CN108798775A - A kind of jacking construction active well - Google Patents

A kind of jacking construction active well Download PDF

Info

Publication number
CN108798775A
CN108798775A CN201810626268.4A CN201810626268A CN108798775A CN 108798775 A CN108798775 A CN 108798775A CN 201810626268 A CN201810626268 A CN 201810626268A CN 108798775 A CN108798775 A CN 108798775A
Authority
CN
China
Prior art keywords
bottom plate
active well
well
jacking
ontology
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810626268.4A
Other languages
Chinese (zh)
Inventor
葛成
陈煜�
李鸿鹏
金炜
葛斐
蒯圣宇
谢涛
盛金马
常江
王力
罗正帮
刘西民
梁东跃
吴义阳
肖俊俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Anhui Electric Power Co Ltd
State Grid Economic and Technological Research Institute
Anhui Huadian Engineering Consulting and Design Co Ltd
Economic and Technological Research Institute of State Grid Anhui Electric Power Co Ltd
Original Assignee
State Grid Anhui Electric Power Co Ltd
Anhui Huadian Engineering Consulting and Design Co Ltd
Economic and Technological Research Institute of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Anhui Electric Power Co Ltd, Anhui Huadian Engineering Consulting and Design Co Ltd, Economic and Technological Research Institute of State Grid Anhui Electric Power Co Ltd filed Critical State Grid Anhui Electric Power Co Ltd
Priority to CN201810626268.4A priority Critical patent/CN108798775A/en
Publication of CN108798775A publication Critical patent/CN108798775A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D5/00Lining shafts; Linings therefor
    • E21D5/04Lining shafts; Linings therefor with brick, concrete, stone, or similar building materials

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Sewage (AREA)

Abstract

A kind of jacking construction active well.It includes ontology, in the surrounding of ontology, gutter is set, reserved opening and jacking hole is arranged in side wall, and haunch is set in inside right angle, borehole wall lower end is arranged to the cutting shoe with tread, and body bottom portion is provided with bottom plate, and bottom plate is placed in the groove of its neighbouring borehole wall, and sump is set on well inner bottom plating, and bottom plate is equipped with certain slope towards sump direction, and back cover and the bottom of a pan are set under bottom plate successively.The feature that the present invention overcomes existing cast in situs active well long in time limit, there is provided that a kind of reasonable design, globality is strong, stability is good, upper pipe working well simple in structure, improving construction efficiency, and influence when reducing construction to close to buildings, it is highly practical, it is easy to promote the use of under the conditions of identical geology.

Description

A kind of jacking construction active well
【Technical field】
The present invention relates to a kind of caisson structures, in particular to a kind of work well construction of jacking construction.
【Background technology】
Pipe-jacking project is a kind of construction method of the embedded underground utilities of modernization, using the municipal buried pipe of jacking construction Net engineering is located on the main line road of cities and towns mostly, is compared with shield construction with corresponding cutting sunken tube method, push pipe Construction has apparent superiority, and this method need not excavate ground notch, but must be opened at the both ends of laid underground piping Dig several active wells, active well is divided into as jacking active well and received well, and wherein reinforced concrete rectangular active well is more normal See, current active well generally uses excavation pit, live assembling reinforcement, formwork supporting plate casting concrete, the construction then backfilled Method, the active well site operation duration is longer, necessarily causes large effect to construction section traffic passage, and pollute week The environment on side has seriously affected the normal life of neighbouring resident.
【Invention content】
The main purpose of the present invention is to provide a kind of jacking construction active wells, overcome the existing cast in situs active well duration Long feature, provides that a kind of reasonable design, globality is strong, stability is good, push pipe work simple in structure, improving construction efficiency Well, and influence when reducing construction to close to buildings, it is highly practical, it is easy to promote the use of under the conditions of identical geology.
To achieve the above object, the technical solution that the present invention takes is:
A kind of jacking construction active well, it includes ontology, gutter is arranged in the surrounding of ontology, reserved opening is arranged in side wall With jacking hole, and haunch is set in inside right angle, borehole wall lower end is arranged to the cutting shoe with tread, and body bottom portion is provided with bottom Plate, and bottom plate is placed in the groove of its neighbouring borehole wall, and sump is set on well inner bottom plating, and bottom plate is set towards sump direction There is certain slope, and back cover and the bottom of a pan are set under bottom plate successively.
Further, the sump length and width, deep size are respectively 2.0m, 0.8m, 0.6m.
Further, the reserved opening and jacking dimension of opening are 1200mm*1200mm.
Further, the active well is to pour the reinforced concrete structure for building up an entirety.
Further, the cutting shoe carries out feather plucking processing.
Compared with prior art, beneficial effects of the present invention:(1) the active well ontology described in uses the stalk of upper and lower uniform thickness The structure of type, the type can preferably constrain the borehole wall, and easily controllable vertical subsidence is smaller to range of disturbance around, and template energy It repeatedly uses.
(2) the active well body plane shape described in is rectangle, effectively increases the utilization rate in open caisson space and convenient for pre- The setting of box out mouth and jacking hole, while four corners of inner wall are equipped with haunch, improve the integrally-built intensity of open caisson.
(3) setting of reserved opening contributes to and underground gallery, trench, pipeline, water inlet window in the advantageous effect (2) described in Equal holes are attached.
(4) the active well body bottom portion described in is placed in equipped with bottom plate in groove, and back cover bottom plate is made more preferably to be connect with the borehole wall, And play the role of effective waterproof while enhancing structure globality.
(5) back cover and the bottom of a pan are set gradually below advantageous effect (4) bottom plate described in, compared with not back cover open caisson, The load that this kind of structure foundation unit area is born is smaller so that it is relatively fewer to stop the heavy rear settling amount of punching;And the bottom of a pan is set Set the overall stability that retaining wall is then enhanced compared with flat-bottom structure.
(6) active well described in is equipped with gutter and sump, contributes to water flooding within the scope of open caisson in the construction process Drainage has been effectively ensured the stabilization of the construction period soil body and the safety of construction, has saved working hour and manpower, it will be apparent that improved work Make efficiency, and reduces the pollution of site environment and the influence caused by traffic, living environment.
(7) active well ontology described in is that cast in situs is compared with assembled, this kind of construction method as a whole, Have the advantages that the big good rigidity of intensity, and excavated volume is small in the work progress of open caisson, contacts closely, ensure with surrounding soil The quality of active well.
【Description of the drawings】
Fig. 1 is the floor map of invention;
Fig. 2 is the A-A sectional views of Fig. 1;
Fig. 3 is the B-B sectional views of Fig. 1.
【Specific implementation mode】
To make the technical means, the creative features, the aims and the efficiencies achieved by the present invention be easy to understand, with reference to Specific implementation mode, the present invention is further explained.
As shown in Figs. 1-3, a kind of jacking construction active well, it includes ontology 1, and the surrounding of ontology 1 is provided with gutter 2, and a concrete road surface 12 is set around gutter 2, and have a slope 13 between the road surface and ground, 1 side wall of main body Reserved opening 5 and jacking hole 6 are set, and haunch 8 is set in inside right angle, borehole wall lower end is arranged to the cutting shoe 7 with tread, 1 bottom of ontology is provided with bottom plate 9, and bottom plate 9 is placed in the groove 4 of its neighbouring borehole wall, and sump is arranged on well inner bottom plating 9 3, and bottom plate 9 is equipped with certain slope, specially 0.5% gradient towards sump direction, and back cover 10 is set under bottom plate successively With the bottom of a pan 11.
The sump size is 2.0mx0.8mx0.6m (long x wide x is deep), and deep ensure that locally is dug within the scope of sump Back cover thickness and back cover is laid with c25 concrete, thickness 0.7m, the lower part the bottom of a pan are filled with block stone, and bosom reaches 0.5m.
The reserved opening and jacking dimension of opening is all 1200mmx 1200mm, and the setting of reserved opening is convenient for and ground Lower gallery, trench, pipeline, the water inlet connections such as window, and the setting at jacking hole is then convenient for tool pipe or development machine from active well Interior shifted onto in received well always across soil layer is sling.
Active well ontology is reinforced concrete structure, and entering well and going out the reserved opening of well should be blocked up before sinking temporarily Plug, it is that the reinforcing bar of 200mm is reinforced, and cutting shoe should also carry out feather plucking processing that a diameter of 8mm, spacing, which is used in combination, and open caisson is being constructed Well-points dewatering is used in the process and is enclosed in well does water-level observation.
The active well of the present invention pours and builds up an entirety, with fabricated active well compared with intensity greatly, good rigidity, with excavation The cast-in-place active well of foundation pit is small compared to excavated volume, and the close stabilization for ensureing the construction period soil body, construction peace are contacted with surrounding soil Entirely, efficient, reduce the pollution site environment and the influence caused by traffic, living environment.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, any made by repair Change, equivalent replacement, improvement etc., should be included within the scope of the present invention.

Claims (5)

1. a kind of jacking construction active well, it is characterised in that:It includes ontology, gutter is arranged in the surrounding of ontology, side wall is set Reserved opening and jacking hole are set, and haunch is set in inside right angle, borehole wall lower end is arranged to the cutting shoe with tread, ontology bottom Portion is provided with bottom plate, and bottom plate is placed in the groove of its neighbouring borehole wall, and sump is arranged on well inner bottom plating, and bottom plate is towards collection Well direction is equipped with certain slope, and back cover and the bottom of a pan is arranged under bottom plate successively.
2. active well according to claim 1, it is characterised in that:The sump length and width, deep size are respectively 2.0m、0.8m、0.6m。
3. active well according to claim 1, it is characterised in that:The reserved opening and jacking dimension of opening are 1200mm*1200mm。
4. active well according to claim 1, it is characterised in that:The active well be pour build up an entirety reinforcing bar it is mixed Xtah Crude Clay structure.
5. active well according to claim 1, it is characterised in that:The cutting shoe carries out feather plucking processing.
CN201810626268.4A 2018-06-14 2018-06-14 A kind of jacking construction active well Pending CN108798775A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810626268.4A CN108798775A (en) 2018-06-14 2018-06-14 A kind of jacking construction active well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810626268.4A CN108798775A (en) 2018-06-14 2018-06-14 A kind of jacking construction active well

Publications (1)

Publication Number Publication Date
CN108798775A true CN108798775A (en) 2018-11-13

Family

ID=64083199

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810626268.4A Pending CN108798775A (en) 2018-06-14 2018-06-14 A kind of jacking construction active well

Country Status (1)

Country Link
CN (1) CN108798775A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109706952A (en) * 2018-12-25 2019-05-03 中建四局第六建筑工程有限公司 Large-scale well-sinking construction method
CN109826630A (en) * 2019-02-02 2019-05-31 上海城建水务工程有限公司 A kind of precast concrete open caisson device and its construction method for jacking construction
CN111608691A (en) * 2020-06-01 2020-09-01 中铁十四局集团大盾构工程有限公司 Shield working well template support construction method
CN113236266A (en) * 2021-06-18 2021-08-10 中冶京诚工程技术有限公司 Construction method for constructing standard segment sump of shield pipe gallery by using steel pipe segments

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020013168A (en) * 2000-08-11 2002-02-20 엄기형 A drainage construction method of ground floor
CN102155025A (en) * 2011-03-23 2011-08-17 东南大学 Late poured band type assembled pipe jacking working open caisson
CN203701145U (en) * 2013-07-15 2014-07-09 金阳升 Underground pipe network inspection well concrete assembly
CN203924085U (en) * 2014-07-01 2014-11-05 中铁城建集团第二工程有限公司 A kind of caisson structure that is applied to collecting well
CN204456186U (en) * 2015-01-14 2015-07-08 国家电网公司 Being hampered for push pipe jacking, the circle of removing obstacles is inverse makes vertical shaft
CN206721925U (en) * 2017-05-16 2017-12-08 国网浙江省电力公司台州供电公司 A kind of anti-settling cable shaft suitable for cable duct bank
CN208473930U (en) * 2018-06-14 2019-02-05 国网安徽省电力有限公司经济技术研究院 A kind of jacking construction active well

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020013168A (en) * 2000-08-11 2002-02-20 엄기형 A drainage construction method of ground floor
CN102155025A (en) * 2011-03-23 2011-08-17 东南大学 Late poured band type assembled pipe jacking working open caisson
CN203701145U (en) * 2013-07-15 2014-07-09 金阳升 Underground pipe network inspection well concrete assembly
CN203924085U (en) * 2014-07-01 2014-11-05 中铁城建集团第二工程有限公司 A kind of caisson structure that is applied to collecting well
CN204456186U (en) * 2015-01-14 2015-07-08 国家电网公司 Being hampered for push pipe jacking, the circle of removing obstacles is inverse makes vertical shaft
CN206721925U (en) * 2017-05-16 2017-12-08 国网浙江省电力公司台州供电公司 A kind of anti-settling cable shaft suitable for cable duct bank
CN208473930U (en) * 2018-06-14 2019-02-05 国网安徽省电力有限公司经济技术研究院 A kind of jacking construction active well

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109706952A (en) * 2018-12-25 2019-05-03 中建四局第六建筑工程有限公司 Large-scale well-sinking construction method
CN109826630A (en) * 2019-02-02 2019-05-31 上海城建水务工程有限公司 A kind of precast concrete open caisson device and its construction method for jacking construction
CN109826630B (en) * 2019-02-02 2024-04-09 上海城建水务工程有限公司 Precast concrete open caisson device for pipe jacking construction and construction method thereof
CN111608691A (en) * 2020-06-01 2020-09-01 中铁十四局集团大盾构工程有限公司 Shield working well template support construction method
CN113236266A (en) * 2021-06-18 2021-08-10 中冶京诚工程技术有限公司 Construction method for constructing standard segment sump of shield pipe gallery by using steel pipe segments

Similar Documents

Publication Publication Date Title
CN203947484U (en) Foundation pit drainage and circulating water utilization system
CN108798775A (en) A kind of jacking construction active well
CN102418347B (en) Drainage construction method for blind drain and sump wells in deep foundation pit
CN102162253B (en) Precipitation construction method employing pipe embedded in deep foundation pits
CN106049530B (en) City integrated piping lane and construction method
CN103046565B (en) Draining method for ultra-deep batholith deep foundation pit
CN210395607U (en) Side slope buried drainage structure
CN113463670A (en) Water pumping and draining method and water pumping and draining structure for deep foundation pit bottom plate construction
KR100665984B1 (en) The construction method of basement self drainage
CN215329049U (en) Track structure with drainage pump station in integral ballast bed
CN102888847A (en) Construction method free from lowering water level for local deep foundation pit of elevator shaft
CN110565686A (en) Construction method for penetrating river channel under pipe gallery
CN109898556A (en) A kind of underground pipe gallery structure and sunk type construction method
CN104074234B (en) The interior river intake structure of electric power plant circulating water system and construction method thereof
CN204551510U (en) A kind of filled-up ground catchments pressure reduction well drop and drainage structure
CN204059460U (en) The interior river intake structure of electric power plant circulating water system
CN208473930U (en) A kind of jacking construction active well
CN105155421B (en) Complete embedding circular construction method in a kind of single pile Single column pier river course shallow water
CN209760299U (en) light and shade of avoiding house to tear open and move is dug and is combined subway station structure
CN111424685A (en) Deep water falling hole processing structure and method for backfilling foundation in large karst depression
CN104846837B (en) The construction method of ultra-deep well in a kind of bright draining foundation ditch
CN109440811A (en) A kind of gully type Dumping Sites loose stone slag blocking wall and surface water channel drainage sunk well technique
CN212405178U (en) Deep water falling hole processing structure of backfill foundation in large karst depression
CN209620111U (en) A kind of well construction that catchments of soft base hydraulic structure basement
CN213014584U (en) Inspection shaft is reformed transform to pipe jacking construction well

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination