CN206706748U - Wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation - Google Patents

Wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation Download PDF

Info

Publication number
CN206706748U
CN206706748U CN201720514413.0U CN201720514413U CN206706748U CN 206706748 U CN206706748 U CN 206706748U CN 201720514413 U CN201720514413 U CN 201720514413U CN 206706748 U CN206706748 U CN 206706748U
Authority
CN
China
Prior art keywords
pile
wet spraying
pile foundation
foundation
casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720514413.0U
Other languages
Chinese (zh)
Inventor
欧阳彦
吴福居
陈正斌
左佑臣
孟源
李鹏
李秋霜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Xiamen Engineering Co Ltd
Original Assignee
CCCC First Highway Xiamen Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Xiamen Engineering Co Ltd filed Critical CCCC First Highway Xiamen Engineering Co Ltd
Priority to CN201720514413.0U priority Critical patent/CN206706748U/en
Application granted granted Critical
Publication of CN206706748U publication Critical patent/CN206706748U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses a kind of wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation, including design pile foundation, wet spraying pile and steel pile casting, several wet spraying piles are looped around around design pile foundation using designing pile foundation as the center of circle, adjacent wet spraying pile is provided with intersecting linkage section, the upper end of design pile foundation is set with steel pile casting, and the outer wall of steel pile casting is bonded with the outer face of adjacent wet spraying pile.Preferably, the vertical distance of the lower surface of steel pile casting to the upper surface of wet spraying pile is L, 1m >=L >=0.1m.The utility model substitutes the interim steel pile casting that lengthens using wet spraying pile and carries out local stiffening processing to unfavorable geology region Construction of Pile Bedding Boring, a circle wet spraying pile is provided with around design pile foundation and forms an annular curtain, play support action, it can so avoid lengthening the waste of steel pile casting, direct saving material cost, economic benefit are obvious.

Description

Wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation
Technical field
The utility model belongs to Bridge Pile Foundation Construction technical field, more particularly to a kind of wet spraying pile controlling stream modeling shape sea sand is blown Fill out area's pile foundation.
Background technology
With the development of society, increasing Oversea bridge is progressively established, general coastal, riverine beach is mainly sea sand Barged-in fill and muck soil, shape is moulded in stream, expending die is larger during pile foundation construction, easily occurs collapse hole problem if not handling, Also increase pile foundation concreting cost simultaneously.Stream modeling shape sea sand hydraulic reclamation region pile foundation expending die traditional control method is to set Put and lengthen interim steel pile casting, steel pile casting must pass through the mud of stream modeling shape, carry out protectiveness construction.But this method is in sea sand hydraulic reclamation Area, steel pile casting can not be pulled out, and cause that steel pile casting waste of material is big, cost is high, and need to carry out casing and cut off, and be unfavorable for subsequently holding The excavation construction of platform, speed of application is slow, the duration is influenceed big.
Utility model content
The purpose of this utility model is to provide a kind of wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation.
To reach above-mentioned purpose, the technical solution adopted in the utility model is:
A kind of wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation, including design pile foundation, wet spraying pile and steel pile casting, several Wet spraying pile is looped around around design pile foundation using designing pile foundation as the center of circle, and adjacent wet spraying pile is provided with intersecting linkage section, designs stake The upper end of base is set with steel pile casting, and the outer wall of steel pile casting is bonded with the outer face of adjacent wet spraying pile.
Preferably, the vertical distance of the lower surface of steel pile casting to the upper surface of wet spraying pile is L, 1m >=L >=0.1m.
Preferably, described L=0.5m.
Preferably, described wet spraying pile is cement mixing pile.
The utility model this have the advantage that:
The utility model substitutes the interim steel pile casting that lengthens using wet spraying pile and unfavorable geology region Construction of Pile Bedding Boring is carried out Local stiffening processing, a circle wet spraying pile is provided with around design pile foundation and forms an annular curtain, support action is played, so may be used Avoid lengthening the waste of steel pile casting, direct saving material cost, economic benefit are obvious.
The utility model technology handles a trifle steel of pile foundation counter-boring techniques, top layer water proof and guide effect using wet spraying pile Casing can directly be hung out afterwards after excavation of foundation pit, eliminate the time for cutting off casing, shorten the project construction duration.
It is strong that the utility model technology significantly reduces worker's broken pile head, the work in levelling of the land on follow-up cushion cap excavation Degree.
Wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area piling strtucture of the present utility model is simple, difficulty of construction is small, construction effect Rate is high, improves pile foundation construction quality, has good economic and social benefit.
The utility model technological applicability is strong, construction is simple, is easy to promote.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the A-A sectional views in Fig. 1;
Fig. 3 is the B enlarged drawings in Fig. 1;
In figure:1 is wet spraying pile, and 2 be design pile foundation, and 3 be ground, and 4 be steel pile casting, and 5 be intersecting linkage section.
Embodiment
As Figure 1-3, a kind of wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation, including design pile foundation, wet spraying pile and Steel pile casting, several wet spraying piles are looped around around design pile foundation using designing pile foundation as the center of circle, and adjacent wet spraying pile is provided with intersecting Linkage section, the upper end for designing pile foundation are set with steel pile casting, and the outer wall of steel pile casting is bonded with the outer face of adjacent wet spraying pile.
So that 1.8m cast-in-situ bored pile is in some footpath as an example, mended and surveyed according to geology, this position goes out strata condition such as following table It is shown:
According to single shaft rotary churning pile churning scope, pressed by calculating in bridge pile foundation(Stake footpath 1.8m)Surrounding lays 11 wet shots Stake, wet spraying pile pile center is away from pile foundation center 1.4m.The vertical distance of the lower surface of steel pile casting to the upper surface of wet spraying pile is L, L= 0.5m。
This engineering wet spraying pile uses the ordinary cement mixing piles of φ 800, using #425 Portland cements, water-stop curtain Cement mixing content is 15%, the ratio of mud 0.28, inside mixes 0.2% calcium lignosulfonate and 0.05% triethanolamine.
It is as follows using single shaft cement mixing pile construction procedure:Levelling of the land → surveying and locating → rig is in place → slurrying → sinking → whitewashing stirring lifting → detergent line is stirred in advance and stirring-head → stake machine shifts → carries out next pile foundation construction
The utility model is applied has re-started observation to the process of pile foundation construction, and the pile foundation is described as:Pile Diameter is: 1.8m, friction pile, hole depth:60.56m, effective length 57.469m.Concrete consumption and hole depth in filling process(Hole depth is: Distance of the aperture away from concrete surface)Control such as following table:
Observed and found by filling process, after being safeguarded using wet spraying pile, the expending die of pile foundation is smaller and more It is stable, illustrate that the utility model application preferably controlling stream can mould shape sea sand hydraulic reclamation region pile foundation expending die, improve pile foundation Construction quality, popularization and application can be carried out in other pile foundation constructions.
Embodiment described above is only that preferred embodiment of the present utility model is described, and is not departing from this reality On the premise of new design spirit, various modifications that those of ordinary skill in the art make to the technical solution of the utility model And improvement, it all should fall into the protection domain of the utility model claims book determination.

Claims (4)

  1. A kind of 1. wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation, it is characterised in that:Including design pile foundation, wet spraying pile and steel Casing, several wet spraying piles are looped around around design pile foundation using designing pile foundation as the center of circle, and adjacent wet spraying pile is provided with phase commissure Section is connect, the upper end for designing pile foundation is set with steel pile casting, and the outer wall of steel pile casting is bonded with the outer face of adjacent wet spraying pile.
  2. 2. wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation as claimed in claim 1, it is characterised in that:The lower end of steel pile casting The vertical distance of face to the upper surface of wet spraying pile is L, 1m >=L >=0.1m.
  3. 3. wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation as claimed in claim 2, it is characterised in that:Described L= 0.5m。
  4. 4. wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation as claimed in claim 3, it is characterised in that:Described wet spraying pile For cement mixing pile.
CN201720514413.0U 2017-05-10 2017-05-10 Wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation Expired - Fee Related CN206706748U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720514413.0U CN206706748U (en) 2017-05-10 2017-05-10 Wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720514413.0U CN206706748U (en) 2017-05-10 2017-05-10 Wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation

Publications (1)

Publication Number Publication Date
CN206706748U true CN206706748U (en) 2017-12-05

Family

ID=60465731

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720514413.0U Expired - Fee Related CN206706748U (en) 2017-05-10 2017-05-10 Wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation

Country Status (1)

Country Link
CN (1) CN206706748U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914397A (en) * 2019-03-19 2019-06-21 重庆建筑工程职业学院 Bridge Pile Foundation Construction method
CN110331733A (en) * 2019-06-10 2019-10-15 中铁五局集团建筑工程有限责任公司 The miniature pile group building enclosure and construction method of large diameter pile foundation

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914397A (en) * 2019-03-19 2019-06-21 重庆建筑工程职业学院 Bridge Pile Foundation Construction method
CN110331733A (en) * 2019-06-10 2019-10-15 中铁五局集团建筑工程有限责任公司 The miniature pile group building enclosure and construction method of large diameter pile foundation
CN110331733B (en) * 2019-06-10 2024-08-27 中铁五局集团建筑工程有限责任公司 Miniature pile group enclosure structure of large-diameter pile foundation and construction method

Similar Documents

Publication Publication Date Title
CN107246006B (en) The pile-filling method of concrete-pile
WO2018210019A1 (en) Pile formation method for down-the-hole impact rotary jet composite piles
CN102943466B (en) Construction method for miniature steel pipe concrete pile to penetrate through roadbed layer for reinforcing soft foundation construction
CN101429766B (en) Ground strengthened high pressure rotary spraying pile construction technique
CN207062970U (en) The double steel pile casting structures of stake in a kind of deep water major diameter water
CN107794915A (en) It is adapted to the karst cave treatment method of pile foundation construction in karst area
CN107989032A (en) A kind of construction method of punching interlocking pile
CN102286984A (en) Water-stop curtain and construction method thereof
CN107012861B (en) A kind of discrete material core expansive concrete stake and its construction method
CN105442532A (en) Construction method for pile-head-expanded bored pile
CN105256795A (en) End support type thread core composite pile and construction device and method for end support type thread core composite pile
CN105297712A (en) Construction method for composite pile of auger-bored high-pressure-jetting cemented soil composite variable-cross-section concrete pile
CN104818713A (en) Profile steel cement soil pile construction method adaptive to various stratums
CN107100164A (en) A kind of long auger guncreting pile construction method
CN206706748U (en) Wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation
CN106592605A (en) Construction method of foundation pit bracing with tri-axial stirring piles overlapped with reinforced concrete cast-in-place piles to be driven
CN109667276A (en) A kind of karst cave treatment and tracking grouting construction method
CN109610473A (en) A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration
CN206721870U (en) A kind of long auger guncreting pile steel reinforcement cage
CN201660880U (en) Double-shaft stirring pile envelop enclosure structure with cast-in place piles driven internally
CN102235008B (en) Engineering pile deviation preventing structure of soft soil foundation and pretreatment method
CN105350544B (en) For water-stop curtain and its construction method containing block stone region
CN109629590A (en) The construction method of Rock Region building pile foundation cushion cap
CN104108919A (en) Environment-friendly water-stop curtain
CN205062810U (en) End support type screw thread core composite pile's construction equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171205