CN203855306U - 加劲环吊装装置 - Google Patents

加劲环吊装装置 Download PDF

Info

Publication number
CN203855306U
CN203855306U CN201420259298.3U CN201420259298U CN203855306U CN 203855306 U CN203855306 U CN 203855306U CN 201420259298 U CN201420259298 U CN 201420259298U CN 203855306 U CN203855306 U CN 203855306U
Authority
CN
China
Prior art keywords
stiffening ring
steel plate
hoisting
cutter
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420259298.3U
Other languages
English (en)
Inventor
成自飞
曹东林
向旭辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group No 2 Engineering Co Ltd
Original Assignee
China Gezhouba Group No 2 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No 2 Engineering Co Ltd filed Critical China Gezhouba Group No 2 Engineering Co Ltd
Priority to CN201420259298.3U priority Critical patent/CN203855306U/zh
Application granted granted Critical
Publication of CN203855306U publication Critical patent/CN203855306U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

本实用新型加劲环吊装装置,两平行吊梁的中部间通过联接轴铰接有两刀卡,两刀卡的上部分别有吊孔,两钢板卡分别位于两平行吊梁的两端且分别通过联接轴固定在两吊梁上,两钢板卡相对应位置上分别有卡槽,两卡槽的槽口相对应。本实用新型能将加劲环锁死,吊运过程不发生侧翻、滑移,规避安全风险,能提高加劲环安装工时工效。

Description

加劲环吊装装置
技术领域:
本实用新型涉及吊装任何板厚压力钢管的加劲环吊装装置。
背景技术:
目前,水电站压力钢管加劲环安装一般采用钢丝绳套吊装或人工搬运方式,采用钢丝绳套吊装,成弧度的加劲环就位后,钢丝绳不易取出,另外因加劲环切割后极容易造成钢丝绳损坏,对节约成本不利,而且吊装工效不理想;而采用人工搬运方式,不仅效率低,极容易发生加劲环脱离伤害人员事故;若加劲环弦长、钢板厚度较大、安装高度高时,利用人工搬运方式无法进行施工。
实用新型内容:
本实用新型的目的是为了克服上述不足,提供一种能将加劲环锁死,吊运过程不发生侧翻、滑移,规避安全风险,能提高加劲环安装工时工效的加劲环吊装装置。
本实用新型的目的是这样来实现的:
本实用新型加劲环吊装装置,两平行吊梁的中部间通过联接轴铰接有两刀卡,两刀卡的上部分别有吊孔,两钢板卡分别位于两平行吊梁的两部且通过联接轴固定在两吊梁上,两钢板卡相对应位置上分别有卡槽,两卡槽的槽口相对应。
使用本实用新型进行施工时,直接利用本实用新型装置的钢板卡接触加劲环底面。钢丝绳穿在两刀卡上的吊孔中,待钢丝绳与刀卡拉紧时,刀卡利用加劲环自重自动锁死加劲环,将加劲环吊装至压力钢管外壁安装部位后,放松钢丝绳,刀卡与加劲环自动脱离;然后将钢板卡向上提高,即可取出本吊装装置,再循环利用。
本实用新型结构灵巧方便,重量轻,制作成本低,能将加劲环锁死,吊装过程中不会发生侧翻、滑移,对加劲环吊装施工有极大的安全保障,提高了工时工效,节约了人工投入,直接加快了压力钢管制作速度。
本实用新型试用于岩滩水电站扩建工程压力钢管制作时加劲环吊装效果良好。使用效果明显,可重复利用。截至目前,岩滩水电站扩建工程压力钢管制作未出现因加劲环吊装不稳的安装事故和险情。
按照岩滩水电站扩建工程压力钢管加劲环安装进行费用测算,加劲环吊装需要辅助人工7人,1天完成1节压力钢管加劲环吊装,人员工资150元/天;本发明投入使用后,仅需2人就可以完成压力钢管加劲环的吊装。
1节压力钢管节约人工成本:7*150-2*150=750元
岩滩水电站扩建工程压力钢管攻击132节,总计节约成本:
132*750=9.9万元
至于加劲环吊装时,节约的安全事故费用是不可估量的,另外间接加快了压力钢管制作施工进度。
采用本实用新型解决了加劲环成弧度重心偏离而造成吊装不平稳的问题;在施工过程中,利用钢板卡将加劲环外弧钢板面卡紧;当加劲环吊装时,刀卡利用加劲环自重将其卡紧、锁死,防止加劲环重心偏移脱落,保证了加劲环吊装过程的安全风险;另外加劲环就位后,仅需将钢板卡向上提起,即可取出吊装装置,提高加劲环吊装工效。该装置重量轻,装、拆灵活方便,可重复使用,安全高效。
附图说明:
图1为本实用新型结构示意图。
图2为图1的俯视图。
图3为图1的左视图。
图4为本实用新型吊装工作时与压力钢管间的位置图。
图5为本实用新型装置与加劲环的位置图。
具体实施例方式:
 参见图1~图3,本实施例加劲环吊装装置,两平行吊梁1的中部间通过第一联接轴2铰接有两刀卡3。两刀卡的上部分别有吊孔4。两钢板卡5分别位于两平行吊梁的两端且分别通过第二联接轴6固定在两吊梁上。两钢板卡7相对应位置上分别有卡槽8,两卡槽的槽口相对应。
上述的钢板卡是与加劲环下端面接触,为锁死加劲环下端面限位,钢板卡卡槽的切割距离应根据加劲环厚度和刀卡最低接触点验算确定,吊梁采用钢板切割制作,刀卡主要是锁死、卡紧加劲环,辅助钢板卡接触点受力,
加劲环吊装装置制作、使用、拆卸程序如下:
(1)加劲环吊装装置制作:利用压力钢管制作后的废弃材料按附图1、图2、图3加工1套,孔轴需进行精加工,确保其安装精度。加工钢板卡时,需考虑加劲环板厚尺寸与卡槽、刀卡的锁死位置。
(2)加劲环吊装装置安装:参见图4、图5,将本装置9从加劲环10凸端沿中心将钢板卡卡槽放置于加劲环两端底面,然后将刀卡放置于加劲环上端面,确保刀卡与上端面能接触;然后用卡环、钢丝绳起吊刀卡上的吊孔。当起吊时,刀卡会利用加劲环自重与钢板卡配合牢固锁死、卡紧加劲环,防止加劲环吊装时侧翻、滑移,规避安全风险。
(3)加劲环吊装装置拆卸:当加劲环吊装至压力钢管11外壁安装位置后,放松刀卡连接的吊装钢丝绳,刀卡与加劲环接触面分开;此时旋动钢板卡卡槽使其与加劲环下接触面松动后移除钢板卡,移除该装置非常省时,完成下次加劲环吊装作业。

Claims (1)

1.加劲环吊装装置,其特征在于两平行吊梁的中部间通过联接轴铰接有两刀卡,两刀卡的上部分别有吊孔,两钢板卡分别位于两平行吊梁的两端且分别通过联接轴固定在两吊梁上,两钢板卡相对应位置上分别有卡槽,两卡槽的槽口相对应。
CN201420259298.3U 2014-05-21 2014-05-21 加劲环吊装装置 Expired - Fee Related CN203855306U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420259298.3U CN203855306U (zh) 2014-05-21 2014-05-21 加劲环吊装装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420259298.3U CN203855306U (zh) 2014-05-21 2014-05-21 加劲环吊装装置

Publications (1)

Publication Number Publication Date
CN203855306U true CN203855306U (zh) 2014-10-01

Family

ID=51605174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420259298.3U Expired - Fee Related CN203855306U (zh) 2014-05-21 2014-05-21 加劲环吊装装置

Country Status (1)

Country Link
CN (1) CN203855306U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104803308A (zh) * 2015-04-28 2015-07-29 中国水利水电第八工程局有限公司 用于钢管加劲环拼装的吊装装置

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104803308A (zh) * 2015-04-28 2015-07-29 中国水利水电第八工程局有限公司 用于钢管加劲环拼装的吊装装置

Similar Documents

Publication Publication Date Title
CN204375432U (zh) 乏燃料干式贮存项目水下操作台吊装用装置
CN104444758A (zh) 一种吊耳及其使用方法
CN203667797U (zh) Sk-2型双块式轨枕简易吊具工装
CN203855306U (zh) 加劲环吊装装置
CN103879883B (zh) 梁吊装紧固式专用夹具
CN202594610U (zh) 压力钢管瓦片吊装工型梁起吊装置
CN106184798A (zh) Fpso直升飞机平台吊装工艺
CN204324677U (zh) 一种可拆卸板式吊耳
CN106744290A (zh) 一种钢件输送转运工装
CN203889888U (zh) 一种钢板吊装夹具
CN205034957U (zh) 一种工字钢吊运用吊具
CN104499706A (zh) 电梯井模板平台及其施工方法
CN209256222U (zh) 烟囱对接辅助工具
CN216336124U (zh) 一种桥式起重机大梁加工用吊装装置
CN210438256U (zh) 一种80吨模块单元吊排
CN103979442A (zh) 6400吨液压复式起重机吊装费托反应器的方法
CN210658056U (zh) 一种桥梁钢立柱吊装转体装置
CN204265208U (zh) 一种管片吊具
CN203998586U (zh) 一种吊具
CN203319500U (zh) 一种钢筋笼对接调整装置
CN105645258A (zh) 翻转吊钩
CN204022282U (zh) 压力钢管三角吊装架
CN103373664A (zh) 自紧式吊具
CN110203834A (zh) 大型造纸机“z”型悬臂梁结构的吊装装置和吊装方法
CN110921484B (zh) 一种用于湿法制硫酸设备的吊装装置及吊装方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA GE ZHOU BA GROUP IS SECOND PROJECT CO., LTD.

Free format text: FORMER NAME: GEZHOUBA GROUP NO.2 ENGINEERING CO.,LTD.

CP01 Change in the name or title of a patent holder

Address after: Qingyang District of Chengdu City Development Zone 610091 in Sichuan province (East) Tongcheng Road No. 8 Building 10

Patentee after: CHINA GEZHOUBA GROUP SECOND ENGINEERING Co.,Ltd.

Address before: Qingyang District of Chengdu City Development Zone 610091 in Sichuan province (East) Tongcheng Road No. 8 Building 10

Patentee before: GEZHOUBA GROUP NO.2 ENGINEERING Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141001

CF01 Termination of patent right due to non-payment of annual fee