KR100665984B1 - The construction method of basement self drainage - Google Patents

The construction method of basement self drainage Download PDF

Info

Publication number
KR100665984B1
KR100665984B1 KR1020050118163A KR20050118163A KR100665984B1 KR 100665984 B1 KR100665984 B1 KR 100665984B1 KR 1020050118163 A KR1020050118163 A KR 1020050118163A KR 20050118163 A KR20050118163 A KR 20050118163A KR 100665984 B1 KR100665984 B1 KR 100665984B1
Authority
KR
South Korea
Prior art keywords
pipe
building
trench
discharge pipe
construction
Prior art date
Application number
KR1020050118163A
Other languages
Korean (ko)
Inventor
박옥교
김형태
최재성
Original Assignee
박옥교
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 박옥교 filed Critical 박옥교
Priority to KR1020050118163A priority Critical patent/KR100665984B1/en
Application granted granted Critical
Publication of KR100665984B1 publication Critical patent/KR100665984B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/10Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure
    • E02D31/12Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure against upward hydraulic pressure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them

Abstract

A construction method of a trench type natural drainageway for reducing uplift pressure of a building is provided to drain off underground water naturally without separate drain facilities by installing a discharge pipe directly to main drainageways. A construction method of a trench type natural drainageway for reducing uplift pressure of a building comprises the steps of leveling up an excavation plane(40), forming trenches(50) on the leveled excavation plane at regular intervals, installing a drainpipe(52) in the trench and filling up an empty space with water permeable gravel(54), placing and connecting drain boards between the trenches at regular intervals and connecting the drain board directly to the drainpipe in the trench at need, inserting non-woven fabrics to the drainpipe to prevent an inflow of floating materials and connecting an outlet of the drainpipe with a discharge pipe(60) installed outside a building, placing lean concrete(10) on the top of the excavation plane and the bottom or top of the drain board and installing vinyl which is a PE film for waterproofing purpose on the lean concrete to prevent an inflow of underground water, forming a lean concrete layer by placing concrete mortar on the excavation plane and the trench to the appointed height, connecting a discharge pipe to a lower discharge pipe(62) and outer main drainageways(70a,70b,70c), forming a trench(64) by laying a lower discharge pipe on the outer space formed on a wall(30) of a building at need and filling up with water permeable gravel(66) and inserting a socket and a connector between the drainpipe and the discharge pipe or the lower discharge pipe at need.

Description

건축물의 상향수압 감소를 위한 트랜치형 자연 배수로 시공방법 {The construction method of basement self drainage}Construction method of trench type natural drainage for reducing upwater pressure of building {The construction method of basement self drainage}
도 1은 종래의 집수정을 이용한 배수로 시공방법을 나타내기 위한 단면도이다.1 is a cross-sectional view showing a drainage construction method using a conventional water collecting well.
도 2는 본 발명의 자연 배수로 시공방법을 나타내기 위한 단면도이다.2 is a cross-sectional view showing a natural drainage construction method of the present invention.
도 3은 본 발명의 자연 배수로 시공방법 중 비합벽을 되메운 상태를 나타내기 위한 단면도이다.3 is a cross-sectional view for showing a state in which the non-combined wall in the natural drainage construction method of the present invention.
도 4a, 4b, 4c, 4d, 4e, 4f는 본 발명의 다양한 시공방법을 나타내기 위한 단면도이다.4A, 4B, 4C, 4D, 4E, and 4F are cross-sectional views illustrating various construction methods of the present invention.
도 5는 본 발명의 시공방법을 나타내기 위한 평면도이다.5 is a plan view for showing the construction method of the present invention.
도 6은 본 발명의 다른 시공방법을 나타내기 위한 평면도이다.6 is a plan view for illustrating another construction method of the present invention.
도 7은 본 발명의 자연 배수 원리를 나타내기 위한 개념도이다.7 is a conceptual diagram illustrating the natural drainage principle of the present invention.
< 도면의 주요 부분에 대한 부호의 설명 ><Description of Symbols for Main Parts of Drawings>
10 : 버림콘크리트층 20 : 바닥콘크리트10: discarded concrete layer 20: floor concrete
30 : 건물 벽체 40 : 굴토마감면30: building wall 40: oyster finish surface
50 : 트랜치 52 : 배수관50: trench 52: drain pipe
54 : 자갈 56 : 배수재54: gravel 56: drainage
58 : 집수정 60 : 배출관58: sump 60: discharge pipe
62 : 하부배출관 64 : 트랜치62: lower discharge pipe 64: trench
66 : 자갈 70, 70a, 70b, 70c : 주배수로66: gravel 70, 70a, 70b, 70c: main drain
80 : 비합벽 구간 82 : 되메움 구간80: non-joint section 82: backfill section
본 발명은 지하층이 깊은 건축물의 바닥 콘크리트에 지하수의 높은 상향수압으로 인해 발생되는 양압을 감소시켜 바닥 콘크리트의 균열 및 누수현상이 발생되는 것을 미연에 방지할 수 있도록, 지하수를 외부로 배출시키기 위한 배수로 시공방법에 관한 것으로, 보다 상세하게는 별도의 동력 배수장치 없이도 자연적으로 배수가 가능하도록 하는 배수로 시공방법에 관한 것이다.The present invention is to reduce the positive pressure generated due to the high water pressure of the groundwater in the floor concrete of the deep underground building to prevent cracking and leakage of the floor concrete in advance, drainage for discharging the groundwater to the outside The present invention relates to a construction method, and more particularly, to a drainage construction method for allowing natural drainage without a separate power drainage device.
대형건물 및 지하구조물 중 특히, 깊은 굴착을 요하는 지하공사는 필연적으로 지하수의 상향수압(Uplift Pressure)에 대한 문제에 직면하게 된다. 현장의 지질과 시공조건을 고려하여 안전하고 경제성 있는 상향수압 처리 방안을 마련하는 것은 상당히 중요한 문제이다. Among large buildings and underground structures, especially underground constructions that require deep excavation inevitably face the problem of uplift pressure of groundwater. Considering the geology and construction conditions of the site, it is very important to prepare a safe and economical upstream hydraulic pressure treatment plan.
일반적으로 건물의 기초 바닥에 작용하는 상향수압 처리를 위해서 사하중과 영구(부력)앙카를 통한 공법이 많이 사용되나, 이는 건물의 내구성 및 안전성과 관 련하여 부력앙카의 인장력에 대한 지속적인 신뢰성이 보장되지 않는다는 한계가 있다.In general, the process through dead weight and permanent (buoyancy) anchor is used for the up-water pressure treatment acting on the foundation floor of the building, but it is not guaranteed continuous reliability of the buoyancy anchor's tensile force in relation to the durability and safety of the building. There is a limit.
이를 개선한 방법이 기초바닥 아래에 인위적인 집수정과 배수층을 형성하여 부지 내로 유입되는 지하수가 배수로를 따라 집수정으로 모이면 정기적으로 이를 펌핑하여 배출시킴으로써 기초바닥 콘크리트에 양압(Uplifting Water Pressure)이 작용하지 않도록 하는 기초바닥 영구 배수시스템(Permanent Underdrainage System)방법이다. 이는 종래의 방법에 비해 높은 지하수위와 비례하여 작용하는 상향수압 문제를 보다 안정적이고, 영구적으로 해결하게 하는 장점이 있다.An improved method is to create an artificial catchment and drainage layer under the foundation floor, and when the groundwater flowing into the site is collected into the sump along the drainage, it is pumped and discharged regularly so that the uplifting water pressure acts on the foundation floor concrete. Permanent Underdrainage System. This has the advantage of more stable and permanently solve the problem of up-water pressure in proportion to the high groundwater level compared to the conventional method.
이러한 영구 배수시스템을 도면을 참조하여 상세하게 설명하도록 한다. 도 1을 참조하면, 종래의 방식은 집수정(130)의 내부로 바닥콘크리트(110)의 하측에서 유입되는 지하수를 배수관(120)을 통해 집수정(130)으로 흐르게 하는 방식이다.This permanent drainage system will be described in detail with reference to the drawings. Referring to FIG. 1, the conventional method is a method of flowing groundwater introduced from the lower side of the bottom concrete 110 into the sump 130 through the drain pipe 120.
집수정(130)에 고인 물은 집수정(130)의 높이(L1)에 따른 용량 범위 내에서 수용되며, 안정수위(L3)보다 낮은 위치(L2)에 별도의 배출관(140)을 구비하여 외부의 배수로(150)로 흘러나가게 된다. 이 때 배수로(150)의 위치는 집수정(130)의 배출관(140) 높이 보다 낮은 위치에 있어, 배출관(140)으로부터 배수로(150)로 중력에 의해 흘러 내려가는 방식을 사용한다.Water accumulated in the sump 130 is accommodated within the capacity range according to the height (L1) of the sump 130, the outside having a separate discharge pipe 140 at a position (L2) lower than the stable water level (L3) Will be drained to the drainage path 150. At this time, the position of the drainage path 150 is lower than the height of the discharge pipe 140 of the sump 130, using a method of flowing down by gravity from the discharge pipe 140 to the drainage path 150.
이러한 종래 방식에는 두 가지 문제점이 있다. 하나는 종래와 같이 대형의 집수정을 구비하여야 하며, 둘째는 배수로(150)가 항상 배출관(140)보다 낮은 위치에 있어야 한다는 조건을 만족하여야 하므로 적용 범위가 상대적으로 좁다는 점이다. 즉, 배수로(150)가 배출관(140)보다 하방에 있어 자연적으로 흘러 내려가도록 하기 위해 배출관(140)이 상측에 있도록 경사진 경우 또는 배수로(150)가 깊숙이 위치된 경우에만 적용이 가능하다는 문제점이 있다.There are two problems with this conventional approach. One is to be provided with a large sump as in the prior art, and the second is that the application range is relatively narrow because the drainage path 150 must satisfy the condition that the discharge pipe 140 should always be at a lower position. That is, in order to allow the drainage pipe 150 to flow downward naturally than the discharge pipe 140, the drainage pipe 140 may be applied only when the drainage pipe 140 is inclined to the upper side or when the drainage pipe 150 is deeply positioned. have.
본 발명은 상기와 같은 문제점을 해결하기 위해 안출된 것으로서, 별도의 집수정, 펌프 및 동력이 없더라도 지하수를 배출시킬 수 있도록 하는 건축물의 상향수압 감소를 위한 자연 배수로 시공방법을 제공하는 것을 목적으로 한다.The present invention has been made to solve the above problems, it is an object of the present invention to provide a natural drainage construction method for reducing the up-water pressure of the building to discharge the groundwater even without a separate sump, pump and power. .
상기와 같은 문제점을 해결하기 위한 본 발명은, 지하 건축 구조물의 바닥 하부에서 발생되는 지하수의 수두차에 의한 높은 상향수압을 방지하며 지하수를 배수시키기 위한 배수로 시공방법에 있어서, 굴토 후의 상면 자체 또는 잔토층, 자갈층, 버럭 등을 이용하여 굴토마감면이 수평을 이루도록 정지하는 수평정지 작업공정; 상기 수평정지 작업공정을 거친 상기 굴토마감면 보다 하측에 배수관을 매설하는 배수관 매설공정; 상기 굴토마감면 위에 몰탈을 소정 높이로 타설하여 버림콘크리트층을 형성하는 버림콘크리트 타설공정; 건축 구조물 외측의 비합벽 구간에 배출관을 구비하는 배출관 시공공정; 상기 배수관의 단부와 상기 배출관을 연결시키는 배수관 연결공정; 및 상기 배출관을 연장 형성하여 그 단부가 외부 측에 위치하고, 상기 건축물에 허용되는 상향수압을 넘지 않을 안전수위 범위 내에 있는 맨홀 또는 하수관 등의 주배수로와 연결되도록 하는 배출관 연결공정;을 포함하여 구성 되는 것을 일 특징으로 한다.The present invention for solving the above problems, in the drainage construction method for draining the groundwater to prevent the high upward water pressure caused by the water head difference of the groundwater generated in the bottom of the underground building structure, the upper surface itself or after gulting A horizontal stop working step of stopping the oyster finish surface horizontally by using a soil layer, a gravel layer, and a bucket; A drain pipe embedding step of embedding a drain pipe in a lower side than the gulto finish surface after the horizontal stop working process; A cast concrete placing process of forming a cast concrete layer by pouring mortar to a predetermined height on the gulting finish surface; A discharge pipe construction process including a discharge pipe in a non-jointed wall section outside the building structure; A drain pipe connecting step of connecting the end of the drain pipe to the discharge pipe; And a discharge pipe connecting process of extending the discharge pipe so that its end is located at the outer side and connected to a main drainage channel such as a manhole or a sewer pipe within a safety level range not exceeding the upstream water pressure allowed for the building. It is characterized by the thing.
상기 배수관 매설공정은: 상기 굴토마감면에 트랜치를 파고, 그 내에 배수관을 매설하는 것을 일 특징으로 한다.The drain pipe embedding process may include: digging a trench in the gulting finish surface and embedding a drain pipe therein.
상기 비합벽 부위 중 상기 배출관이 위치되며 비어있는 공간을 되메우는 되메움 공정을 더 포함하는 것을 일 특징으로 한다.It characterized in that it further comprises a back-filling process of filling the empty space and the discharge pipe is located in the non-join wall portion.
상기 배출관은 수직 배출관 및 하부배출관을 포함하고, 상기 하부배출관은: 건축 구조물 외측의 비합벽 구간 내에 수평하게 위치되며, 상기 굴토마감면 내에 매설되어, 상기 배수관과 상기 굴토마감면 하측에서 상호 연결되는 것을 일 특징으로 한다.The discharge pipe includes a vertical discharge pipe and a lower discharge pipe, wherein the lower discharge pipe is located horizontally in the non-joined wall section outside the building structure, and is embedded in the gulting dead surface, and is connected to each other under the drain pipe and the gulting dead surface. It is characterized by the thing.
상기 배출관은 수직배출관 및 하부배출관을 포함하고, 상기 하부배출관은: 건축 구조물 외측의 비합벽 구간 내에 수평하게 위치되며, 상기 굴토마감면 상측에 위치되어, 상기 배수관의 배수 경로가 상방을 향하도록 형성되어 상호 연결되는 것을 일 특징으로 한다.The discharge pipe includes a vertical discharge pipe and a lower discharge pipe, the lower discharge pipe: is located horizontally in the non-joined wall section outside the building structure, is located above the gulto finish surface, the discharge path of the drain pipe is formed upward It is characterized by being interconnected.
상기 배출관은 수직배출관 및 하부배출관을 포함하고, 상기 하부배출관은: 건축 구조물 외측의 비합벽 구간 내에 수평하게 위치되며, 상기 굴토마감면에 형성된 트렌치의 내부에 위치되어, 상기 배수관과 상기 굴토마감면 하측에서 상호 연결되는 것을 일 특징으로 한다.The discharge pipe includes a vertical discharge pipe and a lower discharge pipe, wherein the lower discharge pipe is located horizontally in the non-joined wall section outside the building structure, and is located inside the trench formed in the gulting dead surface, the drain pipe and the gulting dead surface It is characterized by being interconnected at the lower side.
상기 하부배출관은: 배수판, 다발관, 중공관, 호스, 플라스틱관, 유공관, 무공관, 강관, P.E관, 콘크리트관 또는 토목섬유 중 어느 하나 이상을 사용하는 것을 일 특징으로 한다.The lower discharge pipe is characterized in that any one or more of: drain plate, bundle pipe, hollow pipe, hose, plastic pipe, perforated pipe, non-pipe, steel pipe, P.E pipe, concrete pipe or geotextile.
상기 배수관은 배수판, 다발관, 중공관, 호스, 플라스틱관, 유공관, 무공관, 강관, P.E관 또는 토목섬유 중 어느 하나 이상을 사용하여 배수로를 형성한 것임을 일 특징으로 한다.The drain pipe is characterized in that the drainage pipe, a bundle pipe, a hollow pipe, a hose, a plastic pipe, a perforated pipe, a non-pipe, a steel pipe, a P.E pipe or a geotextile using any one or more of the water.
집수정을 형성하는 집수정 시공공정; 및 상기 배수관의 일 단부를 상기 집수정으로 연결시키는 집수정 연결공정을 더 포함하는 것을 일 특징으로 한다.A collecting well construction process of forming a collecting well; And a sump connection step of connecting one end of the drain pipe to the sump.
건축 구조물이 일정 규모 이상 형성된 후, 상기 집수정과 연결된 상기 배수관의 단부를 막거나 상기 배수관의 배수 경로를 변경하여, 상기 배수관이 상기 집수정과 연결되지 않는 동시에 상기 배수관 내에 흐르는 물이 상기 집수정 쪽으로 흐르지 않도록 하는 집수정 차단공정을 더 포함하는 것을 일 특징으로 한다.After the building structure is formed in a predetermined scale or more, the end of the drain pipe connected to the sump or the drainage path of the drain pipe is changed so that the drain pipe is not connected to the sump but the water flowing in the drain pipe It is characterized in that it further comprises a water collecting well blocking step that does not flow toward.
상기 굴토마감면 하측의 배수관과 상기 비합벽 구간의 배출관은 별도의 소켓 또는 커넥터를 사용하여 연결하는 것을 일 특징으로 한다.The drain pipe of the lower side of the gulto finish surface and the discharge pipe of the non-joint wall section is characterized in that for connecting using a separate socket or connector.
이하 첨부된 도면에 도시된 본 발명의 실시례들을 참조하여, 본 발명의 구성을 보다 상세하게 설명하도록 한다.Hereinafter, with reference to the embodiments of the present invention shown in the accompanying drawings, it will be described in more detail the configuration of the present invention.
도 2는 본 발명의 자연 배수로 시공방법을 나타내기 위한 단면도이고, 도 3은 본 발명의 자연 배수로 시공방법 중 비합벽을 되메운 상태를 나타내기 위한 단면도이다. 도 2를 참조하면, 굴토마감면(40)을 수평으로 정지한 후에는, 그 상면에 소정의 간격으로 트랜치(50)를 형성한다. 트랜치(50)를 형성한 후에는 그 내부에 배수관(52)을 설치하고, 빈 공간으로는 투수성 재료인 자갈(54)을 채워 넣는다.Figure 2 is a cross-sectional view for showing a natural drainage construction method of the present invention, Figure 3 is a cross-sectional view for showing a state in which the non-combined wall of the natural drainage construction method of the present invention. Referring to FIG. 2, after stopping the gulting finish surface 40 horizontally, trenches 50 are formed on the upper surface at predetermined intervals. After the trench 50 is formed, the drain pipe 52 is provided inside, and the gravel 54 which is a permeable material is filled in the empty space.
이러한 트랜치 구조의 사이사이에는 별도의 배수재(56, 도 5)를 가로, 세로 소정 간격으로 배치하여 연결시키며, 경우에 따라서는 배수재(56)를 트랜치 내부의 배수관(52)에 직접 연결시키기도 한다.Between the trench structures, separate drains 56 (FIG. 5) are arranged at predetermined intervals horizontally and vertically, and in some cases, the drains 56 may be directly connected to drain pipes 52 inside the trenches.
배수관(52) 및 배수재(56)는 관 형태, 드레인 매트 형태, S형다발관 형태, 판 형태, 판형 다발관 형태, 중공관, 호스, 합성수지 관, 유공관 , 무공관, 배수판 형태, 콘크리트 블록 형태 중 어느 하나를 선택하여 다양하게 구성할 수 있으며, 그 재질도 목재, 합성수지재, 토목섬유재, 금속재 등 다양하다. The drain pipe 52 and the drain material 56 are in the form of a pipe, a drain mat form, an S-shaped bundle tube form, a plate form, a plate-shaped bundle tube form, a hollow tube, a hose, a synthetic resin tube, a perforated tube, a non-pipe, a drain plate form, and a concrete block form. Any one of them can be selected and configured in various ways, and the materials are also various, such as wood, synthetic resins, geotextiles, metals.
한편, 트랜치(50)는 광의로 해석하여, 자갈(66) 등의 투수성 재료를 채워 넣는 방식의 트랜치뿐만 아니라, 굴토마감면(40) 내에 배수관(52)을 매설하기 위해 파는 소정 깊이, 형상의 공간을 총칭하는 것을 포함한다.On the other hand, the trench 50 is interpreted in a broad manner, and not only a trench for filling a permeable material such as gravel 66, but also a predetermined depth and shape for digging to bury the drain pipe 52 in the gulting finish surface 40. It includes generically the space of.
상기 배수관(52)에는 부직포(미도시)를 개재하여 부유물들이 유입되지 않도록 설치하고, 배치된 배수관(52)이 일측으로 연장되어 배수관(52)의 출구가 건축물의 외벽(30) 바깥, 비합벽 구간에 설치된 배출관(60)과 연결되도록 설치하게 된다.Non-woven fabric (not shown) is installed in the drain pipe 52 so that floating matters do not flow in, and the drain pipe 52 disposed extends to one side so that the outlet of the drain pipe 52 is outside the outer wall 30 of the building and the non-joined wall. It is installed to be connected to the discharge pipe 60 installed in the section.
다음 공정으로는 굴토마감면(40) 위와 배수재(56) 아래 또는 위에 버림콘크리트(10) 및 바닥콘크리트(20)로 지하수가 침투하지 않도록 방수용 P.E필름인 비닐(미도시)을 설치하게 된다. 다음 공정으로서, 굴토마감면(40)과 트랜치(50)의 상면 위에 콘크리트 몰탈을 소정 높이로 타설하여 버림콘크리트(10)를 형성한다.In the next process, a waterproof P.E film vinyl (not shown) is installed so that groundwater does not penetrate into the discarded concrete 10 and the bottom concrete 20 above or below the gulto finish surface 40 and the drain 56. As a next step, concrete mortar is poured on the top surface of the gulting finish surface 40 and the trench 50 to form the discarded concrete 10.
배출관(60)은 수평으로 길게 연장되는 하부배출관(62)과 연결되며, 수직 부분은 연장 형성되어 외부의 주배수로(70a, 70b, 70c)로 연결된다. 하부배출관(62)이 형성된 건물 벽체(30) 바깥쪽의 공간에도, 선택에 따라 하부배출관(62)을 매설하여 트랜치(64)를 형성하고, 투수성 자갈(66)을 채워 넣을 수도 있다. 이 경우, 건물 벽체(30) 외부의 비합벽 구간에 고이는 지하수에 대해서도 배출될 수 있도록 하는 효과가 있다.The discharge pipe 60 is connected to the lower discharge pipe 62 extending horizontally long, the vertical portion is extended is connected to the external main drainage path (70a, 70b, 70c). In the space outside the building wall 30 in which the lower discharge pipe 62 is formed, the lower discharge pipe 62 may be buried to form a trench 64, and the permeable gravel 66 may be filled. In this case, there is an effect that can be discharged to the groundwater accumulated in the non-jointed section outside the building wall 30.
경우에 따라서는 배수관(52)과 배출관(60) 또는 하부배출관(62)의 사이에는 별도의 소켓, 커넥터(미도시)를 삽입하여 보다 용이하게 접속되도록 할 수도 있다.In some cases, a separate socket and connector (not shown) may be inserted between the drain pipe 52 and the discharge pipe 60 or the lower discharge pipe 62 so as to be more easily connected.
이 때 주배수로의 높이는 건물이 뜨지 않고 지탱할 수 있는 압력에 해당되는 안전 수위(H1) 이내의 높이라면, 배출관(60)이 연결된 높이(H2)와 상관없이 연결이 가능하다. 즉, 지하수의 상향 수압과 건물의 자중에 의해 가압된 지하수는 배수재(56), 배수관(52)과 배출관(60)을 통해 밀려나가, 외부의 주배수로(70a, 70b, 70c)로 가압되어 배출된다.At this time, if the height of the main drainage is a height within the safety level (H1) corresponding to the pressure that the building can support without floating, it is possible to connect regardless of the height (H2) connected to the discharge pipe (60). That is, the groundwater pressurized by the upward water pressure of the groundwater and the weight of the building is pushed out through the drain 56, the drain pipe 52 and the discharge pipe 60, and is pressurized to the external main drainage paths 70a, 70b, 70c and discharged. do.
이 때 주배수로(70a)의 위치가 배출관(60)의 배출 위치보다 높더라도, 압력에 의해 가압된 지하수는 배출관(60)을 따라 주배수로(70a)로 배출된다. 만약 주배수로(70a)가 안전수위(H1)보다 높은 위치에 있는 경우에는, 건물이 상향 수압에 의해 떠오르기 때문에, 안전수위(H1)를 수리학적으로 사전 계산하여 이 범위 내에 있는 주배수로(70a, 70b, 70c)를 선정하거나 새로 형성하여야 한다.At this time, even if the position of the main drainage path 70a is higher than the discharge position of the discharge pipe 60, groundwater pressurized by the pressure is discharged to the main drainage path 70a along the discharge pipe 60. If the main drainage channel 70a is at a position higher than the safety level H1, since the building rises due to upward water pressure, the hydraulic drainage level H1 is hydraulically pre-calculated beforehand and the main drainage path 70a is within this range. , 70b, 70c) shall be selected or newly formed.
배수관(52), 하부배출관(62) 및 건물 벽체(30)가 모두 형성된 후에는, 비합벽 구간(80)과 건물 벽체(30) 사이의 빈 공간을 콘크리트, 골재 등으로 되메우게 되는데, 되메움 공정 이후의 모습이 도 3에 도시되어 있다.After all of the drain pipe 52, the lower discharge pipe 62, and the building wall 30 are formed, the empty space between the non-joined section 80 and the building wall 30 is filled with concrete, aggregate, and the like. The state after the process is shown in FIG. 3.
이러한 공정 순서는 자유롭게 변경될 수 있다. 예컨대, 배출관(60) 부분을 먼저 설치한 후에, 배수재(50)를 설치하고 버림콘크리트(10) 및 건물 벽체(30)를 형성할 수도 있으며, 배수재(50), 버림콘크리트(10) 및 건물 벽체(30)를 형성한 후 에, 배출관(60) 부분을 연결할 수도 있다. 전체적인 방식은 청구항에 기재된 공정이 모두 포함되기만 하면, 그 순서는 청구항에 기재된 순서에 제약되지 않는다.This process sequence can be changed freely. For example, after installing the discharge pipe 60 portion first, the drainage material 50 may be installed and the discarded concrete 10 and the building wall 30 may be formed, and the drainage material 50, the discarded concrete 10, and the building wall may be formed. After forming 30, the discharge pipe 60 portion may be connected. The order is not limited to the order set forth in the claims as long as the overall manner includes all the steps set forth in the claims.
도 4a, 4b, 4c, 4d, 4e, 4f는 본 발명의 다양한 시공방법을 나타내기 위한 단면도이다. 도 4a, 4b, 4c, 4d, 4e, 4f를 참조하면, 배수관(52)과 하부배출관(62)의 상호 위치에 따라 다양한 형태, 높이 방식으로 상호 연결될 수 있음을 나타내고 있다.4A, 4B, 4C, 4D, 4E, and 4F are cross-sectional views illustrating various construction methods of the present invention. Referring to FIGS. 4A, 4B, 4C, 4D, 4E, and 4F, it is shown that the drain pipe 52 and the lower discharge pipe 62 may be interconnected in various shapes and heights according to mutual positions.
도 4a 및 도 4b를 참조하면, 하부배출관(62)이 굴토마감면(40) 상에 위치된 상태에서, 배수관(52)은 굴토마감면(40) 내에 매설되고, 하부배출관(62)은 굴토마감면(40) 상에 위치되므로, 배수관(52)이 상방으로 절곡되거나, 별도의 커넥터(미도시) 등을 이용하여 연결이 가능하다. 이 때 도 4b와 같이, 배수관(52) 쪽에 트랜치(50)와 자갈(54)을 배치하여 구성하는 것도 가능하다.4A and 4B, in a state where the lower discharge pipe 62 is located on the gulting finish surface 40, the drain pipe 52 is embedded in the gulting finish surface 40, and the lower discharge pipe 62 is oysters. Since it is located on the tomagam surface 40, the drain pipe 52 is bent upwards, it is possible to connect using a separate connector (not shown). At this time, as shown in Figure 4b, it is possible to arrange the trench 50 and the gravel 54 on the drain pipe 52 side.
하부배출관(62)은 굴토마감면(40) 상에 수평하게 위치되는 것이 바람직하나, 경우에 따라서는 비스듬하게 배치되거나, 비합벽구간 내에 비스듬하게 매설될 수도 있게 된다. 또한 하부배출관(62)은 다소 높은 위치에 설치될 수도 있으며, 비스듬하게 경사져 설치될 수도 있다. 마찬가지로 하부배출관(62)은 다소 깊은 위치에 설치될 수도 있으며, 비스듬하게 경사져 설치될 수도 있다. 이 경우 배수관(52)이 하부배출관(62)의 단부까지 연장 형성되어 상호 결합이 가능하도록 한다. The lower discharge pipe 62 is preferably positioned horizontally on the gulto finish surface 40, but in some cases it may be arranged obliquely, or may be embedded obliquely in the non-joined wall section. In addition, the lower discharge pipe 62 may be installed in a somewhat higher position, may be installed obliquely inclined. Similarly, the lower discharge pipe 62 may be installed at a somewhat deep position, or may be installed obliquely at an angle. In this case, the drain pipe 52 is extended to the end of the lower discharge pipe 62 to enable mutual coupling.
도 4c 및 도 4d를 참조하면, 하부배출관(62)이 굴토마감면(40) 내로 소정 깊이만큼 삽입되어 있는 상태에서, 배수관(52)과 하부배출관(62)은 수평하게 상호 연 결될 수 있게 된다. 이 때 도 4d와 같이, 배수관(52) 쪽에 트랜치(50)와 자갈(54)을 배치하여 구성하는 것도 가능하다.4C and 4D, in a state in which the lower discharge pipe 62 is inserted into the gulting finish surface 40 by a predetermined depth, the drain pipe 52 and the lower discharge pipe 62 can be horizontally connected to each other. . At this time, as shown in FIG. 4D, the trench 50 and the gravel 54 may be disposed on the drain pipe 52 side.
도 4e 및 도 4f를 참조하면, 하부배출관(62)이 형성된 건물 벽체(30) 바깥쪽의 공간에도, 선택에 따라 하부배출관(62)을 매설하여 트랜치(64)를 형성하고, 투수성 자갈(66)을 채워 넣을 수도 있다. 이 때 도 4f와 같이, 배수관(52) 쪽에도 트랜치(50)와 자갈(54)을 배치하여 구성하는 것도 가능하다.4E and 4F, in the space outside the building wall 30 where the lower discharge pipe 62 is formed, the lower discharge pipe 62 is optionally embedded to form the trench 64, and the permeable gravel ( 66) can be filled. At this time, as shown in FIG. 4F, the trench 50 and the gravel 54 may also be arranged on the drain pipe 52 side.
도 5는 본 발명의 시공방법을 나타내기 위한 평면도이다. 도 5를 참조하면, 건물 하방에는 트랜치(50), 배수관(52) 및 배수재(56)가 위치하고, 건물 벽체(30) 바깥 부분과 비합벽 사이의 공간에는 하부배출관(62), 배출관(60)이 위치하게 된다. 건물 하방에 흐르는 지하수는 배수재(56)와 배수관(52)을 따라 건물 벽체(30)를 지나, 하부배출관(62) 또는 배출관(60)과 연결된다. 이러한 지하수의 흐름은 지하수의 상향 수압과 이를 누르는 건물의 자중에 의해 지하수가 압력을 받아, 상방으로 올라가며 흐를 수 있게 되기 때문이다.5 is a plan view for showing the construction method of the present invention. Referring to FIG. 5, a trench 50, a drain pipe 52, and a drain 56 are disposed below the building, and the lower discharge pipe 62 and the discharge pipe 60 are disposed in the space between the outer portion of the building wall 30 and the non-jointed wall. Will be located. The groundwater flowing below the building passes through the building wall 30 along the drain 56 and the drain pipe 52, and is connected to the lower discharge pipe 62 or the discharge pipe 60. This is because the groundwater flows through the groundwater under pressure due to the upward pressure of the groundwater and the weight of the building that presses the groundwater.
도 6은 본 발명의 다른 시공방법을 나타내기 위한 평면도이다. 도 6을 참조하면, 상기 설명과 같이 지하수는 상향 수압과 건물의 자중에 의해 가압되어야 하는데, 건물의 시공 초기에는 건물의 자중이 거의 없으므로, 지하수가 가압되어 자연적으로 배수될 수 없는 상황이다.6 is a plan view for illustrating another construction method of the present invention. Referring to FIG. 6, as described above, the groundwater should be pressurized by the upward pressure and the weight of the building. Since the building has almost no self weight at the beginning of construction, the groundwater is pressurized and cannot be naturally drained.
따라서 시공 초기에는 집수정(58)을 별도로 설치하여 인위적인 배수를 하도 록 할 수도 있다. 배수관(52) 중 일측을 집수정(58)과 연결되도록 하고, 건물의 자중이 형성되기 전까지는 집수정(58)을 통해 물을 저장하여, 펌프(미도시) 등을 이용하여 배수를 하게 된다. 이후 건물의 시공이 진행되면서, 건물의 자중이 어느 정도 발생되는 경우에는, 집수정(58) 쪽으로 배수관(52)의 물이 흐르지 않도록 차단(A)시키고, 배출관(60)을 이용한 자연배수만이 가능하도록 할 수도 있다.Therefore, at the initial stage of construction, the collecting well 58 may be separately installed to allow for artificial drainage. One side of the drain pipe 52 is connected to the sump 58, and the water is stored through the sump 58 until the weight of the building is formed, and drained using a pump (not shown). . Since the construction of the building proceeds to some extent, if the self-weight of the building is generated to some extent, the water of the drain pipe 52 is blocked (A) to flow to the sump (58), and only the natural drainage using the discharge pipe (60) You can also make it possible.
도 7은 본 발명의 자연 배수 원리를 나타내기 위한 개념도이다. 도 7을 참조하면, 건물의 자중(W)과 지하수의 상향 수압(P)에 의해 가압된 지하수는 트랜치(50)의 배수관(52)과 배출관(60)을 타고 외부의 맨홀, 오수관 등의 주배수로(70)로 흐르게 된다. 이 때 허용되는 주배수로(70)와 배수관(52) 위치 사이의 높이차는 건물이 상향 수압에 의해 떠오르지 않는 범위 내에서 가능한 것으로서, 이는 수리학적으로 계산되어야 한다.7 is a conceptual diagram illustrating the natural drainage principle of the present invention. Referring to FIG. 7, the groundwater pressurized by the self weight (W) of the building and the upward water pressure (P) of the groundwater is carried out through the drain pipe 52 and the discharge pipe 60 of the trench 50. It flows into the drainage path 70. At this time, the height difference between the allowable main drainage 70 and the drain pipe 52 position is possible within a range in which the building does not rise due to upward hydraulic pressure, which must be calculated hydraulically.
즉, 별도의 외부 힘없이 지하수가 스스로 배출되도록 하기 위해서는, 건축물의 자중(W)과 지하수의 상향수압(P)에 의해 지하수에 가해진 압력이 지하수가 스며드는 깊이(i)로부터 주배수로(70)로 배출되는 지점(f), 즉, 외부 맨홀(A) 또는 오수관(B) 등과 만나 배출되는 지점까지의 위치에너지차 ΔEp 보다 커야 한다.That is, in order for the groundwater to be discharged by itself without any external force, the pressure applied to the groundwater by the weight of the building (W) and the upward water pressure (P) of the groundwater is transferred from the depth (i) of the groundwater to the main drainage path (70). It must be greater than the potential energy difference ΔEp to the point where it is discharged, that is, the point where it meets with the external manhole A or the sewage pipe B and the like.
또한 동시에 주배수로(70)까지의 높이차가 너무 커서 위치에너지차 ΔEp가 커지는 경우에는, 지하수가 주배수로(70)까지 빠져나가기 이전에, 상향 수압이 건축물을 들어올릴 수도 있으므로, 건축물의 안전수위를 계산하여, 주배수로(70)의 위치를 적절하게 선택하여 선정, 형성하여야 한다.At the same time, if the difference in height to the main drainage channel 70 is so large that the potential energy difference ΔEp is large, before the groundwater exits the main drainage channel 70, the upward hydraulic pressure may lift the building, thus increasing the safety level of the building. By calculating, the position of the main drainage path 70 should be selected and selected appropriately.
따라서 자연 배출을 위해서는 건축물 자중, 양압력에 대한 수리학적 계산을 통해 허용 가능한 배출 지점의 위치, 높이 한계를 산출하여 그 범위 내에서 시공 방법 및 구조를 선정하도록 한다. Therefore, for natural discharge, allowable location and height limit of the discharge point are calculated through hydraulic calculation of building weight and positive pressure, and construction method and structure should be selected within the range.
건축물의 자중과 지하수의 상향수압을 이용하여, 지하수를 자연 배수하는 경우, 별도로 집수정을 만들기 위한 공정이 필요 없으므로 공기가 단축되고 시공비가 절감되는 효과가 있다. 아울러 집수정에 고인 지하수를 인위적으로 배출하는 공정과 구성이 필요 없으므로, 별도의 펌프를 설치하고, 일정 간격으로 이를 가동할 필요가 없게 된다. 따라서 복잡한 펌프 설치 및 동작이 필요 없게 되어, 시공비와 운영비를 절감할 수 있다. 아울러 자연 배수의 경우, 그 구성이 간단하고 견고하여 일단 설치하면 고장이 나거나, 동작이 멈추는 경우가 없어 한 번의 설치만으로 별도의 운영방법이나 운영비 소요 없이 반영구적으로 사용할 수 있는 효과가 있다.When the groundwater is naturally drained by using the self-weight of the building and the upstream pressure of the groundwater, there is no need for a separate process to make the sump, so that the air is shortened and construction costs are reduced. In addition, since there is no need to artificially discharge the groundwater collected in the sump, there is no need to install a separate pump and operate it at regular intervals. This eliminates the need for complicated pump installation and operation, reducing construction and operating costs. In addition, in the case of natural drainage, its configuration is simple and robust, so once installed, there is no breakdown or operation stops, so it can be used semi-permanently without a separate operation method or operation cost by only one installation.
상기와 같은 구성의 본 발명은, 주배수로에 바로 연결되어 외부로 지하수를 배출하는 배출관을 구비하여 지하수가 스스로 밀려나가 자연배수되도록 구성함으로써, 별도의 집수정을 설치하기 위해 하방으로 깊고 넓게 공간을 파 내거나, 별도로 시공해야 하는 불편함이 없게 된다. The present invention of the configuration as described above is provided with a discharge pipe for directly discharged to the main drainage to discharge the groundwater to the ground by self-configured so that the natural drainage, by installing a separate catchment well deep and wide space downward There is no inconvenience to dig or construct separately.
또한 지하수가 외부 동력 없이 스스로 자연 배출되므로, 별도의 펌프를 설치하고 동작시킬 필요가 없으며, 관리, 감독의 필요성이 감소하게 된다.In addition, since the groundwater naturally discharges itself without external power, there is no need to install and operate a separate pump, and the need for management and supervision is reduced.
또한 본 발명은 구성을 단순화시켜 공기를 감소시키고, 자재비, 시공비를 절감시키며, 별도의 운영비와 동작, 감독 없이도 반영구적으로 그 기능을 담당하므로 배수가 용이하고, 관리가 간편하게 되는 효과를 갖는다.In addition, the present invention has the effect of reducing the air by simplifying the configuration, material costs, construction costs, semi-permanent function without a separate operating cost and operation, supervision, easy drainage, and easy management.
또한 본 발명은 건축물의 자중이 없는 시공 초기에는 집수정을 사용하여 물을 배출시킴으로써, 시공상의 편의성을 증대시킨 효과를 갖는다.In addition, the present invention has the effect of increasing the convenience of construction by discharging water by using a water collecting well at the initial stage of construction without the weight of the building.

Claims (11)

  1. 지하 건축 구조물의 바닥 하부에서 발생되는 지하수의 수두차에 의한 높은 상향수압을 방지하며 지하수를 배수시키기 위한 배수로 시공방법에 있어서,In the drainage construction method for preventing the high water pressure caused by the water head difference of the ground water generated in the bottom of the underground building structure and draining the ground water,
    굴토 후의 상면 자체 또는 잔토층, 자갈층, 버럭 등을 이용하여 굴토마감면이 수평을 이루도록 정지하는 수평정지 작업공정;A horizontal stop working step of stopping the oyster finish surface to be horizontal by using the upper surface itself after the gulting or the remaining soil layer, the gravel layer, and the like;
    상기 수평정지 작업공정을 거친 상기 굴토마감면 보다 하측에 배수관을 매설하는 배수관 매설공정;A drain pipe embedding step of embedding a drain pipe in a lower side than the gulto finish surface after the horizontal stop working process;
    상기 굴토마감면 위에 몰탈을 소정 높이로 타설하여 버림콘크리트층을 형성하는 버림콘크리트 타설공정;A cast concrete placing process of forming a cast concrete layer by pouring mortar to a predetermined height on the gulting finish surface;
    건축 구조물 외측의 비합벽 구간에 배출관을 구비하는 배출관 시공공정;A discharge pipe construction process including a discharge pipe in a non-jointed wall section outside the building structure;
    상기 배수관의 단부와 상기 배출관을 연결시키는 배수관 연결공정; 및A drain pipe connecting step of connecting the end of the drain pipe to the discharge pipe; And
    상기 배출관을 연장 형성하여 그 단부가 외부 측에 위치하고, 상기 건축물에 허용되는 상향수압을 넘지 않을 안전수위 범위 내에 있는 맨홀 또는 하수관 등의 주배수로와 연결되도록 하는 배출관 연결공정;을 포함하여 구성되는 것을 특징으로 하는 건축물의 상향수압 감소를 위한 트랜치형 자연 배수로 시공방법.And a discharge pipe connection process of extending the discharge pipe so that its end is located on the outer side and connected to a main drainage channel such as a manhole or a sewer pipe within a safety level range not exceeding the upstream water pressure allowed for the building. Trench type natural drainage construction method for reducing the up water pressure of the building characterized by.
  2. 제 1 항에 있어서,The method of claim 1,
    상기 배수관 매설공정은:The drain pipe embedding process is:
    상기 굴토마감면에 트랜치를 파고, 그 내에 배수관을 매설하는 것을 특징으로 하는 건축물의 상향수압 감소를 위한 트랜치형 자연 배수로 시공방법.A trench-type natural drainage construction method for reducing the up-water pressure of a building, characterized in that the trench is dug on the gulto finish surface, and the drain pipe is embedded therein.
  3. 제 1 항에 있어서,The method of claim 1,
    상기 비합벽 부위 중 상기 배출관이 위치되며 비어있는 공간을 되메우는 되메움 공정을 더 포함하는 것을 특징으로 하는 건축물의 상향수압 감소를 위한 트랜치형 자연 배수로 시공방법.The trench-type natural drainage construction method for reducing the up-water pressure of the building, characterized in that it further comprises a back-filling process of filling the empty space of the discharge pipe is located in the non-joined wall.
  4. 제 1 항에 있어서,The method of claim 1,
    상기 배출관은:The discharge pipe is:
    건축 구조물 외측의 비합벽 구간 내에 위치되며,It is located within the non-jointed section outside the building structure,
    상기 굴토마감면 내에 매설되어,Embedded in the oyster finish surface,
    상기 배수관과 상기 굴토마감면 하측에서 상호 연결되는 것을 특징으로 하는 건축물의 상향수압 감소를 위한 트랜치형 자연 배수로 시공방법.Trench-type natural drainage construction method for reducing the up-water pressure of the building, characterized in that connected to the drain pipe and the bottom of the gulto finish.
  5. 제 1 항에 있어서,The method of claim 1,
    상기 배출관은:The discharge pipe is:
    건축 구조물 외측의 비합벽 구간 내에 위치되며,It is located within the non-jointed section outside the building structure,
    상기 굴토마감면 상측에 위치되어,Located above the gulto finish surface,
    상기 배수관의 배수 경로가 상방을 향하도록 형성되어 상호 연결되는 것을 특징으로 하는 건축물의 상향수압 감소를 위한 트랜치형 자연 배수로 시공방법.Trench-type natural drainage construction method for reducing the upward pressure of the building, characterized in that the drainage path of the drain pipe is formed to be connected upward.
  6. 제 1 항에 있어서,The method of claim 1,
    상기 배출관은:The discharge pipe is:
    건축 구조물 외측의 비합벽 구간 내에 위치되며,It is located within the non-jointed section outside the building structure,
    상기 굴토마감면에 형성된 트렌치의 내부에 위치되어,Located inside the trench formed in the gulto finish surface,
    상기 배수관과 상기 굴토마감면 하측에서 상호 연결되는 것을 특징으로 하는 건축물의 상향수압 감소를 위한 트랜치형 자연 배수로 시공방법.Trench-type natural drainage construction method for reducing the up-water pressure of the building, characterized in that connected to the drain pipe and the bottom of the gulto finish.
  7. 제 3 항 내지 제 6 항 중 어느 한 항에 있어서, 상기 하부배출관은:The bottom discharge tube according to any one of claims 3 to 6, wherein:
    배수판, 다발관, 중공관, 호스, 플라스틱관, 유공관, 무공관, 강관, P.E관 또는 토목섬유 중 어느 하나를 사용하는 것을 특징으로 하는 건축물의 상향수압 감소를 위한 트랜치형 자연 배수로 시공방법.A trench type natural drainage construction method for reducing upstream pressure of a building using any one of a drainage plate, a bundle pipe, a hollow pipe, a hose, a plastic pipe, a perforated pipe, an unopened pipe, a steel pipe, a P.E pipe, or a geotextile.
  8. 제 1 항에 있어서, 상기 배수관은:The method of claim 1, wherein the drain pipe is:
    배수판, 다발관, 중공관, 호스, 플라스틱관, 유공관, 무공관, 강관, P.E관 또는 토목섬유 중 어느 하나를 사용하여 배수로를 형성한 것임을 특징으로 하는 건축물의 상향수압 감소를 위한 트랜치형 자연 배수로 시공방법.Trench type natural drainage for reducing the up-water pressure of the building, characterized in that the drainage is formed by using any one of drainage plate, bundle pipe, hollow pipe, hose, plastic pipe, perforated pipe, non-pipe, steel pipe, PE pipe or geotextile. Construction method.
  9. 제 1 항에 있어서,The method of claim 1,
    집수정을 형성하는 집수정 시공공정; 및 A collecting well construction process of forming a collecting well; And
    상기 배수관의 일 단부를 상기 집수정으로 연결시키는 집수정 연결공정을 더 포함하는 것을 특징으로 하는 건축물의 상향수압 감소를 위한 트랜치형 자연 배수로 시공방법.The trench type natural drainage construction method for reducing the up-water pressure of the building, characterized in that it further comprises a water collecting well connection process for connecting one end of the drain pipe to the water collecting well.
  10. 제 9 항에 있어서,The method of claim 9,
    건축 구조물이 일정 규모 이상 형성된 후, 상기 집수정과 연결된 상기 배수관의 단부를 막거나 상기 배수관의 배수 경로를 변경하여, 상기 배수관이 상기 집수정과 연결되지 않는 동시에 상기 배수관 내에 흐르는 물이 상기 집수정 쪽으로 흐르지 않도록 하는 집수정 차단공정을 더 포함하는 것을 특징으로 하는 건축물의 상향수압 감소를 위한 트랜치형 자연 배수로 시공방법.After the building structure is formed in a predetermined scale or more, the end of the drain pipe connected to the sump or the drainage path of the drain pipe is changed so that the drain pipe is not connected to the sump but the water flowing in the drain pipe Trench-type natural drainage construction method for reducing the up-water pressure of the building, characterized in that it further comprises a water collection block blocking process that does not flow toward.
  11. 제 1 항에 있어서,The method of claim 1,
    상기 굴토마감면 하측의 배수관과 상기 비합벽 구간의 배출관은 별도의 소켓 또는 커넥터를 사용하여 연결하는 것을 특징으로 하는 건축물의 상향수압 감소를 위한 트랜치형 자연 배수로 시공방법.The drain pipe and the discharge pipe of the non-joint wall section below the gulto finish surface is connected to the trench type natural drainage construction method for reducing the up-water pressure of the building, characterized in that connected using a separate socket or connector.
KR1020050118163A 2005-12-06 2005-12-06 The construction method of basement self drainage KR100665984B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050118163A KR100665984B1 (en) 2005-12-06 2005-12-06 The construction method of basement self drainage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050118163A KR100665984B1 (en) 2005-12-06 2005-12-06 The construction method of basement self drainage

Publications (1)

Publication Number Publication Date
KR100665984B1 true KR100665984B1 (en) 2007-01-10

Family

ID=37867243

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050118163A KR100665984B1 (en) 2005-12-06 2005-12-06 The construction method of basement self drainage

Country Status (1)

Country Link
KR (1) KR100665984B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437380A (en) * 2013-09-05 2013-12-11 江苏建筑职业技术学院 Pressure relief device and pressure relief method for preventing pool floating
CN104032773A (en) * 2014-05-16 2014-09-10 江苏建筑职业技术学院 Floating pressure relief device preventing pool from floating

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437380A (en) * 2013-09-05 2013-12-11 江苏建筑职业技术学院 Pressure relief device and pressure relief method for preventing pool floating
CN103437380B (en) * 2013-09-05 2016-02-17 江苏建筑职业技术学院 The floating pressure relief device in anti-pond and method
CN104032773A (en) * 2014-05-16 2014-09-10 江苏建筑职业技术学院 Floating pressure relief device preventing pool from floating

Similar Documents

Publication Publication Date Title
CN103046565B (en) Draining method for ultra-deep batholith deep foundation pit
RU30367U1 (en) Wall drainage device
KR100655384B1 (en) Method of drain construction for basement
KR100753556B1 (en) De-pressure drainage method and the system
KR100481148B1 (en) Drainage System using Hexa-Tube Connector
KR100665984B1 (en) The construction method of basement self drainage
KR100655383B1 (en) Method of drain construction for basement
KR100665985B1 (en) The construction method of basement self drainage
KR200314875Y1 (en) Connector for apparatus draining
KR100556820B1 (en) chamber for uplift reduction processing, and it&#39;s construction method
KR200411498Y1 (en) Vertical type basement drainage system
KR100665986B1 (en) The construction method of basement drainage
KR100326868B1 (en) Drain Board and Drainage method using the same
KR100524136B1 (en) Basic bottom permanent drainage structure using trench and drainage member and it&#39;s construction method
KR200434601Y1 (en) Drain Board System Of Basement Floor Construction
KR100666102B1 (en) Vertical type basement drainage system
KR100666103B1 (en) Convertible de-pressure drainage method and the system
KR200413305Y1 (en) Convertible de-pressure drainage system
KR100656410B1 (en) Vertical type basement drainage system
KR100748607B1 (en) The construction method of basement drainage having double drainage canals and the system
KR200433390Y1 (en) The construction system of basement drainage having double drainage canals
KR20120071569A (en) Collecting well connector for eternal drainage and this construction technique
KR200408863Y1 (en) The construction system of basement drainage having double drainage canals
KR200413300Y1 (en) Vertical type basement drainage system
KR100820572B1 (en) Constructing method of drainage structure by using water way with a gap

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant