CN207228186U - Build the slip casting composite foundation of reinforcement and rectification - Google Patents

Build the slip casting composite foundation of reinforcement and rectification Download PDF

Info

Publication number
CN207228186U
CN207228186U CN201720954883.9U CN201720954883U CN207228186U CN 207228186 U CN207228186 U CN 207228186U CN 201720954883 U CN201720954883 U CN 201720954883U CN 207228186 U CN207228186 U CN 207228186U
Authority
CN
China
Prior art keywords
foundation
reinforcement
bed course
building
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720954883.9U
Other languages
Chinese (zh)
Inventor
崔学栋
吴继光
崔腾跃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Technology Co Ltd Beijing Hengxiang Hongye Foundation Reinforcement
Original Assignee
Technology Co Ltd Beijing Hengxiang Hongye Foundation Reinforcement
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Technology Co Ltd Beijing Hengxiang Hongye Foundation Reinforcement filed Critical Technology Co Ltd Beijing Hengxiang Hongye Foundation Reinforcement
Priority to CN201720954883.9U priority Critical patent/CN207228186U/en
Application granted granted Critical
Publication of CN207228186U publication Critical patent/CN207228186U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of slip casting composite foundation for building reinforcement and rectification, including pile foundation under bed course reinforcement and strengthening layer, foundation stabilization platform and column, bed course reinforcement and strengthening layer is formed for original bed course and grout cures, and slurries are injected in original bed course by bed course reinforcement and strengthening injected hole;Foundation stabilization platform is formed for original ground and grout cures, and slurries are injected in original ground by foundation stabilization injected hole, and foundation stabilization platform is in the lower section of bed course reinforcement and strengthening layer;The lower part arranged for interval of foundation stabilization platform has a pile foundation under multiple columns, and pile foundation is injected solidification in pile foundation injected hole for slurries and formed under column.By way of reinforcing layer by layer, pile foundation forms 3 D stereo support system under bed course reinforcement and strengthening layer, foundation stabilization platform and column, realize that building foundation is reinforced and the integrated purpose of lifting correction, success solves the purpose on building differential settlement and lifting correction basis, building foundation is reached in the range of requirement for bearing capacity and design tolerance.

Description

Build the slip casting composite foundation of reinforcement and rectification
Technical field
Building lot reinforcement and rectification technical field is the utility model is related to, reinforcement and rectification is built in particular to one kind Slip casting composite foundation.
Background technology
The accidents such as generation settles after building up in order to prevent, inclination is even collapsed, build and are starting to build upper strata house Before structure, ground tamping processing is first carried out to the underground of building structure and forms support ground.For example, for current high level The support ground of frame construction forms as follows substantially:First pass through heavy-tamping method and form original ground, then in original ground upper table Face is laid with sand-gravel cushion, is finally laid with concrete valve plate on sand-gravel cushion top again.But in some cases, though soil layer by Heavy tamping treatment, still suffers from weak substratum and the impractical phenomenon of soil layer, weak substratum insufficient strength and foundation bearing capacity is relatively low leads Cause foundation uneven settlement.At this time, it may be necessary to carry out grouting and reinforcing correction processing to support ground, foundation bearing capacity is improved, makes it Sedimentation difference reaches in design allowed band.
The prior art is directly to foundation soil under building foundation(The original ground that i.e. rammed earth is formed)Carry out slip casting, lift Rise.Secondary settlement is be easy to cause, original support ground is damaged.Specifically, there are problems with for the prior art:
1. being possible to form building foundation impact destruction during high-pressure slip-casting lifting, cause sole plate office Play drum, or even cracking in portion.
2. the prior art is there are injected hole away from the shortcomings that small, perforate is more, and aperture is big:Injected hole is away from small, and perforate is more, aperture Greatly, it is larger to building foundation destruction, the service life of building foundation may be caused to shorten.
3. prior art slip casting depth is shallower, big depth soft foundation grouting and reinforcing is not suitable for.
The content of the invention
The main purpose of the utility model is that a kind of slip casting composite foundation for building reinforcement and rectification is provided, it is existing to solve The problem of building foundation lifting deviation correcting technology in technology easily causes secondary settlement to destroy on original ground.
To achieve these goals, the utility model provides a kind of slip casting composite foundation for building reinforcement and rectification, including Pile foundation under bed course reinforcement and strengthening layer, foundation stabilization platform and column, bed course reinforcement and strengthening layer are formed for original bed course and grout cures, Bed course reinforcement and strengthening injected hole extends to the lower surface of original bed course from ground hole, and slurries are noted by bed course reinforcement and strengthening injected hole Enter in original bed course;Foundation stabilization platform is formed for original ground and grout cures, and foundation stabilization injected hole is extended to from ground The lower surface of original ground, slurries are injected in original ground by foundation stabilization injected hole, and foundation stabilization platform is reinforced in bed course The lower section of strengthening course;The lower part arranged for interval of foundation stabilization platform has a pile foundation under multiple columns, and pile foundation injects pile foundation for slurries under column Solidification is formed in injected hole.
Further, the slip casting composite foundation for building reinforcement and rectification further includes former concrete valve plate, bed course reinforcement and strengthening layer It is integrally formed positioned at the lower part of former concrete valve plate and by the way that slurries are cementing.
Further, pile foundation forms tree root by the Soft Soil Layer of slurries horizontal infiltration into foundation stabilization platform lower under column Shape.
Further, under column pile foundation by controlling grouting pressure to form the skirt ladder type that gradually increases from top to bottom.
Further, pile foundation is distributed in the surrounding of building bearing column under column.
Using the technical solution of the utility model, by way of falling down, being layered from above and successively reinforce, first to original pad Layer, original ground carry out grouting and reinforcing, form bed course reinforcement and strengthening layer and foundation stabilization platform so that the connection of primitive architecture basis Into an entirety, its framework intensity is improved, then slip casting is punched in the Soft Soil Layer of foundation stabilization platform lower, forms stake under column Base, the lifting of building foundation is realized by the support force of pile foundation under column, achievees the purpose that correction.In construction work, by layer by layer The mode of reinforcing, pile foundation forms 3 D stereo support system under bed course reinforcement and strengthening layer, foundation stabilization platform and column, is first built Strengthening of foundation is built, then carries out building foundation lifting, building foundation reinforcing and the integrated purpose of lifting correction is realized, successfully solves The purpose on differential settlement and lifting correction basis is built, building foundation is reached requirement for bearing capacity and design tolerance scope It is interior, prevent secondary settlement.
Brief description of the drawings
The accompanying drawings which form a part of this application are used to provide a further understanding of the present invention, this practicality New schematic description and description is used to explain the utility model, does not form the improper restriction to the utility model. In the accompanying drawings:
Fig. 1 shows the overall structure diagram of the slip casting composite foundation of the building reinforcement and rectification of the utility model;
Fig. 2 shows pile foundation and former concrete valve plate portion under bed course reinforcement and strengthening layer in Fig. 1, foundation stabilization platform, column The enlarged structure schematic diagram divided.
Wherein, above-mentioned attached drawing is marked including the following drawings:
10th, bed course reinforcement and strengthening layer;20th, foundation stabilization platform;30th, pile foundation under column;40th, former concrete valve plate;50th, bed course Reinforcement and strengthening injected hole;60th, foundation stabilization injected hole.
Embodiment
It should be noted that in the case where there is no conflict, the feature in embodiment and embodiment in the application can phase Mutually combination.The utility model will be described in detail below with reference to the accompanying drawings and embodiments.
It is noted that described further below is all illustrative, it is intended to provides further instruction to the application.It is unless another Indicate, all technical and scientific terms used herein has usual with the application person of an ordinary skill in the technical field The identical meanings of understanding.
In the utility model, in the case where not making conversely explanation, the noun of locality such as " upper and lower, top, bottom " used is usually Be for direction shown in the drawings, or for component in itself on vertical, vertical or gravity direction for;Together Sample, for ease of understanding and describing, " inside and outside " refers to the inside and outside of the profile relative to each component in itself, but the above-mentioned noun of locality is simultaneously It is not used in limitation the utility model.
Easily secondary settlement destruction is caused to ask on original ground to solve ground lifting deviation correcting technology of the prior art Topic, the utility model provide a kind of slip casting composite foundation for building reinforcement and rectification.
As depicted in figs. 1 and 2, the slip casting composite foundation for building reinforcement and rectification adds including bed course reinforcement and strengthening layer 10, ground Gu pile foundation 30 under platform 20 and column, bed course reinforcement and strengthening layer 10 is formed for original bed course and grout cures, bed course reinforcement and strengthening note Slurry hole 50 extends to the lower surface of original bed course from ground hole, and slurries inject original bed course by bed course reinforcement and strengthening injected hole 50 It is interior;Foundation stabilization platform 20 is formed for original ground and grout cures, and foundation stabilization injected hole 60 extends to primitively from ground The lower surface of base, slurries are injected in original ground by foundation stabilization injected hole 60, and foundation stabilization platform 20 is reinforced in bed course and mended The lower section of strong layer 10;The lower part arranged for interval of foundation stabilization platform 20 has a pile foundation 30 under multiple columns, and pile foundation 30 is slurries note under column Enter solidification in pile foundation injected hole to be formed.
From top to bottom, layering successively reinforce by way of, first to original bed course, original ground carry out grouting and reinforcing, shape Into bed course reinforcement and strengthening layer 10 and foundation stabilization platform 20 so that primitive architecture basis connects into an entirety, improves its framework Intensity, then punches slip casting in the Soft Soil Layer of foundation stabilization platform lower, forms pile foundation 30 under column, pass through the branch of pile foundation under column 30 Support force realizes the lifting of building foundation, achievees the purpose that correction.In construction work, by way of reinforcing layer by layer, bed course is reinforced Pile foundation 30 forms 3 D stereo support system under strengthening course 10, foundation stabilization platform 20 and column, first carries out building foundation reinforcing, then Building foundation lifting is carried out, realizes building foundation reinforcing and the integrated purpose of lifting correction, successfully solution building is uneven sinks Drop and the purpose on lifting correction basis, make building foundation reach in the range of requirement for bearing capacity and design tolerance, prevent secondary Sedimentation.
As shown in Fig. 2, the slip casting composite foundation of building reinforcement and rectification further includes former concrete valve plate 40, bed course reinforcement and strengthening Layer 10 is integrally formed positioned at the lower part of former concrete valve plate 40 and by the way that slurries are cementing.Building bearing relies primarily in the prior art Concrete disc support, but the thickness of concrete valve plate is smaller, the support strength of the foundation structure of concrete valve plate bottom compared with Small and intensity is uneven, and settling or rupturing easily occur in concrete valve plate.The utility model is by by bed course reinforcement and strengthening layer 10 It is integrally formed by slurries are cementing with former concrete valve plate 40, equivalent to the integral thickness for improving concrete valve plate, effectively carries Its high bearing capacity.
Preferably, the construction of bed course reinforcement and strengthening layer 10 and foundation stabilization platform 20 uses the two-tube grouting process in a hole, i.e., Same injected hole installs two slip casting steel pipes respectively, a short tube, a root long pipe, short tube extend at the lower surface of original bed course into Row grouting and reinforcing reinforcement, long tube is extended carries out grouting and reinforcing to the certain depth of the original ground below original bed course.Construct suitable Sequence is:Short tube is first noted, notes long tube afterwards, i.e., first reinforces original bed course, then reinforces original ground, is successively reinforced.This form of construction work Be conducive to use small-bore, big pitch-row, it is small to building/structure base destructiveness, it is cost-effective.
As shown in Figure 1, pile foundation 30 enters the Soft Soil Layer shape of 20 lower part of foundation stabilization platform by slurries horizontal infiltration under column Into tree root shape.It is laterally long equivalent to pile foundation under column 30 after slurries horizontal infiltration enters the Soft Soil Layer of 20 lower part of foundation stabilization platform Go out multiple " roots ", and be linked to be an entirety with " the vertical main root " of pile foundation under column 30, so as to increase pile foundation 30 and weak soil under column Frictional force between layer, effectively improves the load-bearing capacity of pile foundation 30 under column.
As shown in Figure 1, it is characterised in that pile foundation 30 is by controlling grouting pressure to form what is gradually increased from top to bottom under column Pile foundation 30 is up-small and down-big structure under skirt ladder type, i.e. column, and this structure can effectively improve the support energy of pile foundation 30 under column Power, prevents that sedimentation phenomenon occurs in pile foundation 30 under column.
Preferably, pile foundation 30 is distributed in the surrounding of building bearing column under column.Pressure of the building bearing column for building foundation Maximum, this position are easiest to sedimentation phenomenon occur, by pile foundation 30 under setting column in the surrounding of building bearing column, so as to improve The structural strength and enabling capabilities of building bearing column lower part building foundation so that lifting occurs in building bearing column.
Preferably, pile foundation is using the integral protrusive delamination pour slurry construction technology of note is bored under column, and the technique aperture is small, and slip casting is deep Degree is big, and downward slip casting is layered by top, avoids secondary settlement from destroying, slurry infiltration evenly, and is put down by high-pressure slip-casting Steady lifting building foundation, reaches in design requirement deviation range.
It can be seen from the above description that the above embodiments of the present invention achieve the following technical effects:
By way of reinforcing layer by layer, pile foundation 30 forms three under bed course reinforcement and strengthening layer 10, foundation stabilization platform 20 and column Dimensional support system is tieed up, first carries out building foundation reinforcing, then carries out building foundation lifting, realizes that building foundation is reinforced and lifting is entangled Partially integrated purpose, successfully solves the purpose on building differential settlement and lifting correction basis, building foundation is reached carrying In the range of power requirement and design tolerance.
It should be noted that term used herein above is merely to describe embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singulative It is also intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " bag Include " when, it indicates existing characteristics, step, work, device, component and/or combinations thereof.
It should be noted that term " comprising " and " tool in the description and claims of this application and above-mentioned attached drawing Have " and their any deformation, it is intended that cover it is non-exclusive include, for example, containing series of steps or unit Process, method, system, product or equipment are not necessarily limited to those steps clearly listed or unit, but may include without clear It is listing to Chu or for the intrinsic other steps of these processes, method, product or equipment or unit.
The above descriptions are merely preferred embodiments of the present invention, is not intended to limit the present invention, for this For the technical staff in field, various modifications and changes may be made to the present invention.It is all in the spirit and principles of the utility model Within, any modification, equivalent replacement, improvement and so on, should be included within the scope of protection of this utility model.

Claims (5)

  1. A kind of 1. slip casting composite foundation for building reinforcement and rectification, it is characterised in that including:
    Bed course reinforcement and strengthening layer(10), the bed course reinforcement and strengthening layer(10)Formed for original bed course and grout cures, bed course adds Gu reinforcement injected hole(50)The lower surface of the original bed course is extended to from ground hole, slurries pass through bed course reinforcement and strengthening injected hole (50)Inject in the original bed course;
    Foundation stabilization platform(20), the foundation stabilization platform(20)Formed for original ground and grout cures, foundation stabilization note Starch hole(60)The lower surface of the original ground is extended to from ground, slurries pass through the foundation stabilization injected hole(60)Injection institute State in original ground, the foundation stabilization platform(20)In the bed course reinforcement and strengthening layer(10)Lower section;
    Pile foundation under column(30), the foundation stabilization platform(20)Lower part arranged for interval have pile foundation under multiple columns(30), institute State pile foundation under column(30)Inject to solidify in pile foundation injected hole for slurries and formed.
  2. 2. the slip casting composite foundation of building reinforcement and rectification according to claim 1, it is characterised in that the building reinforcing is entangled Inclined slip casting composite foundation further includes former concrete valve plate(40), the bed course reinforcement and strengthening layer(10)Positioned at the former concrete Valve plate(40)Lower part and be integrally formed by the way that slurries are cementing.
  3. 3. the slip casting composite foundation of building reinforcement and rectification according to claim 2, it is characterised in that pile foundation under the column (30)The foundation stabilization platform is entered by slurries horizontal infiltration(20)The Soft Soil Layer of lower part forms tree root shape.
  4. 4. the slip casting composite foundation of building reinforcement and rectification according to claim 3, it is characterised in that pile foundation under the column (30)By controlling grouting pressure to form the skirt ladder type gradually increased from top to bottom.
  5. 5. the slip casting composite foundation of building reinforcement and rectification according to claim 4, it is characterised in that pile foundation under the column (30)It is distributed in the surrounding of building bearing column.
CN201720954883.9U 2017-08-02 2017-08-02 Build the slip casting composite foundation of reinforcement and rectification Active CN207228186U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720954883.9U CN207228186U (en) 2017-08-02 2017-08-02 Build the slip casting composite foundation of reinforcement and rectification

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720954883.9U CN207228186U (en) 2017-08-02 2017-08-02 Build the slip casting composite foundation of reinforcement and rectification

Publications (1)

Publication Number Publication Date
CN207228186U true CN207228186U (en) 2018-04-13

Family

ID=61856371

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720954883.9U Active CN207228186U (en) 2017-08-02 2017-08-02 Build the slip casting composite foundation of reinforcement and rectification

Country Status (1)

Country Link
CN (1) CN207228186U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258677A (en) * 2018-05-25 2019-09-20 北京恒祥宏业基础加固技术有限公司 Lifting method is reinforced in the sedimentation of existing building isolated footing
WO2019206241A1 (en) * 2018-04-26 2019-10-31 北京恒祥宏业基础加固技术有限公司 Pile foundation cap structure settling, reinforcing, lifting and leveling structure, and construction method therefor
CN112081156A (en) * 2019-06-15 2020-12-15 北京恒祥宏业基础加固技术有限公司 Grouting reinforcement lifting method for frame structure building
WO2020248429A1 (en) * 2019-06-14 2020-12-17 北京恒祥宏业基础加固技术有限公司 Method for strengthening and lifting high-rise building having raft foundation
CN112343104A (en) * 2019-08-09 2021-02-09 北京恒祥宏业基础加固技术有限公司 Reinforcing and lifting method for large pier of high-speed rail

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019206241A1 (en) * 2018-04-26 2019-10-31 北京恒祥宏业基础加固技术有限公司 Pile foundation cap structure settling, reinforcing, lifting and leveling structure, and construction method therefor
US11453992B2 (en) 2018-04-26 2022-09-27 Beijing Hengxiang Hongye Foundation Reinforcement Technology Co., Ltd. Pile foundation bearing platform settlement, reinforcement, lift-up and leveling structure, and construction method thereof
CN110258677A (en) * 2018-05-25 2019-09-20 北京恒祥宏业基础加固技术有限公司 Lifting method is reinforced in the sedimentation of existing building isolated footing
WO2020248429A1 (en) * 2019-06-14 2020-12-17 北京恒祥宏业基础加固技术有限公司 Method for strengthening and lifting high-rise building having raft foundation
US11840820B2 (en) 2019-06-14 2023-12-12 Beijing Hengxiang Hongye Foundation Reinforcement Technology Co., Ltd. Method for strengthening and lifting high-rise building having raft foundation
CN112081156A (en) * 2019-06-15 2020-12-15 北京恒祥宏业基础加固技术有限公司 Grouting reinforcement lifting method for frame structure building
CN112081156B (en) * 2019-06-15 2022-04-29 北京恒祥宏业基础加固技术有限公司 Grouting reinforcement lifting method for frame structure building
CN112343104A (en) * 2019-08-09 2021-02-09 北京恒祥宏业基础加固技术有限公司 Reinforcing and lifting method for large pier of high-speed rail

Similar Documents

Publication Publication Date Title
CN207228186U (en) Build the slip casting composite foundation of reinforcement and rectification
CN107435346A (en) A kind of grouting and reinforcing method for correcting error suitable for high building structure
CN101718091B (en) Method for treating foundation consisting of liquid soil layer and soft soil mutual layer
CN105544512A (en) Reinforced sack grouting stone-breaking pile with heat transferring tube buried therein and construction method
CN102653945A (en) Foundation reinforcing and replacing structure and construction method thereof
CN108547336B (en) Sedimentation, reinforcement, jacking and leveling method suitable for independent pile foundation of industrial plant
CN102561384A (en) Steel hoop truss type elevated pile cap tower crane foundation construction method and structure
CN102864781A (en) Foundation pit supporting method utilizing inclined piles
CN103882869A (en) Inclined supporting pile structure for foundation pit support and construction method thereof
CN106013171A (en) Semi-rigid and semi-flexible support structure and method for deep foundation pit side wall
CN104532714B (en) Roadbed structure for treating deep soft soil karst foundation
CN106368219A (en) Supporting reinforcing structure of deep foundation pit and construction method
CN108547641A (en) The bottom stab ilization system and its construction method in rich water soft stratum heavy haul railway tunnel
CN103628463A (en) Construction method for ultra-deep vibroflotation gravel pile of complicated stratum
CN108797578A (en) Crushed stone grouting pile and its construction method with classification enlarged footing
CN106065668B (en) A kind of construction techniques
CN105297717A (en) Composite foundation pile with lower portion enlarged diameter section and construction method of composite foundation pile
CN101418574B (en) Construction method for reinforcing grade beam
CN106480878A (en) A kind of upper and lower part expansion type soil cement is combined pile tube
CN111254909B (en) Construction process of composite pile foundation of soft soil area foundation
CN102966109A (en) Method for constructing zonal deep foundation pit bottom sealing of soft soil foundation
CN205399397U (en) A vertical support structure of variable cross section wall formula for reverse construction method
CN102864796A (en) Construction spreading foundation adaptive to filled ground settlement and construction method
CN103437360B (en) A kind of not support replacement construction method in deep-foundation pit engineering
CN202644518U (en) Post-inserted reinforcement cage cement fly ash gravel pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant