CN204000861U - Bored pile casing in a kind of water - Google Patents
Bored pile casing in a kind of water Download PDFInfo
- Publication number
- CN204000861U CN204000861U CN201420456592.3U CN201420456592U CN204000861U CN 204000861 U CN204000861 U CN 204000861U CN 201420456592 U CN201420456592 U CN 201420456592U CN 204000861 U CN204000861 U CN 204000861U
- Authority
- CN
- China
- Prior art keywords
- casing
- pile
- little
- water
- bored pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses bored pile casing in a kind of water, in this water, bored pile comprises large casing and little casing with casing, described little casing is positioned at large casing inside and both are in the same center line, between described large casing and little casing, be provided with backfill clay, the length of described little casing is greater than the length of large casing.In this water, the large little casing of casing embedded set in casing for bored pile, successively extracts little casing and large casing after pile, has realized the recycling of casing, has saved construction cost; Two casing construction parties have been avoided the quality accident such as mud loss, collapse hole bury drills, have reduced pile risk, have improved pile quality.In water, bored pile double pile casing construction economy benefit is obvious, and constructing operation is convenient, and pile quality is high.
Description
Technical field
The utility model relates to bored pile casing in a kind of water.
Background technology
In water, bored pile construction mainly adopts full casing method at present, and casing can not be recycled, and causes bored pile construction cost in water to increase, and profundal zone bored pile cost increases particularly evident.
Summary of the invention
The technical problems to be solved in the utility model is to provide bored pile casing in a kind of water that can reclaim from construction environment.
For solving the problems of the technologies described above, the utility model adopts following technical scheme: in this water, bored pile comprises large casing and little casing with casing, described little casing is positioned at large casing inside and both are in the same center line, between described large casing and little casing, be provided with backfill clay, the length of described little casing is greater than the length of large casing.
The utility model adopts after technique scheme: the large little casing of casing embedded set in casing for bored pile in this water, after pile, successively extract little casing and large casing, and realize the recycling of casing, save construction cost; Two casing construction parties have been avoided the quality accident such as mud loss, collapse hole bury drills, have reduced pile risk, have improved pile quality.In water, bored pile double pile casing construction economy benefit is obvious, and constructing operation is convenient, and pile quality is high.
Brief description of the drawings
Below in conjunction with the drawings and specific embodiments, the utility model is further described in detail.
Fig. 1 is use schematic diagram of the present utility model.
Detailed description of the invention
As shown in Figure 1, in this water, bored pile comprises large casing 1 and little casing 2 with casing, described little casing is positioned at large casing inside and both are in the same center line, and between described large casing and little casing, is provided with backfill clay 3, and the length of described little casing is greater than the length of large casing.
When use, first in water, set up working platform, utilize leading truck that large casing is transferred to riverbed and adopted vibrating hammer vibration hammering to make large casing sink to certain buried depth, the water in large casing is taken out to backfill clay compacting in large casing.Then little casing sinks to by vibrating hammer hammering, and little casing must pass the back fill course in large casing, and than more than the super dark 0.5m of large casing, little casing exceeds large casing 0.5m, in order to mud circulation.After soil layer in the middle of little casing is cleaned out; under the protection of little casing, can complete smoothly pore-forming, underwater concreting; due to rich and influential family by and little casing between backfill clay, before concrete initial set, little casing can be pulled out, and there will not be the quality problems such as collapse hole, necking down.Concrete completes setting and harden in large casing and backfill clay, wait pile strength reach design strength 75% after, owing to there being the isolation of backfill, large casing also can be pulled out smoothly.
Claims (1)
1. bored pile casing in a water, it is characterized in that: in described water, bored pile casing comprises large casing and little casing, described little casing is positioned at large casing inside and both are in the same center line, between described large casing and little casing, be provided with backfill clay, the length of described little casing is greater than the length of large casing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420456592.3U CN204000861U (en) | 2014-08-13 | 2014-08-13 | Bored pile casing in a kind of water |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420456592.3U CN204000861U (en) | 2014-08-13 | 2014-08-13 | Bored pile casing in a kind of water |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204000861U true CN204000861U (en) | 2014-12-10 |
Family
ID=52040886
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420456592.3U Expired - Fee Related CN204000861U (en) | 2014-08-13 | 2014-08-13 | Bored pile casing in a kind of water |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204000861U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105672255A (en) * | 2016-02-22 | 2016-06-15 | 深圳市工勘岩土集团有限公司 | Double pile casing construction method for controlling perpendicularity |
CN113445488A (en) * | 2021-07-16 | 2021-09-28 | 中铁六局集团有限公司 | Method for treating underground pipeline or karst cave |
CN114135753A (en) * | 2021-11-23 | 2022-03-04 | 华立辉 | Communication equipment support with prevent falling effect |
-
2014
- 2014-08-13 CN CN201420456592.3U patent/CN204000861U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105672255A (en) * | 2016-02-22 | 2016-06-15 | 深圳市工勘岩土集团有限公司 | Double pile casing construction method for controlling perpendicularity |
CN105672255B (en) * | 2016-02-22 | 2018-07-27 | 深圳市工勘岩土集团有限公司 | Control the construction method for double pile casings of verticality |
CN113445488A (en) * | 2021-07-16 | 2021-09-28 | 中铁六局集团有限公司 | Method for treating underground pipeline or karst cave |
CN114135753A (en) * | 2021-11-23 | 2022-03-04 | 华立辉 | Communication equipment support with prevent falling effect |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105908862B (en) | A kind of production method of masonry shell in 3D printing reinforced masonry shear wall | |
CN104514219A (en) | Underwater drilled pile foundation construction system capable of recycling steel casing and construction method thereof | |
CN204000965U (en) | The discontinuous vibration isolation empty well structure that subtracts of a kind of railway | |
CN104480934A (en) | Underwater drilled pile foundation construction system capable of recycling outer steel casing and construction method thereof | |
CN204000861U (en) | Bored pile casing in a kind of water | |
CN106149683A (en) | A kind of cast-in-place pile construction method using double casing to pass through deep metalling | |
CN102425173A (en) | Deep foundation pit earthwork digging method | |
CN104563147B (en) | Composite structure pile foundation applied to karst area and construction method of composite structure pile foundation | |
CN205475201U (en) | A device for constructing steel plate concrete ground is wall even | |
CN104563126B (en) | Construction method for bored pile by rotary drilling rig | |
CN204002832U (en) | A kind of shield tunnel portal structure | |
CN104164873A (en) | Prestressed pipe pile and construction method thereof | |
CN203174595U (en) | Recyclable steel casing | |
CN104594370A (en) | High-pressure combined flushing grouting method and structure in karst region | |
CN106978817A (en) | A kind of Novel retaining wall based process pattern and a kind of Novel retaining wall | |
CN103741690B (en) | A kind of soil plug compensates pile tube and extracts construction method and soil plug used compensation pile tube pile pulling device thereof | |
CN102865083A (en) | Working well free shield arrival engineering method and structure of existing basement structure | |
CN204941551U (en) | A kind of subway station of Curve Pipe Jacking supporting and protection structure enlarging shield-tunneling construction | |
WO2017133373A1 (en) | Small-diameter pile cluster used for pile foundation, and method for construction thereof | |
CN204326068U (en) | Underwater drilling pile foundation construction system with recyclable outer steel casing | |
CN204326069U (en) | Underwater drilling pile foundation construction system with recyclable steel casing | |
CN204326061U (en) | A kind of pile tube be drawn out easily | |
CN205116201U (en) | Open caisson construction equipment | |
CN204266221U (en) | grouting structure suitable for karst region | |
CN204000846U (en) | Floral tube slip casting uplift pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141210 Termination date: 20150813 |
|
EXPY | Termination of patent right or utility model |