CN102155025A - Late poured band type assembled pipe jacking working open caisson - Google Patents

Late poured band type assembled pipe jacking working open caisson Download PDF

Info

Publication number
CN102155025A
CN102155025A CN 201110069982 CN201110069982A CN102155025A CN 102155025 A CN102155025 A CN 102155025A CN 201110069982 CN201110069982 CN 201110069982 CN 201110069982 A CN201110069982 A CN 201110069982A CN 102155025 A CN102155025 A CN 102155025A
Authority
CN
China
Prior art keywords
well
sheet
sections
font
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201110069982
Other languages
Chinese (zh)
Other versions
CN102155025B (en
Inventor
郭正兴
段凯元
刘家彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN2011100699826A priority Critical patent/CN102155025B/en
Publication of CN102155025A publication Critical patent/CN102155025A/en
Application granted granted Critical
Publication of CN102155025B publication Critical patent/CN102155025B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses a bidirectional prestressing type preassembled working open caisson which is applied to pipe jacking projects. The open caisson is rectangular and is formed by splicing prefabricated well pieces with U-shaped and straight sections. Cantilever ends at two sides of each U-shaped well piece are different in length; the horizontal U-shaped well pieces are spliced dissymmetrically according to the lengths of the cantilever ends at two ends; and the vertical adjacent U-shaped well pieces are spliced in a staggered way according to the sizes of the cantilever ends. All the vertical well pieces and the horizontal well pieces are connected through prestressed reinforcements. The vertical prestressed reinforcements are connected through connectors at the transversal abutted seams. The vertical prestressed reinforcements in the well pieces of the blade foot section are subjected to non-bonding treatment. Shear key structures are arranged on the sections of prefabricated well pieces at two sides of transversal abutted seams; and the well pieces provided with the shear key structures adopt a matching prefabrication method to ensure the mounting precision of the open caisson. When in prefabrication, the reinforcements are inserted into a prestressing duct. The bidirectional prestressing type preassembled working open caisson disclosed by the invention remarkably improves the filed casting efficiency of the open caisson, shortens the pipe jacking construction period, and accords with the architectural notion of 'low carbon economy and green construction'.

Description

Ater-casting type assembling upper pipe working well
Technical field
The present invention relates to a kind of open caisson active well that is applied to pipe-jacking project in the municipal underground pipeline project, specifically, is a kind of ater-casting type assembling upper pipe working well.
Background technology
Pipe-jacking project is a kind of modern job practices of burying underground utilities underground.Compare with corresponding fluting pipe laying construction method and shield construction, jacking construction has obvious superiority.This method does not need to excavate the ground notch, but must excavate several active wells at the two ends of laying underground pipeline.Active well can be divided into jacking active well and received well again.Wherein reinforced concrete circular or rectangle active well are comparatively common.The municipal network of underground improvement project of using the pipe-jacking project construction is positioned on the main line road of cities and towns mostly.Present work open caisson generally adopts on-the-spot assembling reinforcement, the job practices of a template concreting.The active well site operation duration is longer, must pass through to the construction section traffic and cause bigger influence.And pollute peripheral environment, had a strong impact near resident normal life.
Summary of the invention
Technical problem:The purpose of this invention is to provide a kind of ater-casting type assembling upper pipe working well that can shorten the active well construction period at the scene.
Technical scheme:The present invention is an ater-casting type assembling upper pipe working well, comprises the above well sheet of two sections of the vertical assembly unit of four vertical late poured band and edge; Every sections is rectangular, comprises two relative U font well sheets and two relative yi word pattern well sheets; U font well sheet is positioned at the minor face place of rectangle; Place, inboard right angle at U font well sheet is provided with haunch; Four late poured band are about the both sides cantilever end of two U font well sheets and two yi word pattern well sheets between the end.
Above-mentioned active well all has the prestressed pore passage that extends along vertical in U font well sheet and the yi word pattern well sheet; Connect by reinforcing bar connector along the horizontal edge joint position of vertical prestressing reinforcing bar between adjacent each sections that vertically passes prestressed pore passage.Horizontal edge joint position between adjacent each sections is provided with the shear connector structure, to resist the shearing action that discontinuous construction is subjected to.Consider that in the pipe-jacking project work progress the inside and outside lateral body of active well sidewall reveals different stress forms, the vertical prestressing reinforcing bar in the active well sidewall is inside and outside two-layer, and inside and outside two-layer prestressed reinforcement is positioned at the both sides of shear connector structure.Above-mentioned active well, U font well sheet and yi word pattern well sheet adopt the prefabricated method of coupling prefabricated, when prefabricated, insert the reinforcing bar plug in the prestressed pore passage.
Above-mentioned active well, in order to increase the caking property of U font well sheet and yi word pattern well sheet and ater-casting, the side of the both sides cantilever end of U font well sheet and the left and right sides end side surface of yi word pattern well sheet are provided with the vertical groove of mutual interlock.
Above-mentioned active well, the well sheet of a nethermost sections are sword pin section well sheet, and vertical prestressing reinforcing bar in the sword pin section well sheet and anchored end anchor all are embedded in the sword pin section well sheet, and the vertical prestressing reinforcing bar in the sword pin section well sheet is handled as the prestressed failure section.The structure that the prestressed failure section is handled is the vertical prestressing rebar surface preservation fat in sword pin section well sheet, and parcel adhesive tape.
Above-mentioned active well, each sections height 2m-3m.
Above-mentioned active well has vertical distributing bar in the late poured band.
Beneficial effect:(1) municipal network of underground improvement project is positioned on the main line road of cities and towns mostly, and the upper pipe working well cast in situs duration is longer, to the bigger influence of the current generation of construction section traffic.Increased bigger current pressure also for simultaneously the road network of periphery.Ater-casting of the present invention type assembling active well can be with large scale active well precast block, made things convenient for transportation, reduced requirement to the large-tonnage crane gear, reduce the duration of open caisson built on-site significantly, significantly improve the construction speed of pipe-jacking project, farthest reduced pipe-jacking project construction section and the current influence of peripheral path traffic.
(2) ater-casting type assembling active well is by being prefabricated in the factory, and the active well contrast with cast-in-place has significantly reduced construction to the pollution of surrounding environment and the influence of resident's normal life.Meet " low-carbon economy, green construction " building theory.
(3) since all the well sheets according to the hoisting and hanging condition of city transport routes and assembling construction point, but piecemeal be prefabricated in the factory, it is manually less that ater-casting type assembling active well needs at the construction field (site), meets the developing direction of country's " industrialization of construction industry ".
(4) determine the rational arrangement of reinforcement scheme of prefabricated well sheet by structural analysis, ater-casting type assembling active well satisfies the needs of pipe-jacking project fully on function, and its construction material expense is compared almost suitable with cast-in-place active well.
Description of drawings
The present invention is described in more detail below in conjunction with drawings and Examples:
Fig. 1 is the tomograph of prefabricated assembled upper pipe working well.
Fig. 2 is the schematic diagram of a sections.
Fig. 3 is prefabricated assembled upper pipe working well two dimension elevation.
Fig. 4 is the A-A sectional drawing of Fig. 3.
Fig. 5 is the B-B sectional drawing of Fig. 3.
Fig. 6 is a prestressed reinforcement exhaustion phase partial enlarged drawing.
Fig. 7 is the local reinforcement constitution figure in ater-casting.
