CN108798775A - A kind of jacking construction active well - Google Patents
A kind of jacking construction active well Download PDFInfo
- Publication number
- CN108798775A CN108798775A CN201810626268.4A CN201810626268A CN108798775A CN 108798775 A CN108798775 A CN 108798775A CN 201810626268 A CN201810626268 A CN 201810626268A CN 108798775 A CN108798775 A CN 108798775A
- Authority
- CN
- China
- Prior art keywords
- bottom plate
- active well
- well
- jacking
- ontology
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 25
- 238000007747 plating Methods 0.000 claims abstract description 4
- 210000003746 feather Anatomy 0.000 claims description 3
- 230000003014 reinforcing effect Effects 0.000 claims description 2
- 239000004927 clay Substances 0.000 claims 1
- 238000011065 in-situ storage Methods 0.000 abstract description 3
- 238000000034 method Methods 0.000 description 5
- 239000002689 soil Substances 0.000 description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 239000004567 concrete Substances 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 239000011150 reinforced concrete Substances 0.000 description 3
- 238000009412 basement excavation Methods 0.000 description 2
- 210000000481 breast Anatomy 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000006641 stabilisation Effects 0.000 description 2
- 238000011105 stabilization Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F16/00—Drainage
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D5/00—Lining shafts; Linings therefor
- E21D5/04—Lining shafts; Linings therefor with brick, concrete, stone, or similar building materials
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Sewage (AREA)
Abstract
A kind of jacking construction active well.It includes ontology, in the surrounding of ontology, gutter is set, reserved opening and jacking hole is arranged in side wall, and haunch is set in inside right angle, borehole wall lower end is arranged to the cutting shoe with tread, and body bottom portion is provided with bottom plate, and bottom plate is placed in the groove of its neighbouring borehole wall, and sump is set on well inner bottom plating, and bottom plate is equipped with certain slope towards sump direction, and back cover and the bottom of a pan are set under bottom plate successively.The feature that the present invention overcomes existing cast in situs active well long in time limit, there is provided that a kind of reasonable design, globality is strong, stability is good, upper pipe working well simple in structure, improving construction efficiency, and influence when reducing construction to close to buildings, it is highly practical, it is easy to promote the use of under the conditions of identical geology.
Description
【Technical field】
The present invention relates to a kind of caisson structures, in particular to a kind of work well construction of jacking construction.
【Background technology】
Pipe-jacking project is a kind of construction method of the embedded underground utilities of modernization, using the municipal buried pipe of jacking construction
Net engineering is located on the main line road of cities and towns mostly, is compared with shield construction with corresponding cutting sunken tube method, push pipe
Construction has apparent superiority, and this method need not excavate ground notch, but must be opened at the both ends of laid underground piping
Dig several active wells, active well is divided into as jacking active well and received well, and wherein reinforced concrete rectangular active well is more normal
See, current active well generally uses excavation pit, live assembling reinforcement, formwork supporting plate casting concrete, the construction then backfilled
Method, the active well site operation duration is longer, necessarily causes large effect to construction section traffic passage, and pollute week
The environment on side has seriously affected the normal life of neighbouring resident.
【Invention content】
The main purpose of the present invention is to provide a kind of jacking construction active wells, overcome the existing cast in situs active well duration
Long feature, provides that a kind of reasonable design, globality is strong, stability is good, push pipe work simple in structure, improving construction efficiency
Well, and influence when reducing construction to close to buildings, it is highly practical, it is easy to promote the use of under the conditions of identical geology.
To achieve the above object, the technical solution that the present invention takes is:
A kind of jacking construction active well, it includes ontology, gutter is arranged in the surrounding of ontology, reserved opening is arranged in side wall
With jacking hole, and haunch is set in inside right angle, borehole wall lower end is arranged to the cutting shoe with tread, and body bottom portion is provided with bottom
Plate, and bottom plate is placed in the groove of its neighbouring borehole wall, and sump is set on well inner bottom plating, and bottom plate is set towards sump direction
There is certain slope, and back cover and the bottom of a pan are set under bottom plate successively.
Further, the sump length and width, deep size are respectively 2.0m, 0.8m, 0.6m.
Further, the reserved opening and jacking dimension of opening are 1200mm*1200mm.
Further, the active well is to pour the reinforced concrete structure for building up an entirety.
Further, the cutting shoe carries out feather plucking processing.
Compared with prior art, beneficial effects of the present invention:(1) the active well ontology described in uses the stalk of upper and lower uniform thickness
The structure of type, the type can preferably constrain the borehole wall, and easily controllable vertical subsidence is smaller to range of disturbance around, and template energy
It repeatedly uses.
(2) the active well body plane shape described in is rectangle, effectively increases the utilization rate in open caisson space and convenient for pre-
The setting of box out mouth and jacking hole, while four corners of inner wall are equipped with haunch, improve the integrally-built intensity of open caisson.
(3) setting of reserved opening contributes to and underground gallery, trench, pipeline, water inlet window in the advantageous effect (2) described in
Equal holes are attached.
(4) the active well body bottom portion described in is placed in equipped with bottom plate in groove, and back cover bottom plate is made more preferably to be connect with the borehole wall,
And play the role of effective waterproof while enhancing structure globality.
(5) back cover and the bottom of a pan are set gradually below advantageous effect (4) bottom plate described in, compared with not back cover open caisson,
The load that this kind of structure foundation unit area is born is smaller so that it is relatively fewer to stop the heavy rear settling amount of punching;And the bottom of a pan is set
Set the overall stability that retaining wall is then enhanced compared with flat-bottom structure.
(6) active well described in is equipped with gutter and sump, contributes to water flooding within the scope of open caisson in the construction process
Drainage has been effectively ensured the stabilization of the construction period soil body and the safety of construction, has saved working hour and manpower, it will be apparent that improved work
Make efficiency, and reduces the pollution of site environment and the influence caused by traffic, living environment.
(7) active well ontology described in is that cast in situs is compared with assembled, this kind of construction method as a whole,
Have the advantages that the big good rigidity of intensity, and excavated volume is small in the work progress of open caisson, contacts closely, ensure with surrounding soil
The quality of active well.
【Description of the drawings】
Fig. 1 is the floor map of invention;
Fig. 2 is the A-A sectional views of Fig. 1;
Fig. 3 is the B-B sectional views of Fig. 1.
【Specific implementation mode】
To make the technical means, the creative features, the aims and the efficiencies achieved by the present invention be easy to understand, with reference to
Specific implementation mode, the present invention is further explained.
As shown in Figs. 1-3, a kind of jacking construction active well, it includes ontology 1, and the surrounding of ontology 1 is provided with gutter
2, and a concrete road surface 12 is set around gutter 2, and have a slope 13 between the road surface and ground, 1 side wall of main body
Reserved opening 5 and jacking hole 6 are set, and haunch 8 is set in inside right angle, borehole wall lower end is arranged to the cutting shoe 7 with tread,
1 bottom of ontology is provided with bottom plate 9, and bottom plate 9 is placed in the groove 4 of its neighbouring borehole wall, and sump is arranged on well inner bottom plating 9
3, and bottom plate 9 is equipped with certain slope, specially 0.5% gradient towards sump direction, and back cover 10 is set under bottom plate successively
With the bottom of a pan 11.
The sump size is 2.0mx0.8mx0.6m (long x wide x is deep), and deep ensure that locally is dug within the scope of sump
Back cover thickness and back cover is laid with c25 concrete, thickness 0.7m, the lower part the bottom of a pan are filled with block stone, and bosom reaches 0.5m.
The reserved opening and jacking dimension of opening is all 1200mmx 1200mm, and the setting of reserved opening is convenient for and ground
Lower gallery, trench, pipeline, the water inlet connections such as window, and the setting at jacking hole is then convenient for tool pipe or development machine from active well
Interior shifted onto in received well always across soil layer is sling.
Active well ontology is reinforced concrete structure, and entering well and going out the reserved opening of well should be blocked up before sinking temporarily
Plug, it is that the reinforcing bar of 200mm is reinforced, and cutting shoe should also carry out feather plucking processing that a diameter of 8mm, spacing, which is used in combination, and open caisson is being constructed
Well-points dewatering is used in the process and is enclosed in well does water-level observation.
The active well of the present invention pours and builds up an entirety, with fabricated active well compared with intensity greatly, good rigidity, with excavation
The cast-in-place active well of foundation pit is small compared to excavated volume, and the close stabilization for ensureing the construction period soil body, construction peace are contacted with surrounding soil
Entirely, efficient, reduce the pollution site environment and the influence caused by traffic, living environment.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field
For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, any made by repair
Change, equivalent replacement, improvement etc., should be included within the scope of the present invention.
Claims (5)
1. a kind of jacking construction active well, it is characterised in that:It includes ontology, gutter is arranged in the surrounding of ontology, side wall is set
Reserved opening and jacking hole are set, and haunch is set in inside right angle, borehole wall lower end is arranged to the cutting shoe with tread, ontology bottom
Portion is provided with bottom plate, and bottom plate is placed in the groove of its neighbouring borehole wall, and sump is arranged on well inner bottom plating, and bottom plate is towards collection
Well direction is equipped with certain slope, and back cover and the bottom of a pan is arranged under bottom plate successively.
2. active well according to claim 1, it is characterised in that:The sump length and width, deep size are respectively
2.0m、0.8m、0.6m。
3. active well according to claim 1, it is characterised in that:The reserved opening and jacking dimension of opening are
1200mm*1200mm。
4. active well according to claim 1, it is characterised in that:The active well be pour build up an entirety reinforcing bar it is mixed
Xtah Crude Clay structure.
5. active well according to claim 1, it is characterised in that:The cutting shoe carries out feather plucking processing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810626268.4A CN108798775A (en) | 2018-06-14 | 2018-06-14 | A kind of jacking construction active well |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810626268.4A CN108798775A (en) | 2018-06-14 | 2018-06-14 | A kind of jacking construction active well |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108798775A true CN108798775A (en) | 2018-11-13 |
Family
ID=64083199
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810626268.4A Pending CN108798775A (en) | 2018-06-14 | 2018-06-14 | A kind of jacking construction active well |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108798775A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109706952A (en) * | 2018-12-25 | 2019-05-03 | 中建四局第六建筑工程有限公司 | Large-scale well-sinking construction method |
CN109826630A (en) * | 2019-02-02 | 2019-05-31 | 上海城建水务工程有限公司 | A kind of precast concrete open caisson device and its construction method for jacking construction |
CN111608691A (en) * | 2020-06-01 | 2020-09-01 | 中铁十四局集团大盾构工程有限公司 | Shield working well template support construction method |
CN113236266A (en) * | 2021-06-18 | 2021-08-10 | 中冶京诚工程技术有限公司 | Construction method for constructing standard segment sump of shield pipe gallery by using steel pipe segments |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20020013168A (en) * | 2000-08-11 | 2002-02-20 | 엄기형 | A drainage construction method of ground floor |
CN102155025A (en) * | 2011-03-23 | 2011-08-17 | 东南大学 | Late poured band type assembled pipe jacking working open caisson |
CN203701145U (en) * | 2013-07-15 | 2014-07-09 | 金阳升 | Underground pipe network inspection well concrete assembly |
CN203924085U (en) * | 2014-07-01 | 2014-11-05 | 中铁城建集团第二工程有限公司 | A kind of caisson structure that is applied to collecting well |
CN204456186U (en) * | 2015-01-14 | 2015-07-08 | 国家电网公司 | Being hampered for push pipe jacking, the circle of removing obstacles is inverse makes vertical shaft |
CN206721925U (en) * | 2017-05-16 | 2017-12-08 | 国网浙江省电力公司台州供电公司 | A kind of anti-settling cable shaft suitable for cable duct bank |
CN208473930U (en) * | 2018-06-14 | 2019-02-05 | 国网安徽省电力有限公司经济技术研究院 | A kind of jacking construction active well |
-
2018
- 2018-06-14 CN CN201810626268.4A patent/CN108798775A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20020013168A (en) * | 2000-08-11 | 2002-02-20 | 엄기형 | A drainage construction method of ground floor |
CN102155025A (en) * | 2011-03-23 | 2011-08-17 | 东南大学 | Late poured band type assembled pipe jacking working open caisson |
CN203701145U (en) * | 2013-07-15 | 2014-07-09 | 金阳升 | Underground pipe network inspection well concrete assembly |
CN203924085U (en) * | 2014-07-01 | 2014-11-05 | 中铁城建集团第二工程有限公司 | A kind of caisson structure that is applied to collecting well |
CN204456186U (en) * | 2015-01-14 | 2015-07-08 | 国家电网公司 | Being hampered for push pipe jacking, the circle of removing obstacles is inverse makes vertical shaft |
CN206721925U (en) * | 2017-05-16 | 2017-12-08 | 国网浙江省电力公司台州供电公司 | A kind of anti-settling cable shaft suitable for cable duct bank |
CN208473930U (en) * | 2018-06-14 | 2019-02-05 | 国网安徽省电力有限公司经济技术研究院 | A kind of jacking construction active well |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109706952A (en) * | 2018-12-25 | 2019-05-03 | 中建四局第六建筑工程有限公司 | Large-scale well-sinking construction method |
CN109826630A (en) * | 2019-02-02 | 2019-05-31 | 上海城建水务工程有限公司 | A kind of precast concrete open caisson device and its construction method for jacking construction |
CN109826630B (en) * | 2019-02-02 | 2024-04-09 | 上海城建水务工程有限公司 | Precast concrete open caisson device for pipe jacking construction and construction method thereof |
CN111608691A (en) * | 2020-06-01 | 2020-09-01 | 中铁十四局集团大盾构工程有限公司 | Shield working well template support construction method |
CN113236266A (en) * | 2021-06-18 | 2021-08-10 | 中冶京诚工程技术有限公司 | Construction method for constructing standard segment sump of shield pipe gallery by using steel pipe segments |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203947484U (en) | Foundation pit drainage and circulating water utilization system | |
CN108798775A (en) | A kind of jacking construction active well | |
CN102418347B (en) | Drainage construction method for blind drain and sump wells in deep foundation pit | |
CN102162253B (en) | Precipitation construction method employing pipe embedded in deep foundation pits | |
CN106049530B (en) | City integrated piping lane and construction method | |
CN103046565B (en) | Draining method for ultra-deep batholith deep foundation pit | |
CN210395607U (en) | Side slope buried drainage structure | |
CN113463670A (en) | Water pumping and draining method and water pumping and draining structure for deep foundation pit bottom plate construction | |
KR100665984B1 (en) | The construction method of basement self drainage | |
CN215329049U (en) | Track structure with drainage pump station in integral ballast bed | |
CN102888847A (en) | Construction method free from lowering water level for local deep foundation pit of elevator shaft | |
CN110565686A (en) | Construction method for penetrating river channel under pipe gallery | |
CN109898556A (en) | A kind of underground pipe gallery structure and sunk type construction method | |
CN104074234B (en) | The interior river intake structure of electric power plant circulating water system and construction method thereof | |
CN204551510U (en) | A kind of filled-up ground catchments pressure reduction well drop and drainage structure | |
CN204059460U (en) | The interior river intake structure of electric power plant circulating water system | |
CN208473930U (en) | A kind of jacking construction active well | |
CN105155421B (en) | Complete embedding circular construction method in a kind of single pile Single column pier river course shallow water | |
CN209760299U (en) | light and shade of avoiding house to tear open and move is dug and is combined subway station structure | |
CN111424685A (en) | Deep water falling hole processing structure and method for backfilling foundation in large karst depression | |
CN104846837B (en) | The construction method of ultra-deep well in a kind of bright draining foundation ditch | |
CN109440811A (en) | A kind of gully type Dumping Sites loose stone slag blocking wall and surface water channel drainage sunk well technique | |
CN212405178U (en) | Deep water falling hole processing structure of backfill foundation in large karst depression | |
CN209620111U (en) | A kind of well construction that catchments of soft base hydraulic structure basement | |
CN213014584U (en) | Inspection shaft is reformed transform to pipe jacking construction well |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |