CN205116201U - Open caisson construction equipment - Google Patents

Open caisson construction equipment Download PDF

Info

Publication number
CN205116201U
CN205116201U CN201520907370.3U CN201520907370U CN205116201U CN 205116201 U CN205116201 U CN 205116201U CN 201520907370 U CN201520907370 U CN 201520907370U CN 205116201 U CN205116201 U CN 205116201U
Authority
CN
China
Prior art keywords
open caisson
scaffold
poppet
construction
location
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520907370.3U
Other languages
Chinese (zh)
Inventor
雷新海
刘国显
王昆峰
郝瑞丽
张文鹏
孙利峰
张春风
吴金玉
马宏杰
田新源
徐宗峰
张安奇
李高立
周怡平
张文龙
吴振鹏
张莉
李敏
王艳艳
车圣君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Water Construction Engineering Co Ltd
Original Assignee
Zhengzhou Water Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Water Construction Engineering Co Ltd filed Critical Zhengzhou Water Construction Engineering Co Ltd
Priority to CN201520907370.3U priority Critical patent/CN205116201U/en
Application granted granted Critical
Publication of CN205116201U publication Critical patent/CN205116201U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses an open caisson construction equipment, including open caisson body and scaffold, the bottom of open caisson body evenly be provided with steel sword foot, open caisson body and steel sword foot junction all be provided with the location poppet, the equal fixed sand bedding course of having laid in bottom of location poppet, the scaffold be the builder's jack, the internal surface of open caisson body be provided with the steel form, the utility model has the characteristics of factor of safety is high, the construction progress is fast and economic benefits is good.

Description

A kind of open caisson construction device
Technical field
The utility model belongs to municipal engineering technical field, relates to a kind of open caisson construction device.
Background technology
At present, municipal administration is buried darker sink hole, catch-basin, electric power well etc. and is all adopted open caisson construction.But carry out sinking construction when pressing close to present situation larger operation pipeline caliber.The open caisson constructions such as existing sink hole, catch-basin, electric power well, are all direct excavations, usually cause soil body flow, are easy to cause outside to run pipeline and move destruction, affect other pipeline performances, even cause the technical problems such as construction safety accident.Domestic have the application of open caisson in current-formed silt and key technology thereof to do particular study, but wherein all ignore the specially treated of soil excavation in groundwater table, mud when to carry out open caisson construction in silt soil, fail effectively to process in well sinking process that groundwater table is too high, soil excavation is difficult, well sinking easily produces prominent heavy, partially heavy, sinking deviation and be difficult to control, sinking final stage easily occurs super heavy, easily occurs the common quality defect phenomenons such as ground water seepage after back cover.Owing to occurring in well sinking process that excessive sinking deviation will cause subsequent construction difficulty to strengthen, not only time-consumingly to take a lot of work, and increase construction cost, secondly, the scaffold that the borehole wall that traditional open caisson construction makes uses needs repeatedly to set up, remove, schedule delays, reduces the efficiency of operation, improves construction cost.The open caisson construction device that a kind of safety factor is high, construction speed is fast and good in economic efficiency is provided to seem particularly important in the face of this phenomenon.
Summary of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art, and the open caisson construction device that a kind of safety factor is high, construction speed is fast and good in economic efficiency provided.
The purpose of this utility model is achieved in that a kind of open caisson construction device, comprise open caisson body and scaffold, the bottom even of described open caisson body is provided with steel sword pin, described open caisson body and steel sword pin junction are provided with location poppet, the bottom of described location poppet is all fixedly equipped with sand cushion, described scaffold is builder's jack, and the inner surface of described open caisson body is provided with steel form.
Described open caisson body is provided with suspension scaffold, and described scaffold is fixedly installed on suspension scaffold.
The left end of described sand cushion is connected with steel sword pin, and the laying length of described sand cushion is greater than the length of location poppet.
Described location poppet and sand cushion are bolted.
Described steel form is according to the specific steel form of open caisson body.
The beneficial effect that the utility model produces is: first, a kind of open caisson construction device, comprise open caisson body and scaffold, reliably safer on sink well technique, shoveling amount is few, smaller on the impact of adjacent structure, open caisson foundation is embedding darker, good stability, can support larger load, and the upper and lower operation of scaffold convenient construction personnel or perimeter security net are gone along with sb. to guard him and high-altitude is installed.Secondly, the bottom even of open caisson body is provided with steel sword pin, overcomes the difficulty due to the well sinking soil excavation that underground soft mud is thicker, groundwater table is higher, local also has the phenomenons such as sub-surface skewness and brings that the medium-and-large-sized open caisson construction of current-formed silt runs into.Open caisson body and steel sword pin junction are provided with location poppet, have greatly ensured that the safety of sinking well engineering sinks to operating, have effectively controlled the correction operation of open caisson, made the stable sinking of open caisson.The bottom of location poppet all fixedly is equipped with sand cushion, and location poppet is stablized, and prevents open caisson body to dash forward the generation of heavy phenomenon, guarantee construction quality.Again, scaffold is builder's jack, be partial precast due to open caisson body and cast-in-placely combine, utilization builder's jack avoids the construction of repeatedly setting up, removing scaffold when the borehole wall is cast-in-place to be made, accelerate engineering construction progress, a large amount of construction costs can be saved again, ensure the safety of open caisson manufacture and back cover process simultaneously.The inner surface of open caisson body is provided with steel form, and improve the reliability of caisson wall quality, safety factor is high.Open caisson body is provided with suspension scaffold, and scaffold is fixedly installed on suspension scaffold, and the construction of convenient construction personnel in turn ensure that the personal safety of constructor simultaneously.The left end of sand cushion is connected with steel sword pin, and the laying length of sand cushion is greater than the length of location poppet, ensures the accuracy of the location of location poppet, in turn ensure that construction quality simultaneously.Location poppet and sand cushion are bolted, stable connection, convenient disassembly.Steel form is according to the specific steel form of open caisson body, uses with open caisson body fits, ensures the construction quality of open caisson construction, improves efficiency of construction.
In a word, the utility model has the advantage that safety factor is high, construction speed is fast and good in economic efficiency.
Accompanying drawing explanation
Fig. 1 is overall structure schematic diagram of the present utility model.
Fig. 2 is partial structurtes schematic diagram of the present utility model.
Fig. 3 is top view of the present utility model.
In figure: 1, open caisson body 2, scaffold 3, steel sword pin 4, location poppet 5, sand cushion 6, steel form 7, suspension scaffold.
Detailed description of the invention
Below in conjunction with accompanying drawing, enforcement of the present utility model is described in detail.
Embodiment 1
As Figure 1-3, a kind of open caisson construction device, comprise open caisson body 1 and scaffold 2, the bottom even of described open caisson body 1 is provided with steel sword pin 3, described open caisson body 1 is provided with steel sword pin 3 junction and locates poppet 4, the bottom of described location poppet 4 is all fixedly equipped with sand cushion 5, and described scaffold 2 is builder's jack, and the inner surface of described open caisson body 1 is provided with steel form 6.
The utility model is in use: first, a kind of open caisson construction device, comprise open caisson body and scaffold, reliably safer on sink well technique, shoveling amount is few, smaller on the impact of adjacent structure, open caisson foundation is embedding darker, good stability, can support larger load, and the upper and lower operation of scaffold convenient construction personnel or perimeter security net are gone along with sb. to guard him and high-altitude is installed.Secondly, the bottom even of open caisson body is provided with steel sword pin, overcomes the difficulty due to the well sinking soil excavation that underground soft mud is thicker, groundwater table is higher, local also has the phenomenons such as sub-surface skewness and brings that the medium-and-large-sized open caisson construction of current-formed silt runs into.Open caisson body and steel sword pin junction are provided with location poppet, have greatly ensured that the safety of sinking well engineering sinks to operating, have effectively controlled the correction operation of open caisson, made the stable sinking of open caisson.The bottom of location poppet all fixedly is equipped with sand cushion, and location poppet is stablized, and prevents open caisson body to dash forward the generation of heavy phenomenon, guarantee construction quality.Again, scaffold is builder's jack, be partial precast due to open caisson body and cast-in-placely combine, utilization builder's jack avoids the construction of repeatedly setting up, removing scaffold when the borehole wall is cast-in-place to be made, accelerate engineering construction progress, a large amount of construction costs can be saved again, ensure the safety of open caisson manufacture and back cover process simultaneously.The inner surface of open caisson body is provided with steel form, and improve the reliability of caisson wall quality, safety factor is high.
Embodiment 2
As Figure 1-3, a kind of open caisson construction device, comprise open caisson body 1 and scaffold 2, the bottom even of described open caisson body 1 is provided with steel sword pin 3, described open caisson body 1 is provided with steel sword pin 3 junction and locates poppet 4, the bottom of described location poppet 4 is all fixedly equipped with sand cushion 5, and described scaffold 2 is builder's jack, and the inner surface of described open caisson body 1 is provided with steel form 6.
Described open caisson body 1 is provided with suspension scaffold 7, and described scaffold 2 is fixedly installed on suspension scaffold 7.
The left end of described sand cushion 5 is connected with steel sword pin 3, and the laying length of described sand cushion 5 is greater than the length of location poppet 4.
Described location poppet 4 is bolted with sand cushion 5.
Described steel form 6 is according to the specific steel form of open caisson body 1.
The utility model is in use: first, a kind of open caisson construction device, comprise open caisson body and scaffold, reliably safer on sink well technique, shoveling amount is few, smaller on the impact of adjacent structure, open caisson foundation is embedding darker, good stability, can support larger load, and the upper and lower operation of scaffold convenient construction personnel or perimeter security net are gone along with sb. to guard him and high-altitude is installed.Secondly, the bottom even of open caisson body is provided with steel sword pin, overcomes the difficulty due to the well sinking soil excavation that underground soft mud is thicker, groundwater table is higher, local also has the phenomenons such as sub-surface skewness and brings that the medium-and-large-sized open caisson construction of current-formed silt runs into.Open caisson body and steel sword pin junction are provided with location poppet, have greatly ensured that the safety of sinking well engineering sinks to operating, have effectively controlled the correction operation of open caisson, made the stable sinking of open caisson.The bottom of location poppet all fixedly is equipped with sand cushion, and location poppet is stablized, and prevents open caisson body to dash forward the generation of heavy phenomenon, guarantee construction quality.The left end of sand cushion is connected with steel sword pin, and the laying length of sand cushion is greater than the length of location poppet, ensures the accuracy of the location of location poppet, in turn ensure that construction quality simultaneously.Location poppet and sand cushion are bolted, stable connection, convenient disassembly.Again, scaffold is builder's jack, be partial precast due to open caisson body and cast-in-placely combine, utilization builder's jack avoids the construction of repeatedly setting up, removing scaffold when the borehole wall is cast-in-place to be made, accelerate engineering construction progress, a large amount of construction costs can be saved again, ensure the safety of open caisson manufacture and back cover process simultaneously.Open caisson body is provided with suspension scaffold, and scaffold is fixedly installed on suspension scaffold, and the construction of convenient construction personnel in turn ensure that the personal safety of constructor simultaneously.The inner surface of open caisson body is provided with steel form, and improve the reliability of caisson wall quality, safety factor is high.Steel form is according to the specific steel form of open caisson body, uses with open caisson body fits, ensures the construction quality of open caisson construction, improves efficiency of construction.
In a word, this use is novel can overcome the deficiencies in the prior art, and the open caisson construction device that a kind of safety factor is high, construction speed is fast and good in economic efficiency provided.
Above embodiment is the utility model preferred embodiment, and under the prerequisite not departing from the utility model principle, can also make suitably change and modify, these changes and modification also should be considered as protection domain of the present utility model.

Claims (5)

1. an open caisson construction device, comprise open caisson body and scaffold, it is characterized in that: the bottom even of described open caisson body is provided with steel sword pin, described open caisson body and steel sword pin junction are provided with location poppet, the bottom of described location poppet is all fixedly equipped with sand cushion, described scaffold is builder's jack, and the inner surface of described open caisson body is provided with steel form.
2. a kind of open caisson construction device according to claim 1, is characterized in that: described open caisson body is provided with suspension scaffold, and described scaffold is fixedly installed on suspension scaffold.
3. a kind of open caisson construction device according to claim 1, is characterized in that: the left end of described sand cushion is connected with steel sword pin, and the laying length of described sand cushion is greater than the length of location poppet.
4. a kind of open caisson construction device according to claim 1, is characterized in that: described location poppet and sand cushion are bolted.
5. a kind of open caisson construction device according to claim 1, is characterized in that: described steel form is according to the specific steel form of open caisson body.
CN201520907370.3U 2015-11-16 2015-11-16 Open caisson construction equipment Expired - Fee Related CN205116201U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520907370.3U CN205116201U (en) 2015-11-16 2015-11-16 Open caisson construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520907370.3U CN205116201U (en) 2015-11-16 2015-11-16 Open caisson construction equipment

Publications (1)

Publication Number Publication Date
CN205116201U true CN205116201U (en) 2016-03-30

Family

ID=55571821

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520907370.3U Expired - Fee Related CN205116201U (en) 2015-11-16 2015-11-16 Open caisson construction equipment

Country Status (1)

Country Link
CN (1) CN205116201U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108914956A (en) * 2018-08-31 2018-11-30 南通华新建工集团有限公司 Scaffold assembled support platform in a kind of rectangular open caisson of more piece
CN109706952A (en) * 2018-12-25 2019-05-03 中建四局第六建筑工程有限公司 Large-scale well-sinking construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108914956A (en) * 2018-08-31 2018-11-30 南通华新建工集团有限公司 Scaffold assembled support platform in a kind of rectangular open caisson of more piece
CN109706952A (en) * 2018-12-25 2019-05-03 中建四局第六建筑工程有限公司 Large-scale well-sinking construction method

Similar Documents

Publication Publication Date Title
CN103195158B (en) Municipal drainage pipeline slurry balance pipe-jacking construction method
CN203174616U (en) Clay foundation rain falling and water saving system
AU2020286274A1 (en) Aquifer connection method for inner dump in open-pit mine
CN104805854A (en) Method for constructing deep-water ultra-long steel plate pile cofferdam in tide environment
CN105780719A (en) Heightened construction method for active service stone building bank protecting wall
CN205116247U (en) Water conservancy is towards heavy well construction equipment
CN206204972U (en) A kind of prefabricated tubular pile as well-points dewatering
CN205857173U (en) A kind of Novel steel casing sheath applying bored concrete pile on the water
CN205116201U (en) Open caisson construction equipment
CN204551510U (en) A kind of filled-up ground catchments pressure reduction well drop and drainage structure
CN108868789A (en) A kind of stratum active support and change method suitable for shield construction tunnel
CN204941551U (en) A kind of subway station of Curve Pipe Jacking supporting and protection structure enlarging shield-tunneling construction
CN104047273B (en) Power station dissipation and scouring wall and construction method thereof
CN108755721A (en) A kind of novel cofferdam method for protecting support for crossing piping lane construction in water river
CN203007967U (en) Photovoltaic plant component bracket foundation for plateau Gobi sandy soil regions
CN205502070U (en) A dual -purpose underground gallery structure
CN205134332U (en) Municipal administration delivery pipeline hole groove supporting construction
CN204080842U (en) Paving steel mesh sprayed mortar bed course
CN204059396U (en) Fixed infrastructure bottom tower crane
CN105544570A (en) Connecting structure for earth rock cofferdam seepage-proof geomembrane and concrete cofferdam
CN203475467U (en) Base plate concrete bottom sealing structure
CN203346865U (en) Soft soil foundation preloading processing structure
CN106480896A (en) Open caisson preliminary sedimentation method when large-scale well-sinking sinks
CN204510861U (en) Whole building mobile route ground anti-settling structure
CN204059356U (en) Extended chemotherapy braced structures in temporary steel trestle water

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160330

Termination date: 20181116