CN204326069U - Bored Pile Foundation construction system in the water of recyclable steel pile casting - Google Patents

Bored Pile Foundation construction system in the water of recyclable steel pile casting Download PDF

Info

Publication number
CN204326069U
CN204326069U CN201420792764.4U CN201420792764U CN204326069U CN 204326069 U CN204326069 U CN 204326069U CN 201420792764 U CN201420792764 U CN 201420792764U CN 204326069 U CN204326069 U CN 204326069U
Authority
CN
China
Prior art keywords
steel pile
pile casting
casting
water
foundation construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420792764.4U
Other languages
Chinese (zh)
Inventor
王学忠
黄士杰
薄春莲
寇海军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 19th Bureau Group Co Ltd
Original Assignee
China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 19th Bureau Group Co Ltd filed Critical China Railway 19th Bureau Group Co Ltd
Priority to CN201420792764.4U priority Critical patent/CN204326069U/en
Application granted granted Critical
Publication of CN204326069U publication Critical patent/CN204326069U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to profundal zone drilled pile technical field, specifically disclose Bored Pile Foundation construction system in a kind of water of recyclable steel pile casting, comprise the marine drilling platform be positioned on sea, be located at the crawler crane on described marine drilling platform and vibrating hammer, be located at seabed and stablize outer steel pile casting between geological stratification and described marine drilling platform, be located at the interior steel pile casting in described outer steel pile casting, the slush pump being located at the drill bit in described interior steel pile casting and being located on described marine drilling platform, reaction frame and jack is provided with between the top mouth of described interior steel pile casting and described marine drilling platform, described drill bit is connected with described vibrating hammer by crawler crane.The utility model solves drilled pile steel pile casting unrenewable problem in profundal zone in prior art.

Description

Bored Pile Foundation construction system in the water of recyclable steel pile casting
Technical field
The utility model relates to profundal zone drilled pile technical field, particularly relate to a kind of under sea level profundal zone implement drilled pile time recyclable steel pile casting water in Bored Pile Foundation construction system.
Background technology
Steel pile casting plays vital role in Bored Pile Foundation construction overall process in water, decides the quality of pile foundation pile quality.Generally, the pile foundation steel pile casting of water jackshaft has to pass through the mud covering layer of sea (river) bed, is driven in stable geological formations, and guarantees creeping in engineering, does not occur the phenomenon of oozing, leaking mud or anti-perforation.According to common process, the steel pile casting of the pile foundation in water plinth of constructing under deepwater environment is disposable input, and after drilled pile pile, steel pile casting will not be removed, and directly remains under water, due to the large usage quantity of steel pile casting, this just causes the increase of drilled pile construction cost and the waste of material.
Utility model content
(1) technical problem that will solve
The purpose of this utility model is to provide Bored Pile Foundation construction system in a kind of water of recyclable steel pile casting, to solve drilled pile steel pile casting unrenewable problem in profundal zone in prior art.
(2) technical scheme
In order to solve the problems of the technologies described above, the utility model provides Bored Pile Foundation construction system in a kind of water of recyclable steel pile casting, comprising: the marine drilling platform on sea, be located at crawler crane on described marine drilling platform and vibrating hammer, be located at the slush pump stablized outer steel pile casting between geological stratification and described marine drilling platform, be located at steel pile casting in described outer steel pile casting, be located at the drill bit in described interior steel pile casting and be located on described marine drilling platform in seabed; Be provided with reaction frame and jack between the top mouth of described interior steel pile casting and described marine drilling platform, described drill bit is connected with described vibrating hammer by crawler crane.
Preferably, described jack is hydraulic jack.
Preferably, the top mouth of described outer steel pile casting 25cm ~ 35cm higher than the top mouth of described interior steel pile casting.
Preferably, the wall thickness of described interior steel pile casting is 10mm ~ 15mm.
Preferably, the internal diameter of described outer steel pile casting 0.8m ~ 1.2m larger than the external diameter of described interior steel pile casting.
Preferably, the internal diameter of described interior steel pile casting 8cm ~ 12cm larger than the stake footpath of design stake.
Preferably, described drill bit is divided into drill hammer and becomes drill, and the diameter 4cm ~ 6cm larger than the stake footpath of design stake of described drill hammer, the diameter of described one-tenth drill is equal with the stake footpath of design stake.
Preferably, being combined as four groups and being along the circumferential direction uniformly distributed of described reaction frame and jack.
(3) beneficial effect
In the water of recyclable steel pile casting of the present utility model, Bored Pile Foundation construction system have employed inside and outside clad steel casing, by the follow-up of interior steel pile casting and boring mud retaining wall and mud off with the use of, after achieving pile, steel pile casting extracts recovery, reduce the construction cost of drilled pile, achieve the recycling of steel pile casting, solve drilled pile steel pile casting unrenewable problem in profundal zone in prior art.
Accompanying drawing explanation
Fig. 1 is the structural representation of Bored Pile Foundation construction system in the water of the recyclable steel pile casting of the utility model embodiment;
Fig. 2 is the schematic diagram of Bored Pile Foundation construction system when interior steel pile casting follow-up in the water of the recyclable steel pile casting of the utility model embodiment;
Fig. 3 is the schematic diagram of Bored Pile Foundation construction system when drilling construction in the water of the recyclable steel pile casting of the utility model embodiment.
In figure, 1: marine drilling platform; 2: vibrating hammer; 3: geological stratification is stablized in seabed; 4: outer steel pile casting; 5: interior steel pile casting; 6: drill hammer; 7: reaction frame and jack; 8: slush pump; 9: become drill.
Detailed description of the invention
Below in conjunction with drawings and Examples, embodiment of the present utility model is described in further detail.Following examples for illustration of the utility model, but can not be used for limiting scope of the present utility model.
As Figure 1-3, in the water of the recyclable steel pile casting of the present embodiment, Bored Pile Foundation construction system comprises: be arranged in the marine drilling platform 1 on sea, crawler crane (figure does not mark) and the vibrating hammer 2 be located on marine drilling platform 1, be located at seabed and stablize the outer steel pile casting 4 between geological stratification 3 and marine drilling platform 1, the steel pile casting 5 being located at outer steel pile casting 4, the drill bit being located at steel pile casting 5 and the slush pump 8 be located on marine drilling platform; Be provided with reaction frame and jack 7 between the top mouth of interior steel pile casting 5 and marine drilling platform 1, described drill bit is connected with vibrating hammer 2 by crawler crane.
In the present embodiment, described jack can be hydraulic jack.The top mouth 25cm ~ 35cm higher than the top mouth of interior steel pile casting 5 of outer steel pile casting 4.The wall thickness of interior steel pile casting 5 is 10mm ~ 15mm.Internal diameter 0.8m ~ the 1.2m larger than the external diameter of interior steel pile casting 5 of outer steel pile casting 4.Internal diameter 8cm ~ the 12cm larger than the stake footpath of design stake of interior steel pile casting 5.
Described drill bit is divided into drill hammer 6 and becomes drill 9, and the diameter 4cm ~ 6cm larger than the stake footpath of design stake of drill hammer 6, becomes the diameter of drill 9 equal with the stake footpath of design stake.
Being combined as four groups and being along the circumferential direction uniformly distributed of described reaction frame and jack 7.
As Figure 1-3, in the water of the above-mentioned recyclable steel pile casting of the application of the present embodiment the recyclable steel pile casting of Bored Pile Foundation construction system water in Bored Pile Foundation foundation construction comprise the following steps:
S1. drilling platform 1 arranges crawler crane and vibrating hammer 2, slush pump 8 at sea.
S2. use crawler crane and the outer steel pile casting of vibrating hammer sinking, make the end mouth injection of outer steel pile casting stablize in geological stratification to seabed;
The internal diameter of interior steel pile casting 5 is than large 10 centimetres of the stake footpath designing stake, and the wall thickness of interior steel pile casting 5 is 12 millimeters, larger than the external diameter of interior steel pile casting 5 1.0 meters of the internal diameter of outer steel pile casting 4.
S3. use crawler crane and vibrating hammer 2 steel pile casting 5 in sinking in steel pile casting 4 outside, between the top mouth and marine drilling platform 1 of interior steel pile casting 5, reaction frame and jack 7 are installed;
Specifically, the counterforce device pushing up installation on mouth and marine drilling platform 1 at interior steel pile casting 5 is made up of four large-tonnage hydraulic jacks and special reaction frame, is arranged at the quarter turn place of interior steel pile casting 5 respectively, and installing must safely, firmly, reliably.
S4. by crawler crane and vibrating hammer 2, drill hammer 6 is put in interior steel pile casting 5;
The diameter of drill hammer 6 is than large 5 centimetres of the stake footpath designing stake, and meanwhile, the diameter of drill hammer 6 is less than the internal diameter of interior steel pile casting 55 centimetres.
S5. as shown in Figure 2, start drill hammer 6 and start drilling construction, along with the continuous propelling of boring, startup reaction frame and jack 7 inwardly steel pile casting 5 apply downward pressure, interior steel pile casting 5 by gradually at the bottom of press-in hole, is stablized in geological stratification 3 until the end mouth of interior steel pile casting 5 arrives seabed under the effect of downward pressure;
Concrete, drill hammer 6 starts drilling construction, along with the continuous drilling depth of boring, start counterforce device and apply downforce, interior steel pile casting 5 is subject to the effect of downforce, adds from gravity, be pressed at the bottom of hole gradually along outer steel pile casting 4 hole wall, reach the effect of " follow-up ", interior steel pile casting 5 always " follow-up " to seabed is stablized in geological stratification 3, guarantee not spillage, not boring a hole can stop " follow-up ".
S6. with powerful slush pump 8, the boring mud in interior steel pile casting 5 is extracted in the gap between outer steel pile casting 4 and interior steel pile casting 5, forms circular boring mud mud off;
Because the diameter difference of interior steel pile casting 5 and outer steel pile casting 4 is designed to 1 meter, therefore there is enough spaces can deposit more boring mud and mud, solves the problem of mud circulation.
S7., as shown in Figure 3, after interior steel pile casting 5 stops " follow-up ", drill hammer 6 is changed into the one-tenth drill 9 of design pile foundation construction, start into drill 9 until complete the pore-forming of drilled pile;
Clay be backfilling into always higher than design stake stake top mark high 1.8 meters ~ 2.2 meters of till, be preferably 2 meters in the present embodiment.
S8. respectively the boring mud in the gap between outer steel pile casting 4 and interior steel pile casting 5 and the new boring mud in interior steel pile casting 5 are extracted out with slush pump 8, then, in the gap outside between steel pile casting 4 and interior steel pile casting 5, backfill clay;
Concrete, after pore-forming, extract boring mud between interior steel pile casting 5 and outer steel pile casting 4 and mud out with slush pump 8, boring mud is abandoned outward, and mud then can recycle, then, backfill clay in gap between interior steel pile casting 5 and outer steel pile casting 4, be backfilled to more than design stake top mark height 2 meters of always.
S9. concrete perfusion in pore-forming, after filling concrete completes, extracts interior steel pile casting 5 with crawler crane and vibrating hammer 2 immediately.
S10. when after the concrete initial set poured in pore-forming, slowly vibrate with crawler crane and vibrating hammer and extract outer steel pile casting.
After filling concrete completes, extract interior steel pile casting 5 immediately with crawler crane and vibrating hammer 2, owing to there being the clay dado of 50 cm thicks between interior steel pile casting 5 and outer steel pile casting 4, therefore, concrete can not scatter and disappear and collapse.It should be noted that the speed of extracting is unsuitable too fast.Outer steel protects, 4 after concrete initial set slowly vibration extract.Enforcement of the present utility model, need the counterforce device of practical a, strong operability, and drilling platform also needs to strengthen, to bear huge downforce.In addition, the clay dado between interior steel pile casting 5 and outer steel pile casting 4 don't fail to be reliable and stable, otherwise after interior steel pile casting 5 extracts, if retaining wall collapses, certainly will affect the concrete quality of pile foundation.
In the water of recyclable steel pile casting of the present utility model, Bored Pile Foundation construction system and construction method thereof have employed inside and outside clad steel casing, by the follow-up of interior steel pile casting and boring mud retaining wall and mud off with the use of, after achieving pile, steel pile casting extracts recovery, reduce the construction cost of drilled pile, achieve the recycling of steel pile casting, solve drilled pile steel pile casting unrenewable problem in profundal zone in prior art.
Embodiment of the present utility model provides for the purpose of example and description, and is not exhaustively or by the utility model be limited to disclosed form.Many modifications and variations are apparent for the ordinary skill in the art.Selecting and describing embodiment is in order to principle of the present utility model and practical application are better described, and enables those of ordinary skill in the art understand the utility model thus design the various embodiments with various amendment being suitable for special-purpose.

Claims (8)

1. Bored Pile Foundation construction system in the water of a recyclable steel pile casting, it is characterized in that, comprising: the marine drilling platform on sea, be located at crawler crane on described marine drilling platform and vibrating hammer, be located at the slush pump stablized outer steel pile casting between geological stratification and described marine drilling platform, be located at steel pile casting in described outer steel pile casting, be located at the drill bit in described interior steel pile casting and be located on described marine drilling platform in seabed; Be provided with reaction frame and jack between the top mouth of described interior steel pile casting and described marine drilling platform, described drill bit is connected with described vibrating hammer by crawler crane.
2. Bored Pile Foundation construction system in the water of recyclable steel pile casting according to claim 1, it is characterized in that, described jack is hydraulic jack.
3. Bored Pile Foundation construction system in the water of recyclable steel pile casting according to claim 1, is characterized in that, the top mouth 25cm ~ 35cm higher than the top mouth of described interior steel pile casting of described outer steel pile casting.
4. Bored Pile Foundation construction system in the water of recyclable steel pile casting according to claim 1, it is characterized in that, the wall thickness of described interior steel pile casting is 10mm ~ 15mm.
5. Bored Pile Foundation construction system in the water of recyclable steel pile casting according to claim 1, is characterized in that, the internal diameter 0.8m ~ 1.2m larger than the external diameter of described interior steel pile casting of described outer steel pile casting.
6. Bored Pile Foundation construction system in the water of recyclable steel pile casting according to claim 5, is characterized in that, the internal diameter 8cm ~ 12cm larger than the stake footpath of design stake of described interior steel pile casting.
7. Bored Pile Foundation construction system in the water of recyclable steel pile casting according to claim 6, it is characterized in that, described drill bit is divided into drill hammer and becomes drill, diameter 4cm ~ the 6cm larger than the stake footpath of design stake of described drill hammer, the diameter of described one-tenth drill is equal with the stake footpath of design stake.
8. according to Bored Pile Foundation construction system in the water of the recyclable steel pile casting in claim 1-7 described in any one, it is characterized in that, being combined as four groups and being along the circumferential direction uniformly distributed of described reaction frame and jack.
CN201420792764.4U 2014-12-12 2014-12-12 Bored Pile Foundation construction system in the water of recyclable steel pile casting Active CN204326069U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420792764.4U CN204326069U (en) 2014-12-12 2014-12-12 Bored Pile Foundation construction system in the water of recyclable steel pile casting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420792764.4U CN204326069U (en) 2014-12-12 2014-12-12 Bored Pile Foundation construction system in the water of recyclable steel pile casting

Publications (1)

Publication Number Publication Date
CN204326069U true CN204326069U (en) 2015-05-13

Family

ID=53162445

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420792764.4U Active CN204326069U (en) 2014-12-12 2014-12-12 Bored Pile Foundation construction system in the water of recyclable steel pile casting

Country Status (1)

Country Link
CN (1) CN204326069U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104514219A (en) * 2014-12-12 2015-04-15 中铁十九局集团有限公司 In-water drilled pile foundation construction system capable of recovering steel protective barrels and construction method thereof
CN105002890A (en) * 2015-07-15 2015-10-28 杭州江润科技有限公司 Abyssal region cast-in-situ bored pile nondestructive assembly and disassembly double-layer steel casing group structure and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104514219A (en) * 2014-12-12 2015-04-15 中铁十九局集团有限公司 In-water drilled pile foundation construction system capable of recovering steel protective barrels and construction method thereof
CN105002890A (en) * 2015-07-15 2015-10-28 杭州江润科技有限公司 Abyssal region cast-in-situ bored pile nondestructive assembly and disassembly double-layer steel casing group structure and construction method
CN105002890B (en) * 2015-07-15 2017-03-08 杭州江润科技有限公司 A kind of profundal zone cast-in-situ bored pile is lossless to assemble and disassemble double-deck steel pile casting group structure and construction method

Similar Documents

Publication Publication Date Title
CN104514219A (en) In-water drilled pile foundation construction system capable of recovering steel protective barrels and construction method thereof
CN104480934A (en) Water drilling pile foundation construction system capable of recycling outer steel protecting tube, and construction method of water drilling pile foundation construction system
CN103726496A (en) Circular deep foundation pit bored secant pile wall supporting construction method
CN104563126B (en) A kind of churning driven bored pile construction method
CN103122632A (en) Construction method for drilling hole and casting pile in plastic flow stratum or karst cave stratum
CN204326069U (en) Bored Pile Foundation construction system in the water of recyclable steel pile casting
CN105133641A (en) Thin-wall continuous-wall-type foundation reinforcing structure and method
CN102912789A (en) Mechanical hole forming technology applied to karst landform
CN104831705A (en) Ultra-deep hole grouting method during underground excavation of tunnel
CN104563100A (en) Cement mixing pile later embedding press-grouting pile support structure and construction method
CN104452751A (en) Secondary pouring pile forming device and pile forming method for bored piles
CN104790982B (en) A kind of bored tunnel superdeep holes grouting sleeve shell material
CN106638579A (en) Construction method of coral sand foundation expanding cement mortar injection pile
CN203625883U (en) Steel sheet support pile with pipes for foundation pit construction
CN105545315A (en) Normal pressure tool replacing method for reinforcing excavation face soil layer in shield tunnel construction
CN204326068U (en) Bored Pile Foundation construction system in the water of recyclable outer steel pile casting
CN204326061U (en) A kind of pile tube be drawn out easily
CN108049804B (en) Scall no-dig technique changes in situ fills out Auger drilling method
CN204827466U (en) Undercut tunnel ultra -deep hole slip casting is with sleeve valve pipe
CN105064352A (en) Building expanding head anchor rod pile construction technology and anchor rod pile adopting technology
CN102296597A (en) Construction method of steel pipe piles in shallow soil layer
CN204827465U (en) Undercut tunnel ultra -deep hole slip casting structure
CN204000861U (en) Bored pile casing in a kind of water
CN102002943B (en) Construction method of rock-socketed secant filling pile
CN204940257U (en) A kind of pore-creating filling pile