CN208733655U - A kind of high water level dewatering construction structure - Google Patents

A kind of high water level dewatering construction structure Download PDF

Info

Publication number
CN208733655U
CN208733655U CN201820908829.5U CN201820908829U CN208733655U CN 208733655 U CN208733655 U CN 208733655U CN 201820908829 U CN201820908829 U CN 201820908829U CN 208733655 U CN208733655 U CN 208733655U
Authority
CN
China
Prior art keywords
basialveolar
line
well
pipe well
top curve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820908829.5U
Other languages
Chinese (zh)
Inventor
李高立
王昆锋
张玉鹏
庞晓克
邵惠涛
张文龙
孙利峰
白康
赵红霞
魏张闯
张元龙
裴大明
侯建强
李晓光
马靓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Water Construction Engineering Co Ltd
Original Assignee
Zhengzhou Water Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Water Construction Engineering Co Ltd filed Critical Zhengzhou Water Construction Engineering Co Ltd
Priority to CN201820908829.5U priority Critical patent/CN208733655U/en
Application granted granted Critical
Publication of CN208733655U publication Critical patent/CN208733655U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model relates to a kind of high water level dewatering construction structures, it include the excavation top curve for position restriction, the basialveolar line limited is excavated for foundation trench inside top curve with being located to excavate, basialveolar line institute's rail portion is that foundation trench excavates position, it was equally spaced in gap between excavation top curve and the basialveolar line around basialveolar line one week and is provided with pipe well, and the pipe well by protrude into the suction channel in pipe well summarize be connected to suction total pipeline on, suction pump is provided on suction total pipeline, the foundation trench excavates the observation well being provided on position for groundwater depth observation, light well point is additionally provided between the basialveolar line and pipe well, the light well point is placed equidistant with one week around basialveolar line.

Description

A kind of high water level dewatering construction structure
Technical field
The utility model relates to high water level construction area precipitation processing technology field, in particular to a kind of Yellow River basin high water level Construction area light well point precipitation technology in conjunction with pipe well.
Background technique
As urban ecology water system builds lasting promotion, water delivery pump station engineering gradually increases.In water delivery pumping plant engineering construction In, since pumping plant generally build river side in, how precipitation just becomes the keys of construction of pumping station success or failure.General Dewatering uses Tube well dewatering, since pumping plant basis is deeper, in Yellow River basin high water level construction area, after these single dewatering measure constructions easily There is side slope occluded water infiltration phenomenon, causes the partial collapse of excavation slope.Since pumping plant foundation excavation is deeper, excavation slope Partial collapse is easy to induce safety accident.Since Yellow River basin is sandy silt layer or fine sand layer, bottom, which is formed, is detained water layer, The easy to carry fine particle of occluded water seepage flow into foundation pit, often results in the partial collapse of excavation slope.
Summary of the invention
The technical solution of the utility model is: a kind of high water level dewatering construction structure includes opening for position restriction Top curve is dug, and positioned at the basialveolar line for excavating limit for foundation trench excavated inside top curve, the enclosing portion, basialveolar line institute It is divided into foundation trench and excavates position, around the setting that is equally spaced in basialveolar line one week in the gap between excavation top curve and the basialveolar line There is a pipe well, and the pipe well summarizes by protruding into the suction channel in pipe well and is connected on suction total pipeline, aspirates total pipeline On be provided with suction pump, the foundation trench excavates the observation well being provided on position for groundwater depth observation, the base Light well point is additionally provided between the line of rabbet joint and pipe well.
The light well point is placed equidistant with one week around basialveolar line.
Beneficial effect caused by the utility model is: since Yellow River basin is sandy silt layer or fine sand layer, bottom It is formed and is detained water layer, single tube well dewatering, the easy to carry fine particle of occluded water seepage flow into foundation pit often results in foundation pit side The partial collapse on slope, light well point and tube well dewatering combined structure efficiently solve occluded water exudation problem;Pipe well with it is light-duty The combination precipitation of well point substantially increases dewatering effect, first use tube well dewatering, quick lowering of watertable, by observe well, Earth excavation is carried out in time, and occluded water in soil layer is discharged in well-points dewatering, solves occluded water Seepage problems, both pit slot water level, meets Execution conditions, while guaranteeing side slope safety.
Detailed description of the invention
Fig. 1 is the structure structure chart of the utility model.
In figure: 1, excavating top curve 2, basialveolar line 3, pipe well 4, observation well 5, light well point.
Specific embodiment
The technical solution of the utility model is described further combined with specific embodiments below.
Embodiment 1
A kind of high water level dewatering construction structure as shown in Figure 1: includes for the excavation top curve 1 of position restriction and position In excavating the basialveolar line 2 for excavating limit for foundation trench inside top curve 1, described 2 rail portions of basialveolar line are opened for foundation trench Position is dug, was equally spaced in the gap between excavation top curve 1 and the basialveolar line 2 around basialveolar line one week and is provided with pipe well 3, And the pipe well 3 by protrude into the suction channel in pipe well summarize be connected to suction total pipeline on, aspirate total pipeline on be arranged There is suction pump, the foundation trench excavates the observation well 4 being provided on position for groundwater depth observation, the basialveolar line 2 Light well point 5 is additionally provided between pipe well 3.
The light well point 5 is placed equidistant with one week around basialveolar line 2.
The utility model is when in use: firstly, first use tube well dewatering, quick lowering of watertable, and by observing well, and Shi Jinhang earth excavation;Water level is close to pit slot basis, and then, Application of light well point precipitation can vacuum cavitations be deep in drainage foundation trench rapidly Spend or more water-bearing layer underground water, and reduce underground flood peak, and can relatively efficiently solve occluded water Seepage problems, prevent from being detained Water carries fine particle seepage flow into foundation pit, to cause the partial collapse of excavation slope.

Claims (2)

1. a kind of high water level dewatering construction structure includes the excavation top curve for position restriction, and is located at and excavates top curve The internal basialveolar line that limit is excavated for foundation trench, basialveolar line institute's rail portion are that foundation trench excavates position, and described opens It was equally spaced in the gap dug between top curve and basialveolar line around basialveolar line one week and is provided with pipe well, and the pipe well is by stretching Enter the suction channel in pipe well summarize be connected to suction total pipeline on, aspirate total pipeline on be provided with suction pump, the foundation trench Excavate the observation well being provided on position for groundwater depth observation, it is characterised in that: between the basialveolar line and pipe well It is additionally provided with light well point.
2. a kind of high water level dewatering construction structure according to claim 1, it is characterised in that: the light well point is around base The line of rabbet joint is placed equidistant with one week.
CN201820908829.5U 2018-06-13 2018-06-13 A kind of high water level dewatering construction structure Expired - Fee Related CN208733655U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820908829.5U CN208733655U (en) 2018-06-13 2018-06-13 A kind of high water level dewatering construction structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820908829.5U CN208733655U (en) 2018-06-13 2018-06-13 A kind of high water level dewatering construction structure

Publications (1)

Publication Number Publication Date
CN208733655U true CN208733655U (en) 2019-04-12

Family

ID=66023759

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820908829.5U Expired - Fee Related CN208733655U (en) 2018-06-13 2018-06-13 A kind of high water level dewatering construction structure

Country Status (1)

Country Link
CN (1) CN208733655U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130376A (en) * 2019-05-09 2019-08-16 中冶集团武汉勘察研究院有限公司 A kind of method of tailing back production ground water drainage
CN112030936A (en) * 2020-09-04 2020-12-04 中交天航滨海环保浚航工程有限公司 Construction method for treating soft soil foundation of hydraulic reclamation project
CN112647527A (en) * 2019-10-12 2021-04-13 中冶天工集团有限公司 Device for preventing basement from floating up through well point replacement and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130376A (en) * 2019-05-09 2019-08-16 中冶集团武汉勘察研究院有限公司 A kind of method of tailing back production ground water drainage
CN112647527A (en) * 2019-10-12 2021-04-13 中冶天工集团有限公司 Device for preventing basement from floating up through well point replacement and construction method
CN112030936A (en) * 2020-09-04 2020-12-04 中交天航滨海环保浚航工程有限公司 Construction method for treating soft soil foundation of hydraulic reclamation project

Similar Documents

Publication Publication Date Title
CN106049532B (en) A kind of pipe gallery open-cut branch blocking means and its construction method
CN208733655U (en) A kind of high water level dewatering construction structure
CN103883796B (en) Silt particle mud district hand pick formula jacking construction device and method
CN106087953B (en) A kind of drainage and construction method for preventing and treating mountain area large size spoil ground mud-rock flow
CN107023026A (en) A kind of sealing bottom type caisson wall and construction method
CN205116247U (en) Water conservancy is towards heavy well construction equipment
CN107700507B (en) Dewatering construction engineering method in steel plate pile water stopping curtain auxiliary tank
CN105133618A (en) Construction method of deep foundation pit penetrating through underground permeable layer
KR20110004264U (en) Vacuum deep well drainage system for underground water level lowering method
CN105888693A (en) Treating construction method for water burst of small underground river of highway tunnel
CN206800431U (en) A kind of sealing bottom type caisson wall
CN204551510U (en) A kind of filled-up ground catchments pressure reduction well drop and drainage structure
CN212336250U (en) Pipe jacking connection guide row structure
CN109853604A (en) A kind of static pressure waterpower suction open caisson construction method
CN109056767A (en) A kind of rich water powder land floor precipitation and recharge construction method
CN203757177U (en) Mud sand sludge area manual pipe jacking construction device
CN111364489A (en) Non-drainage sinking construction method of river channel treatment pipe jacking open caisson in fine sand stratum
CN110185051A (en) Deep narrow excavation water discharge method
CN204435321U (en) A kind of steam power station water intaking open channel
CN205314117U (en) Foundation structure that draw water is carried out with centrifugal pump
CN109555141A (en) Strong drainage system for ultra-large deep foundation pit and construction method
CN104846837A (en) Construction method for ultra-deep well pit in surface drainage foundation pit
CN208815550U (en) A kind of rich water powder land floor precipitation and recharge construction system
CN104264656A (en) Method of reinforcing soft soil foundations through downward drainage during vacuum preloading
CN111719575A (en) Foundation pit anti-settling drainage method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190412