CN203320535U - Rock slope green protection structure - Google Patents

Rock slope green protection structure Download PDF

Info

Publication number
CN203320535U
CN203320535U CN2013202847047U CN201320284704U CN203320535U CN 203320535 U CN203320535 U CN 203320535U CN 2013202847047 U CN2013202847047 U CN 2013202847047U CN 201320284704 U CN201320284704 U CN 201320284704U CN 203320535 U CN203320535 U CN 203320535U
Authority
CN
China
Prior art keywords
rock
concrete slab
safeguard structure
domatic
slope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013202847047U
Other languages
Chinese (zh)
Inventor
龚继周
龚健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2013202847047U priority Critical patent/CN203320535U/en
Application granted granted Critical
Publication of CN203320535U publication Critical patent/CN203320535U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

Provided is a rock slope green protection structure. The rock slope green protection structure solves the problem of rock slope green protection effectively, and improves the green protection effect. The rock slope green protection structure comprises anchoring anchor rods (1), concrete boards (2) and planting nutrient soil (3), wherein the anchoring anchor rods (1) are arranged longitudinally in a spaced and rowed mode along a rock slop face (A), the lower portions of the anchoring anchor rods (1) are connected with a rock body in an anchoring mode, the concrete boards (2) are longitudinally arranged on the rock slope face (A) at intervals, one concrete board (2) is fixedly connected with the exposed sections of the corresponding row of anchoring anchor rods (1), and the planting nutriment soil (3) is backfilled between the concrete boards (2) and the rock slope face (A).

Description

The rock side slope green safeguard structure
Technical field
The utility model relates to the rock side slope Green Protection, particularly ragstone cut slope Green Protection.
Background technology
Rock matter cut slope is one of project very common in the civil workss such as railway, highway, because the excavating cut slope side slope surface is rock, can not on it is domatic, directly carry out Green Protection.Along with improving constantly that the continuous enhancing of China's economic strength and people require environment and view, need to take measures rock slope is carried out to Green Protection, particularly the zone such as in densely populated, tourist attractions.The measure of carrying out at present the Green Protection employing in engineering on rock slope has the sprayed mortar base material to plant the measures such as life, geotechnological gauze pad soil moved in to improve the original grass planting and packed planting for ecologic protection.But every kind of measure has the problem of its existence: as the sprayed mortar base material is planted life, cause the base material water retention property because the concrete substrate thickness sprayed is limited and trophism can not be permanent, plant living plant life generally about 2 years, and this measures engineering cost is higher; Geotechnique's gauze pad soil moved in to improve the original grass planting is not when the engineering initial stage, plant grew, and soil moved in to improve the original easily is washed, and the geonet pad life is very limited in addition, and after lifetime, there is hidden danger in domatic soil moved in to improve the original stability; Packed planting for ecologic protection must take effective measures and guarantee that it is in the domatic life-span and stable, and its construction is comparatively difficult and cost is higher, and steeper its difficulty of slope gradient is larger.Therefore, a kind of economy of active demand, Green Protection are effective, the simple rock side slope green safeguard structure of constructing, and meet the requirement of environmental protection.
The utility model content
Technical problem to be solved in the utility model is to provide a kind of rock side slope green safeguard structure, to efficiently solve rock slope Green Protection problem, improves the Green Protection effect.
It is as follows that the utility model solves the technical scheme that its technical problem adopts:
Rock side slope green safeguard structure of the present utility model is characterized in that it comprises: anchoring rod, along the domatic longitudinal separation of rock slope, be set in row, and its underpart is connected with rock anchorage; Concrete slab, it is domatic upper that longitudinal separation is arranged at rock slope, and each concrete slab is fixedly connected with the exposure section of corresponding anchoring rod in a row; The plantation Nutrition Soil, backfill in concrete slab and rock slope domatic between.
The beneficial effects of the utility model are, backfill plantation Nutrition Soil volume is large, and possesses good water retention, and it is permanent that trophism keeps, but plant living plant long term growth, efficiently solves rock slope Green Protection problem, and Green Protection is effective; Construction is simple, with traditional Green Protection, compares and can save construction costs approximately more than 30%; Meet environmental requirement, there is wide popularizing application prospect.
The accompanying drawing explanation
This manual comprises following six width accompanying drawings:
Fig. 1 is the schematic cross-sectional view of the utility model rock side slope green safeguard structure one embodiment;
Fig. 2 is the schematic cross-sectional view of the utility model rock side slope green safeguard structure one embodiment;
Fig. 3 is the front schematic view of the utility model rock side slope green safeguard structure one embodiment;
Fig. 4 is the front schematic view of the utility model rock side slope green safeguard structure one embodiment;
Fig. 5 is the front schematic view of the utility model rock side slope green safeguard structure one embodiment;
Fig. 6 is the structural representation of concrete slab in the utility model rock side slope green safeguard structure.
Member shown in figure, toponym and corresponding mark: anchoring rod 1, concrete slab 2, plantation Nutrition Soil 3, flower platform 4, steel fabric sheet 5, bank protection framework 6a, skeleton 6b, mark time 7, the domatic A of rock slope, platform B, gutter C
The specific embodiment
Below in conjunction with drawings and Examples, the utility model is further illustrated.
See figures.1.and.2, rock side slope green safeguard structure of the present utility model comprises: anchoring rod 1 arranges along circuit longitudinal separation, and is set in row at interval from top to bottom at the domatic A of rock slope; Concrete slab 2, with domatic anchoring rod in a row 1 exposure part monobloc cast, or adopt prefabricated pattern and with domatic anchoring rod in a row 1 exposure part bind; Plantation Nutrition Soil 3, backfill is between concrete slab 2 and excavation rock slope A; Flower platform 4, be arranged on the rock slope platform; Steel fabric sheet 5 is arranged in concrete slab 2 middle parts; Bank protection framework or skeleton 6 be arranged on rock slope domatic on; Mark time 7, be arranged at the excavation rock slope along circuit longitudinal separation domatic.Backfill plantation Nutrition Soil volume is large, and possesses good water retention, and it is permanent that trophism keeps, but plant living plant long term growth, efficiently solves rock slope Green Protection problem, and Green Protection is effective.Construction is simple, with traditional Green Protection, compares and can save construction costs approximately more than 30%.
With reference to Fig. 3, for ease of construction and regular maintenance, described concrete slab 2 arranges along the grouping of the domatic A of rock slope lateral separation, between two adjacent groups, on the domatic A of rock slope, arranges and marks time 7.See figures.1.and.2, be to strengthen landscape effect, also can between the toe of the domatic A of rock slope and gutter C, platform B be set, along the platform B colored platform 4 that is horizontally arranged at interval, flower platform 4 is interior can plant shrub.
With reference to Fig. 4, for high pond rock side slope, can on the domatic A of rock slope, be fixedly installed bank protection framework 6a, concrete slab 2 longitudinal separations are arranged in the grid of the adjacent beams of bank protection framework 6a, the formation of adjacent longeron.With reference to Fig. 5, or be fixedly installed skeleton 6b on the domatic A of rock slope, concrete slab 2 longitudinal separations are arranged between adjacent two skeleton 6b.
The general desirable 8~10cm of described concrete slab 2 thickness, width is generally 10~20cm, and every 15~20m disconnects or shrinkage joint is set one, and anchoring rod 1 exposure segment length is generally 10~15cm.With reference to Fig. 1, concrete slab 2 can adopt cast in place concrete plate, with the exposure section of corresponding anchoring rod in a row 1, forms anchor connection.With reference to Fig. 2, concrete slab 2 also can adopt precast concrete plank, with the exposure section bind of corresponding anchoring rod in a row 1, connect, when prefabricated with the reserved bind of anchoring rod 1 correspondence position hole, anchoring rod 1 exposure section adopts galvanized anticorrosive to process or be coated with rustproof paint.With reference to Fig. 6, for avoiding concrete slab 2 crackings, can bury steel fabric sheet 5 underground in concrete slab 2, the size of mesh opening of steel fabric sheet 5 should not be greater than 20cm.
Some principles of the above the utility model rock side slope green safeguard structure that just explains through diagrams, be not the utility model to be confined to shown in and in described concrete structure and the scope of application, therefore every corresponding modify likely be utilized and equivalent, all belong to the scope of the claims that the utility model is applied for.

Claims (8)

1. rock side slope green safeguard structure is characterized in that it comprises: anchoring rod (1), along rock slope domatic (A) longitudinal separation, be set in row, and its underpart is connected with rock anchorage; Concrete slab (2), it is upper that longitudinal separation is arranged at rock slope domatic (A), and each concrete slab (2) is fixedly connected with the exposure section of corresponding anchoring rod in a row (1); Plantation Nutrition Soil (3), backfill is between concrete slab (2) and rock slope domatic (A).
2. rock side slope green safeguard structure as claimed in claim 1 is characterized in that: described concrete slab (2) arranges along the grouping of rock slope domatic (A) lateral separation, between two adjacent groups in upper arrange mark time (7) of rock slope domatic (A).
3. rock side slope green safeguard structure as claimed in claim 1, it is characterized in that: be fixedly installed bank protection framework (6a) on described rock slope domatic (A), concrete slab (2) longitudinal separation is arranged in the grid of the adjacent beams of bank protection framework (6a), the formation of adjacent longeron.
4. rock side slope green safeguard structure as claimed in claim 1, it is characterized in that: be fixedly installed skeleton (6b) on described rock slope domatic (A), concrete slab (2) longitudinal separation is arranged between adjacent two skeletons (6b).
5. rock side slope green safeguard structure as claimed in claim 1 is characterized in that: between the toe of described rock slope domatic (A) and gutter (C), platform (B) is set, along platform (B) the colored platform (4) that is horizontally arranged at interval.
6. rock side slope green safeguard structure as claimed in claim 1, is characterized in that: be embedded with steel fabric sheet (5) in described concrete slab (2).
7. rock side slope green safeguard structure as described as claim 1 to 6 any one, it is characterized in that: described concrete slab (2) is cast in place concrete plate, with the exposure section of corresponding anchoring rod in a row (1), forms anchor connection.
8. rock side slope green safeguard structure as described as claim 1 to 6 any one, it is characterized in that: described concrete slab (2) is precast concrete plank, with the exposure section bind of corresponding anchoring rod in a row (1), connects.
CN2013202847047U 2013-05-23 2013-05-23 Rock slope green protection structure Expired - Fee Related CN203320535U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013202847047U CN203320535U (en) 2013-05-23 2013-05-23 Rock slope green protection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013202847047U CN203320535U (en) 2013-05-23 2013-05-23 Rock slope green protection structure

Publications (1)

Publication Number Publication Date
CN203320535U true CN203320535U (en) 2013-12-04

Family

ID=49659901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013202847047U Expired - Fee Related CN203320535U (en) 2013-05-23 2013-05-23 Rock slope green protection structure

Country Status (1)

Country Link
CN (1) CN203320535U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821106A (en) * 2014-02-17 2014-05-28 广州市市政工程设计研究院 Small-scale fishing port and riverway revetment structure
CN105178337A (en) * 2015-08-20 2015-12-23 三峡大学 Side slope ecological protection method combining vegetation nursery grooves with hung-net spray-seeding
CN108040765A (en) * 2017-12-08 2018-05-18 安徽金联地矿科技有限公司 One kind answers green and construction method based on raw basin formula rock side slope is planted
CN108738892A (en) * 2018-08-10 2018-11-06 大连久鼎生态流域治理开发有限公司 Structure and method of tree planting embedded in rocky slope
CN109281325A (en) * 2018-11-01 2019-01-29 重庆市地质矿产勘查开发局208水文地质工程地质队(重庆市地质灾害防治工程勘查设计院) Slope inclined insertion plate type green protection system and construction method
CN114622518A (en) * 2022-02-21 2022-06-14 中国长江三峡集团有限公司 Hydro-fluctuation belt rock slope ram rock ecological nest and construction method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821106A (en) * 2014-02-17 2014-05-28 广州市市政工程设计研究院 Small-scale fishing port and riverway revetment structure
CN103821106B (en) * 2014-02-17 2016-02-17 广州市市政工程设计研究总院 Small-sized fishing port and channel revetment structure
CN105178337A (en) * 2015-08-20 2015-12-23 三峡大学 Side slope ecological protection method combining vegetation nursery grooves with hung-net spray-seeding
CN108040765A (en) * 2017-12-08 2018-05-18 安徽金联地矿科技有限公司 One kind answers green and construction method based on raw basin formula rock side slope is planted
CN108738892A (en) * 2018-08-10 2018-11-06 大连久鼎生态流域治理开发有限公司 Structure and method of tree planting embedded in rocky slope
CN109281325A (en) * 2018-11-01 2019-01-29 重庆市地质矿产勘查开发局208水文地质工程地质队(重庆市地质灾害防治工程勘查设计院) Slope inclined insertion plate type green protection system and construction method
CN114622518A (en) * 2022-02-21 2022-06-14 中国长江三峡集团有限公司 Hydro-fluctuation belt rock slope ram rock ecological nest and construction method
CN114622518B (en) * 2022-02-21 2023-05-09 中国长江三峡集团有限公司 An ecological nest and its construction method of picking slabs and rockfills on rocky slopes in the hydrofluctuation zone

Similar Documents

Publication Publication Date Title
CN203320535U (en) Rock slope green protection structure
CN204305674U (en) Anchor pole grid is utilized to carry out shale side slope plantation greening structure
CN106759104B (en) Ecological slope protection structure and construction method
CN202280064U (en) Protection structure for stone side slope with slope greater than 75 degrees
CN207295737U (en) Suitable for the ecological revetment system in plateau mountainous region
CN201343730Y (en) Ecological protection structure for high rock slope
CN206428709U (en) A kind of highway slope protection
CN202148531U (en) Sand layer cut slope ecological protection structure
CN205000346U (en) Slope frame for slope reinforcement and water drainage
CN207700203U (en) A kind of pile plate wall supporting construction with ecological protective functions
CN203912647U (en) A kind of terrace cropping slot type greening side slope structure
CN207452830U (en) A kind of ecological riverway system of hydraulic engineering
CN205908109U (en) Vertical greening enclosure
CN205276212U (en) River course ecological block barricade
CN205295856U (en) Prefabricated porous disk pipe support
CN207904939U (en) A kind of ecological revetment grass planting plane
CN202850038U (en) Ecological composite slope protection plate and slope protective structure
CN202543946U (en) Supporting structure for drainage type fender posts in soft soil area
CN207176627U (en) Large-scale earthing concrete block
CN206052637U (en) A kind of environmental height flood control barricade
CN213417732U (en) Draw-in groove formula regular hexagon ecological brick and ecological bank protection
CN204608803U (en) A kind of bolt support high gradient slope is with planting raw groove structure
CN206736743U (en) Lay the easy structure of mountable steel bridge
CN203701108U (en) Rotatable button-type ecologic slope protection component
CN201103085Y (en) Two-sided reinforced earth retaining wall of subsidence area plant cover

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131204

Termination date: 20190523