CN204721929U - Building barricade vertical greening structure - Google Patents

Building barricade vertical greening structure Download PDF

Info

Publication number
CN204721929U
CN204721929U CN201520476970.9U CN201520476970U CN204721929U CN 204721929 U CN204721929 U CN 204721929U CN 201520476970 U CN201520476970 U CN 201520476970U CN 204721929 U CN204721929 U CN 204721929U
Authority
CN
China
Prior art keywords
building
barricade
plant hole
vertical greening
infiltrating irrigation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520476970.9U
Other languages
Chinese (zh)
Inventor
王清江
王悦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Technology and Business Institute
Original Assignee
Chongqing Technology and Business Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Technology and Business Institute filed Critical Chongqing Technology and Business Institute
Priority to CN201520476970.9U priority Critical patent/CN204721929U/en
Application granted granted Critical
Publication of CN204721929U publication Critical patent/CN204721929U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)
  • Cultivation Of Plants (AREA)

Abstract

The utility model discloses a kind of building barricade vertical greening structure, comprise the kind plant hole building barricade and along the building through setting of barricade thickness direction and for planting green plants, also comprise the infiltrating irrigation system for irrigating plantation hole irrigation, described infiltrating irrigation system at least comprises introduces the Infiltrating irrigation water pipe of kind of plant hole by infiltration in the soil body of the body of wall back side; By the kind plant hole that building barricade is arranged, multiple afforestation vegetation can be planted, and by infiltrating irrigation system, vegetation is watered, simple structure, there is provided a kind of building barricade vertically to afforest scheme, the concrete surface reducing building barricade causes environmental visual to pollute, and improves afforestation effect.

Description

Building barricade vertical greening structure
Technical field
The utility model relates to building engineering field, particularly one building barricade vertical greening structure.
Background technology
City civil engineering, because landform needs, often can build retaining wall to guarantee the stable of building slope; present stage; building retaining wall mostly is slabstone, the rectangular slab of stone or the form such as brick setting, concrete guard wall, no matter the barricade of which kind of material, and its front is the exposed face of board outside.Barricade front because of above-mentioned material is single grey, and the many meetings of the single look of large area make people produce visual fatigue, cause environmental pollution to a certain extent.Therefore, body of wall front is vertically afforested becomes barricade engineering a great problem, and existing taking plants rattan shape plant measures on wall top or foundation more, this measure makes body of wall front slightly take on a new look, but be generally single green, and longer vegetation period of rattan shape, the object of greens can not be reached very soon.So development a kind of building barricade vertical greening technique scheme or device have seemed very necessary and urgent.
Utility model content
In view of this, the utility model provides a kind of building barricade vertical greening structure, and simple structure, can be used for building barricade and vertically afforest, and avoids building the impact of barricade concrete walls in the face of environment, improves afforestation effect.
Building barricade vertical greening structure of the present utility model, comprise the kind plant hole building barricade and along the building through setting of barricade thickness direction and for planting green plants, also comprise the infiltrating irrigation system for irrigating plantation hole irrigation, described infiltrating irrigation system at least comprises introduces the Infiltrating irrigation water pipe of kind of plant hole by infiltration in the soil body of the body of wall back side.
Further, infiltrating irrigation system also comprise wall the back of the body loaded filter, described Infiltrating irrigation water pipe comprise vertically ooze pipe and level permeation tube, described vertically ooze pipe and described level permeation tube be all embedded in wall carry on the back loaded filter.
Further, infiltrating irrigation system also comprises the row's sewer being arranged on wall back of the body loaded filter top, and described pipe upper end of vertically oozing is communicated with row's sewer, and lower end is stretched in kind of plant hole.
Further, wall back of the body loaded filter is non-woven wraps sand-stone cushion, and wall back of the body loaded filter thickness is 15-20cm.
Further, the Water Leakage cover that Guan Shangshe can filter foreign material is vertically oozed.
Further, building barricade is Gravity Retaining Wall or pH-static method.
Further, plant plant hole and be located at barricade metope, planting plant hole is quincunx laying, through along barricade thickness direction.
Further, planting plant hole diameter is 20-60cm.
Further, planting plant hole is the different two kinds of structures of diameter, and two kinds of structure kind plant hole intervals are arranged.
Further, the spilled water hole position of planting plant hole correspondence building barricade is arranged.
The beneficial effects of the utility model: building barricade vertical greening structure of the present utility model, by the kind plant hole that building barricade is arranged, multiple afforestation vegetation can be planted, and by infiltrating irrigation system, vegetation is watered, simple structure, there is provided a kind of building barricade vertically to afforest scheme, the concrete surface reducing building barricade causes environmental visual to pollute, and improves afforestation effect.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is further described.
Fig. 1 is building barricade vertical greening of the present utility model structure front schematic view;
Fig. 2 is the wall profiles schematic diagram of building barricade vertical greening of the present utility model structure;
Fig. 3 is that the kind plant hole of building barricade vertical greening of the present utility model structure coordinates schematic diagram with Infiltrating irrigation water pipe;
Fig. 4 be building barricade vertical greening of the present utility model structure vertically ooze pipe schematical top view.
Embodiment
Fig. 1 is building barricade vertical greening of the present utility model structure front schematic view, Fig. 2 is the wall profiles schematic diagram of building barricade vertical greening of the present utility model structure, Fig. 3 is that the kind plant hole of building barricade vertical greening of the present utility model structure coordinates schematic diagram with Infiltrating irrigation water pipe, Fig. 4 be building barricade vertical greening of the present utility model structure vertically ooze pipe schematical top view, as shown in the figure: the building barricade vertical greening structure of the present embodiment, comprise the kind plant hole 2 building barricade 1 and along the building through setting of barricade 1 thickness direction and for planting green plants, also comprise the infiltrating irrigation system for irrigating kind of plant hole 2, described infiltrating irrigation system at least comprises introduces the Infiltrating irrigation water pipe of kind of plant hole 2 by infiltration in the soil body of the body of wall back side, kind of plant hole 2 is for planting afforestation vegetation, and plant plant hole 2 and can arrange multiple on building barricade 1, both sides before and after building barricade 1 full thickness direction, infiltrating irrigation system is used for supplying water to kind of plant hole 2, can enter kind of plant hole 2 by seeping water in the soil body of the body of wall back side through Infiltrating irrigation water pipe.
In the present embodiment, infiltrating irrigation system also comprises wall back of the body loaded filter 3, and described Infiltrating irrigation water pipe comprises and vertically oozes pipe 4 and level permeation tube 5, describedly vertically oozes pipe 4 and described level permeation tube 5 is all embedded in wall back of the body loaded filter 3; Wall back of the body loaded filter 3 can filter coming water source from the body of wall back side, prevents foreign material from entering Infiltrating irrigation water pipe, in addition, vertically oozes pipe 4 and level permeation tube 5 is steel skeleton construction.
In the present embodiment, infiltrating irrigation system also comprises the row's sewer 6 being arranged on wall back of the body loaded filter 3 top, and described pipe 4 upper end of vertically oozing is communicated with row's sewer 6, and lower end is stretched in kind of plant hole 2; Wall back of the body loaded filter 3 top is located at by row's sewer 6, to discharge the domatic rainwater in ground, body of wall top, in row's sewer 6, water source is pooled in wall planting cave 2 by vertical water pipe, in arid summer, can use running water in row's sewer 6, or pumping irrigation of digging a well nearby.
In the present embodiment, wall back of the body loaded filter 3 is non-woven wraps sand-stone cushion, and wall back of the body loaded filter 3 thickness is 15-20cm; Namely be convenient to filter, be convenient to again manufacture, cost is lower.
In the present embodiment, vertically ooze the Water Leakage cover 7 pipe 4 established and can filter foreign material; Prevent foreign material from entering and vertically ooze pipe 4.
In the present embodiment, building barricade 1 is Gravity Retaining Wall or pH-static method; Certainly, build barricade 1 and also can be other existing building engineering barricade forms.
In the present embodiment, plant plant hole 2 and be located at barricade metope, plant plant hole 2 in quincunx laying, through along barricade thickness direction.
In the present embodiment, planting plant hole 2 diameter is 20-60cm.
In the present embodiment, planting plant hole 2 be the different two kinds of structures of diameter, two kinds of structure kind plant hole 2 intervals settings; Namely planting plant hole 2 is two kinds, and only have diameter different, structure is identical, and a kind of diameter is 30cm, and another kind of diameter is 50cm, and kind plant hole 2 interval of two kinds of diameters is arranged.
In the present embodiment, the spilled water hole position of planting plant hole 2 correspondence building barricade 1 is arranged; No longer repeat arrange, plant plant hole 2 hold concurrently spilled water hole use.
What finally illustrate is, above embodiment is only in order to illustrate the technical solution of the utility model and unrestricted, although be described in detail the utility model with reference to preferred embodiment, those of ordinary skill in the art is to be understood that, can modify to the technical solution of the utility model or equivalent replacement, and not departing from aim and the scope of technical solutions of the utility model, it all should be encompassed in the middle of right of the present utility model.

Claims (10)

1. a building barricade vertical greening structure, it is characterized in that: comprise the kind plant hole building barricade and along the building through setting of barricade thickness direction and for planting green plants, also comprise the infiltrating irrigation system for irrigating plantation hole irrigation, described infiltrating irrigation system at least comprises introduces the Infiltrating irrigation water pipe of kind of plant hole by infiltration in the soil body of the body of wall back side.
2. building barricade vertical greening structure according to claim 1, it is characterized in that: described infiltrating irrigation system also comprises wall back of the body loaded filter, described Infiltrating irrigation water pipe comprise vertically ooze pipe and level permeation tube, described vertically ooze pipe and described level permeation tube be all embedded in wall carry on the back loaded filter.
3. building barricade vertical greening structure according to claim 2, is characterized in that: described infiltrating irrigation system also comprises the row's sewer being arranged on wall back of the body loaded filter top, and described pipe upper end of vertically oozing is communicated with row's sewer, and lower end is stretched in kind of plant hole.
4. building barricade vertical greening structure according to claim 3, is characterized in that: wall back of the body loaded filter is non-woven wraps sand-stone cushion, and wall back of the body loaded filter thickness is 15-20cm.
5. building barricade vertical greening according to claim 4 structure, is characterized in that: describedly vertically ooze the Water Leakage cover that Guan Shangshe can filter foreign material.
6. building barricade vertical greening structure according to claim 5, is characterized in that: described building barricade is Gravity Retaining Wall or pH-static method.
7. building barricade vertical greening structure according to claim 6, it is characterized in that: described kind of plant hole is located at barricade metope, planting plant hole is quincunx laying, through along barricade thickness direction.
8. building barricade vertical greening structure according to claim 7, is characterized in that: described kind of plant hole diameter is 20-60cm.
9. building barricade vertical greening according to claim 8 structure, is characterized in that: described kind of plant hole is the different two kinds of structures of diameter, and two kinds of structure kind plant hole intervals are arranged.
10. the building barricade vertical greening structure according to the arbitrary claim of claim 1-9, is characterized in that: the spilled water hole position of described kind of plant hole correspondence building barricade is arranged.
CN201520476970.9U 2015-07-06 2015-07-06 Building barricade vertical greening structure Expired - Fee Related CN204721929U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520476970.9U CN204721929U (en) 2015-07-06 2015-07-06 Building barricade vertical greening structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520476970.9U CN204721929U (en) 2015-07-06 2015-07-06 Building barricade vertical greening structure

Publications (1)

Publication Number Publication Date
CN204721929U true CN204721929U (en) 2015-10-28

Family

ID=54380326

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520476970.9U Expired - Fee Related CN204721929U (en) 2015-07-06 2015-07-06 Building barricade vertical greening structure

Country Status (1)

Country Link
CN (1) CN204721929U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109898549A (en) * 2019-03-12 2019-06-18 中国十九冶集团有限公司 Ecological rubble retaining wall and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109898549A (en) * 2019-03-12 2019-06-18 中国十九冶集团有限公司 Ecological rubble retaining wall and construction method thereof

Similar Documents

Publication Publication Date Title
CN103760318B (en) Bidirectional penetration model testing device suitable for soil-rock slopes
CN204697604U (en) Modularization planting pot
CN105104010A (en) Water and fertilizer automatic irrigation greening wall
CN202040445U (en) Salt drainage pipe for soil improvement
CN203320535U (en) Rock slope green protection structure
CN206667420U (en) Sponge city high-effective penetrating type greenery patches constructs
CN204721929U (en) Building barricade vertical greening structure
CN208346836U (en) A kind of hidden drainage system
CN204929795U (en) A kind of liquid manure automatic irrigation greening wall
CN207003470U (en) A kind of pin-connected panel ecological anchor rod retaining wall structure
CN205804423U (en) A kind of discharge structure of basement
CN108633545A (en) Vertical bank revetment vertical planting system and preparation method thereof
CN205024706U (en) Ecological bank protection of landscape design
CN205908109U (en) Vertical greening enclosure
CN202482736U (en) Honeycomb geotechnical lattice room
CN205546831U (en) three-dimensional planting system
CN104652595B (en) Half support water storage type greenery patches structure of a kind of urban flood defence and utilization of flood resources
CN206346091U (en) Water permeable sidewalk
CN203235587U (en) Irrigation-drainage water pipe
CN203618491U (en) Landscape water saving device for park green land
CN207686047U (en) A kind of ecological block wall
CN207219655U (en) A kind of sand ground water and soil conservation device
CN207244677U (en) A kind of stealth aproll building
CN211149914U (en) Sponge city ecological parking lot function demonstration model
CN206629528U (en) A kind of bamboo planting pergola easily moved

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151028

Termination date: 20170706