,且持续性及稳定性较低,还需要搭设简易脚手架,稍有不慎则会伤及电缆和人;手板葫芦上架虽然可解决人力无法上架时的情况,但耗时颇长,效率甚低。 The biggest feature of laying cables in tunnels is that they need to be moved to supports after the laying is completed. However, due to factors such as narrow space and efficiency in the tunnel, manual loading or lever blocks are generally used. For lower bracket heights (below 1.6m) or light weight cables, manual loading is used; for higher bracket heights (above 1.6m) or heavy cable weights, lever hoists are used for loading. Manual racking requires a large number of people, and the continuity and stability are low. Simple scaffolding needs to be erected, and cables and people will be injured if you are not careful; although hand hoist racking can solve the situation when manpower cannot be racked, it is time-consuming. Quite long and very inefficient.

发明内容 Contents of the invention

本实用新型的目的在于考虑上述问题而提供一种确保高效率上架,同时保证不会伤及电缆和人,大大降低安全隐患的隧道敷设电缆提升装置。本实用新型设计合理,方便实用。 The purpose of this utility model is to consider the above problems and provide a tunnel laying cable lifting device that can ensure high-efficiency loading, and at the same time ensure that cables and people will not be hurt, and greatly reduce potential safety hazards. The utility model is reasonable in design, convenient and practical.

本实用新型的技术方案是:本实用新型的隧道敷设电缆提升装置,包括有支柱、电机、拉线、定滑轮,其中电机装设在支柱的下部,支柱的顶部为T字型结构,T字型结构的一侧绑定拉线,T字型结构的另一侧挂有定滑轮,定滑轮上绕有提升线缆,提升线缆的一端与电机的输出轴连接,提升线缆的另一端装设有挂钩,拉线能与提升线缆连接。 The technical scheme of the utility model is: the tunnel laying cable lifting device of the utility model includes a pillar, a motor, a pull wire, and a fixed pulley, wherein the motor is installed at the lower part of the pillar, and the top of the pillar is a T-shaped structure. One side of the structure is bound with a pull wire, the other side of the T-shaped structure is hung with a fixed pulley, and a lifting cable is wound on the fixed pulley. One end of the lifting cable is connected to the output shaft of the motor, and the other end of the lifting cable is installed. There is a hook, and the guy wire can be connected with the lifting cable.

本实用新型隧道敷设电缆提升装置解决了人力无法上架或人力上架十分吃力的困难,持续性和稳定性高,确保高效率上架,同时保证不会伤及电缆和人,大大降低安全隐患。本实用新型设计合理,方便实用,可大大减少施工人员人工成本,且大大缩短施工工期。 The utility model solves the difficulty that manpower cannot or is very laborious for laying cables in tunnels. It has high continuity and stability, ensures high-efficiency loading, and at the same time ensures that cables and people will not be hurt, greatly reducing safety hazards. The utility model is reasonable in design, convenient and practical, can greatly reduce the labor cost of construction personnel, and greatly shorten the construction period.

附图说明 Description of drawings

图1为本实用新型的结构示意图。 Fig. 1 is the structural representation of the utility model.

图2为本实用新型中电缆承托架、承托杆及限位装置的安装结构示意图。 Fig. 2 is a schematic diagram of the installation structure of the cable support bracket, the support rod and the limit device in the utility model.

具体实施方式 detailed description

本实用新型的隧道敷设电缆提升装置,包括有支柱1、电机2、拉线4、定滑轮5,其中电机2装设在支柱1的下部,支柱1的顶部为T字型结构,T字型结构的一侧绑定拉线4,T字型结构的另一侧挂有定滑轮5,定滑轮5上绕有提升线缆,提升线缆的一端与电机2的输出轴连接,提升线缆的另一端装设有挂钩,拉线4能与提升线缆连接。 The tunnel laying cable hoisting device of the present utility model includes a pillar 1, a motor 2, a pull wire 4, and a fixed pulley 5, wherein the motor 2 is installed at the lower part of the pillar 1, and the top of the pillar 1 is a T-shaped structure. One side of the T-shaped structure is bound with a stay wire 4, a fixed pulley 5 is hung on the other side of the T-shaped structure, and a lifting cable is wound on the fixed pulley 5. One end of the lifting cable is connected with the output shaft of the motor 2, and the other end of the lifting cable A hook is installed at one end, and the stay wire 4 can be connected with the lifting cable.

本实施例中,上述电机2通过调整螺栓3锁紧在支柱1的下部,电机2的安装位置可根据现场情况上下调整,调整后用调整螺栓3锁紧在支柱1的下部。 In this embodiment, the above-mentioned motor 2 is locked on the lower part of the pillar 1 through the adjusting bolt 3, and the installation position of the motor 2 can be adjusted up and down according to the site conditions, and is locked on the lower part of the pillar 1 with the adjusting bolt 3 after adjustment.

本实施例中,上述支柱1为钢管,长约3米。 In this embodiment, the above-mentioned pillar 1 is a steel pipe with a length of about 3 meters.

本实施例中,上述支柱1的下方还可设有电缆承托架6,当电缆提升装置把电缆提升至适当高度后将电缆承托架6放置在电缆下方。 In this embodiment, a cable support bracket 6 may also be provided below the above-mentioned pillar 1, and the cable support bracket 6 is placed under the cable after the cable lifting device lifts the cable to an appropriate height.

本实施例中,上述电缆承托架6的顶部装设有承托杆7,承托杆7的末端装设有限位装置8。 In this embodiment, a supporting rod 7 is installed on the top of the above-mentioned cable supporting bracket 6 , and a limiting device 8 is installed at the end of the supporting rod 7 .

本实施例中,上述电缆承托架6为钢管。 In this embodiment, the above-mentioned cable support bracket 6 is a steel pipe.

本实用新型的隧道敷设电缆提升装置在使用时,用吊带绑住电缆并挂在提升线缆的挂钩上,起吊前将拉线4固定,防止挂钩受力时支架往电缆侧倾倒,当电缆提升至比电缆承托架6稍高的高度时,将电缆承托架6摆放在电缆下侧,并把限位装置8依靠在电缆承托架6上,再松下挂钩使电缆放在电缆承托架6上,最后人手将电缆推放在电缆抱箍里。 When the tunnel laying cable hoisting device of the utility model is in use, the cable is tied with a sling and hung on the hook of the hoisting cable. When the height is slightly higher than the cable support bracket 6, place the cable support bracket 6 on the lower side of the cable, and place the limit device 8 on the cable support bracket 6, and then loosen the hook to place the cable on the cable support Finally, manually push the cable into the cable hoop.

本实用新型可多台同时使用,上架效率将会得到提升。多台共用时需要相互配合,避免因不协调导致电缆损伤,同时需注意临时用电安全。 The utility model can be used by multiple sets at the same time, and the shelf-loading efficiency will be improved. When multiple units are used together, they need to cooperate with each other to avoid cable damage due to incoordination, and at the same time, pay attention to the safety of temporary power use.

本实用新型的经济效益可分析如下: The economic benefit of the present utility model can be analyzed as follows:

以电缆线芯截面面积为2500mm2的220kV电力电缆(重量约为每米40kg)搬上高约1.6米的支架为例,每20米电缆上架情况如下: 上架方式 工人数量(个) 时间(分钟) 500米电缆所需时间(小时) 备注 人力上架 15 12 5 需搭1米简易脚手架 手板葫芦 9 10 4 提升装置 7 8 3 Taking a 220kV power cable with a core cross-sectional area of 2500mm2 (the weight is about 40kg per meter) on a support about 1.6 meters high as an example, the situation of putting the cable on the shelf every 20 meters is as follows: How to put it on the shelves Number of workers (units) time (minutes) Time required for 500m cable (hours) Remark Human shelves 15 12 5 Need to build 1 meter simple scaffolding Prototype hoist 9 10 4 lifting device 7 8 3

从上表可看出本实用新型提升装置所需工人和时间均比前两者少,大大减少施工人员人工成本,且大大缩短施工工期。 It can be seen from the above table that the lifting device of the present invention requires fewer workers and less time than the former two, which greatly reduces the labor cost of construction personnel and greatly shortens the construction period.

Claims (6)

1.一种隧道敷设电缆提升装置,其特征在于包括有支柱、电机、拉线、定滑轮,其中电机装设在支柱的下部,支柱的顶部为T字型结构,T字型结构的一侧绑定拉线,T字型结构的另一侧挂有定滑轮,定滑轮上绕有提升线缆,提升线缆的一端与电机的输出轴连接,提升线缆的另一端装设有挂钩,拉线能与提升线缆连接。 1. A tunnel laying cable lifting device is characterized in that it includes a pillar, a motor, a backguy, and a fixed pulley, wherein the motor is installed at the bottom of the pillar, the top of the pillar is a T-shaped structure, and one side of the T-shaped structure is tied Fixed pulley, the other side of the T-shaped structure is hung with a fixed pulley, and a lifting cable is wound around the fixed pulley. One end of the lifting cable is connected to the output shaft of the motor, and the other end of the lifting cable is equipped with a hook. The pulling wire can Connect with lifting cable. 2.根据权利要求1所述的隧道敷设电缆提升装置,其特征在于上述支柱为钢管。 2. The hoisting device for laying cables in tunnels according to claim 1, characterized in that the above-mentioned pillars are steel pipes. 3.根据权利要求1所述的隧道敷设电缆提升装置,其特征在于上述电机通过调整螺栓锁紧在支柱的下部。 3. The hoisting device for laying cables in tunnels according to claim 1, characterized in that the motor is locked to the lower part of the pillar by adjusting bolts. 4.根据权利要求1至3任一项所述的隧道敷设电缆提升装置,其特征在于上述支柱的下方还设有电缆承托架。 4. The hoisting device for laying cables in tunnels according to any one of claims 1 to 3, characterized in that a cable support bracket is also provided under the above-mentioned pillars. 5.根据权利要求4所述的隧道敷设电缆提升装置,其特征在于上述电缆承托架的顶部装设有承托杆,承托杆的末端装设有限位装置。 5. The hoisting device for laying cables in tunnels according to claim 4, characterized in that a supporting rod is installed on the top of the cable supporting frame, and a limit device is installed at the end of the supporting rod. 6.根据权利要求4所述的隧道敷设电缆提升装置,其特征在于上述电缆承托架为钢管。 6. The tunnel laying cable hoisting device according to claim 4, characterized in that the above-mentioned cable support frame is a steel pipe.
CN201520538622.XU 2015-07-23 2015-07-23 Tunnel cabling hoisting device Expired - Lifetime CN205429592U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520538622.XU CN205429592U (en) 2015-07-23 2015-07-23 Tunnel cabling hoisting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520538622.XU CN205429592U (en) 2015-07-23 2015-07-23 Tunnel cabling hoisting device

Publications (1)

Publication Number Publication Date
CN205429592U true CN205429592U (en) 2016-08-03

Family

ID=56517384

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520538622.XU Expired - Lifetime CN205429592U (en) 2015-07-23 2015-07-23 Tunnel cabling hoisting device

Country Status (1)

Country Link
CN (1) CN205429592U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107879269A (en) * 2017-11-08 2018-04-06 国网河南省电力公司郑州供电公司 The electronic lifting bracket of cable tunnel inner column formula cable
CN107973238A (en) * 2017-12-19 2018-05-01 广州供电局有限公司 Cable restocking service hoisting frock and cable pavement system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107879269A (en) * 2017-11-08 2018-04-06 国网河南省电力公司郑州供电公司 The electronic lifting bracket of cable tunnel inner column formula cable
CN107973238A (en) * 2017-12-19 2018-05-01 广州供电局有限公司 Cable restocking service hoisting frock and cable pavement system

Similar Documents

Publication Publication Date Title
US8584429B2 (en) Tower erection system and method
CN206502579U (en) Power pole hoisting device
CN202187601U (en) Single-twisting-grinder double-pole iron tower erecting device of high-voltage power transmission line
CN109687349B (en) Bypass cable wiring method and special equipment thereof
CN104631810A (en) High-altitude movable hanging basket system and construction method thereof
CN201408948Y (en) Adjustable height elevating straddle stringing device
CN108775196A (en) A combined lifting and self-climbing mechanism for erecting transmission towers
CN205429592U (en) Tunnel cabling hoisting device
CN202544476U (en) Tower crane type holding rod
CN108643364A (en) Single-arch progressive net rack mounting method
CN105293301B (en) Windproof tower crane
CN207211918U (en) Internally lifting pole
CN102983517B (en) A kind of integral installation device for transformer test bench
CN105186387B (en) A kind of electric cable with large cross-section tunnel lays uses device
CN204349336U (en) Overhead-groundwire lifter
CN208981895U (en) A hoisting and self-climbing combined mechanism for power transmission tower erection
CN203345999U (en) Special multifunctional lifting frame for busbar bridge
CN103359625A (en) Automatic construction equipment for building hoisting and platform elevating of new rural construction
CN212863940U (en) Transformer quick lifting device
CN105152052A (en) Glass curtain wall component lifting device and glass curtain wall component installing method
CN204980945U (en) Supplementary tower crane dismounting device
CN104701784A (en) Pay-off bracket with adjustable height
CN203624932U (en) Portable indoor material lifter
CN203545559U (en) Electric meter box hoisting tool
CN207375669U (en) The electronic lifting bracket of cable tunnel inner column formula cable

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20160803