CN204000881U - Deep alluvion foundation mesohigh sprays the dado structure of slip casting pore-forming - Google Patents

Deep alluvion foundation mesohigh sprays the dado structure of slip casting pore-forming Download PDF

Info

Publication number
CN204000881U
CN204000881U CN201420373551.8U CN201420373551U CN204000881U CN 204000881 U CN204000881 U CN 204000881U CN 201420373551 U CN201420373551 U CN 201420373551U CN 204000881 U CN204000881 U CN 204000881U
Authority
CN
China
Prior art keywords
forming
slip casting
mesohigh
deep
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420373551.8U
Other languages
Chinese (zh)
Inventor
王登银
汤暘
王栋良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina New Energy Group Co Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201420373551.8U priority Critical patent/CN204000881U/en
Application granted granted Critical
Publication of CN204000881U publication Critical patent/CN204000881U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of dado structure of deep alluvion foundation mesohigh injection slip casting pore-forming.The deep alluvion foundation mesohigh that the purpose of this utility model is to provide a kind of simple in structure, easy construction sprays the dado structure of slip casting pore-forming, to solve in deep alluvion foundation the problem that causes collapse hole in high pressure jet grouting pore-forming because of complex formation (local built on stilts, material composition is loose etc.).The technical solution of the utility model is: a kind of deep alluvion foundation mesohigh sprays the dado structure of slip casting pore-forming, in injected hole, insert and the protection casing of injected hole aperture adaptation, it is characterized in that: in described protection casing, insert the PVC floral tube easily being smashed by high speed water, air-flow.This practicality is newly applicable to the similar engineerings such as deep alluvion foundation high pressure jet grouting processing.

Description

Deep alluvion foundation mesohigh sprays the dado structure of slip casting pore-forming
Technical field
The utility model relates to a kind of dado structure of deep alluvion foundation mesohigh injection slip casting pore-forming.Be applicable to the similar engineerings such as deep alluvion foundation high pressure jet grouting processing.
Background technology
For deep alluvion foundation, when covering layer material forms evenly, when grating is good, in high pressure jet grouting boring, adopt sleeve pipe follow-up to be just easy to pore-forming, when but complicated when formation material composition, local built on stilts phenomenon is serious, overlap joint is comparatively loose between particle, adopt conventional will going wrong with casing drilling pore-forming mode, because in the time that sleeve pipe is extracted, hole wall will there will be and cave in, and the boring completing is by ineffective.
Summary of the invention
The technical problems to be solved in the utility model is: for the problem of above-mentioned existence, the dado structure that provides a kind of deep alluvion foundation mesohigh of simple in structure, easy construction to spray slip casting pore-forming, to solve in deep alluvion foundation the problem that causes collapse hole in high pressure jet grouting pore-forming because of complex formation (local built on stilts, material composition is loose etc.).
The technical scheme that the utility model adopts is: a kind of deep alluvion foundation mesohigh sprays the dado structure of slip casting pore-forming, in injected hole, insert and the protection casing of injected hole aperture adaptation, it is characterized in that: in described protection casing, insert the PVC floral tube easily being smashed by high speed water, air-flow.
Between described PVC floral tube and protection casing, there is gap.
Described protection casing diameter is 178mm, and PVC floral tube diameter is 146mm.
The beneficial effects of the utility model are: the utility model adopts PVC floral tube secondary retaining wall, make sleeve pipe extract rear PVC floral tube and can provide lateral support to the soil body, avoid collapse hole, and in the time of slip casting, can adopt water, air-flow at a high speed that PVC floral tube is smashed, thereby not affect the diffusion of slurries.The utility model dado structure has solved in deep alluvion foundation the problem that causes collapse hole in high pressure jet grouting pore-forming because of complex formation (local built on stilts, material composition is loose etc.) well, this processing method has improved efficiency of construction, reduce construction investment, for carrying out high pressure jet grouting construction method on deep covering layer, new approach is proposed, for similar engineering provides a kind of new thinking, there is certain application value.
Brief description of the drawings
Fig. 1 is elevational schematic view of the present utility model.
Fig. 2 is the A-A sectional view of Fig. 1.
Detailed description of the invention
As shown in Figure 1 and Figure 2, the present embodiment is the dado structure that a kind of deep alluvion foundation mesohigh sprays slip casting pore-forming, is made up of: Part I is high pressure jet grouting hole 1 three parts, and aperture, an array pitch of injected hole are selected according to engineering actual conditions; Part II is the protection casing 2 of conventional boring, and this sleeve plug is suitable with injected hole aperture in injected hole 1; Part III is the secondary retaining wall that adopts PVC floral tube 3, and PVC floral tube 3 diameters are little and easily smashed by high speed water, air-flow compared with protection casing 2 diameters, and PVC floral tube is coaxially placed in protection casing 2, between this PVC floral tube and protection casing 2, has gap, is convenient to sleeve pipe and extracts.It is 178mm that general high voltage is sprayed protection casing 2 diameters in mortar depositing construction, and PVC floral tube 3 diameters adopt 146mm.
In the time that drilling depth reaches designing requirement, extract drilling rod 4, complete transferring of PVC floral tube 3, then extract protection casing 2, make sleeve pipe extract rear PVC floral tube 3 and can provide lateral support to the soil body, avoid collapse hole.When slip casting, water, air-flow at a high speed smashes PVC floral tube 3, thereby do not affect the diffusion of slurries.

Claims (3)

1. the dado structure of a deep alluvion foundation mesohigh injection slip casting pore-forming, in injected hole (1), insert and the protection casing (2) of injected hole aperture adaptation, it is characterized in that: in described protection casing (2), insert the PVC floral tube (3) easily being smashed by high speed water, air-flow.
2. deep alluvion foundation mesohigh according to claim 1 sprays the dado structure of slip casting pore-forming, it is characterized in that: between described PVC floral tube (3) and protection casing (2), have gap.
3. deep alluvion foundation mesohigh according to claim 1 and 2 sprays the dado structure of slip casting pore-forming, it is characterized in that: described protection casing (2) diameter is 178mm, and PVC floral tube (3) diameter is 146mm.
CN201420373551.8U 2014-07-07 2014-07-07 Deep alluvion foundation mesohigh sprays the dado structure of slip casting pore-forming Active CN204000881U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420373551.8U CN204000881U (en) 2014-07-07 2014-07-07 Deep alluvion foundation mesohigh sprays the dado structure of slip casting pore-forming

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420373551.8U CN204000881U (en) 2014-07-07 2014-07-07 Deep alluvion foundation mesohigh sprays the dado structure of slip casting pore-forming

Publications (1)

Publication Number Publication Date
CN204000881U true CN204000881U (en) 2014-12-10

Family

ID=52040906

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420373551.8U Active CN204000881U (en) 2014-07-07 2014-07-07 Deep alluvion foundation mesohigh sprays the dado structure of slip casting pore-forming

Country Status (1)

Country Link
CN (1) CN204000881U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105369825A (en) * 2015-10-30 2016-03-02 国网山东省电力公司东营供电公司 Collapse prevention device of building underground cable channel
CN106087994A (en) * 2016-08-25 2016-11-09 中国水利水电第四工程局有限公司 A kind of high pressure jet grouting pore-forming dado structure and construction method thereof
CN106759562A (en) * 2017-02-23 2017-05-31 陈吉鸥 Foundation reinforcement method
CN113481978A (en) * 2021-07-23 2021-10-08 广州市第一市政工程有限公司 High-pressure jet grouting pile construction method based on PVC (polyvinyl chloride) perforated pipes

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105369825A (en) * 2015-10-30 2016-03-02 国网山东省电力公司东营供电公司 Collapse prevention device of building underground cable channel
CN106087994A (en) * 2016-08-25 2016-11-09 中国水利水电第四工程局有限公司 A kind of high pressure jet grouting pore-forming dado structure and construction method thereof
CN106759562A (en) * 2017-02-23 2017-05-31 陈吉鸥 Foundation reinforcement method
CN113481978A (en) * 2021-07-23 2021-10-08 广州市第一市政工程有限公司 High-pressure jet grouting pile construction method based on PVC (polyvinyl chloride) perforated pipes

Similar Documents

Publication Publication Date Title
CN204000881U (en) Deep alluvion foundation mesohigh sprays the dado structure of slip casting pore-forming
CN203057986U (en) Buried automatic stretching water feeding device used for trickle irrigation
CN105525901A (en) Coal seam hydrofracture strengthening permeability increasing method based on microwave irradiation
CN103470212B (en) A kind of active drilling and sealing device and method
CN202337970U (en) Plugging structure for diversion tunnel
CN202644538U (en) A grouting device used for a water-rich quicksand stratum
CN203569561U (en) Novel pile forming device of steel pipe protection wall cast-in-place piles following up drill
CN203499698U (en) Advanced curtain grouting system applied to underground engineering construction
CN105569045A (en) Grouting pipe
CN204023523U (en) Gate-valve chamber structure in a kind of dam body
CN204125941U (en) Uplift pile structure
CN204326061U (en) A kind of pile tube be drawn out easily
CN204024663U (en) Shield structure biliquid slurry filling adaptor
CN203769790U (en) Shield tunneling machine with shield tail top provided with synchronous grouting device and synchronous grouting device
CN204682066U (en) The telescopic waterworks of Multifunctional underground
CN204212158U (en) A kind of Grouting Pipe with well
CN203412596U (en) Grouting device and grouting pipe for deep rock tunnel
CN104213628B (en) Jacking mechanism for underground pipe culvert engineering
CN204326070U (en) A kind of PHC pile tube open-type steel pile tip
CN204199355U (en) A kind of guide wall of underground continuous wall groove groove milling drill bit
CN204119926U (en) A kind of simple and easy filling device
CN203891831U (en) Double-pipe aggregate pouring device with orifice
CN203383219U (en) Slip casting head structure for sleeve valve pipe
CN103967027B (en) For the construction method of the geotechnological tapping pipe in pattern foundation pit supporting structure
CN205742198U (en) A kind of Grouting Pipe

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA HYDROPOWER ENGINEERING CONSULTING GROUP CO.,

Free format text: FORMER OWNER: CHINA POWER GROUP EAST CHINA INVESTIGATION AND DESIGN INSTITUTE CO., LTD.

Effective date: 20150630

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150630

Address after: 100120 Beijing Xicheng District six paved Kang District

Patentee after: HYDROCHINA Corp.

Address before: 310014 Hangzhou city in the lower reaches of the city of Zhejiang Wang Road, No. 22

Patentee before: POWERCHINA HUADONG ENGINEERING Corp.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230410

Address after: 100162 101, Floor 1, Building 28, Yard 1, Hongye East Road, Daxing District, Beijing

Patentee after: China Power Construction New Energy Group Co.,Ltd.

Address before: 100120 liupukang District 1, Xicheng District, Beijing

Patentee before: HYDROCHINA Corp.