CN203757177U - Mud sand sludge area manual pipe jacking construction device - Google Patents
Mud sand sludge area manual pipe jacking construction device Download PDFInfo
- Publication number
- CN203757177U CN203757177U CN201420164519.9U CN201420164519U CN203757177U CN 203757177 U CN203757177 U CN 203757177U CN 201420164519 U CN201420164519 U CN 201420164519U CN 203757177 U CN203757177 U CN 203757177U
- Authority
- CN
- China
- Prior art keywords
- pipe
- jacking construction
- construction device
- tool pipe
- tool
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 35
- 239000004576 sand Substances 0.000 title abstract 5
- 239000010802 sludge Substances 0.000 title abstract 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 34
- 239000002245 particle Substances 0.000 claims description 17
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 12
- 229910052742 iron Inorganic materials 0.000 claims description 6
- 230000001681 protective effect Effects 0.000 claims description 5
- 239000002689 soil Substances 0.000 abstract description 20
- 238000006243 chemical reaction Methods 0.000 abstract description 3
- 238000000034 method Methods 0.000 description 11
- 230000000694 effects Effects 0.000 description 3
- 238000001556 precipitation Methods 0.000 description 3
- 206010055670 Necrotising ulcerative gingivostomatitis Diseases 0.000 description 2
- 208000006595 Necrotizing Ulcerative Gingivitis Diseases 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 2
- 210000000476 body water Anatomy 0.000 description 2
- 239000003673 groundwater Substances 0.000 description 2
- 230000008595 infiltration Effects 0.000 description 2
- 238000001764 infiltration Methods 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000284 extract Substances 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
- 238000004065 wastewater treatment Methods 0.000 description 1
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
A mud sand sludge area manual pipe jacking construction device comprises a tool pipe, wherein a jack is arranged between the tool pipe and the back of concrete, a water seeping pipe is arranged at the front end of the tool pipe, a potion of the water seeping pipe passes through a pipe cap, the other portion of the water seeping pipe is located in the tool pipe, the rear end of the water seeping pipe is open, and a plurality of water seeping holes are formed in the pipe wall of the water seeping pipe. According to the mud sand sludge area manual pipe jacking construction device and a construction method thereof, the water seeping pipe is arranged at the front end of the tool pipe, the underground water level is reduced through a water collection function of the water seeping pipe, intensity of an operation soil body is improved, conditions are created for manual digging operation. Well point dewatering tubes are arranged on the mud sand sludge area manual pipe jacking construction device, and therefore well point dewatering of a deep well is achieved, water content of a soil body located on a position where the back of the concrete is located is reduced, and intensity of the soil body located on the position where the back of the concrete is located is improved. Additionally, bearing capacity of the back of the concrete is further improved due to the fact that load bearing piles are arranged, and the mud sand sludge area manual pipe jacking construction device can conveniently bear support reaction of the jack.
Description
Technical field
The utility model relates to hand pick formula jacking construction field, particularly a kind of silt particle mud district hand pick formula jacking construction device.
Background technique
In recent years, the fast development of wastewater treatment in China engineering, a lot of Urban Underground large diameter pipelines need to pass through the buildings such as avenue, town road, highway or railway, for reducing building damage, reduce the impact on traffic as far as possible, often adopt jacking construction.Because push pipe special construction apparatus expense is high; in most cases adopt hand pick formula jacking construction; and in the implementation process of push pipe; often can run into the soft stratum such as mud, quicksand; because back can not bear the reaction force in jack-in process; bring great difficulty to common hand pick formula jacking construction, even cause the failure of pipe-jacking project.
When hand is under normal circumstances dug formula jacking construction, in the situation that there is no special correcting device, conventionally employing increases jacking resistance or reduces jacking resistance at the different direction of the import of tool pipe, in jack-in process, make the axis of tool pipe change, thereby ensure that follow-up conduit axis conforms to design.But due to the mobility of mud, quicksand, the inlet of tool pipe often collapses automatically, and even quicksand or mud flow to tool pipe, correction difficulty while causing hand pick formula jacking construction, and then cause jacking construction failure.
Summary of the invention
Technical problem to be solved in the utility model is to provide a kind of silt particle mud district hand pick formula jacking construction device, can reduce the water content of the work surface soil body, improves the success rate of jacking construction.
For solving the problems of the technologies described above, the technological scheme that the utility model adopts is: a kind of silt particle mud district hand pick formula jacking construction device, comprise tool pipe, between tool pipe and concrete back, be provided with jack, front end at tool pipe is provided with soakaway trench, and a part for soakaway trench is through pipe cap, and another part is positioned at tool pipe, described soakaway trench rear end is open, is provided with multiple water seepage holes on the tube wall of soakaway trench.
Be provided with water seepage hole protective housing in the front of each water seepage hole.
Between tool pipe and jack, be provided with top iron.
Below tool pipe, be provided with sump and draining pump.
Described soakaway trench is positioned at the position near tool pipe bottom.
Described soakaway trench is in tilted layout, and rear end is lower.
Adopt above-mentioned constructing device to carry out a method for silt particle mud district hand pick formula jacking construction, comprise the following steps:
One, a side that faces tool pipe in active well is squeezed into the vertical load-bearing stake of a row;
Two, before load-bearing stake, build back, jack and top iron are installed;
Three, at tool pipe front end inner bottom part, squeeze into one or several soakaway trench, near the tool pipe mouth of pipe, the underground water of the soil body oozes out in advance by soakaway trench, makes the tool pipe mouth of pipe within the scope of precipitation funnel;
Four, stroke of the every jacking of tool pipe, soakaway trench shifts to an earlier date stroke of jacking, guarantees that soakaway trench shifts to an earlier date the pre-jacking soil body, and infiltration in advance is also discharged through sump and draining pump, and work surface soil body water content is reduced;
By above-mentioned steps, realize silt particle mud district hand pick formula jacking construction.
Before step 1, in active well, by rear side, multiple well-points dewatering pipes are set outward with active well, carry out well-points dewatering, the degree of depth of well-points dewatering pipe is greater than the degree of depth of active well.
Described described soakaway trench is in tilted layout, and rear end is lower.
In the time of push pipe downstream, adopt vacuum draw draining at the soakaway trench mouth of pipe.
A kind of silt particle mud district hand pick formula jacking construction device that the utility model provides, by the front end at tool pipe, soakaway trench is set, by the effect of the catchmenting dewatering of soakaway trench, improve the intensity of the operation soil body, for the operation of hand pick formula push pipe creates favorable conditions.The well-points dewatering pipe arranging, realizes Deep Pumped Wells, reduces the water content of the back position soil body, improves the intensity of this position soil body.The load-bearing stake arranging has further increased the strength of concrete back, so that the reaction at support of carrying jack.On the phreatic line of tool pipe upper half part in artificial formation, top and soil at both sides become dry, and intensity increases to some extent, and the bottom soil body is still under phreatic line, and large improvement does not occur intensity, still lower.Thereby prevented soil body flow entering tool pipe more than soakaway trench, create better excavation environment.And due to tool pipe top and soil at both sides more dry, be convenient on the top of tool pipe front end and both sides increase resistance or the mode of digging to reduce resistance are rectified a deviation in time.Before water seepage hole, set up water seepage hole protective housing, can prevent that soakaway trench and water seepage hole from stopping up at jack-in process.
Brief description of the drawings
Below in conjunction with drawings and Examples, the utility model is described in further detail:
Fig. 1 is the construction process figure of the utility model method.
Fig. 2 is the schematic top plan view of the utility model device.
Fig. 3 is the B-B cross-sectional schematic of Fig. 2.
Fig. 4 is the A-A cross-sectional schematic of Fig. 2.
In figure: soakaway trench 1, water seepage hole 2, water seepage hole protective housing 3, pipe cap 4, tool pipe 5, active well 6, well-points dewatering pipe 7, load-bearing stake 8, jack 9, top iron 10, sump and draining pump 11, have the phreatic line 12 after soakaway trench, back 13.
Embodiment
Embodiment 1:
In Fig. 2 ~ 4, a kind of silt particle mud district hand pick formula jacking construction device, comprise tool pipe 5, between tool pipe 5 and concrete back, be provided with jack 9, be provided with soakaway trench 1 at the front end of tool pipe 5, a part for soakaway trench 1 is through pipe cap 4, another part is positioned at tool pipe 5, the front end of described soakaway trench 1 is tapered is beneficial to jacking, and rear end opening is beneficial to draining, is provided with multiple water seepage holes 2 on the tube wall of soakaway trench 1.Structure thus, underground water enters soakaway trench 1 by water seepage hole 2 and converges, and has formed cone of groundwater, thereby has reduced the level of ground water of tool pipe 5 front ends, as shown in Fig. 3,4.This has optimized the operating condition of hand pick formula jacking construction.
Preferred scheme, as in Fig. 2,3, is provided with water seepage hole protective housing 3 in the front of each water seepage hole 2.Structure thus, avoids water seepage hole 2 to stop up.
In Fig. 2,3, between tool pipe 5 and jack 9, be provided with top iron 10.Structure thus, is convenient to transmit top power.
In Fig. 2, below tool pipe 5, be provided with sump and draining pump 11.Structure thus, is convenient to discharge the ponding in active well.
Preferred scheme is as in Fig. 3, and described soakaway trench 1 is positioned at the position near tool pipe 5 bottoms.Structure thus, is convenient to further dewatering line.
In preferred scheme, described soakaway trench 1 is in tilted layout, and front end is higher, and rear end is lower.Structure thus, is convenient to draining.
Embodiment 2:
As shown in Fig. 1 ~ 4, a kind of method that adopts the constructing device of above-described embodiment to carry out silt particle mud district hand pick formula jacking construction, comprises the following steps:
One, a side that faces tool pipe 5 in active well is squeezed into the vertical load-bearing stake 8 of a row; Improved the bearing capacity of concrete back 13 by squeezing into load-bearing stake 8;
Two, before load-bearing stake 8, build back 13, jack 9 and top iron 10 are installed;
Three, at tool pipe 5 front end inner bottom parts, squeeze into one or more soakaway trench 1, only illustrate 1 in figure, near the tool pipe mouth of pipe, the underground water of the soil body oozes out in advance by soakaway trench 1, makes the tool pipe mouth of pipe within the scope of precipitation funnel;
Four, stroke of the every jacking of tool pipe 5, soakaway trench 1 stroke of jacking in advance, guarantees that soakaway trench 1 shifts to an earlier date the pre-jacking soil body, infiltration in advance is also discharged through sump and draining pump 11, and work surface soil body water content is reduced;
By above-mentioned steps, realize silt particle mud district hand pick formula jacking construction.Ensured the intensity of the tool pipe 5 front end soil bodys by above-mentioned step, be convenient in jack-in process, cut the earth and rectify a deviation by the resistance of increase different direction, thereby ensured the construction quality of the regional hand pick of silt particle mud formula jacking construction.
Preferred scheme, as in Fig. 2,3, before step 1, arranges multiple well-points dewatering pipes 7 by rear side in active well 6 He outside active well 6, carries out well-points dewatering, and the degree of depth of well-points dewatering pipe 7 is greater than the degree of depth of active well 6.By the precipitation effect of well-points dewatering pipe 7, reduce the water content of the active well 6 back soil bodys, improve the intensity of the soil body, and then strengthened the bearing capacity of concrete back.Under the acting in conjunction of load-bearing stake 8 and well-points dewatering pipe 7 these two kinds of modes, the bearing capacity of back 13 improves a lot, and the effect of counter-force when reaching balance jack 9 and moving, ensures the normal operation of jack in jack-in process.
Preferably, described described soakaway trench 1 is in tilted layout, and rear end is lower, so that draining.
When upstream direction push pipe, utilize supervisor's gradient draining, adopt if desired vacuum draw draining; Adopt and aspirate draining at the soakaway trench mouth of pipe when push pipe downstream, the water of discharge enters sump, extracts out by submersible pump.
In above embodiment, front refers to the left side in Fig. 2,3.
The explanation that above embodiment makes for ease of understanding; not for restriction of the present utility model; protection domain of the present utility model is as the criterion with the protection domain of recording in claims; also comprise and not being documented in claims, but form with the technical characteristics in claims the technological scheme that technical characteristics forms that is equal to replacement, deletes and increases.
Claims (6)
1. a silt particle mud district hand pick formula jacking construction device, comprise tool pipe (5), between tool pipe (5) and concrete back, be provided with jack (9), it is characterized in that: be provided with soakaway trench (1) at the front end of tool pipe (5), a part for soakaway trench (1) is through pipe cap (4), another part is positioned at tool pipe (5), and described soakaway trench (1) rear end is open, is provided with multiple water seepage holes (2) on the tube wall of soakaway trench (1).
2. a kind of silt particle mud according to claim 1 district hand pick formula jacking construction device, is characterized in that: be provided with water seepage hole protective housing (3) in the front of each water seepage hole (2).
3. a kind of silt particle mud according to claim 1 district hand pick formula jacking construction device, is characterized in that: between tool pipe (5) and jack (9), be provided with top iron (10).
4. a kind of silt particle mud according to claim 1 district hand pick formula jacking construction device, is characterized in that: be provided with sump and draining pump (11) in the below of tool pipe (5).
5. a kind of silt particle mud according to claim 1 district hand pick formula jacking construction device, is characterized in that: described soakaway trench (1) is positioned at the position near tool pipe (5) bottom.
6. a kind of silt particle mud according to claim 1 district hand pick formula jacking construction device, is characterized in that: described soakaway trench (1) is in tilted layout, and rear end is lower.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420164519.9U CN203757177U (en) | 2014-04-07 | 2014-04-07 | Mud sand sludge area manual pipe jacking construction device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420164519.9U CN203757177U (en) | 2014-04-07 | 2014-04-07 | Mud sand sludge area manual pipe jacking construction device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203757177U true CN203757177U (en) | 2014-08-06 |
Family
ID=51252454
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420164519.9U Expired - Fee Related CN203757177U (en) | 2014-04-07 | 2014-04-07 | Mud sand sludge area manual pipe jacking construction device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203757177U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103883796A (en) * | 2014-04-07 | 2014-06-25 | 葛洲坝集团第一工程有限公司 | Hand digging type pipe jacking construction device and method for sediment and sludge areas |
CN108662282A (en) * | 2018-05-31 | 2018-10-16 | 成都金玉雄辉建筑工程有限公司 | Muddy ground conduit jacking and pipe jacking construction method |
CN112212069A (en) * | 2020-09-01 | 2021-01-12 | 中国十七冶集团有限公司 | Auxiliary device capable of adjusting stress of jacking pipe and construction method |
-
2014
- 2014-04-07 CN CN201420164519.9U patent/CN203757177U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103883796A (en) * | 2014-04-07 | 2014-06-25 | 葛洲坝集团第一工程有限公司 | Hand digging type pipe jacking construction device and method for sediment and sludge areas |
CN103883796B (en) * | 2014-04-07 | 2015-12-02 | 葛洲坝集团第一工程有限公司 | Silt particle mud district hand pick formula jacking construction device and method |
CN108662282A (en) * | 2018-05-31 | 2018-10-16 | 成都金玉雄辉建筑工程有限公司 | Muddy ground conduit jacking and pipe jacking construction method |
CN112212069A (en) * | 2020-09-01 | 2021-01-12 | 中国十七冶集团有限公司 | Auxiliary device capable of adjusting stress of jacking pipe and construction method |
CN112212069B (en) * | 2020-09-01 | 2022-05-13 | 中国十七冶集团有限公司 | Auxiliary device of adjustable push pipe atress |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103883796B (en) | Silt particle mud district hand pick formula jacking construction device and method | |
US20190153698A1 (en) | Self-starting negative pressure drainage system for draining groundwater in slope and construction method thereof | |
CN208072351U (en) | A kind of siphoning installation of discharge slope underground water | |
CN109440775B (en) | A sinking foundation pit lowering and drainage system, construction method and using method | |
CN105821830A (en) | Permeation increase siphon drainage system for low-permeability soil slope | |
CN102418347A (en) | Drainage construction method for blind ditch and water collection well in deep foundation pit | |
CN103967028A (en) | Immersed tube drainage structure and method for handling suddenly-produced foundation pit water bursting and fountains through immersed tube drainage structure | |
CN110318410A (en) | A kind of deep basal pit chance artesian water is prominent to gush decompression drought stress construction method | |
CN102535490A (en) | Method for dewatering foundation pit by using bored cast-in-place pile | |
CN203757177U (en) | Mud sand sludge area manual pipe jacking construction device | |
CN105926391B (en) | A kind of curb method for widening of existing railway roadbed | |
CN104775438B (en) | The method of tower position foundation pit construction in karst landform basis rainy season | |
CN206204972U (en) | A kind of prefabricated tubular pile as well-points dewatering | |
CN205857173U (en) | A kind of Novel steel casing sheath applying bored concrete pile on the water | |
CN107246022A (en) | A kind of dewatering well tubular construction and construction method for stretching to artesian aquifer | |
CN208733655U (en) | A kind of high water level dewatering construction structure | |
CN204551510U (en) | A kind of filled-up ground catchments pressure reduction well drop and drainage structure | |
CN106939610A (en) | A kind of integrated precipitation pumping system | |
CN206721904U (en) | A kind of integrated precipitation pumping system | |
CN103669333B (en) | It is easy to the friction pile of vacuum-dewatering | |
CN102434718B (en) | Method for reinforcing originating end of push bench | |
CN204418194U (en) | For high water-permeability layer of sand foundation pit dewatering device | |
JP5519722B2 (en) | Ground improvement method | |
CN105401572A (en) | Construction technique for environment-friendly cast-in-situ bored pile provided with wall protecting tube | |
CN203213129U (en) | Controllable non-return drainer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140806 Termination date: 20160407 |