CN204324741U - Load switch of transformer suspended core apparatus - Google Patents

Load switch of transformer suspended core apparatus Download PDF

Info

Publication number
CN204324741U
CN204324741U CN201420764203.3U CN201420764203U CN204324741U CN 204324741 U CN204324741 U CN 204324741U CN 201420764203 U CN201420764203 U CN 201420764203U CN 204324741 U CN204324741 U CN 204324741U
Authority
CN
China
Prior art keywords
auxiliary
transformer
load switch
main
hanging core
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420764203.3U
Other languages
Chinese (zh)
Inventor
王保连
金永生
韩伟
李容刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Jiangsu Electric Power Co Ltd
Lianyungang Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
State Grid Jiangsu Electric Power Co Ltd
Lianyungang Power Supply Co of Jiangsu Electric Power Co
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Jiangsu Electric Power Co Ltd, Lianyungang Power Supply Co of Jiangsu Electric Power Co, State Grid Corp of China SGCC filed Critical State Grid Jiangsu Electric Power Co Ltd
Priority to CN201420764203.3U priority Critical patent/CN204324741U/en
Application granted granted Critical
Publication of CN204324741U publication Critical patent/CN204324741U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

本实用新型公开了一种变压器有载开关吊芯装置,包括三柱调节主立柱杆装置、两杆调节辅助斜撑杆装置、滑轨、滑移轮和充电式电动葫芦;本实用新型使用安全、操作简便,不易发生事故,且通过现有的结构改装组合而成,组装简单、占地面积小、携带方便。

The utility model discloses a transformer on-load switch hanging core device, which comprises a three-column adjustment main column rod device, a two-column adjustment auxiliary oblique brace device, a slide rail, a sliding wheel and a charging electric hoist; the utility model is safe to use , Easy to operate, less prone to accidents, and combined through the modification of the existing structure, simple assembly, small footprint, and easy to carry.

Description

变压器有载开关吊芯装置Transformer on-load switch hanging core device

技术领域technical field

本实用新型属于变压器有载开关检修技术领域,特别是一种变压器有载开关吊芯装置。The utility model belongs to the technical field of transformer on-load switch overhaul, in particular to a transformer on-load switch hanging core device.

背景技术Background technique

变压器是电力系统输配电过程中重要的电力设备之一,而变压器的有载开关是变压升降压的重要操作设施,按照《变压器有载开关检修导则》要求,每5000—7000次(国产)需对变压器的有载开关进行吊芯检查修理。在每次有载开关进行吊芯时,均采用3-4人合一拎拉拽的方式将有载开关进行芯体吊出或放入,非常的不科学、不安全,是一种原始动作,工作人员稍有操作不当,将发生不可预见后果严重性。均有可能引起人身、设备事故。The transformer is one of the important power equipment in the process of power transmission and distribution in the power system, and the on-load switch of the transformer is an important operating facility for step-down and step-down. (domestic) inspection and repair of the hanging core of the on-load switch of the transformer is required. Every time the on-load switch is used to lift the core, 3-4 people are used to lift and pull the core of the on-load switch to lift out or put in the core. It is very unscientific and unsafe, and it is an original action. , If the staff does not operate properly, unforeseen consequences will occur. Both may cause personal and equipment accidents.

实用新型内容Utility model content

本实用新型的目的在于提供一种使用安全、操作简便,不易发生事故的变压器有载开关吊芯装置。The purpose of the utility model is to provide a transformer on-load switch hanging core device which is safe to use, easy to operate and less prone to accidents.

实现本实用新型目的的技术解决方案为:The technical solution to realize the purpose of this utility model is:

一种变压器有载开关吊芯装置,包括三柱调节主立柱杆装置、两杆调节辅助斜撑杆装置、滑轨、滑移轮和充电式电动葫芦;三柱调节主立柱杆装置包括三根被配置用于固定在变压器有载开关井仓口法兰的主立柱杆,主立柱杆平行且与变压器有载开关井仓口法兰垂直,主立柱杆为伸缩式结构,其中一根主立柱杆位于吊芯滑移出方向的相对处,其余两根对称设置在此主立柱杆的两侧,两侧的主立柱杆顶部设置有承载横梁,两杆调节辅助斜撑杆装置位于三柱调节主立柱杆装置的吊芯滑移出方向,两杆调节辅助斜撑杆装置包括两根辅助斜撑杆和设置在两根辅助斜撑杆顶端的辅助横梁,两根辅助斜撑杆和辅助横梁围成梯形,辅助横梁和承载横梁在同一水平面上,滑轨沿吊芯滑移出方向固定设置在辅助横梁和承载横梁的低端,其一端与位于吊芯滑移出方向相对处的主立柱杆固定,滑移轮与滑轨形成滑动副并设置在滑轨的底部,充电式电动葫芦设置在滑移轮的底部。A lifting core device for a transformer on-load switch, comprising a three-column adjustment main column rod device, a two-column adjustment auxiliary oblique strut device, a slide rail, a slip wheel and a rechargeable electric hoist; the three-column adjustment main column rod device includes three quilt It is configured to fix the main column on the flange of the transformer on-load switch well. The main column is parallel to and perpendicular to the flange of the transformer on-load switch well. The main column is a telescopic structure, and one of the main columns Located opposite to the sliding out direction of the suspension core, the other two are arranged symmetrically on both sides of the main column. The tops of the main columns on both sides are provided with load-bearing beams. The hanging core of the column rod device slides out of the direction, and the two-bar adjustment auxiliary diagonal brace device includes two auxiliary diagonal braces and an auxiliary beam arranged at the top of the two auxiliary diagonal braces. Trapezoidal, the auxiliary beam and the load-bearing beam are on the same horizontal plane, the slide rail is fixed at the lower end of the auxiliary beam and the load-bearing beam along the sliding out direction of the hanging core, and one end of it is opposite to the main column rod in the sliding out direction of the hanging core Fixed, the slip wheel and the slide rail form a sliding pair and are arranged at the bottom of the slide rail, and the rechargeable electric hoist is arranged at the bottom of the slip wheel.

本实用新型与现有技术相比,其显著优点:Compared with the prior art, the utility model has significant advantages:

(1)本实用新型能够减少人力使用量,杜绝吊装过程中存在不安全因素,保证在最大程度上降低检修人员的劳动強度,在有载开关吊芯中能轻松、有序的完成操作。(1) The utility model can reduce the amount of manpower used, eliminate unsafe factors in the hoisting process, and ensure that the labor intensity of the maintenance personnel is reduced to the greatest extent, and the operation can be easily and orderly completed in the on-load switch hanging core.

(2)本实用新型可通过现有的结构改装组合而成,组装简单、占地面积小、携带方便,针对两种类型CM型,CV/SV型变压器,只用此套装置,就可完成工作。(2) The utility model can be combined by refitting the existing structure. It is simple to assemble, occupies a small area, and is easy to carry. For two types of CM type and CV/SV type transformers, only this set of devices can be used to complete it. Work.

下面结合附图对本实用新型作进一步详细描述。Below in conjunction with accompanying drawing, the utility model is described in further detail.

附图说明Description of drawings

图1是本实用新型变压器有载开关吊芯装置的总体结构示意图。Figure 1 is a schematic diagram of the overall structure of the transformer on-load switch hanging core device of the present invention.

具体实施方式Detailed ways

结合图1:Combined with Figure 1:

一种变压器有载开关吊芯装置,包括三柱调节主立柱杆装置1、两杆调节辅助斜撑杆装置2、滑轨3、滑移轮4和充电式电动葫芦5;三柱调节主立柱杆装置1包括三根被配置用于固定在变压器有载开关井仓口法兰6的主立柱杆,主立柱杆平行且与变压器有载开关井仓口法兰6垂直,主立柱杆为伸缩式结构,其中一根主立柱杆位于吊芯滑移出方向的相对处,其余两根对称设置在此主立柱杆的两侧,两侧的主立柱杆顶部设置有承载横梁,两杆调节辅助斜撑杆装置2位于三柱调节主立柱杆装置1的吊芯滑移出方向,两杆调节辅助斜撑杆装置2包括两根辅助斜撑杆和设置在两根辅助斜撑杆顶端的辅助横梁,两根辅助斜撑杆和辅助横梁围成梯形,辅助横梁和承载横梁在同一水平面上,滑轨3沿吊芯滑移出方向固定设置在辅助横梁和承载横梁的低端,其一端与位于吊芯滑移出方向相对处的主立柱杆固定,滑移轮4与滑轨3形成滑动副并设置在滑轨3的底部,充电式电动葫芦5设置在滑移轮4的底部。A transformer on-load switch hanging core device, comprising a three-column adjustment main column rod device 1, a two-column adjustment auxiliary diagonal brace device 2, a slide rail 3, a slip wheel 4 and a rechargeable electric hoist 5; the three-column adjustment main column Rod device 1 includes three main poles configured to be fixed on the flange 6 of the transformer on-load switch well, the main poles are parallel to and perpendicular to the transformer on-load switch well mouth flange 6, and the main poles are telescopic One of the main columns is located opposite to the sliding direction of the hanging core, and the other two are symmetrically arranged on both sides of the main column. The strut device 2 is located in the sliding out direction of the hanging core of the three-column adjustment main column pole device 1, and the two-column adjustment auxiliary diagonal strut device 2 includes two auxiliary diagonal struts and an auxiliary beam arranged at the top of the two auxiliary diagonal struts , the two auxiliary diagonal braces and the auxiliary beam form a trapezoid, the auxiliary beam and the bearing beam are on the same horizontal plane, the slide rail 3 is fixedly arranged at the lower end of the auxiliary beam and the bearing beam along the sliding direction of the hanging core, and one end of the The main column pole opposite to the sliding direction of the suspension core is fixed, the sliding wheel 4 and the slide rail 3 form a sliding pair and are arranged on the bottom of the slide rail 3, and the rechargeable electric hoist 5 is arranged on the bottom of the sliding wheel 4.

两杆调节辅助斜撑杆装置2的两根辅助斜撑杆底部通过防劈开装置连接。The bottoms of the two auxiliary diagonal braces of the two-bar adjustment auxiliary diagonal brace device 2 are connected by an anti-split device.

防劈开装置为链条或绳索。The anti-split device is a chain or a rope.

主立柱杆和辅助斜撑杆均采用两段式伸缩结构,两段伸缩结构之间设置有固定装置。Both the main column rod and the auxiliary diagonal brace adopt a two-stage telescopic structure, and a fixing device is arranged between the two telescopic structures.

固定装置为定位插销。The fixing device is a positioning bolt.

本实用新型的安装使用步骤如下:The installation and use steps of the utility model are as follows:

1.先将三柱调节主立柱杆装置1的主立柱杆通过螺钉固定安装在变压器有载开关井仓口法兰上,其中一根主立柱杆安装位置位于吊芯滑移出方向的相对处。其余二杆安装位分别于该杆的两侧,固定方式同样,三杆呈品字形分布;1. First install the main column rod of the three-column adjustment main column rod device 1 on the flange of the transformer on-load switch well bin mouth through screws, and the installation position of one of the main column rods is opposite to the sliding out direction of the hanging core . The rest of the two rods are installed on both sides of the rod respectively, and the fixing method is the same, and the three rods are distributed in the shape of a character;

2.三杆安装固定后,依次拔出定位插销,提拽出上部立柱杆至工作所需高度,插入定位插销;2. After the three poles are installed and fixed, pull out the positioning pins one by one, pull out the upper column rod to the height required for work, and insert the positioning pins;

3.承载横梁底部两端设置有定位柱,将承载横梁上的定位柱插装于对称设置的两根主立柱杆上部方口内,再将滑轨3固定端和与其衔接的位于吊芯滑移出方向的相对处的主立柱杆上端用定位插销固定,然后将滑轨3与承载横梁衔接处用插销固定;3. There are positioning columns at both ends of the bottom of the load-bearing beam. Insert the positioning columns on the load-bearing beam into the upper square openings of the two main columns symmetrically arranged, and then slide the fixed end of the slide rail 3 and the hanging core connected to it. The upper end of the main column rod opposite to the outgoing direction is fixed with a positioning pin, and then the joint between the slide rail 3 and the load-bearing beam is fixed with a pin;

4.将两杆调节辅助斜撑杆装置2的辅助斜撑杆提拽到和主立柱杆相对应工作高度,用定位插销插入固定后,顶部再插入辅助横梁的方槽孔中,然后将滑轨3与辅助横梁衔接处用插销固定,辅助斜撑杆底脚部有防劈开不锈钢链,调整至合适宽度后用扣环固定;4. Lift the auxiliary diagonal brace of the two-bar adjustable auxiliary diagonal brace device 2 to the working height corresponding to the main column rod, insert and fix it with the positioning pin, insert the top into the square slot hole of the auxiliary beam, and then slide the The connection between rail 3 and the auxiliary beam is fixed with a bolt, and the bottom foot of the auxiliary diagonal brace has an anti-split stainless steel chain, which is fixed with a buckle after adjusting to a suitable width;

5.将充电式电动葫芦5上挂钩挂入滑移轮4下部的钩孔内。5. Hang the upper hook of the rechargeable electric hoist 5 into the hook hole at the lower part of the slip wheel 4.

6.检查以上安装有无错误及遗漏之处,如无落,即可进行吊装作业。6. Check the above installation for errors and omissions, if there is no drop, you can carry out hoisting operations.

本实用新型适用于CM型和CV/SV型变压器2种有载开关的吊芯的吊装。通用性极强,能够快速地安全地平稳地实现吊芯从井仓里起吊,滑移,落降至地面等功能。The utility model is suitable for hoisting the hanging cores of two kinds of on-load switches of CM type and CV/SV type transformers. It has strong versatility and can quickly, safely and smoothly realize the functions of hoisting core from the well chamber, sliding, and falling to the ground.

且本实用新型的应用能极大地减轻检修人员的劳动强度,更好地提高工作效率,降低工作危险性,减少发生设备事故率。Moreover, the application of the utility model can greatly reduce the labor intensity of maintenance personnel, better improve work efficiency, reduce work risk, and reduce the rate of equipment accidents.

Claims (5)

1.一种变压器有载开关吊芯装置,其特征在于:包括三柱调节主立柱杆装置(1)、两杆调节辅助斜撑杆装置(2)、滑轨(3)、滑移轮(4)和充电式电动葫芦(5);三柱调节主立柱杆装置(1)包括三根被配置用于固定在变压器有载开关井仓口法兰(6)的主立柱杆,主立柱杆平行且与变压器有载开关井仓口法兰(6)垂直,主立柱杆为伸缩式结构,其中一根主立柱杆位于吊芯滑移出方向的相对处,其余两根对称设置在此主立柱杆的两侧,两侧的主立柱杆顶部设置有承载横梁,两杆调节辅助斜撑杆装置(2)位于三柱调节主立柱杆装置(1)的吊芯滑移出方向,两杆调节辅助斜撑杆装置(2)包括两根辅助斜撑杆和设置在两根辅助斜撑杆顶端的辅助横梁,两根辅助斜撑杆和辅助横梁围成梯形,辅助横梁和承载横梁在同一水平面上,滑轨(3)沿吊芯滑移出方向固定设置在辅助横梁和承载横梁的低端,其一端与位于吊芯滑移出方向相对处的主立柱杆固定,滑移轮(4)与滑轨(3)形成滑动副并设置在滑轨(3)的底部,充电式电动葫芦(5)设置在滑移轮(4)的底部。1. A transformer on-load switch hanging core device is characterized in that: it comprises three-column adjustment main column bar device (1), two-bar adjustment auxiliary oblique strut device (2), slide rail (3), slip wheel ( 4) and rechargeable electric hoist (5); the three-column adjustment main pole device (1) includes three main poles configured to be fixed on the flange (6) of the transformer on-load switch well, and the main poles are parallel And it is perpendicular to the flange (6) of the tank mouth of the transformer on-load switch. The main column is a telescopic structure. One of the main columns is located opposite to the sliding direction of the hanging core, and the other two are symmetrically arranged on this main column. On both sides of the rod, the top of the main column rods on both sides is provided with a load-bearing crossbeam, the two-pole adjustment auxiliary diagonal brace device (2) is located The auxiliary diagonal brace device (2) includes two auxiliary diagonal braces and an auxiliary beam arranged at the top of the two auxiliary diagonal braces, the two auxiliary diagonal braces and the auxiliary beam form a trapezoid, and the auxiliary beam and the load-bearing beam are on the same horizontal plane Above, the slide rail (3) is fixedly arranged at the lower end of the auxiliary beam and the load-bearing beam along the sliding out direction of the hanging core, and one end thereof is fixed to the main column pole opposite to the sliding out direction of the hanging core, and the sliding wheel (4) It forms a sliding pair with the slide rail (3) and is arranged at the bottom of the slide rail (3), and the rechargeable electric hoist (5) is arranged at the bottom of the slip wheel (4). 2.根据权利要求1所述的变压器有载开关吊芯装置,其特征在于:所述的两杆调节辅助斜撑杆装置(2)的两根辅助斜撑杆底部通过防劈开装置连接。2. The hanging core device for transformer on-load switch according to claim 1, characterized in that: the bottoms of the two auxiliary diagonal braces of the two-bar adjustment auxiliary diagonal brace device (2) are connected by an anti-split device. 3.根据权利要求2所述的变压器有载开关吊芯装置,其特征在于:所述的防劈开装置为链条或绳索。3. The transformer on-load switch hanging core device according to claim 2, characterized in that: the anti-split device is a chain or a rope. 4.根据权利要求1或2或3所述的变压器有载开关吊芯装置,其特征在于:所述的主立柱杆和辅助斜撑杆均采用两段式伸缩结构,两段伸缩结构之间设置有固定装置。4. The hanging core device for transformer on-load switch according to claim 1, 2 or 3, characterized in that: the main upright pole and the auxiliary diagonal strut both adopt a two-stage telescopic structure, and the space between the two telescopic structures Set with fixtures. 5.根据权利要求4所述的变压器有载开关吊芯装置,其特征在于:所述的固定装置为定位插销。5. The transformer on-load switch hanging core device according to claim 4, characterized in that: said fixing device is a positioning bolt.
CN201420764203.3U 2014-12-06 2014-12-06 Load switch of transformer suspended core apparatus Expired - Fee Related CN204324741U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420764203.3U CN204324741U (en) 2014-12-06 2014-12-06 Load switch of transformer suspended core apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420764203.3U CN204324741U (en) 2014-12-06 2014-12-06 Load switch of transformer suspended core apparatus

Publications (1)

Publication Number Publication Date
CN204324741U true CN204324741U (en) 2015-05-13

Family

ID=53161121

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420764203.3U Expired - Fee Related CN204324741U (en) 2014-12-06 2014-12-06 Load switch of transformer suspended core apparatus

Country Status (1)

Country Link
CN (1) CN204324741U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105523486A (en) * 2016-01-27 2016-04-27 中国十七冶集团有限公司 Lifting, conveying, loading and unloading device for hole digging of underground pipe gallery vertical shaft
CN107720561A (en) * 2017-10-23 2018-02-23 国网四川省电力公司成都供电公司 A kind of indoor transformer loaded switch core body hangs detecting method and device
CN118877758A (en) * 2024-09-30 2024-11-01 河南泰隆工程技术有限公司 Transformer lifting device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105523486A (en) * 2016-01-27 2016-04-27 中国十七冶集团有限公司 Lifting, conveying, loading and unloading device for hole digging of underground pipe gallery vertical shaft
CN105523486B (en) * 2016-01-27 2018-06-26 中国十七冶集团有限公司 A kind of underground pipe gallery vertical shaft borehole carries fortune handler
CN107720561A (en) * 2017-10-23 2018-02-23 国网四川省电力公司成都供电公司 A kind of indoor transformer loaded switch core body hangs detecting method and device
CN118877758A (en) * 2024-09-30 2024-11-01 河南泰隆工程技术有限公司 Transformer lifting device

Similar Documents

Publication Publication Date Title
CN203871715U (en) Mobile overhaul platform for mechanism case of high-voltage circuit-breaker
CN102996062B (en) Maintenance lifting platform and application method thereof
CN105244788B (en) The special lifting service kit of handcart circuit breaker in a kind of switch gear room
CN204125829U (en) Half high-rise unsettled insulation maintenance gap bridge
CN204324741U (en) Load switch of transformer suspended core apparatus
CN203756015U (en) Aerial work platform for power transmission iron tower
CN201323398Y (en) Small-sized electric power equipment landing gear
CN205442525U (en) Supplementary device of changing of part
CN205016898U (en) Maintenance instrument is lifted by crane in special use of handcart circuit breaker in switch gear room
CN204057856U (en) Job platform on new-type bar
CN204030382U (en) Lift maintaining platform
CN204897278U (en) Cable well cover opening device
CN205555914U (en) Transformer overhauls uses hoisting apparatus
CN201447322U (en) hoisting device
CN205724585U (en) Multi-function overhaul platform
CN103896153A (en) Zig-zag derrick for replacing disconnecting link
CN204384733U (en) Bus plug-in strip Lift-on/Lift-off System
CN203589527U (en) Transformer-substation 10kV middle-mounted circuit breaker hoisting tool
CN209161349U (en) Combined lifting device for on-load tap-changer of transformer
CN203855897U (en) Crossing type multifunctional cantilever outer anti-collision wall mounting and moving device
CN203967573U (en) A kind of replacing current transformer Portable handcart
CN201549792U (en) 220 kV transformer maintenance workbench
CN104112996B (en) Change current transformer Portable handcart and preparation method thereof
CN105552754A (en) Testing auxiliary device for assembly-type disconnecting switch
CN204917669U (en) Overhead hoist for wind generating set

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150513

Termination date: 20181206