CN206706748U - Wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation - Google Patents
Wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation Download PDFInfo
- Publication number
- CN206706748U CN206706748U CN201720514413.0U CN201720514413U CN206706748U CN 206706748 U CN206706748 U CN 206706748U CN 201720514413 U CN201720514413 U CN 201720514413U CN 206706748 U CN206706748 U CN 206706748U
- Authority
- CN
- China
- Prior art keywords
- pile
- wet spraying
- pile foundation
- foundation
- casting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The utility model discloses a kind of wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation, including design pile foundation, wet spraying pile and steel pile casting, several wet spraying piles are looped around around design pile foundation using designing pile foundation as the center of circle, adjacent wet spraying pile is provided with intersecting linkage section, the upper end of design pile foundation is set with steel pile casting, and the outer wall of steel pile casting is bonded with the outer face of adjacent wet spraying pile.Preferably, the vertical distance of the lower surface of steel pile casting to the upper surface of wet spraying pile is L, 1m >=L >=0.1m.The utility model substitutes the interim steel pile casting that lengthens using wet spraying pile and carries out local stiffening processing to unfavorable geology region Construction of Pile Bedding Boring, a circle wet spraying pile is provided with around design pile foundation and forms an annular curtain, play support action, it can so avoid lengthening the waste of steel pile casting, direct saving material cost, economic benefit are obvious.
Description
Technical field
The utility model belongs to Bridge Pile Foundation Construction technical field, more particularly to a kind of wet spraying pile controlling stream modeling shape sea sand is blown
Fill out area's pile foundation.
Background technology
With the development of society, increasing Oversea bridge is progressively established, general coastal, riverine beach is mainly sea sand
Barged-in fill and muck soil, shape is moulded in stream, expending die is larger during pile foundation construction, easily occurs collapse hole problem if not handling,
Also increase pile foundation concreting cost simultaneously.Stream modeling shape sea sand hydraulic reclamation region pile foundation expending die traditional control method is to set
Put and lengthen interim steel pile casting, steel pile casting must pass through the mud of stream modeling shape, carry out protectiveness construction.But this method is in sea sand hydraulic reclamation
Area, steel pile casting can not be pulled out, and cause that steel pile casting waste of material is big, cost is high, and need to carry out casing and cut off, and be unfavorable for subsequently holding
The excavation construction of platform, speed of application is slow, the duration is influenceed big.
Utility model content
The purpose of this utility model is to provide a kind of wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation.
To reach above-mentioned purpose, the technical solution adopted in the utility model is:
A kind of wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation, including design pile foundation, wet spraying pile and steel pile casting, several
Wet spraying pile is looped around around design pile foundation using designing pile foundation as the center of circle, and adjacent wet spraying pile is provided with intersecting linkage section, designs stake
The upper end of base is set with steel pile casting, and the outer wall of steel pile casting is bonded with the outer face of adjacent wet spraying pile.
Preferably, the vertical distance of the lower surface of steel pile casting to the upper surface of wet spraying pile is L, 1m >=L >=0.1m.
Preferably, described L=0.5m.
Preferably, described wet spraying pile is cement mixing pile.
The utility model this have the advantage that:
The utility model substitutes the interim steel pile casting that lengthens using wet spraying pile and unfavorable geology region Construction of Pile Bedding Boring is carried out
Local stiffening processing, a circle wet spraying pile is provided with around design pile foundation and forms an annular curtain, support action is played, so may be used
Avoid lengthening the waste of steel pile casting, direct saving material cost, economic benefit are obvious.
The utility model technology handles a trifle steel of pile foundation counter-boring techniques, top layer water proof and guide effect using wet spraying pile
Casing can directly be hung out afterwards after excavation of foundation pit, eliminate the time for cutting off casing, shorten the project construction duration.
It is strong that the utility model technology significantly reduces worker's broken pile head, the work in levelling of the land on follow-up cushion cap excavation
Degree.
Wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area piling strtucture of the present utility model is simple, difficulty of construction is small, construction effect
Rate is high, improves pile foundation construction quality, has good economic and social benefit.
The utility model technological applicability is strong, construction is simple, is easy to promote.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the A-A sectional views in Fig. 1;
Fig. 3 is the B enlarged drawings in Fig. 1;
In figure:1 is wet spraying pile, and 2 be design pile foundation, and 3 be ground, and 4 be steel pile casting, and 5 be intersecting linkage section.
Embodiment
As Figure 1-3, a kind of wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation, including design pile foundation, wet spraying pile and
Steel pile casting, several wet spraying piles are looped around around design pile foundation using designing pile foundation as the center of circle, and adjacent wet spraying pile is provided with intersecting
Linkage section, the upper end for designing pile foundation are set with steel pile casting, and the outer wall of steel pile casting is bonded with the outer face of adjacent wet spraying pile.
So that 1.8m cast-in-situ bored pile is in some footpath as an example, mended and surveyed according to geology, this position goes out strata condition such as following table
It is shown:
According to single shaft rotary churning pile churning scope, pressed by calculating in bridge pile foundation(Stake footpath 1.8m)Surrounding lays 11 wet shots
Stake, wet spraying pile pile center is away from pile foundation center 1.4m.The vertical distance of the lower surface of steel pile casting to the upper surface of wet spraying pile is L, L=
0.5m。
This engineering wet spraying pile uses the ordinary cement mixing piles of φ 800, using #425 Portland cements, water-stop curtain
Cement mixing content is 15%, the ratio of mud 0.28, inside mixes 0.2% calcium lignosulfonate and 0.05% triethanolamine.
It is as follows using single shaft cement mixing pile construction procedure:Levelling of the land → surveying and locating → rig is in place → slurrying
→ sinking → whitewashing stirring lifting → detergent line is stirred in advance and stirring-head → stake machine shifts → carries out next pile foundation construction
The utility model is applied has re-started observation to the process of pile foundation construction, and the pile foundation is described as:Pile Diameter is:
1.8m, friction pile, hole depth:60.56m, effective length 57.469m.Concrete consumption and hole depth in filling process(Hole depth is:
Distance of the aperture away from concrete surface)Control such as following table:
Observed and found by filling process, after being safeguarded using wet spraying pile, the expending die of pile foundation is smaller and more
It is stable, illustrate that the utility model application preferably controlling stream can mould shape sea sand hydraulic reclamation region pile foundation expending die, improve pile foundation
Construction quality, popularization and application can be carried out in other pile foundation constructions.
Embodiment described above is only that preferred embodiment of the present utility model is described, and is not departing from this reality
On the premise of new design spirit, various modifications that those of ordinary skill in the art make to the technical solution of the utility model
And improvement, it all should fall into the protection domain of the utility model claims book determination.
Claims (4)
- A kind of 1. wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation, it is characterised in that:Including design pile foundation, wet spraying pile and steel Casing, several wet spraying piles are looped around around design pile foundation using designing pile foundation as the center of circle, and adjacent wet spraying pile is provided with phase commissure Section is connect, the upper end for designing pile foundation is set with steel pile casting, and the outer wall of steel pile casting is bonded with the outer face of adjacent wet spraying pile.
- 2. wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation as claimed in claim 1, it is characterised in that:The lower end of steel pile casting The vertical distance of face to the upper surface of wet spraying pile is L, 1m >=L >=0.1m.
- 3. wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation as claimed in claim 2, it is characterised in that:Described L= 0.5m。
- 4. wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation as claimed in claim 3, it is characterised in that:Described wet spraying pile For cement mixing pile.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720514413.0U CN206706748U (en) | 2017-05-10 | 2017-05-10 | Wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720514413.0U CN206706748U (en) | 2017-05-10 | 2017-05-10 | Wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206706748U true CN206706748U (en) | 2017-12-05 |
Family
ID=60465731
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720514413.0U Expired - Fee Related CN206706748U (en) | 2017-05-10 | 2017-05-10 | Wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206706748U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109914397A (en) * | 2019-03-19 | 2019-06-21 | 重庆建筑工程职业学院 | Bridge Pile Foundation Construction method |
CN110331733A (en) * | 2019-06-10 | 2019-10-15 | 中铁五局集团建筑工程有限责任公司 | The miniature pile group building enclosure and construction method of large diameter pile foundation |
-
2017
- 2017-05-10 CN CN201720514413.0U patent/CN206706748U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109914397A (en) * | 2019-03-19 | 2019-06-21 | 重庆建筑工程职业学院 | Bridge Pile Foundation Construction method |
CN110331733A (en) * | 2019-06-10 | 2019-10-15 | 中铁五局集团建筑工程有限责任公司 | The miniature pile group building enclosure and construction method of large diameter pile foundation |
CN110331733B (en) * | 2019-06-10 | 2024-08-27 | 中铁五局集团建筑工程有限责任公司 | Miniature pile group enclosure structure of large-diameter pile foundation and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107246006B (en) | The pile-filling method of concrete-pile | |
WO2018210019A1 (en) | Pile formation method for down-the-hole impact rotary jet composite piles | |
CN102943466B (en) | Construction method for miniature steel pipe concrete pile to penetrate through roadbed layer for reinforcing soft foundation construction | |
CN101429766B (en) | Ground strengthened high pressure rotary spraying pile construction technique | |
CN207062970U (en) | The double steel pile casting structures of stake in a kind of deep water major diameter water | |
CN107794915A (en) | It is adapted to the karst cave treatment method of pile foundation construction in karst area | |
CN107989032A (en) | A kind of construction method of punching interlocking pile | |
CN102286984A (en) | Water-stop curtain and construction method thereof | |
CN107012861B (en) | A kind of discrete material core expansive concrete stake and its construction method | |
CN105442532A (en) | Construction method for pile-head-expanded bored pile | |
CN105256795A (en) | End support type thread core composite pile and construction device and method for end support type thread core composite pile | |
CN105297712A (en) | Construction method for composite pile of auger-bored high-pressure-jetting cemented soil composite variable-cross-section concrete pile | |
CN104818713A (en) | Profile steel cement soil pile construction method adaptive to various stratums | |
CN107100164A (en) | A kind of long auger guncreting pile construction method | |
CN206706748U (en) | Wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation | |
CN106592605A (en) | Construction method of foundation pit bracing with tri-axial stirring piles overlapped with reinforced concrete cast-in-place piles to be driven | |
CN109667276A (en) | A kind of karst cave treatment and tracking grouting construction method | |
CN109610473A (en) | A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration | |
CN206721870U (en) | A kind of long auger guncreting pile steel reinforcement cage | |
CN201660880U (en) | Double-shaft stirring pile envelop enclosure structure with cast-in place piles driven internally | |
CN102235008B (en) | Engineering pile deviation preventing structure of soft soil foundation and pretreatment method | |
CN105350544B (en) | For water-stop curtain and its construction method containing block stone region | |
CN109629590A (en) | The construction method of Rock Region building pile foundation cushion cap | |
CN104108919A (en) | Environment-friendly water-stop curtain | |
CN205062810U (en) | End support type screw thread core composite pile's construction equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |