CN205857173U - A kind of Novel steel casing sheath applying bored concrete pile on the water - Google Patents

A kind of Novel steel casing sheath applying bored concrete pile on the water Download PDF

Info

Publication number
CN205857173U
CN205857173U CN201620789753.XU CN201620789753U CN205857173U CN 205857173 U CN205857173 U CN 205857173U CN 201620789753 U CN201620789753 U CN 201620789753U CN 205857173 U CN205857173 U CN 205857173U
Authority
CN
China
Prior art keywords
sheath
steel
pile casting
water
steel pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620789753.XU
Other languages
Chinese (zh)
Inventor
赖佑贤
赵志杰
陈永喜
陈润胜
冯少龙
李东文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou City Water Conservancy & Hydropower Station Construction Engineering Co Ltd
Original Assignee
Guangzhou City Water Conservancy & Hydropower Station Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou City Water Conservancy & Hydropower Station Construction Engineering Co Ltd filed Critical Guangzhou City Water Conservancy & Hydropower Station Construction Engineering Co Ltd
Priority to CN201620789753.XU priority Critical patent/CN205857173U/en
Application granted granted Critical
Publication of CN205857173U publication Critical patent/CN205857173U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of Novel steel casing sheath applying bored concrete pile on the water, including being positioned at the steel pile casting of lower section and sheath that is above and that be flexibly connected with steel pile casting, the internal diameter of described sheath is big compared with the internal diameter of described steel pile casting, the periphery wall of described steel pile casting is provided with the fixture for fixing described steel pile casting, described sheath is provided with the slurry mouth that overflows, and described excessive slurry mouth and overflows and starches pipe connection.This utility model can facilitate follow-up drilling construction while the most fixing steel pile casting, has saved cost, has improve work efficiency.

Description

A kind of Novel steel casing sheath applying bored concrete pile on the water
Technical field
This utility model relates to a kind of Novel steel casing sheath applying bored concrete pile on the water.
Background technology
Water conservancy or harbour marine traffic engineering, through frequently with filling pile structure waterborne, bored concrete pile of constructing on the water, needs are implemented flat Platform, using more is steel platform, steel pile casting structure.Steel pile casting is to ensure that auxiliary along stake position vertical direction work well of rig Assistant engineer has, and it also plays protection aperture and the mud head improved in stake holes, to prevent the effect of collapse hole.
There is the problem in terms of following two at present conventional steel pile casting: one when being to construct on the water, and for dash, steel protects Cylinder height, often much higher than design height of pile top, after so causing filling pile construction, need to excise stake top with top Point steel pile casting, and the above concrete in stake top to be cut, not only cost of idleness but also waste the duration, be highly detrimental to engineering construction.
Another one problem be heavy set steel pile casting after, stake top soil (mud) matter is soft, and bearing capacity is relatively low, still can collapse The steel pile casting that hole phenomenon, even precompressed are buried also is fallen in stake holes and cannot be extracted, cause in former stake position cannot normal construction, must not Change rig type after not carrying out stake holes backfill or construct again in pile foundation position, waste time and energy, bring to workmen the biggest Puzzlement, and after construction completes, steel pile casting is not easy to take out.
Utility model content
For the deficiencies in the prior art, the purpose of this utility model aims to provide a kind of applies the novel of bored concrete pile on the water Steel pile casting sheath, it can facilitate follow-up drilling construction while the most fixing steel pile casting, save construction cost, improve Work efficiency.
For achieving the above object, this utility model adopts the following technical scheme that and a kind of applies the novel of bored concrete pile on the water Steel pile casting sheath, including the steel pile casting and sheath that is above and that be flexibly connected with steel pile casting, the described sheath that are positioned at lower section Internal diameter big compared with the internal diameter of described steel pile casting, the periphery wall of described steel pile casting is provided with for fixing the fixing of described steel pile casting Part, described sheath is provided with the slurry mouth that overflows, and described excessive slurry mouth and overflows and starches pipe connection.Preferably, on the bottom outer wall of described sheath Being provided with latch, the top outer wall of described steel pile casting is provided with the fastener coordinated with described latch.
Preferably, described fixture is symmetrically welded on the outer wall of described steel pile casting.
Preferably, described fixture includes bending member and is arranged on below bending member in order to support propping up of described bending member Strut.
Preferably, described bending member is bent by the two ends of round steel or shaped steel and forms, and its bending joint portion is right angle, described curved The peristome of folding piece is downward.
Preferably, the length of described steel pile casting is more than the length of described sheath.
Preferably, described excessive slurry pipe be welded to connect with described excessive slurry mouth, described excessive slurry pipe be inclined upwardly and with described sheath Between angle be 70-90 °.
The beneficial effects of the utility model are: this utility model steel pile casting outer wall is provided with fixture, and it can have Follow-up drilling construction is facilitated while the fixing steel pile casting of effect;By increasing sheath on steel pile casting, save construction cost, favorably Carrying out in construction.
Accompanying drawing explanation
Fig. 1 is this utility model embodiment one cross sectional representation.
Reference: steel pile casting 1;Sheath 2;Latch 3;Fastener 4;Overflow slurry mouth 5;Bending member 6;Support bar 7.
Detailed description of the invention
Below, in conjunction with accompanying drawing and detailed description of the invention, this utility model is described further:
Embodiment one:
As it is shown in figure 1, a kind of Novel steel casing sheath applying bored concrete pile on the water, including the steel pile casting 1 being positioned at lower section And above and that be flexibly connected with steel pile casting sheath 2, it is preferable that it is provided with latch 3 on the bottom outer wall of described sheath, The top outer wall of described steel pile casting is provided with the fastener 4 coordinated with described latch.By latch is inserted in fastener, steel pile casting with Sheath realizes being flexibly connected.The internal diameter of described sheath is big compared with the internal diameter of described steel pile casting, and the length of described steel pile casting is more than described The length of sheath.By above-mentioned design, the height of steel pile casting can be constructed to designing height of pile top, uses at height of pile top position and protects Set, to cut off river, on the one hand substantial saving in steel pile casting, extracts sheath after concrete final set simultaneously, and stake top redundance mixes Solidifying soil is washed away by river, slightly with manually rooting out.Steel protects about the 10cm bigger than stake holes diameter of footpath simply, to facilitate carrying of drill bit Rise.When installing steel pile casting, its centrage and stake position centerline deviation not should be greater than 50mm.Steel pile casting should be buried underground the most closely knit, it Embedded depth, not less than 1.5m in sand, not less than 1m in clay, and mud face exceeds level of ground water in answering retaining hole More than 1m.
Described sheath is provided with the slurry mouth 5 that overflows, and described excessive slurry mouth and overflows and starches pipe connection, it is simple to mud overflows and flows back to mud Pond, reclaims and circulates.Described excessive slurry pipe is welded to connect with described excessive slurry mouth, and described excessive slurry pipe is inclined upwardly and protects with described Angle between set is 70-90 °, it is preferable that described excessive slurry pipe be inclined upwardly and and described sheath between angle be 80 °.
Some is overlapping for the top of described steel pile casting and the bottom of described sheath.The periphery wall of described steel pile casting is provided with For fixing the fixture of described steel pile casting, it is preferable that described fixture is the outer end being symmetrically welded at described steel pile casting On outer wall;Preferably, described fixture includes bending member 6 and is arranged on below bending member in order to support propping up of described bending member Strut 7;Preferably, described bending member is bent by the two ends of round steel or shaped steel and forms, and its bending joint portion is right angle, described bending The peristome of part is downward;Preferably, support bar is I-steel.By above-mentioned design, it is possible to while the most fixing steel pile casting Facilitate follow-up drilling construction.
It will be apparent to those skilled in the art that can technical scheme as described above and design, make other various Corresponding change and deformation, and all these change and deformation all should belong to the protection of this utility model claim Within the scope of.

Claims (7)

1. the Novel steel casing sheath applying bored concrete pile on the water, it is characterised in that include being positioned at the steel pile casting of lower section with And above and that be flexibly connected with steel pile casting sheath, the internal diameter of described sheath is big compared with the internal diameter of described steel pile casting, described steel The periphery wall of casing is provided with the fixture for fixing described steel pile casting, and described sheath is provided with the slurry mouth that overflows, described excessive slurry mouth The slurry pipe that overflows with one is connected.
Apply the Novel steel casing sheath of bored concrete pile on the water the most as claimed in claim 1, it is characterised in that described sheath Being provided with latch on the outer wall of bottom, the top outer wall of described steel pile casting is provided with the fastener coordinated with described latch.
Apply the Novel steel casing sheath of bored concrete pile on the water the most as claimed in claim 1, it is characterised in that described fixture It is symmetrically welded on the outer wall of described steel pile casting.
4. the Novel steel casing sheath of the bored concrete pile on the water of the application as described in claim 1 or 3, it is characterised in that described solid Locking member includes bending member and is arranged on below bending member in order to support the support bar of described bending member.
Apply the Novel steel casing sheath of bored concrete pile on the water the most as claimed in claim 4, it is characterised in that described bending member Being bent by the two ends of round steel or shaped steel and form, its bending joint portion is right angle, and the peristome of described bending member is downward.
Apply the Novel steel casing sheath of bored concrete pile on the water the most as claimed in claim 1, it is characterised in that described steel pile casting Length more than the length of described sheath.
Apply the Novel steel casing sheath of bored concrete pile on the water the most as claimed in claim 1, it is characterised in that described excessive slurry pipe Be welded to connect with described excessive slurry mouth, described excessive slurry pipe be inclined upwardly and and described sheath between angle be 70-90 °.
CN201620789753.XU 2016-07-26 2016-07-26 A kind of Novel steel casing sheath applying bored concrete pile on the water Active CN205857173U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620789753.XU CN205857173U (en) 2016-07-26 2016-07-26 A kind of Novel steel casing sheath applying bored concrete pile on the water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620789753.XU CN205857173U (en) 2016-07-26 2016-07-26 A kind of Novel steel casing sheath applying bored concrete pile on the water

Publications (1)

Publication Number Publication Date
CN205857173U true CN205857173U (en) 2017-01-04

Family

ID=57649305

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620789753.XU Active CN205857173U (en) 2016-07-26 2016-07-26 A kind of Novel steel casing sheath applying bored concrete pile on the water

Country Status (1)

Country Link
CN (1) CN205857173U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107646223A (en) * 2017-09-28 2018-02-02 新疆农业科学院土壤肥料与农业节水研究所(新疆维吾尔自治区新型肥料研究中心) A kind of original soil modification method and its device suitable for heavy salinized ground
CN109098174A (en) * 2018-09-18 2018-12-28 中国十九冶集团有限公司 Excavating stake grouting method
CN109853569A (en) * 2019-03-28 2019-06-07 中国建筑第四工程局有限公司 A kind of method and device of Soft Clay pouring pile hole steel pile casting anti-settling deviation
CN111705806A (en) * 2020-06-18 2020-09-25 深圳市蛇口招商港湾工程有限公司 Underwater earth and rockfill excavation method for foundation pits in deep water area

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107646223A (en) * 2017-09-28 2018-02-02 新疆农业科学院土壤肥料与农业节水研究所(新疆维吾尔自治区新型肥料研究中心) A kind of original soil modification method and its device suitable for heavy salinized ground
CN109098174A (en) * 2018-09-18 2018-12-28 中国十九冶集团有限公司 Excavating stake grouting method
CN109853569A (en) * 2019-03-28 2019-06-07 中国建筑第四工程局有限公司 A kind of method and device of Soft Clay pouring pile hole steel pile casting anti-settling deviation
CN111705806A (en) * 2020-06-18 2020-09-25 深圳市蛇口招商港湾工程有限公司 Underwater earth and rockfill excavation method for foundation pits in deep water area

Similar Documents

Publication Publication Date Title
CN101122130B (en) Construction method of drilling follow casting pile used for building or bridge foundation
CN205857173U (en) A kind of Novel steel casing sheath applying bored concrete pile on the water
CN101560770B (en) Novel deep building foundation pit supporting system
CN204370414U (en) A kind of steel pile casting for cast-in-place concrete pile boring and a kind of drilling equipment
CN201713812U (en) Underwater drilling pile foundation protective cylinder
CN104912065A (en) Underwater anchor pile construction method
CN108824471A (en) A kind of deep water drift net multi-column pier foundation and its construction method
CN207362838U (en) A kind of tool-type soft soil foundation irrigates pile wall
CN103572770B (en) A kind of stake case hydraulic structures and construction method thereof
CN203654309U (en) Pile-caisson hydraulic structure
CN201172830Y (en) Anchor rod static-pressing pile foundation in tower crane
CN201172820Y (en) Tied joggle pile mould tube with lubricating valve pile toe
CN214245694U (en) Pile forming system for large-diameter cast-in-situ bored pile in karst area
CN101914915A (en) Construction method for anti-floating anchor rod and special long auger
CN204551510U (en) A kind of filled-up ground catchments pressure reduction well drop and drainage structure
CN103422499B (en) Casing construction method inside and outside a kind of permafrost region pile foundation
CN108798775A (en) A kind of jacking construction active well
CN205276324U (en) Push pipe work well
CN204608813U (en) A kind of prestressed anchor embedding rock offshore wind turbine High-Rise Pile Cap Foundation
CN204780870U (en) Complicated waters slope scar major diameter drilling bored concrete pile
CN203757177U (en) Mud sand sludge area manual pipe jacking construction device
CN205116201U (en) Open caisson construction equipment
CN201883453U (en) Combined pipe jacking working well
CN205242382U (en) Recoverable local fender pile
CN204780894U (en) Can dismantle steel protects wound packages and puts

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant