CN104294846B CN201310295629.9A CN201310295629A CN104294846B CN 104294846 B CN104294846 B CN 104294846B CN 201310295629 A CN201310295629 A CN 201310295629A CN 104294846 B CN104294846 B CN 104294846B
Authority
CN
China
Prior art keywords
concrete
inspection shaft
segment
well
mouth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310295629.9A
Other languages
Chinese (zh)
Other versions
CN104294846A (en
Inventor
金阳升
郑春华
蒋理江
金晓明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310295629.9A priority Critical patent/CN104294846B/en
Publication of CN104294846A publication Critical patent/CN104294846A/en
Application granted granted Critical
Publication of CN104294846B publication Critical patent/CN104294846B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • E02D23/08Lowering or sinking caissons

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a kind of Quick well sinking method of underground pipe network inspection shaft concrete segment, concrete segment includes on concrete segment, concrete bottom holder assembly in neck barrier part, concrete.The step of assembly Quick well sinking method includes: excavates fetch earth also open caisson assembly, concrete segment inspection shaft and couples with pipeline.The present invention conducts a survey making the prefabricated concrete assembly in place well, uses and fetches earth while assembles open caisson, fetches earth and fetch earth in well, reduces ground disturbance, it is not necessary to going along with sb. to guard him of steel sheet pile or timber, speed of application is fast, operating efficiency height, low cost.

Description

A kind of underground pipe network inspection shaft concrete segment Quick well sinking method
Technical field
The present invention relates to underground pipe network inspection shaft, especially belonging to fetches earth quickly to sink by excavation fills concrete segment structure The method of the underground pipe network inspection shaft built.
Background technology
Along with the development of urban construction, construction and the transformation task of underground pipe network are the heaviest.City is newly-built Or underground pipe network inspection shaft three kinds of construction methods of existing usual employing of transformation: whole caisson construction method, ground are opened Dig casting concrete well construction method and brick well method is excavated on ground.
Whole caisson construction method: be at ground casting concrete well, typically needs 28 day curing period concrete just to reach To intensity, then put and can excavate ground, implement open caisson.If the open caisson degree of depth is more than 5 meters, then it is also performed to secondary Open caisson, the well poured on ground to lengthen, and the concrete curing time is further added by a cycle.When open caisson is to design During absolute altitude, smooth shaft bottom, laying metalling, casting concrete base plate.Owing to the method is that open caisson is executed at the scene Work, its shortcoming is long construction period, and work efficiency is low, and execution conditions are poor, and site operation also wants placing of material district.Inspection Look into well easily to leak, perishable.
Ground excavation casting concrete well construction method: determine inspection shaft orientation according to design, deep according to inspection shaft Degree implements going along with sb. to guard him of steel sheet pile or timber, the designed elevation on excavation ground to inspection shaft, the most smooth shaft bottom, paving If metalling, casting concrete base plate.Use concreting inspection shaft again, typically need 28 day curing period rear Pipeline construction can be carried out, finally remove fender post, make earthing construction.The method shortcoming is not only to build to take, tear open Pull out fender post, also want large area excavation ground and earthing construction, excavate and backfill earth moving amount big, and coagulation It is long that soil pours well curing time, time-consuming, and cost is high.Underground construction condition is poor, and work efficiency is low.Construction quality Being difficult to ensure that, inspection shaft leakage is serious.
Brick well method is excavated on ground: the method is substantially similar with ground excavation casting concrete well construction method, and institute is not With the former use concreting inspection shaft, the latter is with brick well body, carry out water at the surfaces externally and internally of brick well body Cement mortar bisque.Pipeline construction can be carried out after brick well reaches intensity, finally remove fender post, make earthing Construction.Similar shortcoming is there is in the method with ground excavation casting concrete well method.
Summary of the invention
The deficiency existed for prior art, the technical problem to be solved in the present invention is to provide a kind of underground pipe network inspection Looking into well concrete segment Quick well sinking method, it can shorten on-site construction time, be effectively improved operating efficiency, Energy leakproof anticorrosion, improves the quality of inspection shaft.
For solving above-mentioned technical problem, a kind of underground pipe network inspection shaft concrete segment Quick well sinking side of the present invention Method, its described underground pipe network inspection shaft concrete segment include on concrete segment in neck barrier part, concrete, Concrete bottom holder assembly, concrete bottom holder assembly includes base element, base liner.
In described concrete, the shape of segment is cast, and its upper end collar is provided with to be carved on mouth, lower end collar Being provided with down and carve mouth, upper and lower mouth of carving is provided with seal groove.
On described concrete, the shape of neck cylinder is bottle-neck type, collar size and concrete stage casing inside and outside its lower end Inside and outside part, collar is corresponding, and lower end collar is provided with down to be carved mouth and carves mouth in middle segment and match, under carve and set on mouth There is seal groove with to carve mouthful seal groove in middle segment corresponding.
The shape of described concrete bottom holder assembly is cartridge type, including concrete bottom seat piece, base liner, coagulation The shape of soil base element is cast, and inside and outside its upper end, collar size is corresponding with segment internal-and external diameter circle in concrete, Upper end collar be provided with carve mouth with carve mouth under segment in concrete and match, on carve mouth be provided with seal groove with in Carving mouthful seal groove under segment corresponding, the bottom of base element is provided with conduit through bore, lower end is provided with cutting shoe;In base The shape of lining is cartridge type, and its bottom base panel is integral with cylinder, and top is provided with the through hole corresponding with base element, Base liner is connected with concrete bottom seat piece.
On described concrete, in neck cylinder, concrete, the outer layer of segment is concrete, and liner is corrosion resistant layer, interior Lining pours integral with outer layer, and the material of liner is anticorrosion fiberglass or plastics.
Described upper and lower mouth-shaped of carving is spigot-and-socket or F type.
Underground pipe network inspection shaft concrete segment Quick well sinking method comprises the following steps that
Step 1, determine the orientation of inspection shaft
Use theodolite to measure the orientation of inspection shaft, concrete segment is transported to well location;
Step 2, excavation fetch earth and open caisson concrete segment
2,1 sinking concrete segment assembles inspection shaft, by place for the base element of base assembly in concrete segment, Excavation fetches earth, and base element starts isostatic settling, if sinking lateral deviation, answers ballast or correction of cutting the earth;
2,2 when the upper end of concrete bottom seat piece sinks down into ground level position, by segment in concrete and base Part is carved mouth and is inserted connection mutually, and two carve dress sealing ring, the sealing between assembly between mouth, then proceed to excavation and fetch earth, Sinking concrete segment;
2,3 absolute altitude constantly measuring open caisson in concrete segment sinking watching, when the end of concrete bottom seat piece When position, face reaches to set absolute altitude, excavation should be stopped and fetching earth;
At the bottom of step 3, adjustment absolute altitude after-pouring concrete well
3,1 by shaft bottom Pass line adjustment to designed elevation, re-lay metalling and tamp, metalling pours Plain concrete layer;
3, after 2 plain concrete layers reach intensity, assembling reinforcement casting concrete base plate on plain concrete layer;
Step 4, inspection shaft couple with pipeline
4,1 between two inspection shafts equipped with pipeline, the end of pipeline stretches in the through hole of concrete bottom seat piece;
4,2 being placed on concrete floor by base liner, the through hole of base liner is corresponding with base element through hole;
4,3 then it is filled with, by solid with concrete bottom seat piece connection for base liner integral;
4,4 leak-proof sealing pads are placed on through hole, and gland is placed on leak-proof sealing pad, it is ensured that through hole is close with pipeline Envelope;
The assembling of neck barrier part on step 5, concrete
The lower end of upper neck barrier part being carved the upper end of mouth and middle segment carve mouth and insert mutually, two-phase is inserted to carve and is installed sealing on mouth Circle, then well lid is placed on neck nozzle, constitute a leakproof corrosion-resistant inspection shaft.
Described step 2, in 1, excavation fetches earth employing grapple or manually fetch earth.
The present invention compared with prior art, its advantage and providing the benefit that:
1, use by making place precast inspection well assembly, it is not necessary to casting concrete or brick build at the construction field (site) Well, is greatly shortened on-site construction time, reduces construction site;
2, inspection shaft uses assembly type open caisson method, each assembly is shaped with and carves mouth and insert mutually by carving mouth;Limit Fetch earth limit open caisson, and beyond open caisson, ground is not excavated, and fetches earth and fetches earth in well, reduces ground disturbance, reduces week Wing base and the impact of building;Without going along with sb. to guard him of steel sheet pile or timber, speed of application is fast, and operating efficiency is high, Saving of work and time, reduces cost;
3, open caisson liner (interior mould) leakproof anticorrosion, improves inspection shaft Corrosion Protection;Assembly is inserted mutually and is carved between mouth Sealing ring improve the watertightness of inspection shaft, beneficially environmental protection.
Accompanying drawing explanation
Below with reference to drawings and Examples, the invention will be further described.
Fig. 1 is the underground pipe network inspection shaft schematic diagram that present invention concrete segment builds;
Fig. 2 is that concrete bottom seat piece is in place to excavation ground schematic diagram;
Fig. 3 is that open caisson puts in place and is placed in schematic diagram on concrete floor.
In figure: concrete floor 1, base element 2, sealing gasket 3, pipeline 4, gland 5, middle segment 6, Carve under upper neck barrier part 7, assembly liner 8, well lid 9, assembly and on mouth 10, assembly, carve mouth 11, seal Circle 12, base element through hole 13, plain concrete layer 14, base element cutting shoe 15, metalling 16, base Liner 17.
Detailed description of the invention
As it is shown in figure 1, be the concrete segment inspection shaft schematic diagram of Quick well sinking method of the present invention, concrete Component inspection well includes: base element 2, base liner 17, middle segment 6, upper neck barrier part 7, assembly liner 8, Well lid 9, under carve mouth 10, on carve mouth 11, sealing ring 12.
Underground pipe network concrete segment inspection shaft of the present invention uses the method for open caisson, and its method comprises the steps:
One, the orientation of inspection shaft is determined
As in figure 2 it is shown, be that concrete bottom seat piece is in place to excavation ground schematic diagram, measure inspection shaft with theodolite The position arranged, then by place for concrete bottom seat piece 2 to the position arranged, in order to excavation ground.Under base element End cutting shoe 15 is for the sinking of base element 2.
Two, excavation fetches earth and open caisson assembly
As it is shown on figure 3, be that open caisson puts in place and is placed in schematic diagram on concrete floor, build inspection with sinking assembly Looking into well, after base element 2 is placed in excavation ground, starts excavation and fetch earth, excavation fetches earth with grapple or manually fetches earth. Cutting shoe band base element 2 isostatic settling of base element, if unbalanced sinking, then to rectify a deviation, can be at base element 2 High side upper end ballast or fetch earth in lower end more.So fetching earth while open caisson, beyond open caisson, ground is not excavated, Fetch earth and fetch earth in well, reduce ground disturbance, reduce roadbed and the impact of building.Without steel sheet pile or wood Going along with sb. to guard him of stake, speed of application is fast, and operating efficiency is high.When the upper end of base element 2 sinks down into ground level position, Middle segment 6 is placed on the upper end of base element 2, base element 2 is carved mouth 11 and carves mouth 10 6 times with middle segment Insert mutually, couple and between the seal groove carving mouth, fill sealing ring 12, for the sealing of open caisson, prevent leakage.Then Continue excavation to fetch earth, sinking assembly.
The absolute altitude of open caisson is constantly measured, when the bottom surface distance of base element 2 sets mark during the open caisson of assembly During high position, excavation should be stopped and fetching earth.
Three, adjust at the bottom of absolute altitude after-pouring concrete well
By shaft bottom Pass line adjustment to designed elevation, lay metalling 16 subsequently and tamp, metalling 16 waters Building plain concrete layer 14, treat that plain concrete layer 14 reaches intensity, on plain concrete layer 14, assembling reinforcement is also Casting concrete base plate 1 (Fig. 3).
Four, inspection shaft couples with pipeline (push pipe or pipe laying)
After concrete floor 1 reaches intensity, pipe laying 4 (push pipe or pipe laying) between two inspection shafts, The end of pipeline 4 is stretched in the through hole 13 of base element 2.Refill base liner 17 in concrete floor 1 On, the through hole 13 of base liner 17 is corresponding with the through hole 13 of base element 2.It is subsequently filled cement mortar the end of by Seat liner 17 is solid with concrete bottom seat piece 2 integral.Through hole 13 is installed leak-proof sealing pad 3, seals Installing gland 5 on pad 3, gland 5 is connected with base element 2 by bolt.Guarantee through hole 13 and pipeline 4 Seal, in case stopping leak leakage (Fig. 3).
Five, the assembling of upper neck barrier part
As it is shown in figure 1, the upper end that the lower end of upper neck cylinder 7 is carved mouth 10 and middle segment 6 is carved mouth 11 phase and is inserted, two Insert mutually and carve installation sealing ring 12 on the seal groove of mouth, be used for sealing.Then well lid 9 is placed on upper neck barrier part 7 Neck nozzle on, constitute a leakproof corrosion-resistant inspection shaft.

Claims (2)

1. a underground pipe network inspection shaft concrete segment Quick well sinking method, described underground pipe network inspection shaft Concrete segment includes on concrete segment, concrete bottom holder assembly, concrete bed in neck barrier part, concrete Assembly includes base element, base liner, it is characterised in that: the step of method includes:
Step 1, determine the orientation of inspection shaft
Use theodolite to measure the orientation of inspection shaft, concrete segment is transported to well location;
Step 2, excavation fetch earth and open caisson concrete segment
2,1 sinking concrete segment assembles inspection shaft, and by place for concrete bottom seat piece, excavation fetches earth, base Part starts isostatic settling;
2,2 when the upper end of concrete bottom seat piece sinks down into ground level position, by segment in concrete and base Part is carved mouth and is inserted connection mutually, and two carve dress sealing ring between mouth, then proceed to excavation and fetch earth, sinking assembly;
2,3 absolute altitude constantly measuring open caisson in assembly sinking watching, when the basal surface position of concrete bottom seat piece When reaching to set absolute altitude, excavation should be stopped and fetching earth;
At the bottom of step 3, adjustment absolute altitude after-pouring concrete well
3,1 by shaft bottom Pass line adjustment to designed elevation, re-lay metalling and tamp, metalling pours Plain concrete layer;
3, after 2 plain concrete layers reach intensity, assembling reinforcement casting concrete base plate on plain concrete layer;
Step 4, inspection shaft couple with pipeline
4,1 between two inspection shafts equipped with pipeline, the end of pipeline stretches in the through hole of concrete bottom seat piece;
4,2 being placed on concrete floor by base liner, the through hole of base liner is corresponding with base element through hole;
4,3 then it is filled with, by solid with concrete bottom seat piece connection for base liner integral;
4,4 leak-proof sealing pads are placed on through hole, and gland is placed on leak-proof sealing pad;
The assembling of neck barrier part on step 5, concrete
The lower end of upper neck barrier part being carved the upper end of mouth and middle segment carve mouth and insert mutually, two-phase is inserted to carve and is installed sealing on mouth Circle, then well lid is placed on neck nozzle.
Underground pipe network inspection shaft concrete segment Quick well sinking method the most according to claim 1, it is special Levying and be: described step 2, in 1, excavation fetches earth employing grapple or manually fetch earth.
CN201310295629.9A 2013-07-15 2013-07-15 A kind of underground pipe network inspection shaft concrete segment Quick well sinking method Expired - Fee Related CN104294846B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310295629.9A CN104294846B (en) 2013-07-15 2013-07-15 A kind of underground pipe network inspection shaft concrete segment Quick well sinking method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310295629.9A CN104294846B (en) 2013-07-15 2013-07-15 A kind of underground pipe network inspection shaft concrete segment Quick well sinking method

Publications (2)

Publication Number Publication Date
CN104294846A CN104294846A (en) 2015-01-21
CN104294846B true CN104294846B (en) 2016-09-07

Family

ID=52314776

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310295629.9A Expired - Fee Related CN104294846B (en) 2013-07-15 2013-07-15 A kind of underground pipe network inspection shaft concrete segment Quick well sinking method

Country Status (1)

Country Link
CN (1) CN104294846B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116290205A (en) * 2021-03-10 2023-06-23 山西碛口红农业科技股份有限公司 Construction method of water storage dry well

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1309211A (en) * 2000-02-16 2001-08-22 周文新 Method for building-up water-proof manhole
CN201276709Y (en) * 2008-10-10 2009-07-22 叶炽凡 Assembled prefabricated inspection shaft
CN101684669A (en) * 2008-09-27 2010-03-31 吴纪东 Submersed type inspection well and construction method thereof
CN201883454U (en) * 2010-12-07 2011-06-29 林刚 Prefabricated reinforced-concrete assembly-type combined inspection well chamber
CN203701145U (en) * 2013-07-15 2014-07-09 金阳升 Underground pipe network inspection well concrete assembly

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004169542A (en) * 2002-10-31 2004-06-17 Orient Kaihatsu Kk Construction method for manhole

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1309211A (en) * 2000-02-16 2001-08-22 周文新 Method for building-up water-proof manhole
CN101684669A (en) * 2008-09-27 2010-03-31 吴纪东 Submersed type inspection well and construction method thereof
CN201276709Y (en) * 2008-10-10 2009-07-22 叶炽凡 Assembled prefabricated inspection shaft
CN201883454U (en) * 2010-12-07 2011-06-29 林刚 Prefabricated reinforced-concrete assembly-type combined inspection well chamber
CN203701145U (en) * 2013-07-15 2014-07-09 金阳升 Underground pipe network inspection well concrete assembly

Also Published As

Publication number Publication date
CN104294846A (en) 2015-01-21

Similar Documents

Publication Publication Date Title
CN100412275C (en) Waterproof and plugging construction method for precipitation well in foundation pit
CN204343312U (en) Plugging device of precipitation well in foundation pit
CN104805866A (en) Prefabricated comprehensive pipe gallery and construction method
CN203222815U (en) Composite basement-structure exterior wall construction formed by utilizing underground diaphragm wall
CN102162253B (en) Precipitation construction method employing pipe embedded in deep foundation pits
US11566390B2 (en) Construction method of reclaiming land from the sea based on basement utilization
CN112727466A (en) Construction method for support-free prefabricated assembled type shield tunnel air shaft structure
CN204753627U (en) Prefabricated comprehensive piping lane
CN104153371A (en) Grouting-to-stop-water construction method of underwater rubble bed
CN103215922A (en) High-pressure high-flow centralized leakage grouting leaking stoppage method
CN104099946B (en) Inspection-pit between a kind of Novel top pipeline section
CN105484277A (en) Component for tubular well precipitation construction in elevator foundation pit or sump and construction method
CN205205844U (en) Member is used in construction of tubular well precipitation in elevator foundation ditch or sump pit
CN102619521B (en) Construction method for vertical shaft bedrock section wall structure
CN104652495A (en) Waterproof construction process for joint of inner support upright post of foundation pit and bottom plate
CN108331024B (en) Assembled rectangular inspection well and installation method thereof
CN203768925U (en) Seal device for dewatering well in foundation pit
CN203701145U (en) Underground pipe network inspection well concrete assembly
CN101781935B (en) Method for substituting pre-embedded waterproof casing pipe in concrete structure
CN103205986A (en) Concrete raft foundation construction-joint grouting device and construction method
CN110552378A (en) Underground space roof subsides post-cast strip and seals structure in advance
CN211395755U (en) Prefabricated square inspection shaft
CN102635126B (en) Method for constructing casting well for aluminum alloy hot-rolled sheet ingots
CN104294846B (en) A kind of underground pipe network inspection shaft concrete segment Quick well sinking method
CN206625238U (en) A kind of assembled waveform steel liner plate supporting construction of Circular Pit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Jin Yangsheng

Document name: payment instructions

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160907

Termination date: 20210715