CN106978817A - A kind of Novel retaining wall based process pattern and a kind of Novel retaining wall - Google Patents

A kind of Novel retaining wall based process pattern and a kind of Novel retaining wall Download PDF

Info

Publication number
CN106978817A
CN106978817A CN201710282452.7A CN201710282452A CN106978817A CN 106978817 A CN106978817 A CN 106978817A CN 201710282452 A CN201710282452 A CN 201710282452A CN 106978817 A CN106978817 A CN 106978817A
Authority
CN
China
Prior art keywords
retaining wall
foundation
bed course
bottom plate
novel retaining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710282452.7A
Other languages
Chinese (zh)
Inventor
常语锋
于建忠
孙永明
吴芳
张旭
高兴和
顾晓峰
吕犇
卞新丰
王振红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taihu Jiangsu Water Conservancy Planning & Design Institute Co Ltd
Original Assignee
Taihu Jiangsu Water Conservancy Planning & Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taihu Jiangsu Water Conservancy Planning & Design Institute Co Ltd filed Critical Taihu Jiangsu Water Conservancy Planning & Design Institute Co Ltd
Priority to CN201710282452.7A priority Critical patent/CN106978817A/en
Publication of CN106978817A publication Critical patent/CN106978817A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/40Foundations for dams across valleys or for dam constructions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Retaining Walls (AREA)

Abstract

The invention discloses a kind of Novel retaining wall based process pattern, first, a bottom of foundation is dug at the lock pool, and some densely covered base pile holes are got out on the foundation using small-sized pit-picker, base pile hole hole depth is controlled within 2m;Then plain concrete is poured in the bottom of foundation and base pile hole rapidly, is allowed to be formed the base wad layer and foundation pile of an entirety.The invention also discloses a kind of Novel retaining wall, including bottom plate, wall, foundation pile and bed course, the bottom plate is integral structure with wall, wall body vertical is located on bottom plate, the bed course lower surface is densely covered with several column foundation piles vertically downward, the foundation pile is structure as a whole with bed course, and the bottom plate is fixedly connected on bed course upper surface.Retaining wall based process pattern of the present invention can be fast and convenient raising foundation bearing capacity by a small margin, effectively shorten the construction period, Novel retaining wall of the present invention is simple in construction, easy construction, good economy performance.

Description

A kind of Novel retaining wall based process pattern and a kind of Novel retaining wall
Technical field
The invention belongs to Hydraulic and Hydro-Power Engineering field, and in particular to a kind of Novel retaining wall based process pattern and one kind are new Type retaining wall.
Background technology
Retaining wall is a kind of important structure type in hydraulic structure, is widely used in Hydraulic and Hydro-Power Engineering.According to 《Water conservancy project DESIGN OF RETAINING WALLS specification》SL379-2007 regulation, stability of the retaining walls, which is calculated, to be included:Bearing capacity of foundation, antiskid are steady Devise a stratagem is calculated, stability against over turning is calculated and nonuniformity coefficient is calculated etc..Usually occurs subsoil under retaining wall in Practical Project Bearing capacity can not meet requirement, in order to reach requirement, in the prior art mostly using pile foundation, change and traditional ground such as fill out Processing mode, retaining wall is also all made up of wall, bottom plate and the part of stanchion three, and the stanchion of retaining wall and retaining wall bottom plate are all It is steel and concrete structure, the framework of steel reinforcement that the framework of steel reinforcement of stanchion is inserted directly into retaining wall bottom plate with retaining wall bottom plate is welded and fixed, But situation about being more or less the same in the bearing capacity of base stress and subsoil, is handled, not only using this method and this kind of structure It is less economical, and the duration is also longer.
The content of the invention
The problem of to solve to mention in the prior art, the present invention provides a kind of Novel retaining wall based process pattern and uses this A kind of Novel retaining wall of pattern processing is handled, the Novel retaining wall is simple in construction, easy construction, good economy performance, the processing-type Formula can be fast and convenient raising foundation bearing capacity by a small margin, effectively shorten the construction period.
In order to reach above-mentioned technique effect, the technical solution adopted by the present invention is:
A kind of Novel retaining wall based process pattern, including following process step:
1) digs pit and drilled:A bottom of foundation is dug at the lock pool, and if being got out on the foundation using small-sized pit-picker Dry densely covered base pile hole, base pile hole hole depth is controlled within 2m;
2) bed course and foundation pile are poured:Pour plain concrete in the bottom of foundation and base pile hole rapidly, be allowed to be formed one it is whole The base wad layer and foundation pile of body.
Further, the small-sized pit-picker is the overall single page drill bit pit-pickers of φ 200mm.
A kind of Novel retaining wall, including bottom plate, wall, foundation pile and bed course, the wall are located on bottom plate, wall and bottom plate It is structure as a whole, the bed course lower surface is densely covered with several column foundation piles vertically downward, the foundation pile and bed course are integrated Structure, the bottom plate is fixedly connected on bed course upper surface.
Further improve as follows as of the invention,
Further, the wall and the reinforced concrete structure that bottom plate is primary concreting.
Further, the foundation pile equidistantly distributed is in bed course lower surface, and bed course is that plain concrete is disposably poured with foundation pile Build and form.
Further, the bottom plate and anti-skidding step of the bed course provided with mutual cooperation.
Further, the anti-skidding step loxosis is in one end of bottom plate and bed course, and anti-skidding step is set obliquely.
Further, the section width of the wall from top to bottom gradually increases.
Compared with prior art, the bearing capacity of the invention that conveniently can slightly improve retaining wall ground and antiskid are steady Capability, while reducing construction cost, accelerating speed of application.
Described above is only the general introduction of technical solution of the present invention, in order to better understand the technological means of the present invention, And can be practiced according to the content of specification, and in order to allow the above and other objects, features and advantages of the present invention can Become apparent, below especially exemplified by preferable case study on implementation, and coordinate accompanying drawing, described in detail.
Brief description of the drawings
Fig. 1 is structural representation of the invention.
Embodiment
As shown in figure 1, a kind of Novel retaining wall, it includes column foundation pile 1, the bottom plate 3 of bed course 2 and wall 4.Wall 4 and bottom The reinforced concrete structure that plate 3 is formed in one, wall 4 is stood upright on bottom plate 3.Preferably, the section width of wall 4 is from top to bottom Gradually increase.Bottom plate 3 is fixedly connected on anti-skidding step of the one end provided with mutual cooperation of the upper surface of bed course 2, bottom plate and bed course, should Anti-skidding step is set obliquely.The lower surface of bed course 2 be densely covered with vertically downward and equidistantly distributed several column foundation piles 1, pad Layer 2 and foundation pile 1 are that plain concrete primary concreting is formed.
Shallow layer foundation processing is first carried out during Novel retaining wall construction of the present invention, at the upper body that retaining wall is then carried out again Reason, i.e., dig pit and bore base pile hole first with small-sized pit-picker, hole depth is according to geological condition, and general control is within 2m, then Pour plain concrete rapidly in the hole and hole dug again, be allowed to be formed the foundation pile 1 and bed course 2 of an entirety, after the completion of it is right again The bottom plate 3 of upper body structure and the construction of the grade of wall 4, are finally completed whole Retaining Wall Engineering.
The present invention has been carried out similar " concrete-pile " by bed course 2 and the structure setting of foundation pile 1 to retaining wall shallow layer foundation Processing, situation about being more or less the same in the bearing capacity of base stress and subsoil, so as to slightly improve ground under retaining wall Bearing capacity, requirement as defined in specification is met, while being also improved to antiskid stabilizing power.Meanwhile, base pile hole can utilize tool The small-sized pit-picker for having flexible and convenient operation is handled, it is ensured that speed of application, reduces construction cost.
The present invention is not limited to above-mentioned specific embodiment, for the person of ordinary skill of the art from above-mentioned structure Think of is set out, and without performing creative labour, made a variety of conversion are within the scope of the present invention.

Claims (8)

1. a kind of Novel retaining wall based process pattern, it is characterised in that including following process step:
1) digs pit and drilled:A bottom of foundation is dug at the lock pool, and is got out on the foundation using small-sized pit-picker some close Cloth base pile hole, base pile hole hole depth is controlled within 2m;
2) bed course and foundation pile are poured:Plain concrete is poured in the bottom of foundation and base pile hole rapidly, is allowed to be formed entirety Base wad layer and foundation pile.
2. a kind of Novel retaining wall based process pattern as claimed in claim 1, it is characterised in that the small-sized pit-picker is φ 200mm entirety single page drill bit pit-pickers.
3. a kind of a kind of Novel retaining wall of Novel retaining wall based process pattern processing described in use claim 1, its feature It is, including bottom plate, wall, foundation pile and bed course, the wall is on bottom plate, and wall is structure as a whole with bottom plate, the pad Layer lower surface is densely covered with several column foundation piles vertically downward, and the foundation pile and bed course are structure as a whole, and the bottom plate is fixed It is connected to bed course upper surface.
4. a kind of Novel retaining wall as claimed in claim 3, it is characterised in that the wall is with bottom plate for primary concreting Into reinforced concrete structure.
5. a kind of Novel retaining wall as claimed in claim 3, it is characterised in that the foundation pile equidistantly distributed is in bed course following table Face, bed course is that plain concrete primary concreting is formed with foundation pile.
6. a kind of Novel retaining wall as claimed in claim 3, it is characterised in that the bottom plate is with bed course provided with mutual cooperation Anti-skidding step.
7. a kind of Novel retaining wall as claimed in claim 6, it is characterised in that the anti-skidding step loxosis is in bottom plate and bed course One end, anti-skidding step sets obliquely.
8. a kind of Novel retaining wall as claimed in claim 3, it is characterised in that the section width of the wall from top to bottom by It is cumulative big.
CN201710282452.7A 2017-04-26 2017-04-26 A kind of Novel retaining wall based process pattern and a kind of Novel retaining wall Pending CN106978817A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710282452.7A CN106978817A (en) 2017-04-26 2017-04-26 A kind of Novel retaining wall based process pattern and a kind of Novel retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710282452.7A CN106978817A (en) 2017-04-26 2017-04-26 A kind of Novel retaining wall based process pattern and a kind of Novel retaining wall

Publications (1)

Publication Number Publication Date
CN106978817A true CN106978817A (en) 2017-07-25

Family

ID=59345386

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710282452.7A Pending CN106978817A (en) 2017-04-26 2017-04-26 A kind of Novel retaining wall based process pattern and a kind of Novel retaining wall

Country Status (1)

Country Link
CN (1) CN106978817A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110374136A (en) * 2019-08-12 2019-10-25 广东电网有限责任公司 Soil-baffling structure suitable for the electrical building building on soft geological
WO2020034793A1 (en) * 2018-08-13 2020-02-20 Qi Shaocheng A fending groyne for protecting important riverside facilities or areas
CN111236474A (en) * 2020-02-27 2020-06-05 南京城镇建筑设计咨询有限公司 Energy station structure outer wall and construction method
CN113373973A (en) * 2021-01-13 2021-09-10 贵州智华建设工程有限责任公司 U type groove cutting integrated configuration retaining wall

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201212151Y (en) * 2008-07-01 2009-03-25 中铁二院工程集团有限责任公司 Retaining wall foundation structure
CN103485363A (en) * 2013-10-10 2014-01-01 海南恒鑫土木工程建设有限公司 Three-dimensional continuous frame type reinforced concrete structure retaining wall
CN104005421A (en) * 2014-05-23 2014-08-27 上海市水利工程设计研究院有限公司 Double-row pile foundation retaining wall combined with foundation pit support and construction method thereof
CN205259210U (en) * 2015-09-17 2016-05-25 山东科技大学 Modular retaining wall
CN105756083A (en) * 2016-03-24 2016-07-13 中水北方勘测设计研究有限责任公司 High retaining wall structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201212151Y (en) * 2008-07-01 2009-03-25 中铁二院工程集团有限责任公司 Retaining wall foundation structure
CN103485363A (en) * 2013-10-10 2014-01-01 海南恒鑫土木工程建设有限公司 Three-dimensional continuous frame type reinforced concrete structure retaining wall
CN104005421A (en) * 2014-05-23 2014-08-27 上海市水利工程设计研究院有限公司 Double-row pile foundation retaining wall combined with foundation pit support and construction method thereof
CN205259210U (en) * 2015-09-17 2016-05-25 山东科技大学 Modular retaining wall
CN105756083A (en) * 2016-03-24 2016-07-13 中水北方勘测设计研究有限责任公司 High retaining wall structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020034793A1 (en) * 2018-08-13 2020-02-20 Qi Shaocheng A fending groyne for protecting important riverside facilities or areas
CN110374136A (en) * 2019-08-12 2019-10-25 广东电网有限责任公司 Soil-baffling structure suitable for the electrical building building on soft geological
CN111236474A (en) * 2020-02-27 2020-06-05 南京城镇建筑设计咨询有限公司 Energy station structure outer wall and construction method
CN113373973A (en) * 2021-01-13 2021-09-10 贵州智华建设工程有限责任公司 U type groove cutting integrated configuration retaining wall

Similar Documents

Publication Publication Date Title
CN106978817A (en) A kind of Novel retaining wall based process pattern and a kind of Novel retaining wall
CN103967031B (en) A kind of caisson of consolidated subsoil and stake combination foundation and construction method thereof
CN203213136U (en) Caisson and pile combined foundation of consolidated subsoil
CN207228186U (en) Build the slip casting composite foundation of reinforcement and rectification
CN107558488A (en) A kind of embedding rock single pile of offshore wind farm and its construction system and construction method
CN206784372U (en) Injection forming club-footed pile
CN105714834B (en) A kind of construction technology of hardpan preexisting hole grouting behind shaft or drift lining H profile steel stake
CN207176723U (en) A kind of embedding rock single pile of offshore wind farm and its construction system
CN206052722U (en) A kind of device of prestressed pipe post-pressure grouting
CN105133641B (en) Thin-wall continuous-wall-type foundation reinforcing structure and method
CN206204967U (en) A kind of double perfusion pile cofferdam
CN107938652B (en) Rock-inlaid steel reinforced cement stirring wall and construction method thereof
CN104532855A (en) Combined pile supporting structure in deep and thick peat soil layer
CN105625480A (en) Anti-floating method and structure for open-segment tunnel structure
CN103334428B (en) Disc type cast-in-place concrete pile and construction process for same
CN208917837U (en) A kind of pile extractor suitable for having enough to meet the need formed steel construction slope protection pile
CN204080796U (en) Injection forming Variable Section Steel pile tube expands crowded device
CN105970917A (en) Method for controlling excessively-poured concrete on pile top of cast-in-situ bored pile
CN206844049U (en) A kind of Novel retaining wall
CN206706748U (en) Wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation
CN212865908U (en) Grouting micro pile
CN211897814U (en) Step type abutment based on steep slope quay wall
CN204645057U (en) A kind of pile body is provided with the Double-row-piles Structure adding the stake of core horizontal jet grouting
CN209603123U (en) A kind of bottom-enlarging filling pile structure for cutting down negative friction
CN208949893U (en) A kind of oblique suspension device of the auxiliary of foundation pit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170725

RJ01 Rejection of invention patent application after publication