CN203701145U - Underground pipe network inspection well concrete assembly - Google Patents

Underground pipe network inspection well concrete assembly Download PDF

Info

Publication number
CN203701145U
CN203701145U CN201320419338.1U CN201320419338U CN203701145U CN 203701145 U CN203701145 U CN 203701145U CN 201320419338 U CN201320419338 U CN 201320419338U CN 203701145 U CN203701145 U CN 203701145U
Authority
CN
China
Prior art keywords
concrete
stage casing
mouth
carve
manhole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320419338.1U
Other languages
Chinese (zh)
Inventor
金阳升
郑春华
蒋理江
金晓明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201320419338.1U priority Critical patent/CN203701145U/en
Application granted granted Critical
Publication of CN203701145U publication Critical patent/CN203701145U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses an underground pipe network inspection well concrete assembly comprising a well lid, a concrete upper neck cylinder member, a concrete middle section member and a concrete pedestal assembly. A cylinder port of the concrete upper neck cylinder member is matched with the concrete well lid; and the concrete middle section member is arranged between the concrete upper neck cylinder member and the concrete pedestal assembly and inserted with thereabove to form an inspection well via a sealing member and a wedge. Inspection assembly members can be prefabricated on a manufacturing site and on-site concrete casting or well bricklaying are avoided, so on-site construction time can be greatly shortened; the inspection well is formed in an assembling caisson construction way; the well is sunk as soil is dug; soil is dug in the well, so disruption to a foundation is reduced; enclosure of a steel sheet pile or a wood pile is unnecessary, thereby providing the underground pipe network inspection well concrete assembly with fast construction speed, high work efficiency and low cost; and an antiseptic lining of the assembly enhances leakage and corrosion resisting performance of the inspection well.

Description

A kind of network of underground manhole concrete segment
Technical field
The utility model relates to network of underground manhole, especially belongs to open caisson concrete assembly, by the excavation sinking concrete assembly that fetches earth, forms network of underground manhole.
Background technology
Along with the development of urban construction, the construction of network of underground and transformation task are very heavy.Existing city network of underground manhole newly-built or transformation has three kinds of constructions conventionally: brick well is excavated on whole caisson construction, ground excavation concreting well construction and ground.
Whole caisson construction: be at ground concreting well, generally need 28 day curing time concrete just to reach intensity, then can excavate ground, enforcement open caisson.If the open caisson degree of depth exceedes 5 meters, also to carry out secondary open caisson, to build and will lengthen on ground, the concrete curing time increases one-period again.When open caisson is during to design elevation, smooth shaft bottom, lay macadam, concreting base plate.Because open caisson is to construct at the scene, its shortcoming is long construction period, and work efficiency is low, and execution conditions are poor, and site operation needs larger placing of material district, and manhole easily leaks, perishable.
Concreting well construction is excavated on ground: determine manhole orientation according to design, implement going along with sb. to guard him of steel sheet pile or timber according to the degree of depth of manhole, excavate the design elevation of ground to manhole, then smooth shaft bottom, laying macadam, concreting base plate.Use again concreting manhole, generally need can carry out pipeline construction after 28 day curing time, finally remove fender post, do earthing construction.Its shortcoming is not only will build to take, tear open and pull out fender post, also wants dig on a wide area ground and earthing construction, and excavation is large with backfill earthwork workload, and concreting well curing time is long, and time-consuming, cost is high.Underground construction condition is poor, and work efficiency is low.Construction quality is difficult to assurance, and manhole leaks serious.
Brick well is excavated on ground: this construction and ground excavation concreting well construction is substantially similar, and the former uses concreting manhole difference, and the latter is with brick well body, carry out cement mortar bisque at the surfaces externally and internally of brick well body.After brick well reaches intensity, can carry out pipeline construction, finally remove fender post, do earthing construction.There is similar shortcoming in itself and ground excavation concreting well construction.
Utility model content
The deficiency existing for prior art, the technical problems to be solved in the utility model is to provide a kind of network of underground manhole concrete segment, and it can shorten on-site construction time, effectively increases work efficiency, and energy leakproof is anticorrosion, improves the quality of manhole.
For solving the problems of the technologies described above, a kind of network of underground manhole concrete segment of the present utility model, comprise concrete manhole cover, also comprise concrete upper hind neck barrier part, concrete stage casing part, concrete bottom holder assembly, the nozzle of concrete upper hind neck barrier part matches with concrete manhole cover, and concrete stage casing part is located between concrete upper hind neck barrier part and concrete bottom holder assembly and by seal and carve mouth and mutually plug together and be connected into manhole.
The shape of described concrete stage casing part is cast, and its upper end collar is provided with and carves mouth, lower end collar is provided with down and carves mouth, and the upper and lower mouth of carving is provided with seal groove, carves mouth for assembling.
The shape of described concrete upper hind neck barrier part is bottle-neck type, the inside and outside collar size in its lower end is corresponding with concrete stage casing part, lower end collar be provided with on the part of concrete stage casing, carve that mouth matches under carve mouth, under carve mouth and be provided with seal groove, corresponding with the seal groove of carving on the part of stage casing mouthful.
The shape of described concrete bottom holder assembly is cartridge type, comprise concrete bed part, base liner, the shape of concrete bed part is cast, the inside and outside collar size in its upper end is corresponding with concrete stage casing part, upper end collar be provided with under the part of concrete stage casing, carve that mouth matches on carve mouthful, on carve mouth be provided with stage casing part under carve the corresponding seal groove of mouthful seal groove, the bottom of base element is provided with pipeline through hole, lower end is provided with sword pin; The shape of base liner is cartridge type, and its bottom base panel and cylindrical shell are integral, and top is provided with the pipeline through hole corresponding with concrete bed part, and base liner is connected by cement paste and concrete bed part after installing.
Described concrete upper hind neck barrier part, the skin of concrete stage casing part are concrete, and liner is corrosion resistant layer, and liner and skin are built integral, and the material of liner is anticorrosion glass fiber reinforced plastic or plastics.
The described upper and lower mouth-shaped of carving is spigot-and-socket or F type.
Compared with prior art, its advantage and beneficial effect are the utility model:
1. making place precast inspection well assembly, without concreting or brick shaft building at the construction field (site), greatly shorten on-site construction time, reduce construction plant; Manhole has substituted existing complexity with assembly open caisson and loaded down with trivial details construction has alleviated labour intensity, has improved the quality of manhole;
2. manhole adopts assembly type open caisson, is shaped with and carves mouth and insert mutually by carving mouth on each assembly; The open caisson while fetching earth, beyond open caisson, does not excavate on ground, fetches earth and fetch earth in well, reduces ground disturbance, reduces the impact on periphery roadbed and building; Without going along with sb. to guard him of steel sheet pile or timber, speed of application is fast, and operating efficiency is high, and saving of work and time reduces costs;
3. open caisson liner (internal mold) adopts leakproof anti-corrosion material, forms with concrete prefabricated, improves manhole antiseptic property; Assembly is inserted mutually to carve between mouth sealing ring is housed, and improves the watertightness of manhole, is conducive to environmental protection.
Accompanying drawing explanation
Below with reference to drawings and Examples, the utility model is further described.
Fig. 1 is the utility model network of underground manhole concrete segment schematic diagram;
Fig. 2 is that concrete bed part is in place to excavating ground schematic diagram;
Fig. 3 is that open caisson puts in place and is placed in schematic diagram on concrete floor.
In figure: carve mouthfuls 10 under concrete floor 1, base element 2, sealing mat 3, pipeline 4, gland 5, stage casing part 6, upper hind neck barrier part 7, assembly liner 8, well lid 9, assembly, carve mouthfuls 11 on assembly, sealing ring 12, base element through hole 13, plain concrete layer 14, base element sword pin 15, macadam 16, base liner 17.
The specific embodiment
As shown in Figure 1, be the utility model network of underground manhole concrete segment schematic diagram.Network of underground manhole is formed by each concrete segment assembling open caisson.The assembly that open caisson is installed is from bottom to top: base assembly, stage casing part 6, upper hind neck barrier part 7, until upper hind neck barrier part 7 is installed, well lid 9 is covered on neck nozzle, and form a manhole.Each specification shape prefabricated component that stage casing part 6, upper hind neck barrier part 7 form the anticorrosion internal mold of fabricating yard made, external mold, reinforcing bar dragon.Internal mold is the liner 8 of manhole, and liner adopts etch-proof glass fiber reinforced plastic or plastic material, and this example adopts glass-reinforced plastic material.Concreting on prefabricated component subsequently, liner 8 is connected into one with concrete, until maintenance reaches intensity, makes manhole concrete segment through vibrating.Base assembly comprises concrete bed part 2, base liner 17, and both are prefabricated respectively, after concrete bed part 2 and base liner 17 are installed, is connected.On each assembly, be shaped with and carve mouth, for connection mutual between each assembly.Carving of each assembly is all shaped with seal groove on mouth.The utility model, making place precast concrete open caisson assembly, can shorten on-site construction time greatly, reduces construction plant.
The shape of concrete stage casing part 6 is cast, is shaped with to carve on mouth 11, lower end collar to be shaped with down and to carve mouth 10 on its upper end collar, and upper and lower carving on mouth 11,10 is shaped with seal groove.
The shape of concrete upper hind neck barrier part 7 is bottle-neck type, the inside and outside collar size in its lower end is corresponding with concrete stage casing part 6 upper end collar sizes, on the collar of lower end, be shaped with on the part of concrete stage casing, carve mouthfuls 11 match under carve mouthfuls 10, under carve on mouthfuls 10 and be shaped with seal groove, corresponding with the seal groove of carving mouthfuls 11 on the part of stage casing.
The shape of concrete bottom holder assembly is cartridge type, comprise concrete bed part 2, base liner 17, the shape of concrete bed part 2 is cast, the inside and outside collar size in its upper end is corresponding with concrete stage casing part 6 lower end collar sizes, on the collar of upper end, be shaped with under concrete stage casing part 6, carve mouthfuls 10 match on carve mouthfuls 11, on carve on mouthfuls 11 and be shaped with seal groove, corresponding with the seal groove of carving mouthfuls 10 under the part of stage casing.The bottom of base element 2 is shaped with pipeline through hole 13, lower end is shaped with sword pin 15, and sword pin 15 is convenient to base element 2 and is sunk.The shape of base liner 17 is cartridge type, and base plate and the cylindrical shell of its bottom are integral, and top is shaped with the pipeline through hole 13 corresponding with concrete bed part 2.
The mouth of carving of each fills sealing ring 12 on seal groove while plugging together, and for the sealing of assembly, that respectively carves mouthful is shaped as spigot-and-socket or F type.After concrete bed part 2 sinks to putting in place, stage casing part 6, upper hind neck barrier part 7 all install, the shaft bottom of macadam 16, plain concrete layer 14, concrete floor 1 is built, tubulature road 4 stretches in the through hole 13 of base element 2, refill base liner 17 on concrete floor 1, base liner 17 is connected with concrete bed part 2.On through hole 13, be equipped with sealing mat 3, gland 5, for sealing, Leakage prevention.
As shown in Figure 2, be that base element is in place to excavating ground schematic diagram.Below by figure, assembly sinking process is further described respectively again: measure the position of manhole setting with transit, then by the position to the arranging in place base element of manhole 2, so that excavation ground.There is the sinking of sword pin 15 for base element 2 lower end of base element 2.
As shown in Figure 3, be that open caisson puts in place and is placed in schematic diagram on concrete floor.Build manhole with sinking assembly, base element 2 is placed in behind excavation ground, starts excavation and fetches earth, fetch earth available grapple or manually fetch earth of excavation.The sword pin 15 of base element is with base element 2 isostatic settlings, if unbalanced sinking will be rectified a deviation, can or fetch earth in lower end at a high side upper end ballast of base element 2 more.The open caisson while fetching earth like this, beyond open caisson, does not excavate on ground, fetches earth and fetch earth in well, reduces ground disturbance, reduces the impact on periphery roadbed and building.Without going along with sb. to guard him of steel sheet pile or timber, speed of application is fast, and operating efficiency is high.In the time that the upper end of base element 2 sinks down into ground line position, stage casing part 6 is placed on to the upper end of base element 2, on base element 2, carve mouthfuls 11 with stage casing part 6 under carve mouthfuls 10 and insert mutually, connect between the seal groove of carving mouth sealing ring 12 be housed, for the sealing of open caisson, with Leakage prevention.Then continue to excavate the sinking assembly that fetches earth.
In the open caisson process of assembly, to constantly measure the absolute altitude of open caisson, when the bottom surface of base element 2 is when setting absolute altitude position, should stop excavation and fetch earth.
Shaft bottom absolute altitude is adjusted to setting absolute altitude, lays subsequently macadam 16 compacting, on macadam 16, build plain concrete layer 14.Treat that plain concrete 14 reaches intensity, assembling reinforcement concreting base plate 1 (seeing Fig. 3) on plain concrete 14.
Concrete floor 1 reaches after intensity, and pipe laying 4 between two manholes (push pipe or pipe laying), stretches in the end of pipeline 4 in the through hole 13 of base element 2.Refill base liner 17 on concrete floor 1, the through hole 13 of base liner 17 is corresponding with the through hole 13 of base element 2.Then fill by cement paste solid integral to base liner 17 and concrete bed part 2, the shape of the concrete bottom holder assembly after connection is solid is cartridge type.Base liner 17 adopts etch-proof glass fiber reinforced plastic or plastic material, and this example adopts glass fiber reinforced plastic.Leak-proof sealing pad 3 is installed on through hole 13, gland 5 is installed on sealing mat 3, gland 5 is connected by bolt and base element 2.Guarantee that through hole 13 and pipeline 4 seal (seeing Fig. 3).
As shown in Figure 1, the lower end of upper hind neck barrier part 7 is carved to mouthfuls 10 and carve mouthfuls 11 with the upper end of stage casing part 6 and insert mutually, two-phase is inserted on the seal groove of carving mouth sealing ring 12 is installed, and then well lid 9 is placed in to neck nozzle, forms a leakproof corrosion-resistant manhole.

Claims (7)

1. a network of underground manhole concrete segment, comprise concrete manhole cover, it is characterized in that: also comprise concrete upper hind neck barrier part, concrete stage casing part, concrete bottom holder assembly, the nozzle of concrete upper hind neck barrier part matches with concrete manhole cover, and concrete stage casing part is located between concrete upper hind neck barrier part and concrete bottom holder assembly and by seal and carve mouth and mutually plug together and be connected into manhole.
2. network of underground manhole concrete segment according to claim 1, is characterized in that: the shape of described concrete stage casing part is cast, and its upper end collar is provided with and carves mouth, lower end collar is provided with down and carves mouth, and the upper and lower mouth of carving is provided with seal groove.
3. network of underground manhole concrete segment according to claim 1, it is characterized in that: the shape of described concrete upper hind neck barrier part is bottle-neck type, the inside and outside collar size in its lower end is corresponding with concrete stage casing part, lower end collar be provided with on the part of concrete stage casing, carve that mouth matches under carve mouth, under carve mouth and be provided with and on the part of stage casing, carve the corresponding seal groove of mouthful seal groove.
4. network of underground manhole concrete segment according to claim 1, it is characterized in that: the shape of described concrete bottom holder assembly is cartridge type, comprise concrete bed part, base liner, the shape of concrete bed part is cast, the inside and outside collar size in its upper end is corresponding with concrete stage casing part, upper end collar be provided with under the part of concrete stage casing, carve that mouth matches on carve mouthful, on carve mouth be provided with stage casing part under carve the corresponding seal groove of mouthful seal groove, the bottom of base element is provided with pipeline through hole, lower end is provided with sword pin; The shape of base liner is cartridge type, and its bottom base panel and cylindrical shell are integral, and top is provided with the pipeline through hole corresponding with concrete bed part, and base liner and concrete bed part are connected.
5. according to the network of underground manhole concrete segment described in arbitrary claim in claim 1 to 4, it is characterized in that: described concrete upper hind neck barrier part, the skin of concrete stage casing part are concrete, and liner is corrosion resistant layer, and liner and skin are built integral.
6. network of underground manhole concrete segment according to claim 5, is characterized in that: the material of described liner is anticorrosion glass fiber reinforced plastic or plastics.
7. according to the network of underground manhole concrete segment described in arbitrary claim in claim 1 to 4, it is characterized in that: the described upper and lower mouth-shaped of carving is spigot-and-socket or F type.
CN201320419338.1U 2013-07-15 2013-07-15 Underground pipe network inspection well concrete assembly Expired - Fee Related CN203701145U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320419338.1U CN203701145U (en) 2013-07-15 2013-07-15 Underground pipe network inspection well concrete assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320419338.1U CN203701145U (en) 2013-07-15 2013-07-15 Underground pipe network inspection well concrete assembly

Publications (1)

Publication Number Publication Date
CN203701145U true CN203701145U (en) 2014-07-09

Family

ID=51051601

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320419338.1U Expired - Fee Related CN203701145U (en) 2013-07-15 2013-07-15 Underground pipe network inspection well concrete assembly

Country Status (1)

Country Link
CN (1) CN203701145U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104294846A (en) * 2013-07-15 2015-01-21 金阳升 Underground pipe network inspection well concrete component and rapid well sinking method thereof
CN108798775A (en) * 2018-06-14 2018-11-13 国网安徽省电力有限公司经济技术研究院 A kind of jacking construction active well
CN109826630A (en) * 2019-02-02 2019-05-31 上海城建水务工程有限公司 A kind of precast concrete open caisson device and its construction method for jacking construction

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104294846A (en) * 2013-07-15 2015-01-21 金阳升 Underground pipe network inspection well concrete component and rapid well sinking method thereof
CN104294846B (en) * 2013-07-15 2016-09-07 金阳升 A kind of underground pipe network inspection shaft concrete segment Quick well sinking method
CN108798775A (en) * 2018-06-14 2018-11-13 国网安徽省电力有限公司经济技术研究院 A kind of jacking construction active well
CN109826630A (en) * 2019-02-02 2019-05-31 上海城建水务工程有限公司 A kind of precast concrete open caisson device and its construction method for jacking construction
CN109826630B (en) * 2019-02-02 2024-04-09 上海城建水务工程有限公司 Precast concrete open caisson device for pipe jacking construction and construction method thereof

Similar Documents

Publication Publication Date Title
CN100412275C (en) Waterproof and plugging construction method for precipitation well in foundation pit
CN104805866A (en) Prefabricated comprehensive pipe gallery and construction method
CN105862916A (en) Superimposed assembled type underground pipe gallery system and construction and manufacturing process
CN102434717B (en) Construction method of joist steel pipe-jacking work pit
CN204753627U (en) Prefabricated comprehensive piping lane
US11566390B2 (en) Construction method of reclaiming land from the sea based on basement utilization
CN108797637A (en) Prefabricated board combined cast-in-situ concrete considers the underground pipe gallery construction method of structure and ground
CN208235555U (en) Prefabricated assembled open caisson
CN206859259U (en) A kind of pipe gallery
CN203701145U (en) Underground pipe network inspection well concrete assembly
CN104099946A (en) Novel jacking pipe intersegment overhaul well
CN203768925U (en) Seal device for dewatering well in foundation pit
CN206035045U (en) Prefabricated assembled underground granary of endocyst plastics
CN107152034A (en) A kind of pipe gallery and its construction method
CN106088758A (en) A kind of double-deck assembled underground granary
CN106368211B (en) Rectangular concrete pile for building piping lane side wall
CN201883453U (en) Combined pipe jacking working well
CN201873991U (en) Device for forming cast-in-place pile through high frequency vibrating and compacting dry soil displacement
CN204080861U (en) Inspection-pit between a kind of Novel top pipeline section
CN104294846B (en) A kind of underground pipe network inspection shaft concrete segment Quick well sinking method
CN106088762A (en) The prefabricated assembled circular underground granary of a kind of insertion slot type encased steel plate
CN202247856U (en) Earth borrowing annular pile for foundation treatment and underground foundation
CN106049948B (en) Bag Plastic preform bulkhead underground granary in a kind of insertion slot type
CN206035047U (en) Prefabricated assembled underground granary of plastic cover
CN106480875B (en) For constructing the rectangular concrete pile of piping lane side wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Jin Yangsheng

Document name: payment instructions

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140709

Termination date: 20210715