CN103883796A - Hand digging type pipe jacking construction device and method for sediment and sludge areas - Google Patents

Hand digging type pipe jacking construction device and method for sediment and sludge areas Download PDF

Info

Publication number
CN103883796A
CN103883796A CN201410135674.2A CN201410135674A CN103883796A CN 103883796 A CN103883796 A CN 103883796A CN 201410135674 A CN201410135674 A CN 201410135674A CN 103883796 A CN103883796 A CN 103883796A
Authority
CN
China
Prior art keywords
pipe
jacking construction
soakaway trench
tool
tool pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410135674.2A
Other languages
Chinese (zh)
Other versions
CN103883796B (en
Inventor
黄浩
肖卓文
高忠武
何延平
孙丽凤
曾利红
汪红兵
王琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group No 1 Engineering Co Ltd
Original Assignee
China Gezhouba Group No 1 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No 1 Engineering Co Ltd filed Critical China Gezhouba Group No 1 Engineering Co Ltd
Priority to CN201410135674.2A priority Critical patent/CN103883796B/en
Publication of CN103883796A publication Critical patent/CN103883796A/en
Application granted granted Critical
Publication of CN103883796B publication Critical patent/CN103883796B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/028Laying or reclaiming pipes on land, e.g. above the ground in the ground

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention provides a hand digging type pipe jacking construction device and method for sediment and sludge areas. The hand digging type pipe jacking construction device comprises a tool pipe, wherein jacks are arranged between the tool pipe and a concrete back. A water seepage pipe is arranged at the front end of the tool pipe. Part of the water seepage pipe penetrates through a pipe cap, and the other part of the water seepage pipe is located in the tool pipe. The rear end of the water seepage pipe is open, and a plurality of water seepage holes are formed in the pipe wall of the water seepage pipe. According to the hand digging type pipe jacking construction device and method for sediment and sludge areas, the water seepage pipe is arranged at the front end of the tool pipe, the underground water level is lowered through the water collection action of the water seepage pipe, and therefore strength of a work soil body is improved, and conditions are created for hand digging type work. Well-point dewatering pipes are arranged, and therefore deep well point dewatering is achieved, the water content of the portion, provided with the concrete back, of the soil body is lowered, and strength of the position of the soil body is improved. Load-bearing piles are arranged, and therefore the force borne by the concrete back is further increased, and end reaction can be conveniently borne by the jacks.

Description

Silt particle mud district hand pick formula jacking construction device and method
Technical field
The present invention relates to hand pick formula jacking construction field, particularly a kind of silt particle mud district hand pick formula jacking construction device and method.
Background technique
In recent years, the fast development of wastewater treatment in China engineering, a lot of Urban Underground large diameter pipelines need to pass through the buildings such as avenue, town road, highway or railway, for reducing building damage, reduce the impact on traffic as far as possible, often adopt jacking construction.Because push pipe special construction apparatus expense is high; in most cases adopt hand pick formula jacking construction; and in the implementation process of push pipe; often can run into the soft stratum such as mud, quicksand; because back can not bear the reaction force in jack-in process; bring great difficulty to common hand pick formula jacking construction, even cause the failure of pipe-jacking project.
When hand is under normal circumstances dug formula jacking construction, in the situation that there is no special correcting device, conventionally employing increases jacking resistance or reduces jacking resistance at the different direction of the import of tool pipe, in jack-in process, make the axis of tool pipe change, thereby ensure that follow-up conduit axis conforms to design.But due to the mobility of mud, quicksand, the inlet of tool pipe often collapses automatically, and even quicksand or mud flow to tool pipe, correction difficulty while causing hand pick formula jacking construction, and then cause jacking construction failure.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of silt particle mud district hand pick formula jacking construction device and method, can reduce the water content of the work surface soil body, improves the success rate of jacking construction.
For solving the problems of the technologies described above, the technical solution adopted in the present invention is: a kind of silt particle mud district hand pick formula jacking construction device, comprise tool pipe, between tool pipe and concrete back, be provided with jack, front end at tool pipe is provided with soakaway trench, and a part for soakaway trench is through pipe cap, and another part is positioned at tool pipe, described soakaway trench rear end is open, is provided with multiple water seepage holes on the tube wall of soakaway trench.
Be provided with water seepage hole protective housing in the front of each water seepage hole.
Between tool pipe and jack, be provided with top iron.
Below tool pipe, be provided with sump and draining pump.
Described soakaway trench is positioned at the position near tool pipe bottom.
Described soakaway trench is in tilted layout, and rear end is lower.
Adopt above-mentioned constructing device to carry out a method for silt particle mud district hand pick formula jacking construction, comprise the following steps:
One, a side that faces tool pipe in active well is squeezed into the vertical load-bearing stake of a row;
Two, before load-bearing stake, build back, jack and top iron are installed;
Three, at tool pipe front end inner bottom part, squeeze into one or several soakaway trench, near the tool pipe mouth of pipe, the underground water of the soil body oozes out in advance by soakaway trench, makes the tool pipe mouth of pipe within the scope of precipitation funnel;
Four, stroke of the every jacking of tool pipe, soakaway trench shifts to an earlier date stroke of jacking, guarantees that soakaway trench shifts to an earlier date the pre-jacking soil body, and infiltration in advance is also discharged through sump and draining pump, and work surface soil body water content is reduced;
By above-mentioned steps, realize silt particle mud district hand pick formula jacking construction.
Before step 1, in active well, by rear side, multiple well-points dewatering pipes are set outward with active well, carry out well-points dewatering, the degree of depth of well-points dewatering pipe is greater than the degree of depth of active well.
Described described soakaway trench is in tilted layout, and rear end is lower.
In the time of push pipe downstream, adopt vacuum draw draining at the soakaway trench mouth of pipe.
A kind of silt particle mud provided by the invention district hand pick formula jacking construction device and method, by the front end at tool pipe, soakaway trench is set, by the effect of the catchmenting dewatering of soakaway trench, improve the intensity of the operation soil body, for the operation of hand pick formula push pipe creates favorable conditions.The well-points dewatering pipe arranging, realizes Deep Pumped Wells, reduces the water content of the back position soil body, improves the intensity of this position soil body.The load-bearing stake arranging has further increased the strength of concrete back, so that the reaction at support of carrying jack.On the phreatic line of tool pipe upper half part in artificial formation, top and soil at both sides become dry, and intensity increases to some extent, and the bottom soil body is still under phreatic line, and large improvement does not occur intensity, still lower.Thereby prevented soil body flow entering tool pipe more than soakaway trench, create better excavation environment.And due to tool pipe top and soil at both sides more dry, be convenient on the top of tool pipe front end and both sides increase resistance or the mode of digging to reduce resistance are rectified a deviation in time.Before water seepage hole, set up water seepage hole protective housing, can prevent that soakaway trench and water seepage hole from stopping up at jack-in process.
Brief description of the drawings
Below in conjunction with drawings and Examples, the invention will be further described:
Fig. 1 is the construction process figure of the inventive method.
Fig. 2 is the schematic top plan view of apparatus of the present invention.
Fig. 3 is the B-B cross-sectional schematic of Fig. 2.
Fig. 4 is the A-A cross-sectional schematic of Fig. 2.
In figure: soakaway trench 1, water seepage hole 2, water seepage hole protective housing 3, pipe cap 4, tool pipe 5, active well 6, well-points dewatering pipe 7, load-bearing stake 8, jack 9, top iron 10, sump and draining pump 11, have the phreatic line 12 after soakaway trench, back 13.
Embodiment
Embodiment 1:
In Fig. 2 ~ 4, a kind of silt particle mud district hand pick formula jacking construction device, comprise tool pipe 5, between tool pipe 5 and concrete back, be provided with jack 9, be provided with soakaway trench 1 at the front end of tool pipe 5, a part for soakaway trench 1 is through pipe cap 4, another part is positioned at tool pipe 5, the front end of described soakaway trench 1 is tapered is beneficial to jacking, and rear end opening is beneficial to draining, is provided with multiple water seepage holes 2 on the tube wall of soakaway trench 1.Structure thus, underground water enters soakaway trench 1 by water seepage hole 2 and converges, and has formed cone of groundwater, thereby has reduced the level of ground water of tool pipe 5 front ends, as shown in Fig. 3,4.This has optimized the operating condition of hand pick formula jacking construction.
Preferred scheme, as in Fig. 2,3, is provided with water seepage hole protective housing 3 in the front of each water seepage hole 2.Structure thus, avoids water seepage hole 2 to stop up.
In Fig. 2,3, between tool pipe 5 and jack 9, be provided with top iron 10.Structure thus, is convenient to transmit top power.
In Fig. 2, below tool pipe 5, be provided with sump and draining pump 11.Structure thus, is convenient to discharge the ponding in active well.
Preferred scheme is as in Fig. 3, and described soakaway trench 1 is positioned at the position near tool pipe 5 bottoms.Structure thus, is convenient to further dewatering line.
In preferred scheme, described soakaway trench 1 is in tilted layout, and front end is higher, and rear end is lower.Structure thus, is convenient to draining.
Embodiment 2:
As shown in Fig. 1 ~ 4, a kind of method that adopts the constructing device of above-described embodiment to carry out silt particle mud district hand pick formula jacking construction, comprises the following steps:
One, a side that faces tool pipe 5 in active well is squeezed into the vertical load-bearing stake 8 of a row; Improved the bearing capacity of concrete back 13 by squeezing into load-bearing stake 8;
Two, before load-bearing stake 8, build back 13, jack 9 and top iron 10 are installed;
Three, at tool pipe 5 front end inner bottom parts, squeeze into one or more soakaway trench 1, only illustrate 1 in figure, near the tool pipe mouth of pipe, the underground water of the soil body oozes out in advance by soakaway trench 1, makes the tool pipe mouth of pipe within the scope of precipitation funnel;
Four, stroke of the every jacking of tool pipe 5, soakaway trench 1 stroke of jacking in advance, guarantees that soakaway trench 1 shifts to an earlier date the pre-jacking soil body, infiltration in advance is also discharged through sump and draining pump 11, and work surface soil body water content is reduced;
By above-mentioned steps, realize silt particle mud district hand pick formula jacking construction.Ensured the intensity of the tool pipe 5 front end soil bodys by above-mentioned step, be convenient in jack-in process, cut the earth and rectify a deviation by the resistance of increase different direction, thereby ensured the construction quality of the regional hand pick of silt particle mud formula jacking construction.
Preferred scheme, as in Fig. 2,3, before step 1, arranges multiple well-points dewatering pipes 7 by rear side in active well 6 He outside active well 6, carries out well-points dewatering, and the degree of depth of well-points dewatering pipe 7 is greater than the degree of depth of active well 6.By the precipitation effect of well-points dewatering pipe 7, reduce the water content of the active well 6 back soil bodys, improve the intensity of the soil body, and then strengthened the bearing capacity of concrete back.Under the acting in conjunction of load-bearing stake 8 and well-points dewatering pipe 7 these two kinds of modes, the bearing capacity of back 13 improves a lot, and the effect of counter-force when reaching balance jack 9 and moving, ensures the normal operation of jack in jack-in process.
Preferably, described described soakaway trench 1 is in tilted layout, and rear end is lower, so that draining.
When upstream direction push pipe, utilize supervisor's gradient draining, adopt if desired vacuum draw draining; Adopt and aspirate draining at the soakaway trench mouth of pipe when push pipe downstream, the water of discharge enters sump, extracts out by submersible pump.
In above embodiment, front refers to the left side in Fig. 2,3.
The explanation that above embodiment makes for ease of understanding; not for restriction of the present invention; protection scope of the present invention is as the criterion with the protection domain of recording in claims; also comprise and not being documented in claims, but form with the technical characteristics in claims the technological scheme that technical characteristics forms that is equal to replacement, deletes and increases.

Claims (10)

1. a silt particle mud district hand pick formula jacking construction device, comprise tool pipe (5), between tool pipe (5) and concrete back, be provided with jack (9), it is characterized in that: be provided with soakaway trench (1) at the front end of tool pipe (5), a part for soakaway trench (1) is through pipe cap (4), another part is positioned at tool pipe (5), and described soakaway trench (1) rear end is open, is provided with multiple water seepage holes (2) on the tube wall of soakaway trench (1).
2. a kind of silt particle mud according to claim 1 district hand pick formula jacking construction device, is characterized in that: be provided with water seepage hole protective housing (3) in the front of each water seepage hole (2).
3. a kind of silt particle mud according to claim 1 district hand pick formula jacking construction device, is characterized in that: between tool pipe (5) and jack (9), be provided with top iron (10).
4. a kind of silt particle mud according to claim 1 district hand pick formula jacking construction device, is characterized in that: be provided with sump and draining pump (11) in the below of tool pipe (5).
5. a kind of silt particle mud according to claim 1 district hand pick formula jacking construction device, is characterized in that: described soakaway trench (1) is positioned at the position near tool pipe (5) bottom.
6. a kind of silt particle mud according to claim 1 district hand pick formula jacking construction device, is characterized in that: described soakaway trench (1) is in tilted layout, and rear end is lower.
7. the constructing device described in employing claim 1 ~ 6 any one carries out a method for silt particle mud district hand pick formula jacking construction, it is characterized in that comprising the following steps:
One, a side that faces tool pipe (5) in active well (6) is squeezed into the vertical load-bearing stake (8) of a row;
Two, build before back (13) in load-bearing stake (8), jack (9) and top iron (10) are installed;
Three, the position of close bottom in tool pipe (5) front end, squeezes into one or several soakaway trench (1), and near tool pipe 0 mouth of pipe, the underground water of the soil body oozes out in advance by soakaway trench (1), makes the tool pipe mouth of pipe within the scope of precipitation funnel;
Four, stroke of the every jacking of tool pipe (5), soakaway trench (1) is stroke of jacking in advance, guarantees that soakaway trench (1) shifts to an earlier date the pre-jacking soil body, and infiltration in advance is also discharged through sump and draining pump (11), and work surface soil body water content is reduced;
By above-mentioned steps, realize silt particle mud district hand pick formula jacking construction.
8. a kind of silt particle mud according to claim 7 district hand pick formula pipe jacking construction method, it is characterized in that: before step 1, in active well (6) and outside active well (6), by rear side, multiple well-points dewatering pipes (7) are set, carry out well-points dewatering, the degree of depth of well-points dewatering pipe (7) is greater than the degree of depth of active well (6).
9. a kind of silt particle mud according to claim 7 district hand pick formula pipe jacking construction method, is characterized in that: described soakaway trench (1) is in tilted layout, and rear end is lower.
10. a kind of silt particle mud according to claim 7 district hand pick formula pipe jacking construction method, is characterized in that: in the time of push pipe downstream, adopt vacuum draw draining at soakaway trench (1) mouth of pipe.
CN201410135674.2A 2014-04-07 2014-04-07 Silt particle mud district hand pick formula jacking construction device and method Expired - Fee Related CN103883796B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410135674.2A CN103883796B (en) 2014-04-07 2014-04-07 Silt particle mud district hand pick formula jacking construction device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410135674.2A CN103883796B (en) 2014-04-07 2014-04-07 Silt particle mud district hand pick formula jacking construction device and method

Publications (2)

Publication Number Publication Date
CN103883796A true CN103883796A (en) 2014-06-25
CN103883796B CN103883796B (en) 2015-12-02

Family

ID=50952842

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410135674.2A Expired - Fee Related CN103883796B (en) 2014-04-07 2014-04-07 Silt particle mud district hand pick formula jacking construction device and method

Country Status (1)

Country Link
CN (1) CN103883796B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104213628A (en) * 2014-08-15 2014-12-17 王永钢 Jacking device for underground pipe culvert engineering
CN104315251A (en) * 2014-09-25 2015-01-28 济南城建集团有限公司 Manual pipe jacking construction method for earth and rock combined geological conditions
CN104455725A (en) * 2014-09-18 2015-03-25 叶长青 Pipe jacking construction method
CN104975611A (en) * 2015-07-17 2015-10-14 河北二十冶建设有限公司 Sinking device and method for well point drawdown pipe of liquid soil layer
CN108662281A (en) * 2018-05-31 2018-10-16 成都金玉雄辉建筑工程有限公司 Conduit jacking and pipe jacking construction method
CN110388530A (en) * 2019-06-13 2019-10-29 泉州市燃气有限公司 Drainage device is used in a kind of repairing of gas pipeline
CN110671538A (en) * 2019-11-06 2020-01-10 江苏科技大学 Underwater laying device and method for ocean oil and gas pipeline
CN112212069A (en) * 2020-09-01 2021-01-12 中国十七冶集团有限公司 Auxiliary device capable of adjusting stress of jacking pipe and construction method
CN113775819A (en) * 2021-07-03 2021-12-10 中建铁路投资建设集团有限公司 In-situ protection large-diameter oil and gas pipeline concrete structure and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1993020371A1 (en) * 1991-03-25 1993-10-14 Mcconnell W Harry Underground pipe replacement method and apparatus
CN102277898A (en) * 2011-04-28 2011-12-14 朱奎 Drain pipe jacking construction method
CN102434717A (en) * 2011-12-16 2012-05-02 中国建筑第八工程局有限公司 Construction method of joist steel pipe-jacking work pit
CN202834382U (en) * 2012-07-02 2013-03-27 中国石油化工股份有限公司 Pipe pushing headpiece used for condition of sludge clay
CN103046637A (en) * 2012-12-21 2013-04-17 广州市市政集团有限公司 Pipe-jacking construction method utilizing pipeline augering
CN203757177U (en) * 2014-04-07 2014-08-06 葛洲坝集团第一工程有限公司 Mud sand sludge area manual pipe jacking construction device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1993020371A1 (en) * 1991-03-25 1993-10-14 Mcconnell W Harry Underground pipe replacement method and apparatus
CN102277898A (en) * 2011-04-28 2011-12-14 朱奎 Drain pipe jacking construction method
CN102434717A (en) * 2011-12-16 2012-05-02 中国建筑第八工程局有限公司 Construction method of joist steel pipe-jacking work pit
CN202834382U (en) * 2012-07-02 2013-03-27 中国石油化工股份有限公司 Pipe pushing headpiece used for condition of sludge clay
CN103046637A (en) * 2012-12-21 2013-04-17 广州市市政集团有限公司 Pipe-jacking construction method utilizing pipeline augering
CN203757177U (en) * 2014-04-07 2014-08-06 葛洲坝集团第一工程有限公司 Mud sand sludge area manual pipe jacking construction device

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104213628A (en) * 2014-08-15 2014-12-17 王永钢 Jacking device for underground pipe culvert engineering
CN104455725A (en) * 2014-09-18 2015-03-25 叶长青 Pipe jacking construction method
CN104455725B (en) * 2014-09-18 2016-08-17 叶长青 A kind of pipe jacking construction method
CN104315251A (en) * 2014-09-25 2015-01-28 济南城建集团有限公司 Manual pipe jacking construction method for earth and rock combined geological conditions
CN104975611A (en) * 2015-07-17 2015-10-14 河北二十冶建设有限公司 Sinking device and method for well point drawdown pipe of liquid soil layer
CN108662281B (en) * 2018-05-31 2020-07-07 成都金玉雄辉建筑工程有限公司 Pipe jacking device and pipe jacking construction method
CN108662281A (en) * 2018-05-31 2018-10-16 成都金玉雄辉建筑工程有限公司 Conduit jacking and pipe jacking construction method
CN110388530A (en) * 2019-06-13 2019-10-29 泉州市燃气有限公司 Drainage device is used in a kind of repairing of gas pipeline
CN110671538A (en) * 2019-11-06 2020-01-10 江苏科技大学 Underwater laying device and method for ocean oil and gas pipeline
CN110671538B (en) * 2019-11-06 2024-01-26 江苏科技大学 Underwater laying device and method for marine oil and gas pipeline
CN112212069A (en) * 2020-09-01 2021-01-12 中国十七冶集团有限公司 Auxiliary device capable of adjusting stress of jacking pipe and construction method
CN112212069B (en) * 2020-09-01 2022-05-13 中国十七冶集团有限公司 Auxiliary device of adjustable push pipe atress
CN113775819A (en) * 2021-07-03 2021-12-10 中建铁路投资建设集团有限公司 In-situ protection large-diameter oil and gas pipeline concrete structure and construction method

Also Published As

Publication number Publication date
CN103883796B (en) 2015-12-02

Similar Documents

Publication Publication Date Title
CN103883796B (en) Silt particle mud district hand pick formula jacking construction device and method
US10577770B2 (en) Self-starting negative pressure drainage system for draining groundwater in slope and construction method thereof
CN105821830A (en) Permeation increase siphon drainage system for low-permeability soil slope
CN102383437B (en) Well point positioned pumping tubular well and well point positioned pumping method
CN103967028A (en) Immersed tube drainage structure and method for handling suddenly-produced foundation pit water bursting and fountains through immersed tube drainage structure
CN102418347A (en) Drainage construction method for blind drain and sump wells in deep foundation pit
CN113279421B (en) Vacuum dewatering process for deep foundation pit
CN110318410A (en) A kind of deep basal pit chance artesian water is prominent to gush decompression drought stress construction method
CN203757177U (en) Mud sand sludge area manual pipe jacking construction device
CN202247920U (en) Construction structure for water drainage of blind ditch and water collecting wells in deep foundation pit
JP5213216B2 (en) Ground improvement method
CN204551510U (en) A kind of filled-up ground catchments pressure reduction well drop and drainage structure
CN206204972U (en) A kind of prefabricated tubular pile as well-points dewatering
CN208733655U (en) A kind of high water level dewatering construction structure
CN107246022A (en) A kind of dewatering well tubular construction and construction method for stretching to artesian aquifer
CN206721904U (en) A kind of integrated precipitation pumping system
CN106939610A (en) A kind of integrated precipitation pumping system
CN204418194U (en) For high water-permeability layer of sand foundation pit dewatering device
JP2007303095A (en) Ground improvement construction method
CN103669333B (en) It is easy to the friction pile of vacuum-dewatering
CN205348204U (en) Light well point precipitation system
CN203213129U (en) Controllable non-return drainer
CN211036962U (en) Underground continuous wall with pit-facing surface and dewatering function
JP5519722B2 (en) Ground improvement method
CN208949889U (en) Deep basal pit karst base lime rock stratum groundwater treatment system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151202

Termination date: 20210407

CF01 Termination of patent right due to non-payment of annual fee