Fig. 8 is a transverse joint place reinforcing bar connection diagram.
Have among the figure: prestressed reinforcement stretch-draw end 1, ater-casting 2, haunch 3, U font well sheet (B prefabricated film) 4, transverse joint 5, yi word pattern well sheet (A prefabricated film) 6, hole 7, prestressed pore passage 8, shear connector structure 9, ater-casting teeth groove 10, prestressed reinforcement 11, steel failure section 12, the erection work well sections 13 that punches, erection work well sword pin section well sheet 14, active well base plate 15, adhesive tape 16, indented bars 17, anchored end ground tackle 18, active well level master muscle 19, muscle 20 is vertically constructed in the ater-casting, reinforcing bar connector 21, bellows 22.
The specific embodiment
The present invention is prefabricated assembled rectangular top pipe active well.Active well vertically is being divided into three sections, and every sections length is between 2m-3m.Each prefabricated well sheet is vertically to connecting by prestressed reinforcement 11.Adopt fining twisted steel as prestressed reinforcement.Laterally each sections is by two U font well sheet 4(B prefabricated films) and two yi word pattern well sheet 6(A prefabricated films) form.Wherein U font well sheet 4 adopts haunch 3 structures.The well sheet is laterally connecting by ater-casting 2.U font well sheet (short side direction) is a push pipe jacking direction.In order to increase the caking property with ater-casting 2, prefabricated well sheet lateral layout is concavo-convex teeth groove 10 forms.
Prestressed reinforcement 11 is positioned at the reserving hole channel 8 of prefabricated well sheet, adopts single-ended stretch-draw at the active well top.
The stretch-draw end is positioned at active well topmost.Be positioned at different well sheets, each of same position section prestressed reinforcement is connected by reinforcing bar connector 21 along vertical transverse joint 5 places in structure.For avoiding be connected 22 of the bellowss of well sheet of transverse joint 5 places that spillage can take place, application structure glue is unified shutoff to the transverse joint place before grouting.The prefabricated well sheet section part of transverse joint both sides is provided with shear connector structure (joint of neighbouring two prefabricated well sheets, a prefabricated well sheet has jut, another has corresponding recess) 9.Prestressed reinforcement duct 8 is distributed in shear connector structure both sides.In order to ensure the precision of installing, adopt prefabricated prefabricated each the well sheet of method of coupling.When the well sheet is prefabricated, adopt the coupling prefabrication, and in prestressed pore passage, insert reinforcing bar carry out prefabricated, prestressed reinforcement 11 contraposition smoothly when guaranteeing the precast construction assembly unit.
Prestressed reinforcement and anchored end ground tackle 18 in the sword pin section well sheet (the well sheet of a nethermost sections) 14 in the prefabricated active well are embedded in the prefabricated well sheet.Pre-buried prestressed reinforcement has adopted local no binder-treatment, promptly at rebar surface preservation fat, and parcel adhesive tape 16, cause the prestressing force partial failure.Prestressing force partial failure section 12 is seen accompanying drawing 3,5.
Consider the loading characteristic of structure, during active well was built, the active well level master muscle 19 that A prefabricated film, B prefabricated film are embedded in the structure of ater-casting was made the U font, and mutual dislocation is pre-buried.Arrange the vertical structure 20 in six roots of sensation ater-casting between two semicircle reinforcing bar sections in the ater-casting, increased the bulk strength of ater-casting structure.The local reinforcement placement in ater-casting is seen accompanying drawing 7.The active well level 19 that stretch out the precast construction both sides is embedded in the ater-casting 2, level master's cross dystopia of muscle and tendon position overlap joint of same position, on-the-spot colligation or welding after-pouring concrete.
The ater-casting structure is fluid concrete after the vertical prestressing reinforced bar stretching is finished, and the strength grade of concrete of cast will be higher than precast construction.The ater-casting formwork can clamp with weldering sealing sheet split bolt.
The U font well sheet of the vertical interstitial segment of active well (erection work well punch sections 13) is reserved push pipe hole 7 at design height, the pre-buried structure steel plate of hole week sheet.
The B prefabricated film of both sides is installed earlier during the mounting shaft sheet, after fill in the A prefabricated film from the side.Be to guarantee the stability of erection stage A prefabricated film, the overlap welding that can keep at a certain distance away of A prefabricated film, B prefabricated film pre-buried U font active well level level master muscle 19 in the structure of ater-casting.
The present invention is an ater-casting type assembling rectangular top pipe active well, has shortened the Cast-in-situs type active well construction period at the scene, has reduced to the pollution of site environment and to the influence that traffic, human settlement cause, and has adapted to the development of " industrialization of construction industry ".Its active well well sheet is prefabricated in the factory, be transported to the scene after, connect by vertical prestressed reinforcement, and build the ater-casting and make the active well global formation, it is in place to sink at last.
Ater-casting of the present invention type assembling rectangle active well is divided into some sections along vertical (highly) direction, and each well sheet vertically connects by the prestressed reinforcement in the reserving hole channel in the well sheet.The length of each prestressed reinforcement is consistent along vertical height with each well sheet.Vertical each section prestressed reinforcement of same position is along vertically being fused by reinforcing bar connector at the transverse joint place of structure.Adopt finish rolling deformed bar as prestressed reinforcement from the loading characteristic analysis of pipe-jacking project active well.Consider transportation and the convenience that lifts, horizontal every sections active well is divided into four, and section is U font and yi word pattern respectively.Yi word pattern well sheet is positioned at place, the long limit of rectangle, and U font well sheet is positioned at rectangle minor face place, and each well sheet of same sections connects by late poured band.

Claims (7)

1. a prefabricated assembled upper pipe working well is characterized in that: along vertically it is spliced by two well blade units more than the sections; Every sections is rectangular, and is made up of two relative U font well sheets (4) and two relative yi word pattern well sheets (6); U font well sheet (4) is positioned at the minor face place of rectangle; The both sides cantilever end length of U font well sheet is unequal; And the place, inboard right angle at U font well sheet is provided with haunch (3); The chain edge fit of U font well sheet and yi word pattern well sheet is provided with ater-casting teeth groove (10), and ater-casting (2) are arranged in ater-casting teeth groove (10), the prestressed pore passage (8) that all has along continuous straight runs and vertical direction to extend in U font well sheet and the yi word pattern well sheet; The transverse prestressed reinforcing steel bar that U font well sheet (4) in the same sections and yi word pattern well sheet (6) pass prestressed pore passage by horizontal direction connects; The horizontal edge joint position of vertical prestressed reinforcement between adjacent each sections that vertically passes prestressed pore passage connects by reinforcing bar connector; Two U font well sheets of same sections are by the splicing of both sides cantilever end length antisymmetry, and the U font well sheet in vertical adjacent each sections is pressed cantilever end size dislocation splicing.
2. prefabricated assembled upper pipe working well as claimed in claim 1 is characterized in that: the horizontal piece between adjacent each sections is provided with shear connector structure (9).
3. prefabricated assembled upper pipe working well as claimed in claim 1 is characterized in that: U font well sheet and the yi word pattern well sheet of forming active well adopt the prefabricated method of coupling prefabricated, when prefabricated, insert reinforcing bar in the prestressed pore passage.
4. prefabricated assembled upper pipe working well as claimed in claim 1 is characterized in that: transverse prestressed reinforcing steel bar in the active well sidewall and vertical prestressed reinforcement are inside and outside two-layer distribution.
5. prefabricated assembled upper pipe working well as claimed in claim 1, it is characterized in that: it is characterized in that: the well sheet of a nethermost sections is a sword pin section well sheet, vertical prestressed reinforcement in the sword pin section well sheet and anchored end ground tackle are embedded in the sword pin section well sheet, and the vertical prestressed reinforcement in the sword pin section well sheet is handled as the prestressed failure section.
6. prefabricated assembled upper pipe working well as claimed in claim 5 is characterized in that: the structure that the prestressed failure section is handled is the vertical prestressed reinforcement surface preservation fat in sword pin section well sheet, and parcel adhesive tape.
7. prefabricated assembled upper pipe working well as claimed in claim 1 is characterized in that: each sections height 2m-3m.
CN2011100699826A 2011-03-23 2011-03-23 Late poured band type assembled pipe jacking working open caisson Expired - Fee Related CN102155025B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100699826A CN102155025B (en) 2011-03-23 2011-03-23 Late poured band type assembled pipe jacking working open caisson

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100699826A CN102155025B (en) 2011-03-23 2011-03-23 Late poured band type assembled pipe jacking working open caisson

Publications (2)

Publication Number Publication Date
CN102155025A true CN102155025A (en) 2011-08-17
CN102155025B CN102155025B (en) 2012-05-23

Family

ID=44436679

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100699826A Expired - Fee Related CN102155025B (en) 2011-03-23 2011-03-23 Late poured band type assembled pipe jacking working open caisson

Country Status (1)

Country Link
CN (1) CN102155025B (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102644296A (en) * 2012-05-09 2012-08-22 东南大学 Prefabricate assembly type pipe jacking working well
CN102877537A (en) * 2012-08-28 2013-01-16 李尚喜 Establishment and construction of sewer of road fixed well
CN102877487A (en) * 2012-08-28 2013-01-16 李尚喜 Construction of manhole cover template facility of roads
CN106149491A (en) * 2016-08-30 2016-11-23 中铁第四勘察设计院集团有限公司 Abutment wall cutting shoe device for jacking construction
CN106224642A (en) * 2016-09-14 2016-12-14 中石化石油工程技术服务有限公司 A kind of prefabricated assembled upper pipe working well of steel construction
CN107974931A (en) * 2017-11-23 2018-05-01 南京工业大学 Self-energy-consumption high pier structure system with post-earthquake recoverable performance
CN108678129A (en) * 2018-07-24 2018-10-19 唐方方 Precast concrete assembled piping shaft and preparation method thereof and installation method
CN108798775A (en) * 2018-06-14 2018-11-13 国网安徽省电力有限公司经济技术研究院 A kind of jacking construction active well
CN109098199A (en) * 2018-08-28 2018-12-28 上海电力设计院有限公司 Caisson structure and construction method applied to 500kV power tunnel engineering
CN109163143A (en) * 2018-10-18 2019-01-08 中国冶集团有限公司 A kind of assembled push pipe work open caisson and the construction method using it
CN109184703A (en) * 2018-09-26 2019-01-11 上海市城市建设设计研究总院(集团)有限公司 The deep big active well method for arranging of the overlapping push pipe done after structure
CN110080295A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of lid of assembled vault greatly across no column underground structure digs full-reverse construction method
CN111608691A (en) * 2020-06-01 2020-09-01 中铁十四局集团大盾构工程有限公司 Shield working well template support construction method
CN112267892A (en) * 2020-08-28 2021-01-26 春涛国际建筑有限公司 Secondary pipe jacking construction operation method and system
CN113294159A (en) * 2021-04-22 2021-08-24 核工业井巷建设集团有限公司 High-stability working well structure suitable for long-distance large-section jacking pipe and construction method
CN114396283A (en) * 2022-02-15 2022-04-26 海南大学 Construction method of assembled pipe-jacking working well

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103195158B (en) * 2013-04-03 2014-12-10 济南城建集团有限公司 Municipal drainage pipeline slurry balance pipe-jacking construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0219252B2 (en) * 1982-12-28 1990-05-01 Nasu Denki Tetsuko Kk
CN101113595A (en) * 2006-07-24 2008-01-30 上海东捷电力设计有限公司 Prefabricated electrical cable working well basic cell
CN101113594A (en) * 2006-07-24 2008-01-30 上海市基础工程公司 Prefabricated electrical cable active well
CN201268852Y (en) * 2008-09-27 2009-07-08 吴纪东 Immersed tube type manhole
CN201272979Y (en) * 2008-08-16 2009-07-15 周佰兴 Precast combined inspection well
CN201276709Y (en) * 2008-10-10 2009-07-22 叶炽凡 Assembled prefabricated inspection shaft
CN201459756U (en) * 2009-08-19 2010-05-12 郑州市市政工程总公司 Hanging-type construction ceiling coil vertical shaft
CN202031108U (en) * 2011-03-23 2011-11-09 东南大学 Post-poured band type fabricated pipe-jacking working well

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0219252B2 (en) * 1982-12-28 1990-05-01 Nasu Denki Tetsuko Kk
CN101113595A (en) * 2006-07-24 2008-01-30 上海东捷电力设计有限公司 Prefabricated electrical cable working well basic cell
CN101113594A (en) * 2006-07-24 2008-01-30 上海市基础工程公司 Prefabricated electrical cable active well
CN201272979Y (en) * 2008-08-16 2009-07-15 周佰兴 Precast combined inspection well
CN201268852Y (en) * 2008-09-27 2009-07-08 吴纪东 Immersed tube type manhole
CN201276709Y (en) * 2008-10-10 2009-07-22 叶炽凡 Assembled prefabricated inspection shaft
CN201459756U (en) * 2009-08-19 2010-05-12 郑州市市政工程总公司 Hanging-type construction ceiling coil vertical shaft
CN202031108U (en) * 2011-03-23 2011-11-09 东南大学 Post-poured band type fabricated pipe-jacking working well

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102644296A (en) * 2012-05-09 2012-08-22 东南大学 Prefabricate assembly type pipe jacking working well
CN102877537A (en) * 2012-08-28 2013-01-16 李尚喜 Establishment and construction of sewer of road fixed well
CN102877487A (en) * 2012-08-28 2013-01-16 李尚喜 Construction of manhole cover template facility of roads
CN106149491B (en) * 2016-08-30 2018-07-06 中铁第四勘察设计院集团有限公司 For the abutment wall cutting shoe device of jacking construction
CN106149491A (en) * 2016-08-30 2016-11-23 中铁第四勘察设计院集团有限公司 Abutment wall cutting shoe device for jacking construction
CN106224642A (en) * 2016-09-14 2016-12-14 中石化石油工程技术服务有限公司 A kind of prefabricated assembled upper pipe working well of steel construction
CN107974931B (en) * 2017-11-23 2019-05-31 南京工业大学 Self-energy-consumption high pier structure system with post-earthquake recoverable performance
CN107974931A (en) * 2017-11-23 2018-05-01 南京工业大学 Self-energy-consumption high pier structure system with post-earthquake recoverable performance
CN108798775A (en) * 2018-06-14 2018-11-13 国网安徽省电力有限公司经济技术研究院 A kind of jacking construction active well
CN108678129A (en) * 2018-07-24 2018-10-19 唐方方 Precast concrete assembled piping shaft and preparation method thereof and installation method
CN109098199A (en) * 2018-08-28 2018-12-28 上海电力设计院有限公司 Caisson structure and construction method applied to 500kV power tunnel engineering
CN109184703A (en) * 2018-09-26 2019-01-11 上海市城市建设设计研究总院(集团)有限公司 The deep big active well method for arranging of the overlapping push pipe done after structure
CN109163143A (en) * 2018-10-18 2019-01-08 中国冶集团有限公司 A kind of assembled push pipe work open caisson and the construction method using it
CN110080295A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of lid of assembled vault greatly across no column underground structure digs full-reverse construction method
CN111608691A (en) * 2020-06-01 2020-09-01 中铁十四局集团大盾构工程有限公司 Shield working well template support construction method
CN112267892A (en) * 2020-08-28 2021-01-26 春涛国际建筑有限公司 Secondary pipe jacking construction operation method and system
CN113294159A (en) * 2021-04-22 2021-08-24 核工业井巷建设集团有限公司 High-stability working well structure suitable for long-distance large-section jacking pipe and construction method
CN113294159B (en) * 2021-04-22 2024-04-12 核工业井巷建设集团有限公司 High-stability working well structure suitable for long-distance large-section jacking pipe and construction method
CN114396283A (en) * 2022-02-15 2022-04-26 海南大学 Construction method of assembled pipe-jacking working well

Also Published As

Publication number Publication date
CN102155025B (en) 2012-05-23

Similar Documents

Publication Publication Date Title
CN102155025B (en) Late poured band type assembled pipe jacking working open caisson
CN202559384U (en) Prefabricated assembled pipe-jacking working well
CN202031108U (en) Post-poured band type fabricated pipe-jacking working well
CN108951870B (en) Construction method of low-rise fully-assembled concrete shear wall structure system
CN102644296A (en) Prefabricate assembly type pipe jacking working well
CN103912011B (en) The prefabricated assembled underground structure of open cut
CN107268366B (en) Assembled wallboard and pile plate combined soilless roadbed
CN206707124U (en) Prefabricated assembling type reinforced concrete component with joint of steel structure
CN109555535B (en) Lower-way truss type prestressed pipe curtain structure and construction method
CN207660136U (en) A kind of assembly concrete frame-shear wall keyway connection structure
CN111365018A (en) Cover arch reinforcement method suitable for small tunnel clearance
CN207998860U (en) A kind of assembled pipe gallery
CN105672144B (en) A kind of medium-small span bridges are reinforced with spelling wide structure and its construction method
CN106381886A (en) Partially-prefabricated assembled steel and concrete combined utility tunnel
CN110552706A (en) Permanent-temporary combined shield hoisting hole sealing structure and method
CN212656260U (en) Assembled rail top air duct structure of underground station
CN109137984A (en) Assembled integral mixes prefabricated pipe gallery
CN107514012A (en) A kind of partial precast assembly steel concrete combination underground pipe gallery for exempting from template
CN112211085A (en) Concrete floor slab walking trestle device for large crawler crane and mounting method thereof
CN108286267B (en) Assembled corrugated steel Combined concrete pipe gallery
CN114215171B (en) Assembled structure slurry overflow connection node and construction method thereof
CN211948032U (en) Prefabricated assembled concrete arch culvert
CN210163936U (en) Pile culvert integrally-assembled steel bone concrete comprehensive pipe gallery
CN212927241U (en) Steel pipe concrete column-H steel beam-support-Pi-shaped combined corner column middle node
CN211900603U (en) Face combination shield structure hole of hoist enclosed construction forever

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120523