CN204326061U - A kind of pile tube be drawn out easily - Google Patents
A kind of pile tube be drawn out easily Download PDFInfo
- Publication number
- CN204326061U CN204326061U CN201420799599.5U CN201420799599U CN204326061U CN 204326061 U CN204326061 U CN 204326061U CN 201420799599 U CN201420799599 U CN 201420799599U CN 204326061 U CN204326061 U CN 204326061U
- Authority
- CN
- China
- Prior art keywords
- stake
- tubulose
- tubulose stake
- drawn out
- out easily
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses a kind of pile tube be drawn out easily, comprise the tubulose stake of hollow and be filled in the filling tube core of tubulose stake inside, the sealed bottom shutoff of described tubulose stake; Described filling tube core can move axially in tubulose stake, and the tube wall of described tubulose stake is evenly provided with several perforates.When extracting, comprise extract fill tube core, inject pressure-air, destroy soil structures outside tubulose stake, tubulose stake cleaning, and reuse step.Adopt after said structure, structure is simple, easy construction, has constructed easily to extract afterwards, and do not affect the rigidity of stake, intensity, the stake after extracting can reuse, and does not also affect the use of extracting rear place.Both be conducive to construction industry development, and had and be beneficial to protection of the environment and economize on resources.The utility model has good economic benefit and environmental benefit, significant to the sustainable development of builing industry.
Description
Technical field
The utility model relates to a kind of pile tube, belongs to field of civil engineering, as the pattern foundation pit supporting structure, slope retaining, grouser basis etc. of civil engineering; Particularly a kind of pile tube be drawn out easily.
Background technology
Stake is the important primary structure member in civil engineering, and because its stress performance is good, easy construction, the application in modern civil engineering field widely.In traditional construction, stake is embedded in sub-surface, extracts very difficult, intactly extract just more difficult.But in modern Foundation Design and slope project, having a large amount of stakes to be that temporary lining is used, after engineering completes, needs are extracted.Conventional dismounting piling method adopts blasting technique to carry out destructiveness to remove, and wastes ample resources.A kind of pile tube being easy to extract of the utility model, in engineering, application can save ample resources, easy construction, plays a significant role in following civil engineering construction.
The current utility model about stake mainly increases the performance of stake by the section optimal of stake, as: CN102713077A discloses a kind of steel pipe pile, mainly solve the resistance reduced when stake is buried, patent CN102575446A discloses a kind of concrete filled steel tube compound pile, be the loading characteristic of performance according to different materials and stake, be optimized.
Along with the development of China's civil engineering, the pile foundation that increasing needs are removed or soldier pile are there is, also there is corresponding patented technology: as patent CN101173517 discloses a kind of pile-pulling construction method, steel bushing is squeezed into as casing in stake periphery, the shortcoming in force of this method is if run into underground obstacle, sleeve pipe cannot sink to, and the local pressure that cannula tip bears hammering is in addition crossed conference and caused casing deformation, and sleeve pipe is not easy to transfer to; Utilize full-rotating drill to extract the method (CN101629421) of deep pile foundation disclosed in Zhang Ruichang etc., abrasion drill pore-forming technique, according to illustration method, is implemented very difficult.A kind of intertidal zone beam lower carriage steel pipe pile of utility model patent CN203129146U utility model extracts equipment, and it utilizes hoist engine and truss and crossbeam etc. to carry out pile pulling, have certain feasibility, be also only limitted to Coastal Area.Above utility model all considers extracting of stake less than the structure design from stake self.
Utility model content
The technical problems to be solved in the utility model is for above-mentioned the deficiencies in the prior art, and provides one to extract conveniently, and the stake after extracting can re-use, the pile tube be drawn out easily economized on resources.
For solving the problems of the technologies described above, the technical solution adopted in the utility model is:
The pile tube be drawn out easily, comprises the tubulose stake of hollow and is filled in the filling tube core of tubulose stake inside, the sealed bottom shutoff of described tubulose stake; Described filling tube core can move axially in tubulose stake, and the tube wall of described tubulose stake is evenly provided with several perforates.
The material of described tubulose stake is steel pipe or steel concrete.
The diameter of described tubulose stake is less than 500mm.
Described perforate is that plum blossom-shaped is arranged.
The diameter of described perforate is 10-15mm, and perforate spacing is the 1/6-1/5 of tubulose stake diameter.
The diameter 3-5mm less of the diameter of tubulose stake of described filling tube core.
The material of described filling tube core is hard plastic tube.
The utility model adopts after said structure, and the tube pile structure of the application is simple, easy construction, has constructed easily to extract afterwards, and do not affect the rigidity of stake, intensity, the stake after extracting can reuse, and does not also affect the use of extracting rear place.Builing industry is the mainstay industry of China, and the making of pile foundation needs to consume a large amount of steel and cement, if stake can extract re-using, is both conducive to construction industry development, has and is beneficial to protection of the environment and economizes on resources.The utility model has good economic benefit and environmental benefit, significant to the sustainable development of builing industry.
Accompanying drawing explanation
Fig. 1 is the facade structures schematic diagram of a kind of pile tube be drawn out easily of the utility model;
Fig. 2 is the cross-sectional view of a kind of pile tube be drawn out easily of the utility model;
Fig. 3 shows the schematic diagram that pressure-air destroys soil structures outside pile tube.
Wherein have: 1. tubulose stake; 2. fill tube core; 3. perforate; 4. the soil body.
In addition, in Fig. 3, arrow shows the flow direction of pressure-air.
Detailed description of the invention
Below in conjunction with accompanying drawing and concrete better embodiment, the utility model is described in further detail.
As shown in Figure 1, a kind of pile tube be drawn out easily, comprises the tubulose stake 1 of hollow and is filled in the filling tube core 2 of tubulose stake 1 inside, the sealed bottom shutoff of tubulose stake 1; Fill tube core 2 to move axially in tubulose stake 1.
As shown in Figure 2, the tube wall of tubulose stake 1 is evenly provided with several perforates 3.Perforate 3 is preferably arranged in plum blossom-shaped.The diameter of perforate 3 is preferably 10-15mm, and perforate 3 spacing is preferably the 1/6-1/5 of tubulose stake 1 diameter.
The material of above described tubular stake 1 is preferably steel pipe or steel concrete, and the diameter of tubulose stake 1 is less than 500mm and is advisable.
The diameter of above-mentioned filling tube core 2 is advisable than the little 3-5mm of the diameter of tubulose stake 1.The material of filling tube core 2 is preferably hard plastic tube.Fill the setting of tube core 2, when pile tube inserts in soil body process, the soil body outside tubulose stake 1 and water can be prevented, enter tubulose stake 1 inside by perforate 3, thus make follow-up high pressure ascending pipe be difficult to insert or do not have the effect of spraying water with high pressure.
A method for pulling out for the pile tube be drawn out easily, comprises the following steps:
The first step, extracts and fills tube core 2: extracted out by the filling tube core 2 being positioned at tubulose stake 1 inside.
Second step, injects pressure-air: high pressure water injection pipe is stretched into the first step and extracted tubulose stake 1 inside of filling tube core 2, start to inject pressure-air.Here high pressure water injection pipe, preferably shutoff bottom it, the sidewall of high pressure water injection pipe is provided with several perforates.
3rd step, destroy the soil structures outside tubulose stake 1: as shown in Figure 3, high pressure water injection tube edge rotates limit and is promoted to tubulose stake 1 top, and pressure-air is sprayed to the soil body 4 outside tubulose stake 1 by perforate 3, thus the soil structures outside tubulose stake 1 is destroyed, thus reduce pile extraction resistance;
4th step, tubulose stake 1 is cleared up, and reuses.Meanwhile, with the hole that earthen backfill tubulose stake 1 is extracted.
Tube pile structure of the present utility model is simple, easy construction, has constructed easily to extract afterwards, and do not affect the rigidity of stake, intensity, the stake after extracting can reuse, and does not also affect the use of extracting rear place.Builing industry is the mainstay industry of China, and the making of pile foundation needs to consume a large amount of steel and cement, if stake can extract re-using, is both conducive to construction industry development, has and is beneficial to protection of the environment and economizes on resources.The utility model has good economic benefit and environmental benefit, significant to the sustainable development of builing industry.
Claims (7)
1. the pile tube be drawn out easily, is characterized in that: comprise the tubulose stake of hollow and be filled in the filling tube core of tubulose stake inside, the sealed bottom shutoff of described tubulose stake; Described filling tube core can move axially in tubulose stake, and the tube wall of described tubulose stake is evenly provided with several perforates.
2. the pile tube be drawn out easily according to claim 1, is characterized in that: the material of described tubulose stake is steel pipe or steel concrete.
3. the pile tube be drawn out easily according to claim 2, is characterized in that: the diameter of described tubulose stake is less than 500mm.
4. the pile tube be drawn out easily according to claim 1, is characterized in that: described perforate is that plum blossom-shaped is arranged.
5. the pile tube be drawn out easily according to claim 1 or 4, is characterized in that: the diameter of described perforate is 10-15mm, and perforate spacing is the 1/6-1/5 of tubulose stake diameter.
6. the pile tube be drawn out easily according to claim 1, is characterized in that: the diameter 3-5mm less of the diameter of tubulose stake of described filling tube core.
7. the pile tube be drawn out easily according to claim 6, is characterized in that: the material of described filling tube core is hard plastic tube.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420799599.5U CN204326061U (en) | 2014-12-18 | 2014-12-18 | A kind of pile tube be drawn out easily |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420799599.5U CN204326061U (en) | 2014-12-18 | 2014-12-18 | A kind of pile tube be drawn out easily |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204326061U true CN204326061U (en) | 2015-05-13 |
Family
ID=53162437
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420799599.5U Active CN204326061U (en) | 2014-12-18 | 2014-12-18 | A kind of pile tube be drawn out easily |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204326061U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106592569A (en) * | 2016-12-30 | 2017-04-26 | 铁道第三勘察设计院集团有限公司 | Device and method for reinforcing silty-fine sand foundation of passenger dedicated line |
CN108612104A (en) * | 2016-11-11 | 2018-10-02 | 叶长青 | Pile pile removal method |
-
2014
- 2014-12-18 CN CN201420799599.5U patent/CN204326061U/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108612104A (en) * | 2016-11-11 | 2018-10-02 | 叶长青 | Pile pile removal method |
CN108612105A (en) * | 2016-11-11 | 2018-10-02 | 叶长青 | Pile-pulling construction method |
CN108643182A (en) * | 2016-11-11 | 2018-10-12 | 叶长青 | Different soil property pile extracting methods |
CN106592569A (en) * | 2016-12-30 | 2017-04-26 | 铁道第三勘察设计院集团有限公司 | Device and method for reinforcing silty-fine sand foundation of passenger dedicated line |
CN106592569B (en) * | 2016-12-30 | 2019-08-20 | 中国铁路设计集团有限公司 | A kind of equipment and reinforcement means for reinforcing Line for Passenger Transportation Extra-fine sand ground |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102852141B (en) | Rock-socketed pipe pile foundation with pile core by concrete pouring and pile side by static pressure grouting and construction method for rock-socketed pipe pile foundation | |
CN103422868B (en) | The structure of a kind of Super-void Water Pressure that dissipates, reinforcing shield tunnel soil body and method | |
CN104164873B (en) | Prestressed pipe pile and construction method thereof | |
CN104563147B (en) | Composite structure pile foundation applied to karst area and construction method of composite structure pile foundation | |
CN103526754A (en) | Method for constructing head-expanded anchoring rod in sand-rich decomposed rock | |
CN204326061U (en) | A kind of pile tube be drawn out easily | |
CN104074183A (en) | Drilling and concrete injected root composite pile implanting pile structure and construction method | |
CN204000881U (en) | Deep alluvion foundation mesohigh sprays the dado structure of slip casting pore-forming | |
CN101575855A (en) | Non soil taking hole guiding process for sinking prestressed pipe pile or prefabricated square pile | |
CN210266039U (en) | Active ejection type pile end rear grouting valve | |
CN205444232U (en) | Stock - gravity type infiltration retaining wall | |
CN204941551U (en) | A kind of subway station of Curve Pipe Jacking supporting and protection structure enlarging shield-tunneling construction | |
CN204252119U (en) | The special-shaped supporting pile structure of X | |
CN204000861U (en) | Bored pile casing in a kind of water | |
CN204125941U (en) | Uplift pile structure | |
CN101525875B (en) | Reinforced concrete bifurcated pipe structure under action of high pressure water and construction method | |
CN202787275U (en) | Tubular soil nailing wall of novel pneumatic impact anchor | |
CN206173985U (en) | Well casing | |
CN108755721A (en) | A kind of novel cofferdam method for protecting support for crossing piping lane construction in water river | |
CN211230475U (en) | Construction working face for pipe jacking to penetrate existing building downwards | |
CN203383219U (en) | Slip casting head structure for sleeve valve pipe | |
CN204000846U (en) | Floral tube slip casting uplift pile | |
CN203808074U (en) | Synchronous steel plate pile hole filling device | |
CN209293051U (en) | A kind of open caisson reserved opening plugging structure | |
CN203129140U (en) | Soil nailing tube with functions of water injecting, hole forming, grouting, anchoring, pumping and water discharging |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP01 | Change in the name or title of a patent holder |
Address after: 210022 Jiangsu City, Qinhuai Province, red village, No. 136, Su Yao building, 5F, Patentee after: NANJING WATER PLANNING AND DESIGNING INSTITUTE CO., LTD. Address before: 210022 Jiangsu City, Qinhuai Province, red village, No. 136, Su Yao building, 5F, Patentee before: Nanjing Water Planning and Designing Institute Co., Ltd. |