CN106149683A - A kind of cast-in-place pile construction method using double casing to pass through deep metalling - Google Patents
A kind of cast-in-place pile construction method using double casing to pass through deep metalling Download PDFInfo
- Publication number
- CN106149683A CN106149683A CN201510194932.9A CN201510194932A CN106149683A CN 106149683 A CN106149683 A CN 106149683A CN 201510194932 A CN201510194932 A CN 201510194932A CN 106149683 A CN106149683 A CN 106149683A
- Authority
- CN
- China
- Prior art keywords
- steel pile
- pile casting
- casting
- deep
- metalling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
A kind of cast-in-place pile construction method using double casing to pass through deep metalling, it is characterized in that comprising the following steps: the fixture (2) of a vibration hammer (1) clamps the groove part of outer steel pile casting (5), the native stone core in outer steel pile casting (5) is drawn and is taken totally by b Spiral digging machine;C vibration hammer is sling interior steel pile casting (3), and d vibration hammer (1) clamps the hanger (4) being arranged on outer steel pile casting (5), and e Spiral digging machine fetches earth in interior steel pile casting (3), f descending reinforcing cage, g casting concrete, h vibration hammer (1) is extracted interior steel pile casting (3), is completed bored concrete pile and pour.The cast-in-place pile construction method using double casing to pass through deep metalling of the present invention has and does not uses the special equipment can be in bad ground double casings construction bored concrete piles, the feature that speed of application is fast and cost is low.
Description
Technical field
The present invention relates to a kind of cast-in-place pile construction method, specifically, be a kind of cast-in-place pile construction method using double casing to pass through deep metalling.
Background technology
Wall protecting method many employings mud off of the most conventional bored concrete pile.But bored concrete pile of constructing in some deep & thick silt layers, the effect of mud off is frequently not very well, it may appear that a lot of problem such as collapse hole, undergauge, sediment.
In order to solve the problems referred to above, the method occurring in that full casing construction bored concrete pile, i.e. first steel pile casting sinking is put in place before construction bored concrete pile, then bored concrete pile of constructing under the protection of steel pile casting.The most conventional lower steel pile casting method has: rotary (the full casing of Spiral digging machine band, pipe rubbing machine, full circle swinging etc. represent equipment), vibration type (vibration hammer etc. represent equipment), paddle type mill (impact pile driving machine etc. represent equipment), static pressure type (static pile press etc. represent equipment).
Above-mentioned construction equipment is the most no problem when constructing soft layer, but running into top backfill deep (10 meters) metalling, bottom be again soft layer simultaneously steel pile casting diameter 1 meter and above time, some equipment often runs into the situation that difficulty even cannot be sunk.Vibration hammer is also a kind of equipment that lower casing is conventional, but its sinking casing in deep rubble is also at a loss what to do.
Currently for this Special Geological Condition, the construction equipment that can use is little, and full circle swinging equipment can be used, but its efficiency of construction is the lowest, is not suitable for large quantities of engineering pile.Most recently newly go out a kind of device name be multifunctional drill, carry two unit heads, a unit head drives casing to sink, and another unit head drives long screw drill rod to fetch earth.But current equipment construction ability can only casing within construction diameter 800mm.There is a method in which and join special double-walled casing for high-power rotary drilling rig, efficiency is fast compared with full circle swinging.But, three of the above method have one what is common is that construction equipment is few, equipment purchasing price high.
Therefore the cast-in-place pile construction method passing through deep metalling known to also exists above-mentioned all inconvenience and problem.
Summary of the invention
The purpose of the present invention, is to propose a kind of cast-in-place pile construction method using double casing to pass through deep metalling using vibration hammer that steel pile casting passes through deep metalling.
For achieving the above object, the technical solution of the present invention is:
A kind of cast-in-place pile construction method using double casing to pass through deep metalling, it is characterised in that comprise the following steps:
A, clamping the groove part of outer steel pile casting with the fixture of vibration hammer, vibration-sunk is to flushing with ground;As relatively big in the power that is hampered, continue to sink to position after being drawn out by inside soil stone core with Spiral digging machine;The long 10m of outer steel pile casting, internal diameter 1.2m, wall thickness 15mm;
B, with Spiral digging machine the native stone core in outer steel pile casting drawn take clean;
C, interior steel pile casting of slinging with vibration hammer, through outer steel pile casting, shake interior steel pile casting and sink to overhead 200-300mm;The long 25m of interior steel pile casting, internal diameter 1m, wall thickness 15mm;
D, clamp the hanger being arranged on outer steel pile casting with vibration hammer, extract outer steel pile casting;
E, fetch earth in interior steel pile casting with Spiral digging machine, until designed elevation;
F, descending reinforcing cage;
G, casting concrete;
H, extract interior steel pile casting with vibration hammer, complete bored concrete pile and pour.
The cast-in-place pile construction method using double casing to pass through deep metalling of the present invention can also be further achieved by the following technical measures.
Aforesaid method, in wherein said step a, soil stone core is drawn out facility and is used punching to grab cone.
Aforesaid method, wherein said interior steel pile casting uses 16Mn steel matter, and the upper and lower two ends of interior steel pile casting are respectively provided with Reinforced Hoop.
Aforesaid method, wherein said outer steel pile casting uses 16Mn steel matter, and the upper and lower two ends of outer steel pile casting are respectively provided with Reinforced Hoop.
Aforesaid method, wherein said vibration hammer selects electric vibrating hammer or hydraulic vibration driver.
After using technique scheme, the cast-in-place pile construction method using double casing to pass through deep metalling of the present invention has the advantage that
1, without expensive special equipment, the construction of the common equipment such as vibration hammer and ordinary steel casing is only used;
2, construction quality is safe and reliable, be beneficial to organizing construction, and speed of application is fast, and cost is low;
3, Construction Cost is reduced.
Accompanying drawing explanation
Fig. 1 is the double casing sinking schematic diagrams in the filling pile construction of the embodiment of the present invention.
In figure: 1 vibration hammer, 2 fixtures, steel pile casting in 3,4 hangers, 5 outer steel pile casting.
Detailed description of the invention
Below in conjunction with embodiment and accompanying drawing thereof, the present invention is illustrated further.
Embodiment 1
Referring now to the double casing sinking schematic diagrams in the filling pile construction that Fig. 1, Fig. 1 are the embodiment of the present invention.
Double casing that uses of the present invention passes through the cast-in-place pile construction method of deep metalling, it is characterised in that comprise the following steps:
A, fixture 2 with electronic vibration hammer 1 clamp the groove part of outer steel pile casting 5, and vibration-sunk is to flushing with ground;As relatively big in the power that is hampered, continue to sink to position after being drawn out by inside soil stone core with Spiral digging machine;The outer long 10m of steel pile casting 5, internal diameter 1.2m, wall thickness 15mm;Described outer steel pile casting (5) uses 16Mn steel matter, and the upper and lower two ends of outer steel pile casting are respectively provided with Reinforced Hoop.
B, with Spiral digging machine the native stone core in outer steel pile casting 5 drawn take clean.
C, interior steel pile casting 3 of slinging with vibration hammer, through outer steel pile casting 5, shake interior steel pile casting (3) and sink to overhead 200-300mm;The long 25m of interior steel pile casting, internal diameter 1m, wall thickness 15mm;Described interior steel pile casting 3 uses 16Mn steel matter, the upper and lower two ends of interior steel pile casting to be respectively provided with Reinforced Hoop.
D, clamp the hanger 4 being arranged on outer steel pile casting 5 with vibration hammer 1, extract outer steel pile casting 5;
E, fetch earth in interior steel pile casting 3 with Spiral digging machine, until designed elevation;
F, descending reinforcing cage;
G, casting concrete;
H, extract interior steel pile casting 3 with vibration hammer 1, complete bored concrete pile and pour.
The present invention has substantive distinguishing features and significant technological progress, and the cast-in-place pile construction method using double casing to pass through deep metalling of the present invention does not use the special equipment can be at the double casings construction bored concrete piles of bad ground, and speed of application is fast, and cost is low.
Above example is used for illustrative purposes only, rather than limitation of the present invention, person skilled in the relevant technique, without departing from the spirit and scope of the present invention, it is also possible to make various conversion or change.Therefore, the technical scheme of all equivalents also should belong to scope of the invention, should be limited by each claim.
Claims (5)
1. one kind uses the cast-in-place pile construction method that double casing passes through deep metalling, it is characterised in that comprise the following steps:
A, clamping the groove part of outer steel pile casting (5) with the fixture (2) of vibration hammer (1), vibration-sunk is to flushing with ground;As relatively big in the power that is hampered, continue to sink to position after being drawn out by inside soil stone core with Spiral digging machine;Outer steel pile casting (5) long 10m, internal diameter 1.2m, wall thickness 15mm;
B, with Spiral digging machine the native stone core in outer steel pile casting (5) drawn take clean;
C, interior steel pile casting (3) of slinging with vibration hammer, through outer steel pile casting (5), shake interior steel pile casting (3) and sink to overhead 200-300mm;The long 25m of interior steel pile casting, internal diameter 1m, wall thickness 15mm;
D, clamp the hanger (4) being arranged on outer steel pile casting (5) with vibration hammer (1), extract outer steel pile casting (5);
E, fetch earth in interior steel pile casting (3) with Spiral digging machine, until designed elevation;
F, descending reinforcing cage;
G, casting concrete;
H, extract interior steel pile casting (3) with vibration hammer (1), complete bored concrete pile and pour.
2. the cast-in-place pile construction method using double casing to pass through deep metalling as claimed in claim 1, it is characterised in that in described step a, soil stone core is drawn out facility and is used punching to grab cone.
3. the cast-in-place pile construction method using double casing to pass through deep metalling as claimed in claim 1, it is characterised in that described interior steel pile casting (3) uses 16Mn steel matter, and the upper and lower two ends of interior steel pile casting are respectively provided with Reinforced Hoop.
4. the cast-in-place pile construction method using double casing to pass through deep metalling as claimed in claim 1, it is characterised in that described outer steel pile casting (5) uses 16Mn steel matter, and the upper and lower two ends of outer steel pile casting are respectively provided with Reinforced Hoop.
5. the cast-in-place pile construction method using double casing to pass through deep metalling as claimed in claim 1, it is characterised in that described vibration hammer selects electric vibrating hammer or hydraulic vibration driver.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510194932.9A CN106149683A (en) | 2015-04-23 | 2015-04-23 | A kind of cast-in-place pile construction method using double casing to pass through deep metalling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510194932.9A CN106149683A (en) | 2015-04-23 | 2015-04-23 | A kind of cast-in-place pile construction method using double casing to pass through deep metalling |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106149683A true CN106149683A (en) | 2016-11-23 |
Family
ID=57347917
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510194932.9A Pending CN106149683A (en) | 2015-04-23 | 2015-04-23 | A kind of cast-in-place pile construction method using double casing to pass through deep metalling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106149683A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106677178A (en) * | 2016-11-25 | 2017-05-17 | 上海市基础工程集团有限公司 | Graded mounting construction method for super-long protective cylinder of rotatably excavated cast-in-situ bored pile |
CN107476300A (en) * | 2017-08-08 | 2017-12-15 | 中建四局第建筑工程有限公司 | A kind of tool-type soft soil foundation perfusion pile wall and its construction method |
CN108330964A (en) * | 2018-01-10 | 2018-07-27 | 中铁大桥局集团第四工程有限公司 | Complicated landform steel pile casting mounting device and its installation method |
CN109706921A (en) * | 2019-01-29 | 2019-05-03 | 中国港湾工程有限责任公司 | The double casing construction technologies of bored concrete pile |
CN112392044A (en) * | 2020-11-27 | 2021-02-23 | 中国建筑第四工程局有限公司 | Construction method of bored pile of long hollow pile in complex geology |
CN112554176A (en) * | 2020-11-23 | 2021-03-26 | 四川路航建设工程有限责任公司 | Full-casing twisted pipe follow-up rotary drilling pore-forming construction method |
CN112982390A (en) * | 2019-12-17 | 2021-06-18 | 上海三航奔腾海洋工程有限公司 | Steel casing of rock-socketed cast-in-place pile capable of not sinking along with punching |
CN113774909A (en) * | 2021-08-05 | 2021-12-10 | 深圳宏业基岩土科技股份有限公司 | Hole forming construction method for double-layer steel casing in deep rockfill and sludge area |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB993233A (en) * | 1964-03-18 | 1965-05-26 | John Joseph Dougherty | Collapsible filing |
GB2322893A (en) * | 1997-01-29 | 1998-09-09 | Roxbury Ltd | Improvements in or relating to apparatus for forming ground engaging supports |
CN101705684A (en) * | 2009-11-13 | 2010-05-12 | 中铁大桥局集团第四工程有限公司 | Method for sinking steel protecting canister for drilled pile construction |
CN102966096A (en) * | 2012-11-30 | 2013-03-13 | 天津第三市政公路工程有限公司 | Construction method for double pile casings of large-diameter cast-in-situ bored pile |
CN203403404U (en) * | 2013-07-15 | 2014-01-22 | 深圳市工勘岩土工程有限公司 | High-efficiency cast-in-place pile device |
-
2015
- 2015-04-23 CN CN201510194932.9A patent/CN106149683A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB993233A (en) * | 1964-03-18 | 1965-05-26 | John Joseph Dougherty | Collapsible filing |
GB2322893A (en) * | 1997-01-29 | 1998-09-09 | Roxbury Ltd | Improvements in or relating to apparatus for forming ground engaging supports |
CN101705684A (en) * | 2009-11-13 | 2010-05-12 | 中铁大桥局集团第四工程有限公司 | Method for sinking steel protecting canister for drilled pile construction |
CN102966096A (en) * | 2012-11-30 | 2013-03-13 | 天津第三市政公路工程有限公司 | Construction method for double pile casings of large-diameter cast-in-situ bored pile |
CN203403404U (en) * | 2013-07-15 | 2014-01-22 | 深圳市工勘岩土工程有限公司 | High-efficiency cast-in-place pile device |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106677178A (en) * | 2016-11-25 | 2017-05-17 | 上海市基础工程集团有限公司 | Graded mounting construction method for super-long protective cylinder of rotatably excavated cast-in-situ bored pile |
CN107476300A (en) * | 2017-08-08 | 2017-12-15 | 中建四局第建筑工程有限公司 | A kind of tool-type soft soil foundation perfusion pile wall and its construction method |
CN108330964A (en) * | 2018-01-10 | 2018-07-27 | 中铁大桥局集团第四工程有限公司 | Complicated landform steel pile casting mounting device and its installation method |
CN109706921A (en) * | 2019-01-29 | 2019-05-03 | 中国港湾工程有限责任公司 | The double casing construction technologies of bored concrete pile |
CN112982390A (en) * | 2019-12-17 | 2021-06-18 | 上海三航奔腾海洋工程有限公司 | Steel casing of rock-socketed cast-in-place pile capable of not sinking along with punching |
CN112554176A (en) * | 2020-11-23 | 2021-03-26 | 四川路航建设工程有限责任公司 | Full-casing twisted pipe follow-up rotary drilling pore-forming construction method |
CN112392044A (en) * | 2020-11-27 | 2021-02-23 | 中国建筑第四工程局有限公司 | Construction method of bored pile of long hollow pile in complex geology |
CN113774909A (en) * | 2021-08-05 | 2021-12-10 | 深圳宏业基岩土科技股份有限公司 | Hole forming construction method for double-layer steel casing in deep rockfill and sludge area |
CN113774909B (en) * | 2021-08-05 | 2022-09-23 | 深圳宏业基岩土科技股份有限公司 | Hole forming construction method for double-layer steel casing in deep rockfill and sludge area |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106149683A (en) | A kind of cast-in-place pile construction method using double casing to pass through deep metalling | |
CN103603342B (en) | Major diameter assembled casing super-long filling pile construction method | |
CN105569560B (en) | A full set of tubular type long auger stake machine and the method for utilizing the ram machine construction | |
CN105649083B (en) | The clear stake device of the disposable rotary-cutting type of full-sleeve and its clear piling method | |
CN101851922B (en) | Method for eliminating underground anchor rope/rod by using all casing drill | |
CN102587380A (en) | Construction method for wholly removing drilling pile head | |
CN105178861A (en) | Drilling hole enlarging mechanism | |
CN103122632A (en) | Construction method for drilling hole and casting pile in plastic flow stratum or karst cave stratum | |
CN104775433B (en) | A kind of method of pile pulling construction | |
EP3406802A1 (en) | Offshore rock-drilling redriving-type large-diameter pile structure and construction method | |
CN104480934A (en) | Water drilling pile foundation construction system capable of recycling outer steel protecting tube, and construction method of water drilling pile foundation construction system | |
CN101982614A (en) | Method for drilling rocks into pile by utilizing all casing drill | |
CN102383431A (en) | Sinking device and novel sinking method of center dug prestressed centrifuge pipe pile (square pile) | |
CN102605788A (en) | Double-tube-sinking and inner-tube-drawing bored cast-in-place pile construction method and application | |
CN102373706B (en) | Middle pick hydraulic method prestressed centrifugally pile tube pile-sinking device and pile-sinking method thereof | |
CN102966094B (en) | Method for constructing concrete pile through rotary excavating and pressure irrigation | |
CN1963044A (en) | Construction method for withdrawal of waste pile | |
CN104141455B (en) | Drilling equipment and rig drilling method | |
CN103821137B (en) | The construction method of guncreting pile at the bottom of the embedding rock of a kind of long auger, expansion | |
CN204000861U (en) | Bored pile casing in a kind of water | |
CN207331690U (en) | Pile pile sunk stake machine | |
CN102644274A (en) | Pile-forming construction method for penetrating through existing structure by fender post | |
CN102383428B (en) | Middle pick reverse drawing method prestressed centrifugally pile tube pile-sinking device and pile-sinking method thereof | |
CN105544551B (en) | A kind of super-long filling pile quickly transfers the construction method of steel reinforcement cage | |
CN108005065A (en) | The constructing structure and construction method of PHC static pressure pipe piles |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161123 |